Site and Arch - 3 homes - 2001June 28, 2002
Mr. Omid Shakeri
The Ridgecrest Group
3131 Bascom Ave. STE 110
Campbell, CA 95008
Re: Building Permit No.: BLD2002-00641 to -00643
127 4 Walnut Drive
Dear Mr. Shakeri:
The Planning Division has reviewed your plan submittal for the above referenced property in
light of the Planning Commission approval per Resolution No. 3427 and Resolution No. 3428.
The submitted plans are generally consistent with this approval, subject to the following
modifications or the provision of additional details:
1. Park Impact Fee: The Park Impact fee for the project is $21,980. Prior to the recordation of
the Final Map, 75% of the required Park Impact Fee ($16,485) is due. The remaining 25%
($5,495) is due prior to the issuance of a certificate of building occupancy.
2. Final Parcel Map: The Final Parcel Map shall be recorded prior to the issuance of building
permi ts.
3. Contractor Contact Information Posting: The project site shall be posted with the name and
contact number of the lead contractor in a location visible from the public street prior to the
issuance of building permits.
4. Fences: Fencing along the property lines shall be replaced at the expense of the applicant,
unless it is determined to be in good condition by the Community Development Director.
Any newly proposed fencing shall comply with Section 21.59.090 of the Campbell
Municipal Code.
5. Decorative Pavement Treatment: The applicant shall provide decorative pavement within the
driveways and walkways. Please submit a sample of the proposed pavement treatment for
review and approval by the Community Development Director and indicate such treatment
on the Landscape Plan.
6. Colors and Materials: The approved colors and materials for the wall, trim, and roof shall be
indicated on the plans. The composition roof material shall be 40-year quality.
70 North First Street . Campbell, California 95008-1436 . TEL 408.866.2140 . FAX 408.866.8381 . TDO 408.866.2790
BLD2002-00641 to -0064;" -·1274 Walnut Drive
Page 2 of2
7. Parcell: The following revisions should be made to the plans for Parcell:
a. The dutch-gable detail on the front elevation should incorporate horizontal wood
siding.
b. The site plan indicates a 14-inch Walnut tree to the right of the driveway. This tree is
an Oak tree and should be reflected as such on the plans.
c. Sheets A-5 and A-6 indicate that the roof material is wood shake. Please revise these
sheets to be consistent with the approved composition shingle roof material.
8. Parcel 2: The following revisions should be made to the plans for Parcel 2:
a. Please remove the area of the pool from the lot coverage calculation.
b. The site plan indicates that a 9-inch Almond tree in the Right-of-Way is to be
removed. Trees within the Right-of-Way cannot be removed without approval from
the Public Works Department.
c. The roof on the left elevation should be revised to present a less awkward roof form.
9. Parcel 3: The following revisions should be made to the plans for Parcel 3:
a. The dutch-gable detail on the front elevation should incorporate horizontal wood
siding.
b. The site plan indicates that a 7-inch Almond tree in the Right-of-Way is to be
removed. Trees within the Right-of-Way cannot be removed without approval from
the Public Works Department.
10. Landscaping: The applicant shall submit four sets of a revised landscape and irrigation plan
indicating an evergreen variety of trees along the rear property lines to provide year-round
privacy and screening from the adjacent commercial property. Additionally, the 24-inch box
Coast Live Oak replacement trees should be moved towards the front property line and away
from the home so that the trees will have adequate room to grow.
If you have any questions please do not hesitate to contact me at (408) 866-2143 or via email at
stephaniew@cityofcampbell.com
Sincerely,
~.
Stephanie Willsey ~
Planner I
cc: Frank Mills, Senior Building Inspector
Geoff Bradley, Senior Planner
Reza Norouzi, Memarie Associates, 12201 Saratoga-Sunnyvale Rd. #D, Saratoga, CA 95070
April 30, 2002
Omid Shakeri
The Ridgecrest Group
3131 S. Bascom Avenue, Suite 110
Campbell, CA 95008
Re: Application PLN 2002-141(PM)/PLN 2001-142(S)/PLN 2002-0 1 (TRP) at
1274 Walnut Drive
Dear Mr. Shakeri:
The Planning Commission, at its meeting of April 23, 2002, adopted Resolution 3426 approving
a Tentative Parcel Map and Resolution 3427 approving a Site and Architectural Review Permit
to allow the construction of three new single-family residences.
At your earliest convenience, I would like to arrange a meeting with you, your consultants, and
the City's Public Works land development representative(s). The purpose of the meeting would
be to review the conditions of approval imposed by the Public Works Department and the
Department's procedures and requirements for satisfaction of those conditions. The land
development representative(s) may also include staff members from the Planning and Building
Divisions, if necessary. We hope this meeting will facilitate your project and assist in making
your project a success.
Please contact me at (408)866-2158 to arrange a meeting time and to answer any questions.
I~~n~erel!, / _./..;
,~~~k~¿;/
I. í4Ç6fff($~-7
Land--IJê'~opment Engméer
Cc: Fred Nourzad, 3131 S. Bascom Ave., Ste. 110, Campbell 95008
Memarie Associates, Inc. 12202 Saratoga-Sunnyvale Rd. #D, Saratoga 95070
Marvin Kirkeby, 3249 Stevens Creek Blvd. #101, San Jose 95117
Frank Mills, Senior Building Inspector
Stephanie Willsey, Planner I
h:\landdev/1274 walnut stdltr(mp)
70 North First Street· Campbeil. California 95008-1423 HL 408.866.:2150 . FAX 408.376.0958 . TUO .108.866.2790
April 25, 2002
Omid Shakeri
The Ridgecrest Group
3131 S. Bascom Avenue, Suite 110
Campbell, CA 95008
Re: PLN2001-141 (PM)/PLN2001-142 (S)/PLN2002-01 (TRP) -1274 Walnut Drive
Dear Applicant:
Please be advised that at its meeting of April 23, 2002, the Planning Commission took the following
actions:
1. Adopted Resolution No. 3426 approving a Tentative Parcel Map (PLN2001-141) to create three lots;
2. Adopted Resolution No. 3427 approving a Site and Architectural Review Permit to allow the
construction of three new single-family residences; and
3. Adopted Resolution No. 3428 granting a Tree Removal Permit (PLN2002-01) to allow the removal of
three walnut trees, ranging in size from 12 to 17 inches in diameter, on the above referenced property.
This action is effective in ten calendar days, unless appealed in writing to the City Clerk by 5 p.m. on
Friday, May 3, 2002. California Code of Civil Procedure, Section 1094.6, governs the time within which
judicial review of this decision must be sought.
If you have any questions, please do not hesitate to contact me at (408) 866-2140.
Sincerely,
~~
Stephanie Willsey
Planner I
cc:
Fred Nourzad (Property Owner)
3131 S. Bascom Avenue, Suite 110
Campbell, CA 95008
Marvin Kirkeby (Project Engineer)
3249 Stevens Creek Blvd., #101
San Jose, CA 95117
Memarie Associates, Inc. (Designers)
12202 Saratoga-Sunnyvale Road, #D
Saratoga, CA 95070
Frank Mills, Building
Chris Veargason, Fire
Harold Housley, Public Works
/t.) ~(Hdl 'irq ~trl.-·ct (~¡\mph~'1 (;l\jf,'!I¡;;i ,¡-~;)(~'-, i -1-~!,
; (¡~ ~ C!I.~: i ·1 () 1\ '.11 I'; ;'" I)i,~:' '.... 1
I ): _ t ( J '-, -..; ( , I ~ '_~~' (,I (
RESOLUTION NO. 3426
BEING A RESOLUTION OF THE PLANNING COMMISSION OF
THE CITY OF CAMPBELL APPROVING A TENTATIVE PARCEL
MAP (PLN2001-141) TO CREATE THREE LOTS ON PROPERTY
OWNED BY MR. FRED NOURZAD AT 1274 WALNUT DRIVE IN
AN R-l-lO (SINGLE FAMILY RESIDENTIAL) ZONING
DISTRICT. APPLICATION OF MR. OMID SHAKERI, ON
BEHALF OF THE RIDGECREST GROUP. FILE NO. PLN2001-141.
After notification and public hearing, as specified by law, and after presentation by the
Community Development Director, proponents and opponents, the hearing was closed.
After due consideration of all evidence presented, the Planning Commission did find as follows
with respect to application PLN2001-141:
1. The proposed project has a density range between 2.7 and 2.9 units per gross acre, which is
consistent with the General Plan land use designation of Low Density Residential (less than
3.5 units per gross acre).
2. The proposed map is consistent with the development standards (including lot size and
minimum lot width) of the R-I-I0 Zoning District and the San Tomas Area Neighborhood
Plan (ST ANP).
3. The proposed subdivision layout allows for access to sunlight.
4. Each new lot created has adequate access to a public right-of-way.
5. The project qualifies as a Categorically Exempt project per Section 15315, Class 15 (Minor
Land Divisions) of the California Environmental Quality Act (CEQA).
Based upon the foregoing findings of fact, the Planning Commission further finds and concludes
that:
1. The proposed subdivision is consistent with the General Plan and the Zoning Ordinance.
2. The proposed Tentative Parcel Map does not impair the balance between the housing needs
of the region and the public service needs of its residents and available fiscal and
environmental resources.
3. The design of the Tentative Parcel Map provides, to the extent feasible, for future passive or
natural heating and cooling opportunities.
4. The proposed development will aid in the harmonious development of the immediate area.
5. There is a reasonable relationship and a rough proportionality between the Conditions of
Approval and the impacts of the project.
'Planning Commission Reso'~LlOn No. 3426
PLN2001-141 - 1274 Walnut Drive -- Tentative Parcel Map - Three Lots
Page 2
6. No substantial evidence has been presented from which a reasonable argument could be
made that shows that the project, as currently presented and subject to the required
Conditions of Approval, will have a significant adverse impact on the environment.
NOW, THEREFORE, BE IT RESOLVED that the Planning Commission approves a Tentative
Parcel Map (PLN2001-141) to create three lots on property owned by Mr. Fred Nourzad at 1274
Walnut A venue, subject to the following conditions:
Where approval by the Director of Community De\l~lopment, City Engineer, Public Works
Director, City Attorney or Fire Department is required, that review shall be for compliance with
all applicable conditions of approval, adopted policies and guidelines, ordinances, laws and
regulations and accepted engineering practices for the item under review. Additionally, the
applicant is hereby notified that he/she is required to comply with all applicable Codes or
Ordinances of the City of Campbell and the State of California that pertain to this development
and are not herein specified.
