ENC2010-00022 ENCROACHMENT PERMIT Permit No.: ENC2010-00022
Print Form - (for working within the public
right-of-way) Application Date: 03/11 /10
CITY OF CAMPBELL
KS ~ 1 1 ~ / t0
l I ____...---
DEPT. OF PUBLIC WOR
70 North First Street Issued
3 G (_
Permit Expiration Date Application
09/11 /10
Expiration Date:
Campbell, CA 95008 -
Ph. (408) 866-2150
Fx. (408) 376-0958 X-Ref. File APN: 279-40-010 _.__.
APPLICATION -Application is hereby made for a Public Works Permit in accordance with Campbell Municipal Code, Section 11.04. (Application expires in six
(6) months if the permit is not issued. Application Fee is non-refundable.)
q, Work Addressor Tract No.: 236 N.15T STREET (X-ST. LATIMER AVENUE)
Utility Trench Location:
g, Nature of Work: HYDRANT REPLACEMENT ON 3/18/10 (4'X4' CUT IN LANDSCAPE AREA)
C, Attach four (4) copies of an en a'll show the rela~ on of t elproposed work to ex st ng surface and unde grolund improvements. When approved
Estimate of work. The plans sh
by the City Engineer, said plan becomes a part of this permit.
p, All d on t elreverse side Land the Spec apProv lions for this permit listed belowlsFailuretloabTde by~hese olndition and p ovesio sCmay re~ult
liste
in job shutdown and/or forfeiture of Faithful Performance Sureties and cash deposits. (See General Permit Conditions 1 an 2.
E, The Contractor must have this permit and approved plans at the site and must notify the Public Works Department at feast two days before
starting work. Notice must be given to Public Works at least 24 hours before restarting any work.
Telephone: (408) 279-7865
Name of Applicant: SAN JOSE WATER COMPANY
Address: 1221 SOUTH BASCOM AVENUE, SAN JOSE, CA 95128 _ _ ~~ -
__._ r 24-HOUR EMERGENCY PHONE NUMBER: ~~~~~
E-Mail Address: ~-
Isthis work being done by the property owners at their own residence? r YES ("-', NO
The Applicant/Permittee hereby agrees by affixing their signature to this permit to hold the City of Campbell, its officers, agents, and employees free, safe
and harmless from any claim or demand for damages resulting from the work covered by this permit.
The AppticanUPermittee hereby acknowledges that they have read and understand both the front and back of this permit, and they will inform their
contractor(s) of the information. Applicant is advised that upon issuance of this permit, property owner, or property owner's successors, shall be
responsible for any and all damages arising out of the condition of any private improvements in the public right-of-way.
Date: (408) 279-7865
Accepted: PAMELA SANTOS (EMERGENCY VERBAL)
(Applicant Permittee) (sign)
(Contractor) (Print Name)
Date
caFnal PROVISIONS:
1. Street shall not be open cut for underground installations. Minimum cuts m;iy be allowed for connections or exploration holes. Such cuts
~.,pri~ annroved by the Inspector prior to cuttin.4•
2. Pavement may be cut for underground mstallations and must be restored in accordance with the Standard Details Trench Restoration Metho
"A",unless otherwise approved by the Engineer.
3. Work to be staked by a licensed Land Surveyor or Civil Engineer and two (2) copies of the cut sheets sent to the Public Works Department
before starting work.
4. Per Section 4215 of the Government Code this permit is not valid for excavations until Underground Service Alert (USA) has been notified an
9 y
the inquiry identification num ownershall execute an Ag eementfor Privateo mprovem0ents n the PubE c RO ht-of-Wa ,which shall be
5. Prior to any work, the property
recorded.
6. Public Notification Requirements:
7.
r~ouC ~"'ORKS FEE SrHFnUI F FOR CURRENT FEES
AMOUNT / _ ^ RECEIPT N0./i
5 (Q~J CSC
PERMIT APPLICATION FEE 5
PLAN CHECK DEPOSIT
SECURITY FOR FAITHFUL PERFORMANCE/LABOR & MATERIALS
CTION CASH DEPOSIT $
5
~
CONSTRU $
PLAN CHECK & INSPECTION FEE ~ 2 ~'G ~
/_!.
