Loading...
Admin Site - Res Add - 2011CITY of CAMPBELL Community Development Department April 19, 2011 David Perng 10268 Bandley Drive, #102 Cupertino, CA 95014 Re: File No: 1'LN2011-44 Address: 546 Weston Drive Application: Administrative Site and Architectural Review Permit Dear Mr. Perng, On April 19, 2011, the Community Development Director approved your Administrative Site & Architectural Review Permit for construction of a 497 square-foot rear addition to a one-story single family residence located at the above referenced address, subject to the enclosed Conditions of Approval. This action is effective in ten calendar days, or the next work day if the tenth calendar day falls on either a Saturday or a Sunday, unless appealed in writing to the City Clerk by 5:00 p.m. on Monday May 2, 2011. If an appeal is received, you will be immediately notified of its receipt. If you should have any questions regarding this approval, please feel free to contact me at (408) 866-2142 or by email at stevep~,cityofcampbell.com. Sincerely, Steve Prosser Associate Planner Encl: Conditions of Approval - PLN2011-44 cc: Paul Kermoyan, Planning Manager Mr. & Mrs. Ngai, 546 Weston Drive, Campbell, CA 95008 Bill Bruckart, Building Official CONDITIONS OF APB JVAL - PLN2011-44 ~ 546 WESTO~ DRIVE P~. 1 of CONDITIONS OF APPROVAL FOR FILE NO. PLN20ll-44 SITE ADDRESS: 546 Weston Drive APPLICANT: David Perng OWNER: Mr. Kit-Han Hanna Ngai & Mrs. Cheung-Ching Lam DATE: April 19, 2011 The applicant is hereby notified, as part of this application, that (s)he is required to meet the following conditions in accordance with the ordinances of the City of Campbell and the State of California. The lead department with which the applicant will work is identified on each condition where necessary. Where approval by the Director of Community Development, City Engineer, Public Works Director, City Attorney, or Fire Department is required, that review shall be for compliance with all applicable conditions of approval, adopted policies and guidelines. ordinances, laws and regulations, and accepted engineering practices, for the items under review. Additionally, the applicant is hereby notified that (s)he is required to comply with all applicable Codes or Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified: COMMUNITY DEVELOPMENT DEPARTMENT Planning Division: Approved Project: Approval is granted for an Administrative Site and Architectural Review Permit (PLN2011-44) for the construction of a 497 square-foot addition to an existing single- family residence located at 546 Weston Drive. The project shall substantially conform to the project plans as received by the Community Development Department on April 6, 2011. except as maybe modified by the Conditions of Approval herein. 2. Planning Final Required: Planning sign off is required prior to Building Permit final. Construction not in substantial compliance with the approved project plans shall not be approved without prior authorization of the necessary approving body. 3. Permit Approval Expiration: The Administrative Site and Architectural Review Permit approval shall be valid for one year from the date of final approval. Within this one-year period a building permit must be obtained. Failure to meet this deadline will result in the Administrative Architectural Site and Review Permit being void. 4. Fences/Walls: Any existing or proposed fencing or walls shall comply with Section 21.18.060 of the Campbell Municipal Code. At no time shall fencing exceed three feet, 6 inches in height within the first 15 feet of the property from the publicright-of--way. 5. Contractor Contact Information Posting: The project site shall be posted with the name and contact number of the lead contractor in a location visible from the public street prior to the issuance of building permits. 6. On-Site Lighting: On-site lighting shall be shielded away from adjacent properties and directed on site. The design and type of lighting fixtures and lighting intensity of any proposed exterior lighting for the project shall be reviewed and approved by the Community Development Director prior to installation of the lighting for compliance with all applicable 70 North First Street • Campbell CA 9008-1-123 • Tel (408) 866 ? 140 • Fez (408) 866-~ 140 • e-n~a.iL planning(a.cityof~campbell.com CONDITIONS OF APB JVAL - PLN2011-44 N 546 WESTO. DRIVE Pg. 2 of Conditions of Approval, ordinances, laws and regulations. Lighting fixtures shall be of a decorative design to be compatible with the residential development and shall incorporate energy saving features. 