COMMUNITY DEVELOPMENT DEPARTMENT
Plannios! Division
1. Approved Permit: Approval is granted for a Tentative Parcel Map to create three lots. The
Final Parcel Map shall substantially conform to the Tentative Parcel Map prepared by
Kirkeby Engineering and submitted to the Planning Division on March 28, 2002, except as
may be modified by the Conditions of Approval herein.
2. Approval Expiration: The Tentative Parcel Map approval is valid for a period of two years
from the date of approval unless an extension of approval is granted prior to the expiration
date.
3. Park Impact Fee: A park impact fee of $10,990 per unit is due upon development of the site.
Credit in the amount of $10,990 will be given for the existing single-family residence. Prior
to recordation of the Final Parcel Map, 75% of this fee is due. The remaining 25% is due
prior to issuance of a certificate of building occupancy.
4. Property Maintenance: The property is to be maintained free of any combustible trash,
debris, and weeds until the time that actual construction commences. All existing structures
shall be secured by having windows boarded up and doors sealed shut, or be demolished or
removed from the property (Section 11.201 and 11.414,1985 Ed. Uniform Fire Code.)
PUBLIC WORKS DEPARTMENT
5. Parcel Map: Prior to the issuance of any building permits for the project, the applicant shall
submit a Parcel Map for recordation upon approval by the City. The current plan check fee
is $1,215 plus $25 per parcel.
Planning Commission Reso. __.tOn No. 3426
PLN2001-141 - 1274 Walnut Drive -- Tentative Parcel Map - Three Lots
Page 3
6. Preliminary Title Report: Prior to the recordation of the Parcel Map, the applicant shall
provide a current Preliminary Title Report.
7. Public Service Easement: Upon recordation of the Final Parcel Map, the applicant shall
grant a lO-foot Public Service Easement on private property contiguous with the public
right-of-way along Walnut Drive frontage. The applicant shall cause all documents to be
prepared by a registered civil engineer/land surveyor, as necessary, for the City's review and
recordation.
8. Monumentation for Parcel Map: Prior to the recordation of the Parcel Map, the applicant
shall provide security for setting all monuments shown on the map.
9. Storm Drain Area Fee: Prior to the recordation of the Parcel Map, the applicant shall pay
the required storm drain area fee which is $2,000 per acre.
10. Demolition: Prior to the recordation of the Final Parcel Map, the applicant shall obtain a
Demolition Permit from the Building Division to remove any nonconforming structures
PASSED AND ADOPTED this 23rd day of April, 2002, by the following roll call vote:
AYES:
Commissioners:
Alderete, Doorley, Francois, Gibbons, Hernandez, Jones
and Leonard
None
None
None
NOES:
ABSENT:
ABSTAIN:
Commissioners:
Commissi oners:
Commissioners:
APPROVED:
Tom Francois, Chair
ATTEST:
Sharon Fierro, Secretary
RESOLUTION NO. 3427
BEING A RESOLUTION OF THE PLANNING COMMISSION OF
THE CITY OF CAMPBELL GRANTING A SITE AND
ARCHITECTURAL REVIEW PERMIT (PLN2001-142) TO ALLOW
THE CONSTRUCTION OF THREE NEW SINGLE-FAMILY
RESIDENCES ON PROPERTY OWNED BY MR. FRED NOURZAD
AT 1274 WALNUT DRIVE IN AN R-l-lO (SINGLE FAMILY
RESIDENTIAL) ZONING DISTRICT. APPLICATION OF MR.
OMID SHAKERI, ON BEHALF OF THE RIDGECREST GROUP.
FILE NO. PLN2001-142.
After notification and public hearing, as specified by law, and after presentation by the
Community Development Director, proponents and opponents, the hearing was closed.
After due consideration of all evidence presented, the Planning Commission did find as follows
with respect to application PLN2001-142:
1. The proposed residential project is consistent with the R-l-lO (Single-Family Residential,
10,000 square foot minimum lot size) Zoning District, as required per the Zoning Ordinance
and the San Tomas Area Neighborhood Plan.
2. The proposed project has a density range between 2.7 and 2.9 units per gross acre, which is
consistent with the General Plan land use designation of Low Density Residential (less than
3.5 units per gross acre).
3. The proposed project is well designed and is architecturally compatible with the surrounding
neighborhood.
4. The project provides 16 on-site parking spaces, where 6 spaces are required.
5. The proposed homes have a front yard setback between 25 feet 6 inches and 35 feet 6 inches,
to emulate the existing varied block pattern, and large rear yard setbacks between 48 feet 5
inches and 58 feet 5 inches.
6. The proposed project will contribute to the housing stock in the City of Campbell and serve
the housing needs of the community.
7. The proposed project is consistent with the San Tomas Area Neighborhood Plan.
8. The proposed project is surrounded by other residential uses to the north, south, and west and
a commercial office building to the east.
9. The project qualifies as a Categorically Exempt project per Section 15303, Class 3 (New
Construction or Conversion of Small Structures) of the California Environmental Quality Act
(CEQA).
'Planning Commission Reso....âon No. 3427
PLN2001-142 - 1274 Walnut Drive
Site and Architectural Review Permit - Three New Single-Family Residences
Page 2
Based upon the foregoing findings of fact, the Planning Commission further finds and concludes
that:
1. The proposed project is consistent with the General Plan and Zoning Ordinance.
2. The proposed project, as conditioned, will aid in the harmonious development of the
immediate area.
3. There is a reasonable relationship between the use of the fees imposed upon the project and
the type of development project.
4. No substantial evidence has been presented from which a reasonable argument could be
made that shows that the project, as currently presented and subject to the required
Conditions of Approval, will have a significant adverse impact on the environment.
5. There is a reasonable relationship and a rough proportionality between the Conditions of
Approval and the impacts of the project.
NOW, THEREFORE, BE IT RESOLVED that the Planning Commission approves a Site and
Architectural Review Permit (PLN2001-142) to allow the construction of three new single-
family residences on property owned by Mr. Fred Nourzad at 1274 Walnut Drive, subject to the
following conditions:
Where approval by the Director of Community Development, City Engineer, Public Works
Director, City Attorney or Fire Department is required, that review shall be for compliance with
all applicable conditions of approval, adopted policies and guidelines, ordinances, laws and
regulations and accepted engineering practices for the item under review. Additionally, the
applicant is hereby notified that he/she is required to comply with all applicable Codes or
Ordinances of the City of Campbell and the State of California that pertain to this development
and are not herein specified.
COMMUNITY DEVELOPMENT DEPARTMENT
Plannin2 Division
1. Approved Permit: Approval is granted for a Site and Architectural Review Permit to
construct three new single-family homes on property located at 1274 Walnut Drive. The
project shall substantially conform to the project exhibits listed below, except as may be
modified by the Conditions of Approval contained herein:
a. Project plans prepared by Memarie Associates Inc. and received by the Planning
Division on April 16, 2002, including a site plan, floor plans, roof plans, and elevations.
b. Color samples and roof samples received by the Planning Division on April 18, 2002.
'Planning Commission Reso._<lOn No. 3427
PLN2001-142 - 1274 Walnut Drive
Site and Architectural Review Permit - Three New Single-Family Residences
Page 3
2. Approval Expiration: The Site and Architectural Review Permit approval shall be valid for a
period of one year from the date of final approval. Within this one-year period, a building
permit must be obtained and construction completed one year thereafter or the Site and
Architectural Review Permit shall be void.
3. Park Impact Fee: A park impact fee of $10,990 per unit is due upon development of the site.
Credit in the amount of $10,990 will be given for the existing single-family residence. Prior
to recordation of the Final Parcel Map, 75% of this fee is due. The remaining 25% is due
prior to issuance of a certificate of building occupancy.
4. Property Maintenance: The property is to be maintained free of any combustible trash,
debris, and weeds until the time that actual construction commences. Any vacant existing
structures shall be secured, by having windows boarded up and doors sealed shut, or be
demolished or removed from the property (Section 11.201 and 11.414, 1985 Ed. Uniform
Fire Code).
5. Final Parcel Map: The Site and Architectural Review Permit approval is contingent upon
recordation of the Final Parcel Map to divide the subject property. The Final Parcel Map
shall be recorded prior to the issuance of building permits.
6. Parking and Driveways:
a) All parking and driveway areas shall be developed in compliance with the standards in
Chapter 21.50 of the Campbell Municipal Code.
H.
b) The applicant shall provide decorative pavement within the driveways and walkways.
The design and materials used for the decorative pavement shall be reviewed and
approved by the Community Development Director prior to the issuance of building
permi ts.
c) The applicant shall re-configure the driveway on Lot 1 to allow the retention of the 14-
inch diameter Oak tree along the right side of the driveway. The revised configuration
shall be reviewed and approved by the Community Development Director prior to the
issuance of building permits.
7. Fences: Fencing along the property lines shall be replaced at the expense of the applicant,
unless it is determined to be in good condition by the Community Development Director.
Any newly proposed fencing shall comply with Section 21.59.090 of the Campbell
Municipal Code.
8. Utility Boxes and Back-Flow Preventers: The applicant shall submit a plan to the Planning
Division prior to installation of PG&E utility (transformer) boxes and San Jose Water
Company back-flow pre venters , indicating the location of the boxes and screening (if the
boxes are above ground) for review and approval by the Community Development Director.
Planning Commission Reso.__.ton No. 3427
PLN2001-142 - 1274 Walnut Drive
Site and Architectural Review Permit - Three New Single-Family Residences
Page 4
9. Contractor Contact Information Posting: The project site shall be posted with the name and
contact number of the lead contractor in a location visible from the public street prior to the
issuance of building permits.
10. Building Elevations Details: The applicant shall submit detailed building elevations
depicting architectural details. Detailed elevations shall be reviewed and approved by the
Community Development Direcwr prior to the issuance of building permits and shall include
the following:
a) Provision of building elevations and details illustrating architectural features such as
porches and railings, window boxes, veneers, tile, or brick details.
b) Composition roof materials shall be 40-year quality.
c) Windows shall have significant insets (4-inches minimum) to create shadow lines and
shall be detailed with trim and sill details. The applicant shall submit elevations with
window schedules depicting high quality windows.
d) Garage doors shall have automatic opening devices and shall have decorative features
such as windows and panels.
e) Architectural details shall be carried throughout all four elevations of the homes.
