Pre-Application - 2001CITY OF CAA1PBELL
Community Development Department
February 16,2001
Thomas Yates
1361 Peggy Ave.
Campbell, CA 95008
Subject:
PRE200 1-04 - New detached garage at 1361 Peggy Ave. in Campbell
Dear Mr. Yates,
Thank you for your submittal of a pre-application for a new detached garage and recreation room on your
property. A preliminary review of your proposal indicated that all setback requirements have been met as well as
lot coverage and floor-to-area ratios. As part of the review of your official building plans, we will also check to
see that the proposed building materials and style match that of the existing house.
The only concern that would arise over a detached building such as this is that it would not be difficult to convert
the building into an additional living unit, given that all the electrical and plumbing equipment (as well as a such
amenities as a fireplace and a covered porch) would be in place. It is easy to see that with the current house
being relatively small, the detached garage and recreation room provide space for parking and storage that is not
present in the main house. However, if you decide at any point to enlarge the main house, it is possible that the
City will ask for the filing of a deed restriction on the property to ensure that the detached structure not be
converted into a separate living space that can be utilized for sleeping purposes or contain any appliances for
cooking. The minimum lot size required for a secondary living unit on a single-family property is 12,000 square
feet. Since this lot does not meet the minimum requirement, a secondary unit would not be permitted.
Aside from that issue, the Planning Division does not have any other comments regarding this proposal. Please
find enclosed Preliminary Comments from the Building Division and the Department of Public Works.
If you have any questions regarding these items, please feel free to phone me at (408) 866-2142.
Sincerely,
~ì~ e,~~
Kristi Bascom
Planner I
cc:
GeoffBradley, Senior Planner
Bill Bruckart, Building Official
Harold Housley, Department of Public Works
encl.:
Preliminary Conditions of Approval from Department of Public Works
Preliminary Conditions of Approval from Building Division
70 North First Street
Campbell, California 95008-\436
TEL 408.866.~140
FAX 408.866.838\ . TOO 408.866.2790
. ~.
CITY OF CAMPBELL
BUILDING INSPECTION DIVISION - COMMENTS TO THE DEVELOPMENT REVIEW COMMITTEE
DRC: February 14,2001
ADDRESS:
1361 Peggy Ave.
Project Application: PRE-2001-00004
RECOMMENDATION:
Note: No building code issue has been reviewed at Development Review Committee; it will be reviewed in the
Building Permit process. Please be aware that building codes are changing constantly; plans submitted for
building permit shall comply with the code in effect at that time. Submit permit application together with
required documents to the Building Inspection Division to obtain a building permit. No construction can be
commenced without an appropriate building permit.
It is recommended that this item be forwarded to the Planning Commission for Approval, with the following
conditions.
TO THE SA TISF ACTION OF THE BUILDING DIVISION MANAGER/BUILDING OFFICIAL:
1.
PERMITS REQUIRED: A building permit application shall be required for the proposed new
structure. The building permit shall include ElectricallPlumbinglMechanical fees when such
work is part of the permit.
2.
CONSTRUCTION PLANS: The conditions of Approval shall be stated in full on the cover
sheet of construction plans submitted for building permit.
3.
SIZE OF PLANS: The minimum size of construction plans submitted for building permits shall
be 24 in. X 36 in.
4.
SITE PLAN: Application for building permit shall include a competent site plan that identifies
property and proposed structures with dimensions and elevations as appropriate. Site plan shall
also include site drainage details.
5.
FOUNDATION INSPECTIONS: A pad certificate prepared by a licensed civil engineer or land
surveyor shall be submitted to the project building inspector upon foundation inspection. This
certificate shall certify compliance with the recommendations as specified in the soils report and
the building pad elevation and on-site retaining wall locations and elevations are prepared
~ . . .-..
, r'
according to approved plans. Horizontal and vertical controls shall be set and certified by a
licensed surveyor or registered civil engineer for the following items:
a. pad elevation
b. finish floor elevation (first floor)
c. foundation corner locations
6.
SPECIAL INSPECTIONS: When a special inspection is required by U.B.c. Section 1701, the
architect or engineer of record shall prepare an inspection program that shall be submitted to the
Building Official for approval prior to issuance of the building permits, in accordance with
u.B.C Section 106.3.5. Please obtain City of Campbell, Special Inspection forms from the
Building Inspection Division Counter.
7.
The City of Campbell, standard Santa Clara Valley Non-point Source Pollution Control Program
specification sheet shall be part of plan submittal. The specification sheet (size 24" X 36") is
available at the Building Division service counter.
