ENC2009-00011....Print Form
Permit No ~N ~ Z` ~ `j " C'CiU I I
CITY OF CAMPBELL ENCROACHMENT PERMIT
DEPT. OF PUBLIC WORKS (for working within the public X-Ref. File _~i_
70 North First Street right-of-way) Application Date _ l 2`L~~" `
Campbell, CA 95008 Applic~i'n Expiration Date
Ph. (408) 866-2150 Issued y(Z Z~L ~I APN 2 .• ~? ~ A'~Q
Fx. (408) 376-0958
Permit Expiration Date 2 Z I
APPLICATION -Application is hereby made for a Public Works Permit in accordance with Campbell Municipal Code, Section 1 1.04. (Application. expires in six
(6) months if the permit is not issued. Application Fee isnon-refundable.)
A. Work Address or Tract No.: I ~1.A 'J_ ~tl J h
Utility Trench Location:
B. Nature of Work: I~t ~ „.~ ~ ~ti ,,.ry jA~~
C. Attach four (4) copies of an engineered plain sh wing the location and extent of the work, and four (4) copies of the preliminary Engineer's
Estimate of work. Tl~e plans shall show the relation of the proposed work to existing surface and underground improvements. When approved
by the City Engineer, said plan becomes a part of [his permit.
D. All work shall conform to the City of Campbell Standard Specifications and Details for Public Works Construction; the General Permit Conditions
listed on the reverse side; and the Special Provisions for this permit, listed below. Failure to abide by these conditions and provisions may result
in job shutdown and/or forfeiture of Faithful Performance Sureties and cash deposits. (See General Permit Conditions 1 and 2.)
E. The Contractor must have this permit and approved plans at the site and must notify the Public Works Department at least two days before
starting work. Notice must be given to Public Works at least 24 hours before restarting any work.
Name of Applicant: i~ /,~(~~
Address: ~l~V ~~_ #!. b~l}Y•S. ~~Z~~
E-Mail Address: ~. •~~, yti//~ ~ • U 24-HOUR EMERGENCY PHONE NUMBER:
Is this work being done} y the propUe/rt"y"o'wneGrsL7at+jthe' own residen~e? r YES NO~~~~
The Applicant;Permittee hereby agrees by affixing their signature to this permit to hold the City of Campbell, its officers, agents, and employees free, safe
and harmless from any claim or demand for damages resulting from the work covered by this permit.
The ApplicanttPermittee hereby acknowledges that they have read and understand both the front and back of this permit, and they will inform their
contractor(s) of the information. Applicant is advised that upon issuance of this permit, property owner, or property owner's successors, shall be
responsible for apy-a"rjd~ll damages arisirl'g out of the condition of any private improvements in the public right-of-way.
(Applicant Permittee) (sign)
Telephone: ~ ~" Y ` t
(Contractor) (Print Name) n,~e
SPECIAL PROVISIONS
t. Street shall not be open cut for underground installations. Minimum cuts may be allowed for connections or exploration holes. Such tuts may bebe
iDecfically aooroved by the Insoector onion to cutting.
_2. Pavement may be cut for underground installations and must be restored in accordance with the Standard Details Trench Restoration Method
"A",unless otherwise approved by the Engineer.
3. Work to be staked by a licensed Land Sun~eyor or Civil Engineer and two (2) copies of the cut sheets sent to the Public Works Department
before starting work.
_4. Per Section 4215 of the Government Code this permit is not valid for excavations until Underground Service Alert (USA) has been notified and
the inquiry identiFication number has been entered hereon. USA Phone: 1-800-227-2b00. USA TICKET NO. __
S. Prior to any work, the property owner shall execute an Agreement for Private Improvements in the Public Right-of-Way, which shall be
recorded.
b. Public Notification Requirements:
7.