11. Elevation Detail: The applicant shall indicate on the building plan submittal a brick veneer
detail along the base of the front elevation on the residence on Parcel 2. The plan shall be
reviewed and approved by the Community Development Director prior to the issuance of
building permits.
12. Landscaping: The applicant shall submit four sets of a landscape and irrigation plan
indicating type and size of plant material and details regarding the automatic irrigation
system to the Planning Division for review and approval by the Community Development
Director prior to the issuance of building permits and shall include:
a) Three 24-inch box replacement trees for the three protected trees removed.
b) A minimum of one tree per each 2,000 square feet of net lot area, as required by the
STANP.
c) A combination of trees, shrubs, and groundcover to effectively landscape the front yard
and side yard areas.
d) Landscape and irrigation plans shall be consistent with the City's Water Efficient
Landscaping Standards (WELS).
13. Tree Protection Plan: The applicant shall submit a tree protection plan in accordance with
the City's Water Efficient Landscape Standards (WELS) for all protected trees to be retained
Planning Commission Reso. _ton No. 3427
PLN2001-142 - 1274 Walnut Drive
Site and Architectural Review Permit - Three New Single-Family Residences
Page 5
on site, and shall contain specific information about the preservation of the trees during any
grading or building on site. The tree protection plan shall be submitted to the Planning
Division for review and approval by the Community Development Director prior to the
issuance of building permits.
14. On-site lighting: On-site lighting shall be shielded away from adjacent properties and
directed on site. The design and type of lighting fixtures and lighting intensity of any
proposed exterioí lighting for the project shall be reviewed and approved by the Community
Development Director prior to installation of the lighting for compliance with all applicable
Conditions of Approval, ordinances, laws and regulations. Lighting fixtures shall be of a
decorative design to be compatible with the residential development and shall incorporate
energy saving features.
15. Construction Mitigation Measures: The applicant shall implement the following construction
mitigation measures:
a) Construction activities will be limited to daytime hours of 8:00 am to 5:00 p.m.
weekdays and 9:00 a.m. to 4:00 p.m. Saturdays. Construction is prohibited on Sundays
and Holidays, unless an exception is granted by the Building Official.
b) No pile driving is allowed for construction of the project.
c) All internal combustion engines for construction equipment used on the site will be
properly muffled and maintained.
d) All stationary noise generating construction equipment, such as air compressors and
portable power generator, will be located as far as practical from the existing residences
and businesses.
e) All active construction areas shall be watered at least twice daily.
f) Cover all trucks hauling soil and other loose materials stationed or prior to leaving the
site.
g) Pave, apply water, or apply non-toxic soil stabilizers on all unpaved surfaces, and
staging areas at the construction site.
Buildin2 Division
16. Permits Required: A building permit application shall be required for each proposed new structure.
The building permit shall include Electrical/PlumbinglMechanical fees when such work is part of the
permit.
· Planning Commission Resc ~_âon No. 3427
PLN2001-142 - 1274 Walnut Drive
Site and Architectural Review Pennit - Three New Single-Family Residences
Page 6
17. Construction Plans: The Conditions of Approval shall be stated in full on the cover sheet of
construction plans submitted for building permit. Each detached structure shall be submitted
separately.
18. Size of Plans: The minimum size of construction plans submitted for building permits shall
be 24 inches by 36 inches.
19. Plan Preparation: This project requires plans prepared under the direction and oversight of a
California licensed Engineer or Architect. Plans submitted for building permits shall be "wet
stamped" and signed by the qualifying professional person.
20. Soils Report: Two copies of a current soils report, prepared to the satisfaction of the Building
Official, containing foundation and retaining wall design recommendations shall be
submitted with the building permit application. This report shall be prepared by a licensed
engineer specializing in soils mechanics.
21. Site Plan: Application for building permit shall include a competent site plan that identifies property
and proposed structures with dimensions and elevations as appropriate. Site plan shall also include
site drainage details.
22. Foundation Inspections: A pad certificate prepared by a licensed civil engineer or land
surveyor shall be submitted to the project building inspector upon foundation inspection.
This certificate shall certify compliance with the recommendations as specified in the soils
report and the building pad elevation and on-site retaining wall locations and elevations are
prepared according to approved plans. Horizontal and vertical controls shall be set and
certified by a licensed surveyor or registered civil engineer for the following items:
a) pad elevation.
b) finished floor elevation (first floor).
c) foundation comer locations.
23. Title 24 Energv Compliance: California Title 24 Energy Compliance forms CF-IR and MF-IR shall
be blue-lined on the construction plans. 8Yí X 11 calculations shall be submitted as well.
24. Special Inspections: When a special inspection is required by UB.c. Section 1701, the
architect or engineer of record shall prepare an inspection program that shall be submitted to
the Building Official for approval prior to issuance of the building permits, in accordance
with U.B.C Section 106.3.5. Please obtain City of Campbell, Special Inspection forms from
the Building Inspection Division Counter.
25. Water Pollution Prevention: The City of Campbell, standard Santa Clara Valley Non-point
Source Pollution Control Program specification sheet shall be part of plan submittal. The
specification sheet (size 24" X 36") is available at the Building Division service counter.
Planning Commission Res'- jon No. 3427
PLN2001-142 - 1274 Walnut Drive
Site and Architectural Review Permit - Three New Single-Family Residences
Page 7
26. Approvals Required: The project requires the following agency approval prior to issuance of
the building permit:
a) West Valley Sanitation District (378-2407)
b) Santa Clara County Fire Department (378-4010)
c) Bay Area Air Quality Management District (Demolitions Only)
d) School District:
· Campbell Union School District (378-3405)
· Campbell Union High School District (371-0960)
· Moreland School District (379-1370)
· Cambrian School District (377-2103)
Note: To Determine your district, contact the offices identified above. Obtain the School
District payment form from the City Building Division, after the Division has approved
the building permit application.
27. Water Pollution Prevention: The City of Campbell, standard Santa Clara Valley Non-point
Source Pollution Control Program specification sheet shall be part of plan submittal. The
specification sheet (size 24" X 36") is available at the Building Division service counter.
PUBLIC WORKS DEPARTMENT
28. Street Improvements: Prior to issuance of any grading or building permits for the site, the
applicant shall execute a Street Improvement Agreement and shall cause plans for public
Street Improvements to be prepared by a registered civil engineer, pay various fees and
deposits, post security and provide insurance necessary to obtain an encroachment permit for
construction of the standard public street improvements, as required by the City Engineer.
The fee for a non-utility encroachment permit application is currently $255.00. The plans
shall include the following:
a) Installation of storm drain improvements on Walnut Drive as determined by the City
Engineer.
b) Construction of conforms to existing public and private improvements, as necessary.
29. Work in the Public Right-of-Way: Prior to doing any work in the public Right-of-Way, the
applicant shall obtain an encroachment permit, provide plans, pay fees and deposits, post
security, and provide insurance.
-Planning Commission Resol .. .ion No. 3427
PLN2001-142 - 1274 Walnut Drive
Site and Architectural Review Permit - Three New Single-Family Residences
Page 8
30. Water Meter(s) and Sewer Cleanout(s): Existing and proposed Water Meter(s) and Sewer
Cleanout(s) shall be installed on private property behind the public right-of-way line.
31. Soils Report: Prior to issuance of any grading or building permits for the site, the applicant
shall provide a Soils Report prepared by a registered geotechnical or civil engineer.
32. Utilities: All new on-site utilities shall be installed underground per Section 20.36.150 of the
Campbell Municipal Code for any new or remodeled buildings or additions. Applicant shall
comply with all plan submittals, permitting, and fee requirements of the serving utility
companIes.
33. Utility Installation Plan: Prior to issuance of building permits for the site, the applicant shall
submit a Utility Installation Coordination Plan and Schedule for approval by the City
Engineer for installation of street improvements and/or abandonment of all utilities. Streets,
which have been resurfaced within the previous five years, will require boring and jacking
for all new utility installations. Applicant shall also prepare pavement restoration plans for
approval by the City Engineer prior to any utility installation or abandonment.
34. Grading and Drainage Plan: Prior to issuance of any grading or building permits for the site,
the applicant shall conduct hydrology studies based on a 10 year storm frequency, prepare an
engineered Grading and Drainage Plan, and pay fees required to obtain necessary grading
permits. The plans shall comply with the 1998 edition of the California Building Code
including Chapters 10, 11, 18,33, and Appendix Chapter 33.
35. Storm Water Pollution Prevention Measures: Prior to issuance of any grading or building
permits, the applicant shall comply with the National Pollution Discharge Elimination
System (NPDES) permitting requirements and the California Storm Water Best Management
Practices Handbook prepared by the Storm Water Quality Task Force, Santa Clara Valley
Water District and the City of Campbell Municipal Code regarding Storm Water Pollution
Prevention. The City will provide the applicant with information to assist in complying with
this Condition of Approval. The primary objective is to improve the quality and reduce the
quantity of storm water runoff to the Bay.
PASSED AND ADOPTED this 23rd day of April, 2002, by the following roll call vote:
AYES:
Commissioners:
Alderete, Doorley, Francois, Gibbons, Hernandez, Jones
and Leonard
None
None
None
NOES:
ABSENT:
ABSTAIN:
Commissioners:
Commissioners:
Commissioners:
APPROVED:
ATTEST:
Tom Francois, Chair
Sharon Fierro, Secretary
RESOLUTION NO. 3428
BEING A RESOLUTION OF THE PLANNING COMMISSION OF
THE CITY OF CAMPBELL GRANTING A TREE REMOVAL
PERMIT (PLN2002-01) TO ALLOW THE REMOVAL OF THREE
WALNUT TREES, RANGING IN SIZE FROM 12 TO 17 INCHES IN
DIAMETER, ON PROPERTY OWNED BY MR. FRED NOURZAD
AT 1274 WALNUT DRIVE IN AN R-I-lO (SINGLE FAMILY
RESIDENTIAL) ZONING DISTRICT. APPLICATION OF MR.
OMID SHAKERI, ON BEHALF OF THE RIDGECREST GROUP.
FILE NO. PLN2002-01.
