Loading...
Pre-Application - 2003CITY OF CAMPBELL Community Development Department August 27, 2003 Mr. Richard Pedley 3600 Pmneridge Ave - Suite 370 Santa Clara, CA 95051 Re: Preliminary Application Comments File No.: PRE2003-00041 80 E. Hamilton A venue Dear Mr. Pedley: Thank you for your submittal of a preliminary application for the 9~quare foot addition to an existing office building located at 80 E. Hamilton A ven~ ~he subject property is presently zoned P-O-S (Professional Office) and is designated as Professional Office on the City's General Plan Land Use Map. The proposed project would require approval of a Modification to a Site and Architectural Review Permit to allow the office addition. The Modification approves the site plan, elevations, and floor plans for the subject property. A Modification to a Site and Architectural Review Permit will require approval by the Community Development Department through an administrative review process. The Planning Division completed the review of your preliminary application and has the following comments regarding your proposal: 1. Proposed Esther A venue Elevation: Per our phone conversation on August 22, 2003, staff recommends the addition of two new windows instead of one new window on the second floor elevation to better integrate the addition with the existing building. Your application was distributed to the Public Works Department, Building Division, Planning Division, and County Fire Department. In addition to the Planning Division's comments contained in this letter, please find enclosed comments from the Building Division. Please note that these comments are meant to be preliminary. Conditions of approval from each department will be developed when the formal application is submitted. Please submit revised drawings to the Planning Division for review and approval of a Modification to a Site and Architectural Review Permit. The Modification to a Site and 70 North First Street. Campbell, California 95008- I 436 . TEL 408.866.2 I 40 . FAX 408.87 1.5 I 40 . TOO 408.866.2790 PRE2003-00041- 80 E. Ht....iltonAvenue Page 2 of2 Architectural Review Permit must be reviewed and approved prior to your Building Permit submittal. You may contact me at (408) 866-2142 or via email at melindad@cityofcampbell.com if you have any questions about these comments or the review process. Sincerely, vf11dtufl eJ)~ Melinda Denis Planner I end: Building Division Comments, 8/21/03 cc: Geoff Bradley, Senior Planner Paul Middione 80 E. Hamilton Avenue. Campbell. CA 95008 CITY OF CAMPBELL BUILDING INSPECTION DMSION - COMMENTS TO THE DEVELOPMENT REVIEW COMMITTEE DRC: August 21,2003 ADDRESS: 80 E. Hamilton Ave. Project Application: PRE-2003-00041 RECOMMENDATION: Note: No building code issue has been reviewed at Development Review Committee; it will be reviewed in the Building Permit process. Please be aware that building codes are changing constantly; plans submitted for building permit shall comply with the code in effect at that time. Submit permit application together with required documents to the Building Inspection Division to obtain a building permit. No construction can be commenced without an appropriate building permit. It is recommended that this item be forwarded to the Planning Commission for review, with the following conditions. TO THE SA TISF ACTION OF THE BUILDING DIVISION MANAGER/BUILDING OFFICIAL: 1. PERMITS REQUIRED: A building permit application shall be required for the proposed addition to the (e) structure. The building permit shall include Electrical/PlumbinglMechanical fees when such work is part of the permit. 2. CONSTRUCTION PLANS: The conditions of Approval shall be stated in full on the cover sheet of construction plans submitted for building permit. 3. SIZE OF PLANS: The minimum size of construction plans submitted for building permits shall be 24 in. X 36 in. 4. PLAN PREPARATION: This project requires plans prepared under the direction and oversight of a California licensed Engineer or Architect. Plans submitted for building permits shall be "wet stamped" and signed by the qualifying professional person. 5. SITE PLAN: Application for building permit shall include a competent site plan that identifies property and proposed structures with dimensions and elevations as appropriate. Site plan shall also include site drainage details. Site address and parcel numbers shall also be clearly called out. Site parking and path of travel to public sidewalks shall be detailed. 6. TITLE 24 ENERGY COMPLIANCE: California Title 24 Energy Standards Compliance forms shall be blue-lined on the construction plans. Compliance with the Standards shall be demonstrated for conditioning of the building envelope and lighting of the building. J:\Building DRC Comments\8Oehamiltonave.doc 7. 8. 9. 10. SPECIAL INSPECTIONS: When a special inspection is required by U.B.C. Section 1701, the architect or engineer of record shall prepare an inspection program that shall be submitted to the Building Official for approval prior to issuance of the building permits, in accordance with U.B.C Section 106.3.5. Please obtain City of Campbell, Special Inspection fonns from the Building Inspection Division Counter. The City of Campbell, standard Santa Clara Valley Non-point Source Pollution Control Program specification sheet shall be part of plan submittal. The specification sheet (size 24" X 36") is available at the Building Division service counter. TITLE 24 ACCESSffiILITY - COMMERCIAL: On site general path of travel shall comply with the latest California Title 24 Accessibility Standards. Work shall include but not be limited to accessibility to building entrances from parking facilities and sidewalks. TITLE 24 ACCESSffiILITY - COMMERCIAL: Projects seeking to use the Title 24 Hardship exemption clause shall blue-line completed, City of Campbell "20%" exemption form on submitted construction plans. Form is available at Building Division service counter. 12. APPROV ALS REQUIRED: The project requires the following agency approval prior to issuance of the building permit: a. West Valley Sanitation District b. Santa Clara County Fire Department c. School District: i) Campbell Union School District (378-3405) ii) Campbell Union High School District (371-0960) iii) Moreland School District (874-2900) iv) Cambrian School District (377-2103) 13. P.G.& E.: Applicant is advised to contact Pacific Gas and Electric Company as early as possible in the approval process. Service installations, changes and/or relocations may require substantial scheduling time and can cause significant delays in the approval process. Applicant should also consult with P.G. and E. concerning utility easements, distribution pole locations and required conductor clearances. J:\Building DRC Comments\8Oehamiitonave.doc August 7, 2003 Dear Planning Dept: The new designs we are submitting are to change the building from a multi-tenant use to a single tenant use building. The office will be used entirely by The Property Network, Inc. A Real Estate & Loan company. The hours of operation for our company are from 8:30am - 5:00pm, Monday through Friday. Open by appt on the weekends. We have currently 5 independent agents and 2 salaried workers on staff. The building is surrounded by Hamilton Ave on the North, Office buildings on the East & West and a large commercial parking lot to the South. 274 E. Hamilton Ave., Suite G . Campbell, CA 95008 . Phone: 408-374-9500 . Fax: 408-374-5100