SEE PUBLIC WORKS FEE SCHEDULE FOR CURRENT FEE
PERMIT APPLICATION FEE
PLAN CHECK DEPOSIT
SECURITY FOR FAITHFUL PERFORib1ANCE/LA3OR & r41ATERIALS
CGNSTRUCTION CASH DEPOSIT
PLAN CHECK & INSPECTION FEE
APPROVEDFORISSUANCE
Atv1OUNT - RECElPT~
s 32S
5__
5--
5~ G;
For City Engineer
Permit Expires 12 Months After Date of Issuance
I!?2,~G`h
~'c`l~r~~'~_
i
I ~-
GENERAL PERMIT CONDITIONS
1. A Construction Cash Deposit is required. Charges will be made against this deposit if there is an emergency call-out, overtime inspection or when City
ordered barricading is required. Any such costs in excess of the deposit will be billed to the Permittee.
2. A one-year maintenance period and surety are required. Such period will begin on date of written acceptance by the City.
3. Refund or the cash deposit balance and refund or cancellation of the Faithful Performance Surety will be initiated by the written acceptance of the work
by the City.
4. The Permittee must request in writing a final inspection and acceptance of the work upon completion. Acceptance by the City will be made in writing
to the Permittee.
5. Maintain safe pedestrian and vehicular crossings and free access to private driveways, bus stops, fire hydrants, and water valves.
6. A Construction Traffic Control Flan and a Construction Schedule are required for all lane closures, detours, and stteet closures. This plan must be
reviewed and approved prior to any :ape closures.
7. A Construction Traffic Control Plan shall conform to the Caitrans Manual oFTraffic Controls for Construction and Maintenance Work Zones, dated
1990, available at Caltrans. Traffic control equipment shall include Type II flashing arrow signs if required.
8. Replace as directed by ;he City Engineer any damaged or removed improvements in accordance with City Standards and Specifications at the sole
expense of the Permittee.
9. Sawcut For all PCC or AC removals. All PCC removals shall be to the nearest scoremark and shall be doweled to exisrng improvements.
10. Prior approval of inspector is required for any work done after normal working hours, on weekends or holidays and may require reimbursement of
inspection costs at the current overtime rate.
11. Adequate signing and barricading is required on the job site. Failure to provide such signing and barricading may result in the City's providing signing
and barricades and charging the cost ;including all labor and materials) against the cash deport.
12. Compaction testing of subgrade, base rock, and asphalt concrete by Permittee is required unless otherwise stated by the Cihy Engineer.
13. The Contractor or PermiGee will have a supervisory representarve available for contact on the project at all times during construction. Contractor or
Permittee shall provide a phone number at which they can be contacted outside the hours of 8:00 a.m. to 4:00 p.m.
14. No storage of materials or equipment will be allowed near the edge of pavement, the traveled way, or within the shoulderline which would create a
hazardous condition to the public.
15. This permit shall not be construed as authorization for excavation and grading on private property adjacent to the work or any other work for whi<;n a
separate permit may be required, nor does it relieve the Permittee of any obligation to obtain any other permit required bylaw.
16. This permit does not release the Permittee from any liabilities contained in other agreements or contacts with the Cihj and any other public agency.
17. This permit a not transferable. Work must be performed by the Permittee or his designated agent or contractor as specif ed thereon.
18. Call back (call out) due to emeregencies regarding this permit shall be at the current overtime rate with a three (3) hour minimum charge per
occurrence.
19. Pursuant to Chapter 14.02 of the Campbell Municipal Code, applicant shall not cause to be discharged any material into the municipal storm drain
system other than storm water. Applicant shall adhere to the BEST MANAGEMENT PRACTICES established by the Santa Clara Valley Urban Runoff
Pollution Prevention Program.
20. If the public interest requires a modification of, or a departure from the plans and specifi<ations,tho Ciry shall have the authority to require or approve
any modification or departure and to specify the manner in which the same is to be made for City-owned or maintained facilities.
21. Pe: mitttee must provide advance notification to all parties that may be affected by the permit activities. Notification shall be reviewed by the Cihj prior
to distribution and include dates of work and a contact name and phone number.
Applicant shall be responsible for ensuring that all those providing serAces under the applicant are aware and understand all of the above conditions.
eat
Contracmr (Print Name) Date:
:\FCRMS\7emplares\Encroachrnent PerrnitslEncroachment Permit STATIC form2.pdf
Rev.3!O8
1
d
G
s~
....