After notification and public hearing, as specified by law, and after presentation by the
Community Development Director, proponents and opponents, the hearing was closed.
After due consideration of all evidence presented, the Planning Commission did find as follows
with respect to application PLN2002-0 1:
1. The proposed Tree Removal Permit is consistent with the R-l-lO (Single-Family Residential,
10,000 square foot minimum lot size) Zoning District and the Low Density Residential (less
than 3.5 units per gross acre) General Plan Designation.
2. The proposed tree replacement requirement of three 24-inch box size trees is consistent with
the requirements of the Tree Protection Ordinance.
3. The proposed replacement trees will be a sufficient replacement for the trees to be removed
and will continue the diversity of tree species found in the community.
4. The Walnut trees have been determined to have structural decay according to an I.S.A.
Certified Arborist.
Based upon the foregoing findings of fact, the Planning Commission further finds and concludes
that:
1. The retention of the three Walnut trees restricts the economic enjoyment of the property or
creates an unusual hardship for the property owner by severely limiting the use of the
property in a manner not typically experienced by owners of similarly zoned and situated
properties and the applicant has demonstrated, to the satisfaction of the Planning
Commission, that there are no reasonable alternatives to preserve the trees.
2. The three Walnut trees are irreparably diseased and the applicant has demonstrated, to the
satisfaction of the Planning Commission, that this cannot be controlled or remedied through
reasonable preservation and/or preventative procedures and practices such that the public
health and safety requires its removal.
3. There is a reasonable relationship and a rough proportionality between the Conditions of
Approval and the impacts of the project.
· Planning Commission ReSl jon No. 3428
PLN2002-01 - 1274 Walnut Drive -- Tree Removal Permit
Page 2
NOW, THEREFORE, BE IT RESOLVED that the Planning Commission grants a Tree Removal
Permit (PLN2002-0 1) to allow the removal of three walnut trees, ranging is size from 12 to 17
inches in diameter on property owned by Mr. Fred Nourzad at 1274 Walnut Drive, subject to
the following conditions:
Where approval by the Director of Community Development, City Engineer, Public Works
Director, City Attorney or Fire Department is required, that review shall be for compliance with
all applicable conditions of approval, adopted policies and guidelines, ordinances, laws and
regulations and accepted enginee~ng practices for the item under review. Additionally, the
applicant is hereby notified that he/she is required to comply with all applicable Codes or
Ordinances of the City of Campbell and the State of California that pertain to this development
and are not herein specified.
COMMUNITY DEVELOPMENT DEPARTMENT
Planning Division
1. Approved Permit: Approval is granted for a Tree Removal Permit to allow the removal of
three Walnut trees, ranging in size from 12 inches to 17 inches in diameter, on property
located at 1274 Walnut Drive. This permit shall only be valid in conjunction with the
approved Site and Architectural Review Permit (PLN2001-142).
2. Replacement Trees: Three 24-inch box size trees shall be required as replacement for the
three protected Walnut trees to be removed. The location and species of these trees shall be
shown on the detailed landscape and irrigation plans that shall be submitted to the Planning
Division for review and approval by the Community Development Director, prior to the
issuance of building permits. The proposed replacement trees shall continue the diversity of
tree species found in the community and shall be a species listed in the City's Water Efficient
Landscaping Standards (WELS).
PASSED AND ADOPTED this 23rd day of April, 2002, by the following roll call vote:
AYES:
Commissioners:
Alderete, Doorley, Francois, Gibbons, Hernandez, Jones
and Leonard
None
None
None
NOES:
ABSENT:
ABSTAIN:
Commissioners:
Commissioners:
Commissioners:
APPROVED:
Tom Francois, Chair
A TrEST:
Sharon Fierro, Secretary
ITEM NO.4
..\.~.o'<. . CA-'I1,.o<9
!::: ~
v r-
o 0
.- >.
~'" r...~
. O~CH "Ill>'
ST AFF REPORT - PLANNING COMMISSION MEETING OF
APRIL 23, 2002
Shakeri, O.
Public Hearing to consider the applications of Mr. Omid Shakeri, on behalf
of The Ridgecrest Group, to allow the following on property located at 1274
Walnut Drive in an R-I-I0 (Single-Family Residential) Zoning District:
a) A Tentative Parcel Map (PLN2001-141) to allow the creation of three
lots;
b) A Site and Architectural Review Permit (PLN2001-142) to allow the
construction of three new single-family residences; and
c) A Tree Removal Permit (PLN2002-01) to allow the removal of four
Walnut trees, ranging in size from 12 inches to 17 inches in diameter.
PLN2001-141
PLN2001-142
PLN2002-01
STAFF RECOMMENDATION
That the Planning Commission take the following actions:
1. Adopt a Resolution, incorporating the attached findings, approving a Tentative Parcel Map
(PLN2001-141) to allow the creation of three lots, subject to the attached Conditions of
Approval.
2. Adopt a Resolution incorporating the attached findings, approving a Site and Architectural
Review Permit (PLN2001-142) to allow the construction of three new single-family
residences, subject to the attached Conditions of Approval.
3. Adopt a Resolution incorporating the attached findings, approving a Tree Removal Permit
(PLN2002-01) to allow the removal of four Walnut trees, ranging in size from 12 inches to
17 inches in diameter, subject to the attached Conditions of Approval.
ENVIRONMENT AL DETERMINATION
This project is Categorically Exempt under Section 15303, Class 3, of the California
Environmental Quality Act (CEQA) pertaining to the construction of three single-family
residences in an urbanized area and Section 15315, Class 15, of the California Environmental
Quality Act (CEQA) pertaining to the division of property in urbanized areas into four or fewer
parcels when the division is in conformance with the City's General Plan and Zoning Code;
therefore, no environmental action is required.
PROJECT DATA
Cate or
Gross Lot Area:
Net Lot Area:
Lot Width:
Densi t :
Pro osed - Parcel 1
14,738.5 s . ft. (.34 acres)
12,211.9 s . f1. (.28 acres)
84.22 feet
2.9 units/ ross acre
Re uired/ Allowed
N/A
10,000 s . ft.
80 feet minimum
Less than 3.5 units/ ross acre
Staff Report - Planning Commission Meeting of April 23, 2002
PLN2001-141/142 & PLN2002-01 - 1274 Walnut Drive
Page 2 of 6
Cate or
Pro osed Residence:
1 st Floor:
2n Floor:
Gara e:
Total Unit Area:
Porch Area:
Buildin Covera e:
Floor Area Ratio:
Parkin :
Buildin Hei ht:
Pro osed - Parcell
Re uired/ Allowed
1,992.7 s uare feet
1,560.8 s uare feet
717.2 s uare feet
4,270.7 s uare feet
130.2 s uare feet
2,840.1 s uare feet (23%)
4,270.7 s uare feet (35%)
3 covered, 2 uncovered
26 feet, 8 inches
N/A
N/A
200 s uare feet minimum
N/A
N/A
35% maximum
45% maximum
1 covered, 1 uncovered
28 feet maximum
CateQ:orv Pronosed - Parcel 2 Reouired! Allowed
Gross Lot Area: 15,741.25 sq. f1. (.36 acres) N/A
Net Lot Area: 13,042.75 sq. ft. (.30 acres) 10,000 sq. ft.
Lot Width: 89.95 feet 80 feet minimum
Density: 2.7 units/gross acre Less than 3.5 units/gross acre
Proposed Residence:
1 st Floor: 2,160.2 square feet N/A
2nd Floor: 1,500.1 square feet N/A
Garage: 660.4 square feet 200 square feet minimum
Total Unit Area: 4,320.7 square feet N/A
Porch Area: 387 square feet N/A
Building Coverage: 3,207.6 square feet (25%) 35% maximum
Floor Area Ratio: 4,320.7 square feet (33%) 45% maximum
Parking: 3 covered, 3 uncovered 1 covered, 1 uncovered
Building Height: 26 feet, 4 inches 28 feet maximum
CateQ:orv ProDosed - Parcel 3 Reouired/ Allowed
Gross Lot Area: 15,239 Sq. ft. (.35 acres) N/A
Net Lot Area: 12,626.6 sq. ft. (.29 acres) 10,000 sq. ft.
Lot Width: 87.08 feet 80 feet minimum
Density: 2.9 units/gross acre Less than 3.5 units/gross acre
Proposed Residence:
1 st Floor: 1,992.7 square feet N/A
2nd Floor: 1,560.8 square feet N/A
Garage: 717.2 square feet 200 square feet minimum
Total Unit Area: 4,270.7 square feet N/A
Porch Area: 130.2 square feet N/A
Building Coverage: 2,840.1 square feet (22%) 35% maximum
Floor Area Ratio: 4,270.7 square feet (34%) 45% maximum
Parking: 3 covered, 2 uncovered 1 covered, 1 uncovered
Building Height: 26 feet, 8 inches 28 feet maximum
Staff Report - Planning Commission Meeting of April 23, 2002
PLN2001-1411142 & PLN2002-01 - 1274 Walnut Drive
Page 3 of 6
DISCUSSION
Applicant's Proposal: The applicant is requesting approval of a Tentative Parcel Map
(PLN2001-141) to allow the creation of three lots, a Site and Architectural Review Permit
(PLN2001-142) to allow the construction of three new single-family residences, and a Tree
Removal Permit (PLN2002-01) to allow the removal of four Walnut trees, ranging in size from
12 inches to 17 inches in diameter, on property located at 1274 Walnut Drive.
The subject property is located on the east side of Walnut Drive, directly across from Wendell
Drive. Single-family residences surround the subject property on three sides and a commercial
office building is located to the east.
Background: Historically the project site was a fruit orchard and is currently developed with a
single-family home and in-ground swimming pool. Many of the old orchard trees remain on site
as well as some new trees such as Palm trees and Oak trees. The home would be demolished for
this project and the swimming pool is proposed to remain and be incorporated into the new
development on Parcel 2.
The project was continued from the January 22, 2002 Planning Commission meeting to allow
time for the applicant to revise the project plans to incorporate suggestions from the Planning
Commission and neighborhood. These suggestions included reducing the mass of the second
story, varying the lot sizes, varying the front yard setbacks, preserving the Oak tree along the
southern property line, and replacing the three-car garages with two-car garages or three-car
detached garages. The plans have been revised to provide a less massive second story, varied lot
sizes, varied front setbacks to emulate the existing varied block pattern, the preservation of the
Oak tree along the southern property line, and the replacement of the three-car garage doors
facing the street with two (2) three-car tandem garages with two-car garage doors and one (1)
three-car side-loading garage.