8.
APPROV ALS REQUIRED: The project requires the following agency approval prior to
issuance of the building permit:
a.
b.
West Valley Sanitation District (378-2407)
Santa Clara County Fire Department (378-4010)
Note: To Determine your district, contact the offices identified above.
Obtain the School District payment form from the City Building Division,
after the Division has approved the building permit application.
J:\Building ORC Comments\1361peggyave,doc
~.... --
~,
MEMORANDlJl\iI
CITY OF CAMPBELL
TO:
FROM:
Kristi Bascom, Project Planner
DATE: 2/14/2001
Lynn Penoyer, Land Development Manager
1fv Harold Housley, Land Development Engineer
SUBJECT:
DRC APPLICATION
Site Address: 1361 Peggy Avenue
For File No(s): PRE 2001-00004
Project Description: New attached garage with recreation room
Applicant: Thomas Yates
PUBLIC WORKS DEPARTMENT PRELIMINARY CONDITIONS OF APPROVAL
Proof of Ownership: Prior to issuance of any grading, drainage, or building permits for
the site, the applicant shall provide a current preliminary title report, grant deed, or other
satisfactory proof of ownership.
Right-of-Wav for Public Street Purposes: Prior to issuance of any grading or building
permits for the site, the applicant shall cause additional Right-of-Way to be granted for
Public Street Purposes along the Peggy Avenue frontage to accommodate a 25 foot half
street. The applicant shall cause all documents to be prepared by a registered civil
engineerlland surveyor, as necessary, for the City's review and recordation.
Public Service Easement: Prior to issuance of any grading or building permits for the
site, the applicant shall grant a 5 foot Public Service Easement on private property
contiguous with the public right-of-way along the Peggy A venue frontage, The applicant
shall cause all documents to be prepared by a registered civil engineerlland surveyor, as
necessary, for the City's review and recordation,
Unsecured Deferred Street Improvement Agreement: Prior to issuance of any grading,
drainage, or building permits for the site, the owner shall execute an unsecured deferred
street improvement agreement for construction of standard street improvements.
Street Improvements Pursuant to a Minor Encroachment Permit: Prior to issuance of
an encroachment permit for construction of any public street improvements in the public
Right-of-Way the applicant shall cause plans to be prepared, post security, and provide
insurance, all as required by the City Engineer. The fee for a minor non-utility
encroachment permit is $50,00. The plans shall include the following:
. AC driveway approach.
. Construction of conforms to existing public and private improvements as necessary.
Page 1 of 2
~ . ....
. t'
Site Address: 1361 Peggy Avenue
For File No(s): PRE 2001-00004
Project Description: New attached garage with recreation room
Applicant: Thomas Yates
PUBLIC WORKS DEPARTMENT PRELIMINARY CONDITIONS OF APPROVAL
Water Meter(s) and Sewer Cleanout(s): Existing and proposed Water Meter(s) and
Sewer Cleanout(s) shall be installed on private property behind the public right-of-way
line.
Utilities: All new on-site Utilities shall be installed underground per Section 20.36.150 of
the Campbell Municipal Code for any new or remodeled buildings or additions. Applicant
shall comply with all plan submittals, permitting, and fee requirements of the serving
utility companies.
Utility Installation Plan: Prior to issuance of building permits for the site, the applicant
shall submit a Utility Installation Coordination Plan and Schedule for approval by the City
Engineer for installation of street improvements and/or abandonment of all utilities,
Streets which have been resurfaced within the previous 5 years will require boring and
jacking for all new utility installations. Applicant shall also prepare pavement restoration
plans for approval by the City Engineer prior to any utility installation or abandonment.
Storm Drain Area Fee: Prior to issuance of any grading or building permits for the site,
the applicant shall pay the required Storm Drain Area fee which is $2,000 per acre,
Storm Water Pollution Prevention Measures: Prior to issuance of any grading or
building permits, the applicant shall comply with the National Pollution Discharge
Elimination System (NPDES) permitting requirements and the California Storm Water
Best Management Practices handbook prepared by the Storm Water Quality Task Force,
Santa Clara Valley Water District and the City of Campbell Municipal Code regarding
Storm Water Pollution Prevention.
Site Plan: Upon submittal of a formal application, the developer shall provide a complete
and accurate Site Plan in accordance with the Planning Division's checklist,
J: \Ianddev\ 1361 peggy
Page 2 of 2
~. ....
, T'