Loading...
Site Modifications-Shell-2003CITY OF CAMPBELL Community Development Department January 7,2004 Haleh Mousavi, Project Coordinator ARC, Inc. Architects 940 Tyler Street, Suite 23 Benicia, CA 94510 Subject: PLN2003-1 09, 110 - 2029 S. Bascom Avenue Shell Station Retail Visual Identity Remodel Site and Architectural Review Permit Approval/Sign Program Dear Ms. Mousavi: Thank you for your revised Site and Architectural Review Permit/Sign Program application submitted on December 2,2003, for the remodel of the Shell Gasoline Service Station at 2029 S. Bascom Avenue. Your application has been conditional approved by the Community Development Director as a Modification to the prior Site and Architectural Approval and approval of a Sign Application and is subject to the attached Conditions of Approval. Please do not hesitate to contact me at (408) 866-2144 or via e-mail at TimH@cityofcampbell.com., if you should have any questions regarding the conditions or this decision, ~~ \-\;r Tim J- Hale~ Associate Planner cc: Geoff Bradley, Senior Planner Frank Mills, Senior Building Inspector 70 North First Street - Campbell, California 95008-1436 . TEL 408.866.2140 . FAX 408.871.5140 . TIm 408.866.2790 PLN 2003-109,110 2029 S. Bascom Avenue January 7, 2003 Page 2 of 4 CONDITIONS OF APPROVAL FOR FILE NO. PLN 2003-109,110 SITE ADDRESS: 2029 S. Bascom Avenue APPLICANT: ARC Inc., Architects DATE: January 7,2004 The applicant is hereby notified, as part of this application, that (s)he is required to meet the following conditions in accordance with the ordinances of the City of Campbell and the State of California. The lead department with which the applicant will work is identified on each condition where necessary, Where approval by the Director of Community Development, City Engineer, Public Works Director, City Attorney, or Fire Department is required, that review shall be for compliance with all applicable conditions of approval, adopted policies and guidelines, ordinances, laws and regulations, and accepted engineering practices, for the items under review. Additionally, the applicant is hereby notified that (s)he is required to comply with all applicable Codes or Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified: COMMUNITY DEVELOPMENT DEPARTMENT Plannine Division 1. Approved Proiect: Approval is granted for a Site and Architectural Review Permit (PLN2003-110) to allow the exterior remodel of an existing gasoline service station and a Sign Application (PLN 2003- 109) on property located at 2029 S. Bascom A venue. The site, building, and landscaping design shall substantially conform to the project exhibits listed below, except as may be modified by the Conditions of Approval herein: a. Set of plans prepared by ARC, Inc. Architects, revised November 11, 2003, including building elevations, site plan, and a signage plan consisting of nine sheets. 2, Site and Architectural Review Permits Approval Expiration: Within one year from the date of approval, a building permit must be obtained and construction completed one year thereafter or the Site and Architectural Review Permit approvals shall be void. 3. Fencing: Any existing or proposed fencing shall comply with Section 21.59.090 of the Campbell Municipal Code, 4, Signing: This Sign Permit has been approved subject to the following conditions of approval: a. The applicant shall obtain a demolition permit for removal of the building signage and monument sIgn b. The applicant shall obtain any necessary building or electrical permits from the Building Division prior to sign installation. c. The proposed wall and freestanding signs shall be fabricated and installed per the approved plans dated as approved on November 17,2003. d. The sign shall be maintained in good condition at all times and shall be repaired or replaced as necessary. J:\Correspondence\PLN 2003-109,110 2029 S. Bascom Ave. Approval.doc PLN 2003-109,110 2029 S. Bascom Avenue January 7,2003 Page 3 of 4 7. Mechanical Equipment: All roof mounted and ground mounted equipment shall be screened with architecturally compatible materials, subject to approval by the Community Development Director, prior to the issuance of building permits, 8. Utilities: All new on-site Utilities shall be installed underground per Section 20.36,150 of the Campbell Municipal Code for any new or remodeled buildings or additions. Applicant shall comply with all plan submittals, permitting, and fee requirements of the serving utility companies. 9, Operational Hours: Operational hours shall be limited to 7 a.m. to 11 p.m. daily for both gasoline and repair uses, unless a conditional Use Permit is obtained from the Planning Commission for late night operations. Buildine Division 10, Permits Required: A building permit application shall be required for each proposed new structure. The building permit shall include Electrical/PlumbinglMechanical fees when such work is part of the permi t. 11, Construction Plans: The Conditions of Approval shall be stated in full on the cover sheet of construction plans submitted for building permit. 12, Size of Plans: The maximum size of construction plans submitted for building permits shall be 24 inches by 36 inches. 