ANAL YSIS
General Plan Designation: The General Plan land use designation for the project site is Low
Density Residential (less than 3.5 units per gross acre). The proposed project has a density range
between 2.7 and 2.9 units per gross acre, which is within the density range allowed for the site.
The proposed project complies with the following General Plan Land Use Element policies and
strategies:
Strategy LUT-5.2a: Neighborhood Compatibility: Promote new residential
development and substantial additions that are designed to maintain and support
the existing character and development pattern of the surrounding neighborhood,
especially in historic neighborhoods with consistent design characteristics.
Strategy LUT-7.2n: Consistency with Plans: Ensure that new development and
substantial remodeling projects are consistent with Specific Plans, Area Plans,
City Standard Details, and adopted Streetscape Standards to create cohesive
design.
Staff Report - Planning Commission Meeting of April 23, 2002
PLN2001-1411142 & PLN2002-01 - 1274 Walnut Drive
Page 4 of 6
Policy LUT-9.3: Design and Planning Compatibility: Promote high quality,
creative design and site planning that is compatible with surrounding
development, public spaces and natural resources.
Strategy LUT-9.3e: Building Materials: Encourage the use of long-lasting, high
quality building materials on all buildings to ensure the long-term quality of the
built environment.
The project site is located in the San Tomas Neighborhood and is subject to the San Tomas Area
Neighborhood Plan (ST ANP). Staff finds that the proposal is consistent with the development
standards and design guidelines of the ST ANP.
Zoning Designation: The zoning designation for the project site is R-I-I0 (Single-Family
Residential, 10,000 square foot minimum lot size). The proposed project is consistent with this
zoning designation and meets the minimum lot size, lot width, setbacks, height, building
coverage, floor area ratio, and parking requirements of the R-I-lO Zoning District.
Subdivision Design: The proposed Tentative Parcel Map divides the existing 37,881.25 square
foot lot into three individual lots. The proposed Tentative Parcel Map indicates Parcel 1 is
12,211.9 square feet with a lot width of 84.22 feet, Parcel 2 is 13,042.75 square feet with a lot
width of 89.95 feet, and Parcel 3 is 12,626.6 square feet with a lot width of 87.08 feet. All three
lots would take access from Walnut Drive.
All three lots meet the subdivision requirements which require a minimum lot size of 10,000
square feet and minimum lot width of 80 feet.
Street Improvements: The project site does not have standard street improvements (curb, gutter
or sidewalks) and none are required/allowed by the STANP along Walnut Drive.
Site Plan: The site plan proposes the construction of three single-family residences, each on
individual lots. The proposed residences have varied front yard setbacks between 25 feet 6
inches and 35 feet 6 inches, to emulate the existing varied block pattern, and large rear yard
setbacks between 48 feet 5 inches and 58 feet 5 inches. The decoratively paved driveways
bottleneck down from the garage entrance to the street to reduce the amount of impervious
surface on site and allow for more landscaping. The proposed garages on Parcel 1 and Parcel 3
are three-car tandem garages with a two-car garage door that faces the street and the proposed
garage on Parcel 2 is a three-car side-loading garage.
Architecture: The proposed residences each have a distinctive design and well-articulated
features. All three residences have varied exterior elevations which incorporate different
rooflines, front entry treatments, window styles, window trim treatments, and exterior materials
and colors. The applicant uses a one and a half story design with dormers to minimize the
perceived scale and mass of the residences and uses three-car tandem garages and one side-
loading, three-car garage to limit the dominance of the garage on the front elevation.
Staff Report - Planning Commission Meeting of April 23, 2002
PLN2001-141/142 & PLN2002-01 - 1274 Walnut Drive
Page 5 of 6
The proposed home on Parcel 1 has exterior horizontal wood siding, a front porch with
decorative columns and railings, and a gabled front entry feature with double doors. The
proposed home on Parcel 2 has exterior stucco siding, a large front porch with decorative
railings, and a hipped front entry feature with double doors. The proposed residence for Parcel 3
has exterior horizontal wood siding, a front porch with decorative railings, a rolled roof entry
feature, and large arched divided windows.
The applicant proposes a different color scheme for each home comprised of contrasting natural
toned body and trim colors with a different accent color for the door. Composition shingle
roofing will be used for all three homes, each roof different in various shades of dark gray and
dark brown.
Staff finds that the proposed design is well articulated and meets the development standards and
design guidelines set forth in the ST ANP.
LandscapinglTrees: Pursuant to the ST ANP, the applicant is required to provide a total of seven
trees on each lot - one tree per 2,000 square feet of net lot area. The Conditions of Approval
require that the applicant submit a landscape plan indicating the required trees on site and the
effective landscaping of the front and side yard areas.
The applicant is proposing to remove four trees that are protected under the City's Tree
Protection Ordinance. Four Walnut trees, varying in size from 12 inches to 17 inches in
diameter, are proposed to be removed to accommodate the new residences and driveways. An
arborist report was prepared by Blair Glenn, an LS.A. Certified Arborist from Saratoga Tree
Service, and it was concluded that the Walnut trees proposed for removal suffer from structural
decay.
The Conditions of Approval require that the applicant submit a landscape plan that shows the
required replacement trees. The Conditions of Approval also require that the applicant submit a
tree protection plan, in accordance with the City's Water Efficient Landscape Standards
(WELS), for any protected trees to be retained on site.
Neighborhood Meeting: A neighborhood meeting was held on March 28, 2002 which included
Planning Staff, the applicant, and many people from the neighborhood. The neighbors that
attended the meeting expressed contentment with the revised plans and acknowledged that the
applicant had made many changes in order to incorporate the neighbors concerns.
Site and Architectural Review Committee: The Site and Architectural Review Committee
reviewed this project at its meeting of April 9, 2002. The Committee was supportive of the
project as proposed with a recommendation that the applicant consider a change in the pitch of
the roof on the entry feature and dormer on the residence on Parcel 1 and that the windows
facing the existing neighbors homes on Parcell and Parcel 3 be revised to reduce the privacy
impacts. The applicant has revised the plans since the SARC meeting to address these issues.
Staff Report - Planning Commission Meeting of April 23, 2002
PLN2001-1411l42 & PLN2002-01 - 1274 Walnut Drive
Page 6 of 6
Attachments:
1. Findings Recommending Approval ofPLN2001-141 (Tentative Parcel Map)
2. Findings Recommending Approval ofPLN2001-142 (Site and Architectural Review Pennit)
3. Findings Recommending Approval of PLN2002-01 (Tree Removal Permit)
4. Recommended Conditions of Approval for PLN2001-141 (Tentative Parcel Map)
5. Recommended Conditions of Approval for PLN2001-142 (Site and Architectural Review
Pennit)
6. Recommended Conditions of Approval for PLN2002-01 (Tree Removal Permit)
7. Site Plan, Floor Plans, Roof Plans, and Elevations
8. Tentative Parcel Map and Preliminary Grading Plan
9. Arborist Report
10. Planning Commission Meeting Minutes from January 22,2002
11. Location Map
Prepared by:
~~
Stephanie Willsey, Planner I
Approved by:
Ge~~~
~
Attachment #1
FINDINGS RECOMMENDING APPROVAL OF FILE NO PLN2001-141
(TENT A TIVE PARCEL MAP)
SITE ADDRESS:
APPLICANT:
P.C. MEETING:
1274 Walnut Drive
Omid Shakeri, on behalf of The Ridgecrest Group
April 23, 2002
Findings for the Planning Commission to approve a Tentative Parcel Map to allow the creation
of three lots at 1274 Walnut Drive.
The Planning Commission finds as follows with regard to File No. PLN2001-141:
1. The proposed project has a density range between 2.7 and 2.9 units per gross acre, which is
consistent with the General Plan land use designation of Low Density Residential (less than
3.5 units per gross acre).
2. The proposed map is consistent with the development standards (including lot size and
minimum lot width) of the R-l-lO Zoning District and the San Tomas Area Neighborhood
Plan (ST ANP).
3. The proposed subdivision layout allows for access to sunlight.
4. Each new lot created has adequate access to a public right-of-way.
5. The project qualifies as a Categorically Exempt project per Section 15315, Class 15 (Minor
Land Divisions) of the California Environmental Quality Act (CEQA).
Based upon the foregoing findings of fact, the Planning Commission further finds and concludes
that:
1. The proposed subdivision is consistent with the General Plan and the Zoning Ordinance.
2. The proposed Tentative Parcel Map does not impair the balance between the housing needs
of the region and the public service needs of its residents and available fiscal and
environmental resources.
3. The design of the Tentative Parcel Map provides, to the extent feasible, for future passive or
natural heating and cooling opportunities.
4. The proposed development will aid in the harmonious development of the immediate area.
5. There is a reasonable relationship and a rough proportionality between the Conditions of
Approval and the impacts of the project.
Attachment #1
Page 2 of 2
6. No substantial evidence has been presented from which a reasonable argument could be
made that shows that the project, as currently presented and subject to the required
Conditions of Approval, will have a significant adverse impact on the environment.
Attachment #2
FINDINGS RECOMMENDING APPROVAL OF FILE NO PLN2001-142
(SITE AND ARCHITECTURAL REVIEW PERMIT)
SITE ADDRESS:
APPLICANT:
P.C. MEETING:
1274 Walnut Drive
Omid Shakeri, on behalf of The Ridgecrest Group
April 23, 2002
Findings for the Planning Commission to approve a Site and Architectural Review Permit to
allow the construction of three new single-family residences at 1274 Walnut Drive.
The Planning Commission finds as follows with regard to File No. PLN2001-142:
1. The proposed residential project is consistent with the R-I-lO (Single-Family Residential,
10,000 square foot minimum lot size) Zoning District, as required per the Zoning
Ordinance and the San Tomas Area Neighborhood Plan.
2. The proposed project has a density range between 2.7 and 2.9 units per gross acre, which
is consistent with the General Plan land use designation of Low Density Residential (less
than 3.5 units per gross acre).
3. The proposed project is well designed and IS architecturally compatible with the
surrounding neighborhood.