7. Construction Activities: The applicant shall abide by the following requirements during construction: a. Construction activities shall be limited to weekdays between 8:00 a.m. and 5:00 p.m. and Saturdays between 9:00 a.m. and 4:00 p.m. No construction shall take place on Sundays or holidays unless an exception is granted by the Building Official. b. All construction equipment with internal combustion engines used on the project site shall be properly muffled and maintained in good working condition. c. Unnecessary idling of internal combustion engines shall be strictly prohibited. d. All stationary noise-generating construction equipment, such as air compressors and portable power generators, shall be located as far as possible from noise-sensitive receptors such as existing residences and businesses. e. Use standard dust and erosion control measures that comply with the adopted Best Management Practices for the City of Campbell. Building Division: 8. Permits Required: A building permit application shall be required for the proposed addition to and remodel of the existing structure. The building perllit shall include Electrical/Plumbing/Mechanical fees when such work is part of the permit. 9. Construction Plans: The Conditions of Approval shall be stated in full on the cover sheet of construction plans submitted for building permit. 10. Size of Plans: The minimum size of construction plans submitted for building permits shall be 24 in. X 36 in. 1 1. Plan Preparation: This project may require plans prepared under the direction and oversight of a California licensed Engineer or Architect. When applicable, plans submitted for building permits shall be "wet stamped'' and signed by the qualifying professional person. 12. Site Plan: Application for building permit shall include a competent site plan that identifies property and proposed structures with dimensions and elevations as appropriate. Site plan shall also include site drainage details. Elevation bench marks shall be called out at all locations that are identified as "natural grade'" and intended for use to determine the height of the proposed structure. 13. Title 24 Ener~y Compliance: California Title 24 Energy Compliance forms shall be blue- lined on the construction plans. Compliance with the Standards shall be demonstrated for conditioning of the building envelope and lighting of the building. 70 North First Street • Campbell CA 9008-1423 • Tee (408) 866-2140 • F,~x (408) 866-5 I40 • E-61A~L planning(a?cityotcampbell.com CONDITIONS OF API JVAL - PLN20ll-44 ~ 546 WESTOi DRIVE Pg. 3 of 3 14. Special Inspections: When a special inspection is required by C.B.C. Chapter 17, the architect or engineer of record shall prepare an inspection program that shall be submitted to the Building Official for approval prior to issuance of the building permits, in accordance with C.B.C Appendix Chapter 1, Section 106. Please obtain City of Campbell, Specia] Inspection forms from the Building Inspection Division Counter. 15. Non-point Pollution Control Program: The City of Campbell, standard Santa Clara Valley Non-point Source Pollution Control Program specification sheet shall be part of plan submittal The specification sheet (size 24" X 36") is available at the Building Division service counter. 16. Approvals Re uq fired: The project requires the following agency approval prior to issuance of the building permit: a. West Valley Sanitation District (378-2407) b. Santa Clara County Fire Department (378-4010) 17. P.G.&E: Applicant is advised to contact Pacific Gas and Electric Company as early as possible in the approval process. Service installations, changes and/or relocations may require substantial scheduling time and can cause significant delays in the approval process. Applicant should also consult with P.G.&E concerning utility easements, distribution pole locations and required conductor clearances. 18. Intent to Occupy During Construction: Owners shall declare their intent to occupy the dwelling during construction. The Building Inspection Division may require the premises to he vacated wring portions of construction because of substandard and unsafe living conditions created by construction. 19. Build it Green: Applicant shall complete and submit a "Build it Green" inventory of the proposed single family project prior to the issuance of any Building Permit. 7U North First Street • Campbell CA 95008-1423 • THL f408) 866-2140 • F.~.x (408) 866-5140 • E-~tnt~ planning(acityol'campbell.com