13. Plan Preparation: This project requires plans prepared under the direction and oversight of a California Licensed Engineer or Architect. Plans submitted for building permits shall be "wet stamped" and signed by the qualifying professional person, 14, Site Plan: Application for building permit shall include a competent site plan that identifies property and proposed structures with dimensions and elevations as appropriate. Site plan shall also include site drainage details. Site address and parcel numbers shall also be clearly called out.. Site parking and path of travel to public sidewalks shall be detailed. 15, Title 24 Energv compliance: California Title 24 Energy Standards Compliance forms shall be blue- lined on the construction plans, Compliance with the Standards shall be demonstrated for conditioning of the building envelope and lighting of the building. 16. Special Inspections: When a special inspection is required by U.B.C. Section 1701, the architect or engineer of record shall prepare an inspection program that shall be submitted to the Building Official for approval prior to issuance of the building permits, in accordance with UB.C Section 106,3.5. Please obtain City of Campbell, Special Inspection forms from the Building Inspection Division Counter. 17. Non-Point Source Pollution Control: The City of Campbell, standard Santa Clara Valley Non-point Source Pollution Control Program specification sheet shall be part of plan submittal. The specification sheet (size 24" by 36") is available at the Building Division service counter. J:\Correspondence\PLN 2003-109,110 2029 S. Bascom Ave. Approval.doc PLN 2003-109,110 2029 S. Bascom Avenue January 7, 2003 Page 4 of 4 18. Title 24 Accessibilitv - Commercial: On site general path of travel shall comply with the latest California Title 24 Accessibility Standards. Work shall include but not be limited to accessibility to building entrances from parking facilities and sidewalks. Projects seeking to use the Title 24 Hardship exemption clause shall blue-line completed, City of Campbell "20%" exemption form on submitted construction plans. Form is available at Building Division service counter. 19, Approvals Required: The project requires the following agency approvals prior to issuance of the building permit: a. Santa Clara County Fire Department (378-4010) PUBLIC WORKS DEPARTMENT No Conditions J:\Correspondence\PLN 2003-109,110 2029 S. Bascom Ave. Approval.doc ARC Inc. December 8, 2003 . . Mr. Tim J. Haley City of Campbell Planning Division 70 North First Street Campbell, California 95008 940 Tyler Street, Suite 23 ßenicia, CA 94510 Tel: 707.745.0502 Fax: 707.745.0592 ARC I ncArchitects. com Shell Stations 1530 W. Campbell Avenue 2029 South Bascom Avenue Campbell, California Re: iV~~ '~j,.~, ':0',' ,it. ' Df ' C 0 9 2003 CITY OF " PLANN/~'AGMPB~LL DfPr, Subject: Re-Submittal Dear Mr. Haley, Enclosed please find the following for the above referenced project: Quantity Date Description 1 ea 11-29-03 Owner Authorization letter We have provided these documents for your use and records as required for review. Please contact me if you have any questions or need additional information. Sincerely, ARC Inc. ~.tvv Haleh Mousavi, Project Coordinator Enclosures cc: Jennifer Firman, Trammell Crow Coy McDaniel, Trammell Crow Tom Wilson, ARC Inc. TC 126 / C-1 w/encls. Overnight .. - -'.--- . ARC Inc. December 2, 2003 ARCHITECTS Mr. Tim J. Haley City of Campbell Planning Division 70 North First Street Campbell, California 95008 940 Tyler Street, Suite 23 ßenicia, CA 94510 Tel: 707.745.0502 Fax: 707.745.0592 ARC I ncArchitects. com Re: Shell Stations 1530 W. Campbell Avenue 2029 South Bascom Avenue Campbell, California RE CE IVED DEe 04 2003 CplTYLAOF CAMPBELL NNING DEPT. Subject: Re-Submittal Dear Mr. Haley, Enclosed please find the following for the above referenced project: Quantity Date Description 1 Set 11-03 Revised Design Drawings, including colored elevations, for each site We are in the process of obtaining owner authorization for the station at 2029 S. Bascom Avenue. I will send you the authorization letter as soon as I receive it. The station located at 1530 Campbell Avenue is owned by Shell. Equilon Enterprises is wholly owned by Shell Oil Products Company. Equilon Enterprises is an operating name used to define a Joint Venture between Shell and Texaco that started in 1998. The Joint Venture was resolved in 2002 and Shell took ownership of all assets. We have provided these documents for your use and records as required for review. Please contact me if you have any questions or need additional information. Sincerely, ARC Inc. tt. ~ - Haleh Mousavi, Project Coordinator Enclosures cc: Jennifer Firman, Trammell Crow Coy McDaniel, Trammell Crow Tom Wilson, ARC Inc. TC125, TC126/ C-1 w/encls. Overnight , ~ ,...,-, November 24, 2003 E. Barbano Enterprises 951 Michael Drive Campbell, CA 95008 Shell Lubricants ] 2700 Northborough Drive Houston, TX 77067 Subject: Shell Service Station, 2029 S. Bascom, Campbell, CA To Whom It May Concern: SheD Oiì Company ~s illì.he process of fc-imaging its sel-vi¡,;e statiÙli netwûïK in ì"::H1hCln