4. The project provides 16 on-site parking spaces, where 6 spaces are required.
5. The proposed homes have a front yard setback between 25 feet 6 inches and 35 feet 6
inches, to emulate the existing varied block pattern, and large rear yard setbacks between
48 feet 5 inches and 58 feet 5 inches.
6. The proposed project will contribute to the housing stock in the City of Campbell and
serve the housing needs of the community.
7. The proposed project is consistent with the San Tomas Area Neighborhood Plan.
8. The proposed project is surrounded by other residential uses to the north, south, and west
and a commercial office building to the east.
9. The project qualifies as a Categorically Exempt project per Section 15303, Class 3 (New
Construction or Conversion of Small Structures) of the California Environmental Quality
Act (CEQA).
Based upon the foregoing findings of fact, the Planning Commission further finds and concludes
that:
1. The proposed project is consistent with the General Plan and Zoning Ordinance.
2. The proposed project, as conditioned, will aid in the harmonious development of the
immediate area.
Attachment #2
Page 2 of 2
3. There is a reasonable relationship between the use of the fees imposed upon the project and
the type of development project.
4. No substantial evidence has been presented from which a reasonable argument could be
made that shows that the project, as currently presented and subject to the required
Conditions of Approval, will have a significant adverse impact on the environment.
5. There is a reasonable relationship and a rough proportionality between the Conditions of
Approval and the impacts of the project.
Attachment #3
FINDINGS RECOMMENDING APPROVAL OF FILE NO PLN2002-01
(TREE REMOVAL PERMIT)
SITE ADDRESS:
APPLICANT:
P.c. MEETING:
1274 Walnut Drive
Omid Shakeri, on behalf of The Ridgecrest Group
April 23, 2002
Findings for the Planning Commission to approve a Tree Removal Permit to allow the removal
of three Walnut trees. ranging in size from 12 inches to 17 inches in diameter at 1274 Walnut
Drive.
The Planning Commission finds as follows with regard to File No. PLN2002-01:
1. The proposed Tree Removal Permit is consistent with the R-l-lO (Single-Family
Residential, 10,000 square foot minimum lot size) Zoning District and the Low Density
Residential (less than 3.5 units per gross acre) General Plan Designation.
2. The proposed tree replacement requirement of three 24-inch box size trees is consistent
with the requirements of the Tree Protection Ordinance.
3. The proposed replacement trees will be a sufficient replacement for the trees to be removed
and will continue the diversity of tree species found in the community.
4. The Walnut trees have been determined to have structural decay according to an I.S.A.
Certified Arborist.
Based upon the foregoing findings of fact, the Planning Commission further finds and concludes
that:
1. The retention of the three Walnut trees restricts the economic enjoyment of the property or
creates an unusual hardship for the property owner by severely limiting the use of the
property in a manner not typically experienced by owners of similarly zoned and situated
properties and the applicant has demonstrated, to the satisfaction of the Planning
Commission, that there are no reasonable alternatives to preserve the trees.
2. The three Walnut trees are irreparably diseased and the applicant has demonstrated, to the
satisfaction of the Planning Commission, that this cannot be controlled or remedied through
reasonable preservation and/or preventative procedures and practices such that the public
health and safety requires its removal.
3. There is a reasonable relationship and a rough proportionality between the Conditions of
Approval and the impacts of the project.
Attachment #4
RECOMMENDED CONDITIONS OF APPROVAL FOR FILE NO. PLN2001-141
(TENTATIVE PARCEL MAP)
SITE ADDRESS:
APPLICANT:
P.c. MEETING:
1274 Walnut Drive
Omid Shakeri, on behalf of The Ridgecrest Group
April 23, 2002
The applicant is hereby notified, as part of this application, that (s)he is required to meet the
following conditions in accordance with the ordinances of the City of Campbell and the State of
California. The lead department with which the applicant will work is identified on each
condition where necessary. Where approval by the Director of Community Development, City
Engineer, Public Works Director, City Attorney, or Fire Department is required, that review shall
be for compliance with all applicable conditions of approval, adopted policies and guidelines,
ordinances, laws and regulations, and accepted engineering practices, for the items under review.
Additionally, the applicant is hereby notified that (s)he is required to comply with all applicable
Codes or Ordinances of the City of Campbell and the State of California that pertain to this
development and are not herein specified:
COMMUNITY DEVELOPMENT DEPARTMENT
Planninl! Division
1. Approved Permit: Approval is granted for a Tentative Parcel Map to create three lots. The
Pinal Parcel Map shall substantially conform to the Tentative Parcel Map prepared by
Kirkeby Engineering and submitted to the Planning Division on March 28, 2002, except as
may be modified by the Conditions of Approval herein.
2. Approval Expiration: The Tentative Parcel Map approval is valid for a period of two years
from the date of approval unless an extension of approval is granted prior to the expiration
date.
3. Park Impact Fee: A park impact fee of $10,990 per unit is due upon development of the site.
Credit in the amount of $10,990 will be given for the existing single-family residence. Prior
to recordation of the Final Parcel Map, 75% of this fee is due. The remaining 25% is due
prior to issuance of a certificate of building occupancy.
4. Property Maintenance: The property is to be maintained free of any combustible trash,
debris, and weeds until the time that actual construction commences. All existing structures
shall be secured by having windows boarded up and doors sealed shut, or be demolished or
removed from the property (Section 11.201 and 11.414, 1985 Ed. Uniform Fire Code.)
PUBLIC WORKS DEPARTMENT
5. Parcel Map: Prior to the issuance of any building permits for the project, the applicant shall
submit a Parcel Map for recordation upon approval by the City. The current plan check fee
is $1,215 plus $25 per parcel.
Attachment #4
Page 2 of 2
6. Preliminary Title Report: Prior to the recordation of the Parcel Map, the applicant shall
provide a current Preliminary Title Report.
7. Public Service Easement: Upon recordation of the Pinal Parcel Map, the applicant shall
grant a lO-foot Public Service Easement on private property contiguous with the public
right-of-way along Walnut Drive frontage. The applicant shall cause all documents to be
prepared by a registered civil engineer/land surveyor, as necessary, for the City's review and
recordati on.
8. Monumentation for Parcel Map: Prior to the recordation of the Parcel Map, the applicant
shall provide security for setting all monuments shown on the map.
9. Storm Drain Area Fee: Prior to the recordation of the Parcel Map, the applicant shall pay
the required storm drain area fee which is $2,000 per acre.
10. Demolition: Prior to the recordation of the Final Parcel Map, the applicant shall obtain a
Demolition Permit from the Building Division to remove any nonconforming structures.
Attachment #5
RECOMMENDED CONDITIONS OF APPROVAL FOR FILE NO. PLN2001-142
(SITE AND ARCHITECTURAL REVIEW PERMIT)
SITE ADDRESS:
APPLICANT:
P.e. MEETING:
1274 Walnut Drive
Omid Shakeri, on behalf of The Ridgecrest Group
April 23, 2002
The applicant is hereby notified, as part of this application, that (s)he is required to meet the
following conditions in accordance with the ordinances of the City of Campbell and the State of
California. The lead department with which the applicant will work is identified on each
condition where necessary. Where approval by the Director of Community Development, City
Engineer, Public Works Director, City Attorney, or Fire Department is required, that review shall
be for compliance with all applicable conditions of approval, adopted policies and guidelines,
ordinances, laws and regulations, and accepted engineering practices, for the items under review.
Additionally, the applicant is hereby notified that (s)he is required to comply with all applicable
Codes or Ordinances of the City of Campbell and the State of California that pertain to this
development and are not herein specified:
COMMUNITY DEVELOPMENT DEPARTMENT
Plannine Division
1. Approved Permit: Approval is granted for a Site and Architectural Review Permit to
construct three new single-family homes on property located at 1274 Walnut Drive. The
project shall substantially conform to the project exhibits listed below, except as may be
modified by the Conditions of Approval contained herein:
a. Project plans prepared by Memarie Associates Inc. and received by the Planning
Division on April 16, 2002, including a site plan, floor plans, roof plans, and elevations.
b. Color samples and roof samples received by the Planning Division on April 18, 2002.
2. Approval Expiration: The Site and Architectural Review Permit approval shall be valid for a
period of one year from the date of final approval. Within this one-year period, a building
permit must be obtained and construction completed one year thereafter or the Site and
Architectural Review Permit shall be void.
3. Park Impact Fee: A park impact fee of $10,990 per unit is due upon development of the site.
Credit in the amount of $10,990 will be given for the existing single-family residence. Prior
to recordation of the Final Parcel Map, 75% of this fee is due. The remaining 25% is due
prior to issuance of a certificate of building occupancy.
4. Property Maintenance: The property is to be maintained free of any combustible trash,
debris, and weeds until the time that actual construction commences. Any vacant existing
structures shall be secured, by having windows boarded up and doors sealed shut, or be
demolished or removed from the property (Section 11.201 and 11.414, 1985 Ed. Uniform
Fire Code).
Attachment #5
Page 2 of 6
5. Final Parcel Map: The Site and Architectural Review Permit approval is contingent upon
recordation of the Final Parcel Map to divide the subject property. The Final Parcel Map
shall be recorded prior to the issuance of building permits.
6. Parking and Driveways:
a. All parking and driveway areas shall be developed in compliance with the standards in
Chapter 21.50 of the Campbell Municipal Code.
b. The applicant shall provide decorative pavement within the driveways and walkways.
The design and materials used for the decorati ve pavement shall be reviewed and
approved by the Community Development Director prior to the issuance of building
permits.
7. Fences: Fencing along the property lines shall be replaced at the expense of the applicant,
unless it is determined to be in good condition by the Community Development Director.
Any newly proposed fencing shall comply with Section 21.59.090 of the Campbell
Municipal Code.
8. Utility Boxes and Back-Flow Preventers: The applicant shall submit a plan to the Planning
Division prior to installation of PG&E utility (transformer) boxes and San Jose Water
Company back-flow preventers, indicating the location of the boxes and screening (if the
boxes are above ground) for review and approval by the Community Development Director.
9. Contractor Contact Information Posting: The project site shall be posted with the name and
contact number of the lead contractor in a location visible from the public street prior to the
issuance of building permits.
