Loading...
Admin PD - Bakery - 2011CITY of CAMPBELL Community Development Department November 8, 2011 Edick Lazari 6154 Royal Acorn Pl. San Jose, CA 95120 Re: File No: PLN2011-171 Address: 2265 S. Winchester Blvd. Application: Administrative Planned Development Permit Status: APPROVED Dear Mr. Lazari, The Community Development Director has approved your Administrative Planned Development Permit (PLN2011-171) to establish a retail bakery on property located at the above referenced address, subject to the enclosed Conditions of Approval. Please note that Condition of Approval No. 5 requires revisions to the project plans to incorporate required landscaping in the 1•ear parking lot and changes to the parking lot striping. These revisions must be incorporated into the tenant improvement plans submitted to the Building Division for a building permit. This action is effective in ten calendar days, unless appealed in writing to the City Clerk by 5:00 p.m. on November 18, 2011. If an appeal is received, you will be immediately notified of its receipt. Otherwise, consider this approval final at the close of the ten day appeal period. Please note that a building permit cannot be issued until after November 18t1i If you should have any questions regarding this approval, please feel free to contact me at (408) 866-2193 or by email at danielf(cr~cit o~pbell.com. Sincerely, Daniel Fama Assistant Planner Encl: Conditions of Approval - PLN2011-171 cc: Paul Kermoyan, Planning Manager Hadi Farahani, 301 Budd Ave., Campbell, CA 95008 CONDITIONS OF APPRO~ AL - PLN2011-171 ~ 2265 S. WINCHI/~TER BLVD., I'g. l of 4 -_ _.,, ,.~w_ CONDITIONS OF APPROVAL FOR FILE NO. PLN2011-171 '''~ ~ -~~--~-~-~-(L` 1-7M~.-~ /^~ SITE ADDRESS: 2265 S. Winchester Blvd. ~~~'~~ APPLICANT: Edick Lazari ~ ~~~ ~ ~~~ ~ ~ ~ ~~~~~~~ OWNER: Hadi Farahani - f, ~::, DATE: November 8, 2011 n,~ s ,~~ e_; t! l~r/!(___ :.-r .__ _ ~.._.. The applicant is hereby notified, as part of this application, tha~.:~la~/she ~-i uired_..to meet the _ __ following conditions in accordance with the ordinances of the City of Campbell and the State of California. Where approval by the Community Development Director, City Engineer, Public Works Director, City Attorney, or Fire Department is required, that review shall be for compliance with all applicable Conditions of Approval, adopted policies and guidelines, ordinances, laws and regulations, and accepted engineering practices for the item under review. Additionally, the applicant is hereby notified that he/she is required to comply with all applicable Codes or Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified: COMMUNITY DEVELOPMENT DEPARTMENT Planning Division 1. Approved Pro•e,~ct: Approval is granted for an Administrative Planned Development Permit (PLN2011-171) to allow establishment of a retail bakery within an existing commercial building located at 2265 S. Winchester Boulevard. The project shall substantially conform to the revised project plans dated as received by the Planning Division on October 25, 2011 and revised operational description dated as received by the Planning Division on July 28, 2011, except as may be modified by the Conditions of Approval contained herein. 2. Approval Expiration: The Administrative Planned Development Permit approval shall be valid for one year from the effective date of the Community Development Director" s approval. Within this one year period, the approved use shall be established (including obtaining a City Business License) on the property. Failure to meet this deadline will result in the Administrative Planned Development Permit being void. Once the approved use has been established, the Administrative Planned Development Permit approval shall be valid in perpetuity with continued operation. Abandonment, discontinuation, or ceasing of operations for a continuous period of twelve months shall void the Administrative Planned Development Permit approved herein. 3. Previous Conditional Use Permit: Upon establishment of the retail bakery approved by this Administrative Planned Development Permit (PLN2011-171), the previously approved Conditional Use Permit for establishment of a retail/office use (UP76-ll / PLN2003-63) shall be void and shall permanently be superseded by the Administrative Planned Development Permit approved herein. 4. Revocation of Permit: Operation of the use in violation of the Administrative Planned Development Permit or any standards, codes, or ordinances of the City of Campbell shall be grounds for consideration of revocation of the Administrative Planned Development Permit F ~ ~ .'~i~~ ~~ ~y~t~e~~~o~nmunity Development Director. ~'~ c s , o •i .:~w 6 . 70 T7o first Street • Campbell CA 9008-1423 • TES (408) 866-2140 • Fax (408) 866-5140 • E-MAIL planning~a?cityofcampbell.com CONDITIONS OF' APPROVAL - PLN2011-171 ~ 2265 S. WINCHESTER BLVD. Pg. 2 of 4 5. Revision to Plans: The building permit submittal construction plans shall incorporate the following revisions: a. Conditions of Approval: Print the Conditions of Approval on a separate sheet within the construction plans. b. Site Plan (Sheet A1): The following revisions are required to the Site Plan: i. Parking Requirements a. Resize all parking spaces to the City's uni-stall standard of 8 '/z feet by 18 feet. b. Convert parking space #11 to a motorcycle parking space (4 feet by 6 feet). This space shall be clearly marked as a motorcycle space either with a sign or painted letters. c. Eliminate parking space # 12. ii. Landscaping Requirements a. Provide a 5-foot landscaping strip along the western property line. b. Provide a 3-foot landscaping strip along the southern property line within the rear parking lot c. Provide a 5-foot landscaping strip along the northern property line within the rear parking lot. d. Show landscaping within the void space at the northwest corner of the property. e. Show all new landscaping areas planted with a mixture of shrubs, trees, and ground cover in compliance with the CMC 21.26.030, including installation of an irrigation system. c. 1 loor Plan (Sheet A2): Remove the references to the "portable trash can", both t:he floor plan drawing and the photograph. 