California. The fe-image work consists of painting the building, canopy and replacing the primary ID sign to conforn1 with city requirements. The city responsible for reviewing our application has requested that we obtain property owner permission to apply for permits. We request that you signify your approval by signing in the space below and return this letter to us in the enclosed envelope. A copy of this letter is enclosed for your records. We would appreciate receiving this letter as soon as possible, inasmuch as we would like to move as quickly as possible with this process. Any questions you may have should be directed to me at 281-874- 7771. ~ Matthew Kelley Project Manager This is to advise that pern1ission to alter the above referenced service station site to Shell colors and trademarks is granted. Authorized Signature: . ¡J c~'-'- 7"~ LCF Printed Name: P A L-t , I rye P lè I N 6- L 'E Date: )1 CV. ;Z 7 ?- ~, (,¡ 3 - April, 21, 2003 Shell Lubricants 12700 Norfhborough Drive Houston TX 77067 . -' Subject: Shell Upgrading Service Stations to its Retlil Visual Identity (RVI) T (\ \X¡1)o::1 It ~.fay Coucè:rn: Please be advised by this correspondence Ù1at ARC, Inc. has been authorizcd to act as :\gcnt on behalf of Shell Oil Products US for the purpose of making application submittals and ncgotiating conditions for the above referenced Shell R VI Program. The RVI program entails the re-imaging of existing Shell service stations in the San Francisco Bar ¡\rca. Our re-branding process invoh'cs modifications to the signage, canopy, and buildings. If you have any questions or comments, please do not hesitate to contact me at 281-874-7771 regarding this matter Thank you for your assistance. " -€~~ Project Manager - 0__'.-_-.-- August 15, 2003 ARC Inc. ARCHITECTS City of Campbell Planning Division 70 North First Street Campbell, California 95008 940 Tyler Street, Suite 23 Benicia, CA 94510 Tel: 707.745.0502 Fax: 707.745.0592 ARC IncArchitects. com Re: Shell Stations 1530 W. Campbell Avenue 2029 South Bascom Avenue Campbell,California Subject: Review Submittal Dear Sir or Madam, Enclosed please find the following for the above referenced project: Quantity Date Description 08-15-03 Design Drawings, Sheets A-1 to A-9 (including colored elevations) Sign/Site Development Review Application completed and signed Location Map Photographs of existing conditions Color and Material Sheet Check No. I ~Z-S8' 1 0 Sets 1 ea 1 ea 1 ea 1 ea 1 ea 08-15-03 08-15-03 We have provided these documents for your use and records as required for review. Please contact me if you have any questions or need additional information. Sincerely, ARC Inc. Enclosures cc: Dawn Spillane, Trammell Crow w/encls. Tom Wilson, ARC Inc. TC035 / C-1 w/encls. Hand-delivered SHELL RENOVATION NARRATIVE Shell has recently embarked on a nationwide program to convert their gray and yellow Shell Retail Gasoline Stations image to their international image standard. The international image standard, known as RVI (Retail Visual Identity), has been designed to embody the core values of the Shell brand in a modern and welcoming design resulting in a retail environment that is warm, friendly and inviting. The functional benefits of Shell's RVI include, for example, the design of signs that communicate information clearly and lighting that provides illumination for safety and visibility. One of the emotional benefits of RVI design is that it creates a clean and comfortable environment - an ambience that is more "retail" and less "industrial". Shell is in the process of upgrading all Shell branded sites over the next few years and they are very excited about the positive effect these upgrades will have on their customers and the communities they serve. The conversions of their facilities will include painting, general maintenance, and signage that will considerably improve the facilities' appearances. Standard Proposed Upç¡rades* . Paint building white with gray band at bottom Add yellow/red sign fascia to building, where applicable Add yellow/blue sign fascia to car wash, where applicable Yellow canopy fascia with illuminated red band, where applicable Paint canopy columns white with gray band at bottom Replace pumps and pump valences (removing pump spandrels where applicable) Reface sign (where applicable) " . . . . . . . Please refer to "scope of work" notes for specific proposed upgrades located on cover page of each site's architectural drawings. 0\ . CAIf1 . 