10. Building Elevations Details: The applicant shall submit detailed building elevations
depicting architectural details. Detailed elevations shall be reviewed and approved by the
Community Development Director prior to the issuance of building permits and shall include
the following:
a) Provision of building elevations and details illustrating architectural features such as
porches and railings, window boxes, veneers, tile, or brick details.
b) Composition roof materials shall be 40-year quality.
c) Windows shall have significant insets (4-inches minimum) to create shadow lines and
shall be detailed with trim and sill details. The applicant shall submit elevations with
window schedules depicting high quality windows.
d) Garage doors shall have automatic opening devices and shall have decorative features
such as windows and panels.
e) Architectural details shall be carried throughout all four elevations of the homes.
Attachment #5
Page 3 of 6
11. Elevation Detail: The applicant shall indicate on the building plan submittal a brick veneer
detail along the base of the front elevation on the residence on Parcel 2. The plan shall be
reviewed and approved by the Community Development Director prior to the issuance of
building permits.
12. Landscaping: The applicant shall submit four sets of a landscape and irrigation plan
indicating type and size of plant material and details regarding the automatic irrigation
system to the Planning Division for review and approval by the Community Development
Director prior to the issuance of building permits and shall include:
a) Four 24-inch box replacement trees for the protected trees removed.
b) A minimum of one tree per each 2,000 square feet of net lot area, as required by the
STANP.
c) A combination of trees, shrubs, and groundcover to effectively landscape the front yard
and side yard areas.
d) Landscape and irrigation plans shall be consistent with the City's Water Efficient
Landscaping Standards (WELS).
13. Tree Protection Plan: The applicant shall submit a tree protection plan in accordance with
the City's Water Efficient Landscape Standards (WELS) for all protected trees to be retained
on site, and shall contain specific information about the preservation of the trees during any
grading or building on site. The tree protection plan shall be submitted to the Planning
Division for review and approval by the Community Development Director prior to the
issuance of building permits.
14. On-site lighting: On-site lighting shall be shielded away from adjacent properties and
directed on site. The design and type of lighting fixtures and lighting intensity of any
proposed exterior lighting for the project shall be reviewed and approved by the Community
Development Director prior to installation of the lighting for compliance with all applicable
Conditions of Approval, ordinances, laws and regulations. Lighting fixtures shall be of a
decorative design to be compatible with the residential development and shall incorporate
energy saving features.
15. Construction Mitigation Measures: The applicant shall implement the following construction
mitigation measures:
a) Construction activities will be limited to daytime hours of 8:00 am to 5:00 p.m.
weekdays and 9:00 a.m. to 4:00 p.m. Saturdays. Construction is prohibited on Sundays
and Holidays unless an exception is granted by the Building Official.
b) No pile driving is allowed for construction of the project.
c) All internal combustion engines for construction equipment used on the site will be
properly muffled and maintained.
Attachment #5
Page 4 of 6
d) All stationary noise generating construction equipment, such as air compressors and
portable power generator, will be located as far as practical from the existing residences
and businesses.
e) All active construction areas shall be watered at least twice daily.
f) Cover all trucks hauling soil and other loose materials stationed or prior to leaving the
site.
g) Pave, apply water, or apply non-toxic soil stabilizers on all unpaved surfaces, and
staging areas at the construction site.
Buildinl! Division
16. Permits Required: A building permit application shall be required for each proposed new
structure. The building permit shall include Electrical/PlumbinglMechanical fees when such
work is part of the permit.
17. Construction Plans: The Conditions of Approval shall be stated in full on the cover sheet of
construction plans submitted for building permit. Each detached structure shall be submitted
separately.
18. Size of Plans: The minimum size of construction plans submitted for building permits shall be 24
inches by 36 inches.
19. Plan Preparation: This project requires plans prepared under the direction and oversight of a
California licensed Engineer or Architect. Plans submitted for building permits shall be "wet
stamped" and signed by the qualifying professional person.
20. Soils Report: Two copies of a current soils report, prepared to the satisfaction of the Building
Official, containing foundation and retaining wall design recommendations shall be submitted with
the building permit application. This report shall be prepared by a licensed engineer specializing in
soils mechanics.
21. Site Plan: Application for building permit shall include a competent site plan that identifies
property and proposed structures with dimensions and elevations as appropriate. Site plan
shall also include site drainage details.
22. Foundation Inspections: A pad certificate prepared by a licensed civil engineer or land surveyor shall
be submitted to the project building inspector upon foundation inspection. This certificate shall
certify compliance with the recommendations as specified in the soils report and the building pad
elevation and on-site retaining wall locations and elevations are prepared according to approved
plans. Horizontal and vertical controls shall be set and certified by a licensed surveyor or registered
civil engineer for the following items:
a) pad elevation.
b) finished floor elevation (first floor).
Attachment #5
Page 5 of 6
c) foundation comer locations.
23. Title 24 Energy Compliance: California Title 24 Energy Compliance forms CF-IR and MF-
lR shall be blue-lined on the construction plans. 8Yz X 11 calculations shall be submitted as
well.
24. Special Inspections: When a special inspection is required by D.B.C. Section 1701, the architect or
engineer of record shall prepare an inspection program that shall be submitted to the Building
Official for approval prior to issuance of the building permits, in accordance with D.B.C Section
106.3.5. Please obtain City of Campbell, Special Inspection forms from the Building Inspection
Division Counter.
25. Water Pollution Prevention: The City of Campbell, standard Santa Clara Valley Non-point Source
Pollution Control Program specification sheet shall be part of plan submittal. The specification sheet
(size 24" X 36") is available at the Building Division service counter.
26. Approvals Required: The project requires the following agency approval prior to issuance of the
building permit:
a) West Valley Sanitation District (378-2407)
b) Santa Clara County Fire Department (378-4010)
c) Bay Area Air Quality Management District (Demolitions Only)
d) School District:
. Campbell Union School District (378-3405)
· Campbell Union High School District (371-0960)
· Moreland School District (379-1370)
. Cambrian School District (377-2103)
Note: To Determine your district, contact the offices identified above. Obtain the School
District payment form from the City Building Division, after the Division has approved the
building permit application.
27. Water Pollution Prevention: The City of Campbell, standard Santa Clara Valley Non-point
Source Pollution Control Program specification sheet shall be part of plan submittal. The
specification sheet (size 24" X 36") is available at the Building Division service counter.
PUBLIC WORKS DEPARTMENT
28. Street Improvements: Prior to issuance of any grading or building permits for the site, the
applicant shall execute a Street Improvement Agreement and shall cause plans for public
Street Improvements to be prepared by a registered civil engineer, pay various fees and
Attachment #5
Page 6 of 6
deposits, post security and provide insurance necessary to obtain an encroachment permit for
construction of the standard public street improvements, as required by the City Engineer.
The fee for a non-utility encroachment permit application is currently $255.00. The plans
shall include the following:
a) Installation of storm drain improvements on Walnut Drive as determined by the City
Engineer.
b) Construction of conforms to existing public and private improvements, as necessary.
29. Work in the Public Right-of-Way: Prior to doing any work in the public Right-of-Way, the
applicant shall obtain an encroachment permit, provide plans, pay fees and deposits, post
security, and provide insurance.
30. Water Meter(s) and Sewer Cleanout(s): Existing and proposed Water Meter(s) and Sewer
Cleanout(s) shall be installed on private property behind the public right-of-way line.
31. Soils Report: Prior to issuance of any grading or building permits for the site, the applicant
shall provide a Soils Report prepared by a registered geotechnical or civil engineer.
32. Utilities: All new on-site utilities shall be installed underground per Section 20.36.150 of the
Campbell Municipal Code for any new or remodeled buildings or additions. Applicant shall
comply with all plan submittals, permitting, and fee requirements of the serving utility
compames.
33. Utility Installation Plan: Prior to issuance of building permits for the site, the applicant shall
submit a Utility Installation Coordination Plan and Schedule for approval by the City
Engineer for installation of street improvements and/or abandonment of all utilities. Streets,
which have been resurfaced within the previous five years, will require boring and jacking
for all new utility installations. Applicant shall also prepare pavement restoration plans for
approval by the City Engineer prior to any utility installation or abandonment.
34. Grading and Drainage Plan: Prior to issuance of any grading or building permits for the site,
the applicant shall conduct hydrology studies based on a 10 year storm frequency, prepare an
engineered Grading and Drainage Plan, and pay fees required to obtain necessary grading
permits. The plans shall comply with the 1998 edition of the California Building Code
including Chapters 10, 11, 18,33, and Appendix Chapter 33.
35. Storm Water Pollution Prevention Measures: Prior to issuance of any grading or building
permits, the applicant shall comply with the National Pollution Discharge Elimination
System (NPDES) permitting requirements and the California Storm Water Best Management
Practices Handbook prepared by the Storm Water Quality Task Force, Santa Clara Valley
Water District and the City of Campbell Municipal Code regarding Storm Water Pollution
Prevention. The City will provide the applicant with information to assist in complying with
this Condition of Approval. The primary objective is to improve the quality and reduce the
quantity of storm water runoff to the Bay.
Attachment #6
RECOMMENDED CONDITIONS OF APPROVAL FOR FILE NO. PLN2002-01
(TREE REMOVAL PERMIT)
SITE ADDRESS:
APPLICANT:
P.C. MEETING:
1274 Walnut Drive
Omid Shakeri, on behalf of The Ridgecrest Group
April 23, 2002
The applicant is hereby notified, as part of this application, that (s)he is required to meet the
following conditions in accordance with the ordinances of the City of Campbell and the State of
California. The lead department with which the applicant will work is identified on each
condition where necessary. Where approval by the Director of Community Development, City
Engineer, Public Works Director, City Attorney, or Fire Department is required, that review shall
be for compliance with all applicable conditions of approval, adopted policies and guidelines,
ordinances, laws and regulations, and accepted engineering practices, for the items under review.
Additionally, the applicant is hereby notified that (s)he is required to comply with all applicable
Codes or Ordinances of the City of Campbell and the State of California that pertain to this
development and are not herein specified:
COMMUNITY DEVELOPMENT DEPARTMENT
Plannim! Division
1. Approved Permit: Approval is granted for a Tree Removal Permit to allow the removal of
four Walnut trees, ranging in size from 12 inches to 17 inches in diameter, on property located
at 1274 Walnut Drive. This permit shall only be valid in conjunction with the approved Site
and Architectural Review Permit (PLN2001-142).
