Loading...
Draft EIR - 1991 DRAFT ENVIRONMENTAL IMPACT REPORT McGlincey Lane Expansion to Central Campbell Redevelopment Area Lead Agency: City of Campbell SCH #: 91053013 CHMHILl September 1991 . ::rt::nt ::::i:~ DRAFT ENVIRONMENTAL IMPACT REPORT McGlincey Lane Expansion to the Central Campbell Redevelopment Area Corrections to Document Page Paragraph Correction 1-1 1 The area to be added is the McGlincey Lane area and consists of approximately 8Q.I0l acres. 4-1 1 The McGlincey Lane Expansion Area consists of approximately 8Q.I0l acres, and is located... Additions to the document are underlined and deletions are struck out. 9/18/91 deircorrect(mc11 ) CO NTENTS 1 Summary Brief Project Description Summary of Impacts and Mitigation Areas of Controversy Alternatives 2 Project Description Project Description and Location Project Objectives Uses of the EIR 3 Consistency With Plans and Policies 4 Environmental Setting, Impacts, and Mitigation Land Use Traffic/Circulation Noise Air Quality Hazardous Materials Public Services and Utilities Aesthetics Biological Resources Cultural Resources Geology Drainage/Flooding 5 Alternatives 6 Cumulative Impacts 7 Any Significant Environmental Impacts That Cannot Be Avoided if the Proposed Action is Implemented 8 Any Significant Irreversible Environmental Changes That Would be Involved in the Proposed Action, Should it be Implemented 9 Relationship Between Local Short-Term Uses of Man's Environment and the Maintenance and Enhancement of Long-Term Productivity 10 Growth Inducing Impacts 11 Report Preparation SJCR67n09C.51 11 Page 1-1 1-1 1-1 1-7 1-7 2-1 2-1 2-7 2-8 3-1 4-1 4-1 4-8 4-68 4-83 4-90 4-93 4-99 4-108 4-111 4-113 4-117 5-1 6-1 7-1 8-1 9-1 10-1 11-1 CONTENTS 12 13 Persons and Organizations Consulted Sources and References Appendix A: Initial Study, Notice of Preparation (NOP) and Responses to NOP Appendix B: Summary of Public Scoping Meetings Appendix C: Preliminary Redevelopment Plan for the Expansion Area Appendix D: Phase I and Phase II Site Investigations for the Drive-in Site Appendix E: Traffic Analysis Appendix F: Noise Analysis Appendix G: Air Quality Analysis Appendix H: Cultural Resource Analysis TABLES 4-1 4-2 4-3 4-4 4-5 4-6 4-7 4-8 4-9 4-10 4-11 4-12 4-13 4-14 Existing Levels of Service for Signalized Intersections Existing Levels of Service for Unsignalized Intersections Existing PM Peak Hour Volume-to-Capacity Ratios for Roadway Links 1994 Baseline Levels of Service for Signalized Intersections (Without SR-85) 1994 Baseline Levels of Service for Unsignalized Intersections (With SR-85) 1994 Baseline Levels of Service for Signalized Intersections (With SR-85) 1994 Baseline Levels of Service for Unsignalized Intersections (Without SR-85) PM Peak Traffic Generation at Costco and Home Club Sites Trip Generation for Destination Commercial, Industrial, and Maintenance Yards Project Trip Types Used for PM Peak Hour Distribution 1994 Projected Levels of Service and Delay for Signalized Intersections (Without SR-85) 1994 Projected Levels of Service for Unsignalized Intersections (Without SR-85) 1994 Projected Levels of Service and Delay for Signalized Intersections (With SR-85) 1994 Projected Levels of Service for Unsignalized Intersections (With SR-85) SJCR67 n09C.51 iii Page 12-1 13-1 4-16 4-16 4-18 4-26 4-27 4-29 4-30 4-31 4-31 4-32 4-40 4-41 4-43 4-44