16& ~. ~ ..... ,.... U r- CAMPBELL -' - "- ",' 'ORCHA~O' r-- L---.. " 0 --- -- ,--~----------~----~ CITY OF CAMPBELL Community Development Department September 12, 2003 Ron Duttamel ARC, Inc. Architects 940 Tyler Street, Suite 23 Benicia, CA 94510 Subject: PLN2003-1O9,llO - 2029 S. Bascom Avenue Shell Station Retail Visual Identity Remodel Site and Architectural Review Permit Approval/Sign Program Dear Mr. Duttamel: Thank you for your Site and Architectural Review Permit/Sign Program application submitted on August 15,2003, for the remodel of the Shell gasoline service station at 2029 S. Bascom Avenue. Your application was distributed to the City's Development Review Committee. The Committee, which consists of the Fire Department, Building Division, Planning Division and Public Works Department, reviewed the application for completeness and compliance with the City's Zoning Code and General Plan. The Planning Division has prepared comments that are included herein. The other departments did not have comments at this time. DesieD The project site is located within the Site and Architectural Design Review Area and subject to the development policies of the General Plan. Development requirements for this area are intended to enhance the character, stability, and integrity of the business districts and to assure high quality architectural design and optimum site design, The City recently adopted a General Plan Update, which states clearly that generic "corporate architecture is discouraged." Corporate architecture is more difficult to blend with existing development and becomes dated quickly. Development projects are required to be compatible with surrounding development, which can be achieved through careful attention to scale, materials, colors, building form, and design details. The proposed Shell station remodel does not blend with the surrounding architecture and the canopy design does not complement the main building design. Your design should include features, colors, or materials that complement the surrounding buildings. The retention of the sloped red tile roof material is an important characteristic of this site and neighborhood. The Planning Division is not supportive of the proposed projects since it does not meet the City's design requirements and is not consistent with the City's General Plan in regards to corporate architecture. 70 North First Street. Campbell, California 95008-1436 . TEL 408.866.2140 . FAX 408-871.5140 . TJ)[) 408.866.2790 PLN2003-109,1l0 2029 S. Bascom Avenue September 12,2003 Page 2 of 3 Simaee The proposed remodel involves the addition and reconfiguration of signage. The City considers the entire yellow and red fascia panel and dispenser spandrels to be signage since they are designated Shell colors that reflect the corporate identity. Additional sign age requires the approval of a Sign Exception under a separate application. The City is not supportive of additional signage beyond what is permitted for service stations in the Sign Ordinance, which consists of only: 1. One wall sign per business, mounted parallel to the building. Any illumination shall be provided by interior lights or reflectors concealed in shrubbery or decorative structures. Such illumination shall not cause glare on surrounding streets or adjacent property. 2. One freestanding sign for each parcel. The maximum height of a freestanding sign shall be fourteen feet above ground. 3. A maximum of two readerboard signs, not to exceed sixteen square feet each, to be attached to an approved freestanding sign, the building, the canopy or secured to the property; Generally, the proposed sign program exceeds the number and area standards of the sign ordinance. Liehtine If any new lighting is proposed with the remodel, it should be as minimal as possible. A photometric lighting plan must be provided. The City will not be supportive of metal halide lighting that spills light off the property, causes glare, or uses excessive amounts of energy. The lighting should be fully shielded and carefully installed to maximize their effectiveness on the site and minimize their adverse impacts beyond the site. The following items and details are required to complete your application: 1. Property Owner's Sienature a. The owners of record according to the County Assessor are: Barbano Enterprises, LLC - 2029 S. Bascom Avenue 2. Plan Submittal Site Plan The site plan submitted is incomplete and does not meet the application requirements. These include: 1. Setbacks - indicate the dimensions of all setbacks from property line and distances between buildings/structures. 2. Landscaping - conceptual landscape plans indicating existing and proposed landscaping. Show PLN2003-109,110 2029 S. Bascom Avenue September 12, 2003 Page 3 of 3 existing trees with a trunk diameter larger than four inches to be removed/retained. Indicate the trunk diameter, tree drip line and tree type. 3. Fencing, including retaining walls, existing and/or proposed to be shown (type, height, and materials). The stations must have a masonry wall a minimum of six feet in height on abutting property lines. Existing fencing that does not meet this standard shall be upgraded to meet the standards. 4. Provide location and uses of buildings on adjacent properties. Describe the height, setbacks and type of structures on adjacent properties Elevations 5. Provide a detail of the proposed new dispenser spandrels with graphics valance and decals. Your application has been deemed incomplete and will not be placed on the Planning Commission agenda until additional information and details are submitted and your application is deemed complete. Please do not hesitate to contact me at (408) 866-2144 to arrange a meeting to discuss the above comments or if you wish clarification of any of the above items. s~ (~~~' Tim J. Haley Associate Planner cc: Geoff Bradley, Senior Planner