APPROVED FOR ISSUANCE _ For City ngineer Date
Permit Expires 12 Months After Date of Issuance
1. A Construction Cash Deposit is required. Charges will be made against this deposit if there is an emergency call-out, overtime inspection or when City
ordered barricading is required. Any such costs in excess of the deposit will be billed to the Permittee.
2. A one-year maintenance period and surety are required. Such period will begin on date of written acceptance by the City.
3. Refund or the cash deposit balance and refund or cancellation of the Faithful Performance Surety will be initiated by the written acceptance of the work
by the City.
4. The Permittee must request in writing a final inspection and acceptance of the work upon completion. Acceptance by the City will be made in writing
to the Permittee.
5. Maintain safe pedestrian and vehicular crossings and free access to private driveways, bus stops, Hire hydrants, and water valves.
6. A Construction Traffic Control Plan and a Construction Schedule are required for all lane closures, detours, and street closures. This plan must be
reviewed and approved prior to any lane closures.
7. A Construction Traffic Control Plan shall conform to the Caltrans Manual of Traffic Controls for Construction and Maintenance Work Zones, dated
1990, available at Caltrans. Traffic control equipment shall include Type II flashing arrow signs if required.
8. Replace as directed by the City Engineer any damaged or removed improvements in accordance with City Standards and Speciflications at the sole
expense of the Permlttee.
9. Sawcut for all PCC or AC removals. All PCC removals shall be to the nearest scoremark and shall be doweled to existing improvements.
10. Prior approval of inspector is required for any work done after normal working hours, on weekends or holidays and may require reimbursement of
inspection costs at the current overtime rate.
11. Adequate signing and barricading is required on the job site. Failure to provide such signing and barricading may result in the City's providing signing
and barricades and charging the cost (including all labor and materials) against the cash deposit.
12. Compaction testing of subgrade, base rock, and asphalt concrete by Permittee is required unless otherwise stated by the City Engineer.
13. The Contractor or Permittee will have a supervisory representative available for contact on the project at all times during construction. Contractor or
Permittee shall provide a phone number at which they can be contacted outside the hours of 8:00 a.m. to 4:00 p.m.
14. No storage of materials or equipment will be allowed near the edge of pavement, the traveled way, or within the shoulderline which would create a
hazardous condition to the public.
15. This permit shall not be construed as authorization for excavation and grading on private property adjacent to the work or any other work for which a
separate permit may be required, nor does it relieve the Permittee of any obligation to obtain any other permit required bylaw.
16. This permit does not release the Permittee from any liabilities contained in other agreements or contracts with the City and any other public agency.
17. This permit is not transferable. Work must be performed by the Permittee or his designated agent or contractor as specified thereon.
18. Call back (call out) due to emeregencies regarding this permit shall be at the current overtime rate with a three (3) hour minimum charge per
occurrence.
19. Pursuant to Chapter 14.02 of the Campbell Municipal Code, applicant shall not cause to be discharged any material into the municipal storm drain
system other than storm water. Applicant shall adhere to the BEST MANAGEMENT PRACTICES established by the Santa Clara Valley Urban Runoff
Pollution Prevention Program.
20. If the public interest requires a modification of, or a departure from the plans and specifications, the City shall have the authority to require or approve
any modification or departure and to specify the manner in which the same is to be made for City-owned or maintained facilities.
21. Permitttee must provide advance notification to all parties that may be affected by the permit activities. Notification shall be reviewed by the City prior
to distribution and include dates of work and a contact name and phone number.
Applicant shall be responsible for ensuring that all those providing services under the applicant are aware and understand all of the above conditions.
Applicant: PAMELA SANTOS (EMERGENCY VERBAL) Date: 3/11/10
Contractor (Print Name)
Date:
J:Reina\Website\Land Dev Forms\Encroachment Permit STATIC form2.pdf
Rev. (11/9/05)