6. Hours of Operation: The hours of operation shall be restricted to 7:00 AM to 9:00 PM Monday through Sunday. Business hours (customers on site) shall be restricted to 9:00 AM to 7:00 PM. Outside of these hours, no employees or customers shall be on-site. 7. Property Maintenance: The owner/operator of the subject property shall maintain all exterior areas of the business free from graffiti, trash, rubbish, posters and stickers placed on the property. 8. Noise Standard: Any noises, sounds and/or voices, including but not limited to amplified ~, ~ ~•,~~ ~~ ~, ~s,~,ntd~, (thOud speakers, sounds from audio sound systems, and/or music, generated by the .. '. i~ •`.!'. '1µr1 ~ F'g Lbv L 4i ~~`d ~~~3,r~ r: R , , 7~1~1 first Street • Campbell, CA 95008-1423 • TEL (408) 866-2140 • Fnx (408) 866-5140 • E-MAIL planning~:,cityofcampbell.com CONDITIONS OF APPRO~ tiL - PLN2011-171 ~ 2265 S. WINCH>/~TER BLVD. Pg. 3 of 4 subject use shall not be audible to a person of normal hearing capacity from any residential property. Public address systems of all types are strictly prohibited. 9. Trash & Clean: All trash, normal clean up, carpet cleaning, etc. shall be done between the hours of 7'.:00 a.m. to 9:00 p.m. At no time shall noise generating cleanup, including the dumping of trash and/or recyclables occur between 9:00 p.m. and 7:00 a.m. Building Division 10. Permits Required: A building permit application shall be required for the proposed tenant improvements for the proposed "Bakery" use in the exising commercial structure. The building permit shall include Electrical/Plumbing/Mechanical fees when such work is part of the permit. 1 1. Construction Plans: The Conditions of Approval shall be stated in full on the cover sheet of construction plans submitted for building permit. 12. Size of Plans: The minimum size of construction plans submitted for building permits shall be 24 in. X 36 in. 13. Plan Preparation: This project requires plans prepared under the direction and oversight of a California licensed Engineer or Architect. Plans submitted for building permits shall be "wet stamped" and signed by the qualifying professional person. 14. Site Plan: Application for building permit shall include a competent site plan that identifies property and proposed structures with dimensions and elevations as appropriate. Site plan shall also include site drainage details. Site address and parcel numbers shall also be clearly called out. Site parking and path of travel to public sidewalks shall be detailed. 15. Title 24 Energy Compliance: California Title 24 Energy Standards Compliance forms shall be blue-lined on the construction plans. Compliance with the Standards shall be demonstrated for conditioning of the building envelope and lighting of the building. 16. Special Inspections: When a special inspection is required by C.B.C. Chapter 17, the architect or engineer of record shall prepare an inspection program that shall be submitted to the Building Official for approval prior to issuance of the building permits, in accordance with C.B.C Appendix Chapter 1, Section 106. Please obtain City of Campbell, Special Inspection fo1-ms from the Building Inspection Division Counter. 17. Non-Point Source: The City of Campbell, standard Santa Clara Valley Non-point Source Pollution Control Program specification sheet shall be part of plan submittal. The specification sheet (size 24" X 36") is available at the Building Division service counter. 18. Title 24 Accessibility -Commercial: On site general path of travel shall comply with the latest Califomia Title 24 Accessibility Standards. Work shall include but not be limited to accessibility to building entrances from parking facilities and sidewalks. .` f r' ~~ r111 ~~~ F ~~~ '~O~No li ors 'trees • Campbell, CA 9008-1423 • Tet (408) 866-2140 • Fnx (408) 866-5140 • E-MAIL planning~ci~cityofcampbell.com CONDITIONS OF APPRO~tiL - PLN2011-171 ~ 2265 S. WINCHI/.~ E'ER BLVD. Pg. 4 of 4 19. Title 24 Accessibility - Commercial: Projects seeking to use the Title 24 Hardship exemption clause shall blue-line completed, City of Campbell "20%" exemption form on submitted construction plans. Fonn is available at Building Division service counter. 20. Approvals Required: The project requires the following agency approval prior to issuance of the building permit: a. West Valley Sanitation District b. Santa Clara County Fire Department c. Santa Clara County Department of Environmental Health 21. P.G.& E.: Applicant is advised to contact Pacific Gas and Electric Company as early as possible in the approval process. Service installations, changes and/or relocations may require substantial scheduling time and can cause significant delays in the approval process. Applicant should also consult with P.G. and E. concerning utility easements, distribution pole locations and required conductor clearances. '~~' ~ 1. ?~ Y~ ,~j~. ..fir`°~.,, ~`~~L. Tlp 70 North First Street • Campbell CA 95008-1423 • TEL (408) 866-2140 • Fnx (408) 866-5140 • e-MAIL planningC~cityofcampbell.com