2. Replacement Trees: Four 24-inch box size trees shall be required as replacement for the four
Walnut trees to be removed. The location and species of these trees shall be shown on the
detailed landscape and irrigation plans that shall be submitted to the Planning Division for
review and approval by the Community Development Director, prior to the issuance of
building permits. The proposed replacement trees shall continue the diversity of tree species
found in the community and shall be a species listed in the City's Water Efficient
Landscaping Standards (WELS).
Attachment #6
RECOMMENDED CONDITIONS OF APPROVAL FOR FILE NO. PLN2002-01
(TREE REMOVAL PERMIT)
SITE ADDRESS:
APPLICANT:
P.c. MEETING:
1274 Walnut Drive
Omid Shakeri, on behalf of The Ridgecrest Group
April 23, 2002
The applicant is hereby notified, as part of this application, that (s)he is required to meet the
following conditions in accordance with the ordinances of the City of Campbell and the State of
California. The lead department with which the applicant will work is identified on each
condition where necessary. Where approval by the Director of Community Development, City
Engineer, Public Works Director, City Attorney, or Fire Department is required, that review shall
be for compliance with all applicable conditions of approval, adopted policies and guidelines,
ordinances, laws and regulations, and accepted engineering practices, for the items under review.
Additionally, the applicant is hereby notified that (s)he is required to comply with all applicable
Codes or Ordinances of the City of Campbell and the State of California that pertain to this
development and are not herein specified:
COMMUNITY DEVELOPMENT DEPARTMENT
Plannin2: Division
1. Approved Permit: Approval is granted for a Tree Removal Permit to allow the removal of
three Walnut trees, ranging in size from 12 inches to 17 inches in diameter, on property
located at 1274 Walnut Drive. This permit shall only be valid in conjunction with the
approved Site and Architectural Review Permit (PLN2001-142).
2. Replacement Trees: Three 24-inch box size trees shall be required as replacement for the
three protected Walnut trees to be removed. The location and species of these trees shall be
shown on the detailed landscape and irrigation plans that shall be submitted to the Planning
Division for review and approval by the Community Development Director, prior to the
issuance of building permits. The proposed replacement trees shall continue the diversity of
tree species found in the community and shall be a species listed in the City's Water Efficient
Landscaping Standards (WELS).
01/15/2002 12:13
4082552421
S~RÄTOG~ TREE SERVIC
Attachment #9
Saratoga Tree Service
13745 Skyline Blvd.
Los Gatos, CA 95033
1-13-02
Omid Shakera
R Idgeçrcst Group
3131 S Bascom, Ste. 110
Campbell, CA 95008
Re. 1274 Walnut Ave
A sIte inspecuon was perfonneá at the above location to determlOe the condition of several trees.
To the left of the driveway are two Black Walnut trees. These are old orchard trees that were
grafted for nut producTIon. As 15 common \vith many old orchard trees. these are both showing
signs of decay In the grafted sections. There is also sigmficant lOternal decay in one of these trees.
Facing the front of the house, on the far left side of the property is another Black Walnut tree.
Thls is showIng similar problems as the above mentioned two trees. None of these three
walnuts arc major trees in age or stature and are not of any hentage tree status
Adjacent to the single Walnut is a Coast Live Oak. This tree has a diameter of about 16 inches
(I).B. H.). This tree does not show any problems assocIated with decay or dieback. The tree does
have an imbalance due to the location of the adjacent tree
Respectfully submitted
~~~)~
Blair Glenn
I S A Certitìed Arborist #654
Attachment #10
Planning Commission Minmes of January 22, 2002
3.
PLN2001-141 (PM)
PLN2001-142 (8)
PLN2002-001 (TRP)
Shakeri, O.
Public Hearing to consider the application of Mr. Omid Shakeri, on
behalf of the Ridgecrest Group, for a Tentative Parcel Map
(PLN2001-141) to allow the creation of three lots, a Site and
Architectural Review Permit (PLN2001-142) to allow the
construction of three new single-family residences and a Tree
Removal Permit (PLN2002-001) to allow the removal of five trees
on property located at 1274 Walnut Drive in an R-l-lO (Single
Family Residential) Zoning District. This project is Categorically
Exempt. Planning Commission decision final in 10 days, unless
appealed in writing to the City Clerk. Project Planner: Stephanie
Willsey, Planner I
Ms. Stephanie Willsey, Planner I, presented the staff report as follows:
· Advised that this application is for a Parcel Map, Site and Architectural Review Permit and
Tree Removal Permit for property at 1274 Walnut Drive.
· Stated that the existing single-family residence will be demolished.
· Said that this project is proposed to be developed at 2.9 units per gross acre, which is
consistent with the General Plan allowance of less than 3.5 units per gross acre.
· Added that this proposal is consistent with the requirements of the R-l-lO Zoning.
· Described that three homes will be constructed, each of which will be accessed from
Walnut. Each home has a distinctive design with different exterior treatments for each one.
· Advised that five trees are proposed for removal, four walnut trees (12 to 17 inches in
diameter) and one coast live oak (16 inches in diameter). The Arborist's report states that
the walnut trees are suffering from structural decay and recommends their removal.
· Recommended approval.
Vice Chair Hernandez presented the Site and Architectural Review Committee report as
follows:
· SARC reviewed this project on January 8, 2002, and was supportive.
Chairman Francois opened the Public Hearing for Agenda Item No.3.
Mr. David Brady, 1360 Walnut Drive, Campbell:
· Stated that his home is located at the comer of Walnut and Chapman and that he has
resided in this neighborhood for 18 years.
· Said that while he likes the idea of this land being developed, he does not like the "cookie
cutter" approach of these homes within an established neighborhood.
· Advised that he had remodeled his own house but managed to keep the integrity of the
surrounding neighborhood.
· Declared that these may be beautiful homes but wished they would conform better to this
neighborhood.
· Pointed out that three-car garages are not typical and asked if perhaps the third garage
space could be made less visible such as being accessed from the side.
· Expressed concern over the privacy of the adjacent neighbor.
· Suggested that one of the oak trees that offers privacy to the neighbor be retained instead of
removed as proposed.
· Stated that a key reason people reside in this area is to enjoy big lots.
Planning Commission Minmes of January 22,2002
· Suggested that the project be redesigned with single-story structures.
Mr. Craig Simmons, 1305 Walnut Drive, Campbell:
· Said that his home, located across the street from proposed Parcel #3, has been in his
family for a number of years.
· Pointed out that these three homes are identical and represent big tract homes.
· Reminded that the San Tomas Area Neighborhood Plan requires new homes to conform
with the neighborhood. These homes, which are twice as big as any in the neighborhood
do not conform. Additionally, the 35-foot front setback is not consistent with the typical
25-foot setbacks on this street.
Mr. Mitchell Stermer, 1312 Walnut Drive, Campbell:
· Advised that he has resided adjacent to this project site since 1988 with his wife and son.
· Thanked the San Tomas Area Neighborhood Association for informing him of this Public
Hearing.
· Pointed out that Walnut is one of the last areas with a rural feel to it.
· Said that he had several concerns with this project, the potential removal of an oak tree at
the property line that he states is healthy and essential to retaining the privacy of his home.
Added that he is not as concerned about the removal of the other proposed four trees.
· Declared that these homes will dwarf those already in the neighborhood, probably twice as
large as his home, and that having a three-car facing the street changes the character of this
street.
· Opined that these are three identical tract type homes.
· Asked that the 35-foot front setbacks be reduced to 25 or 30 feet.
· Suggested the inclusion of six-foot fences with lattice or, as an alternative, to match the
existing fence separating the property from the P-Com commercial site.
· Asked that the power lines be placed underground.
· Expressed concern for the potential impact of construction noise and asked that no evening
or weekend construction be permitted.
· Restated that he wants to retain the rural atmosphere of this street and does not want to see
the installation of curb, gutters or sidewalks with this project.
· Said he is not surprised that this property is being developed and will welcome new homes
as long as they match the neighborhood.
· Distributed several photographs of two-story structures in the nearby area.
· Said that the residents have a long-term commitment to this neighborhood and that this is
not a tract home neighborhood. They will have to live with the impact of these homes in
their neighborhood for the long term, not the developer.
· Asked that the Commission consider requiring detached garages at the back of the property
or limits to two-car garages.
Commissioner Doorley asked about rear yard landscaping requirements.
Ms. Stephanie Willsey, Planner I:
· Replied that a requirement for landscaping for the rear yards could be included.
· Added that construction hours are from 8 a.m. to 5 p.m., Monday through Friday, from 9
a.m. to 4 p.m. on Saturdays, with construction prohibited on Sunday and Holidays.
Planning Commission Minutes of January 22,2002
· Clarified that new utility hookups would be underground but that existing service would
remain as it is.
Senior Planner Geoff I. Bradley added that per development standards, any new service drops
must be placed below ground but that existing lines along the frontage would not be placed
underground.
Chairman Francois asked if there is decay in the oak tree at the shared property line.
Planner Stephanie Willsey replied no. She added that according to the Arborist's report, it is
believed that the tree would be adversely impacted by construction, if not immediately than in
the foreseeable future, and should be removed at this time.
Commissioner Doorley sought assurance that there are no street improvements planned.
Planner Stephanie Willsey replied that he is correct that there will be no street improvements.
City Attorney William Seligmann clarified that if the tree is on the property line or on the
adjacent property owner's parcel, this applicant could not remove it. The owner may have to
have a survey prepared to determine on which property the tree in question is located. This
refers to the location of the trunk and not the branches.
Ms. Audrey Kiehtreiber, 1509 Walnut Drive, Campbell:
· Identified herself as a representative of the San Tomas Area Neighborhood Association.
· Stated that she has reviewed the plans and agrees that it meets the established standards for
the San Tomas Area Neighborhood Plan and thanked staff for that fact.
· Pointed out that she is also a resident of Walnut Drive with a home on a large lot.
· Described the area as rural with wonderful character.
· Said that these are tract style homes that do not fit into the neighborhood.
· Said that she had originally assumed that this property would be developed with two homes
rather than three.
· Pointed out that typically lots in the neighborhood, while zoned for 10,000 square foot lots,
typically have 14,000 square foot lots or larger.
· Asked that this project be sent "back to the drawing board" and revised a bit.
Ms. Joanne Carroll, 1395 Walnut Drive, Campbell:
· Advised that she and her husband moved into the neighborhood three years ago and that
their next-door neighbors constructed a second story addition shortly after they arrived.
· Said that this neighbor modified his design to ensure their privacy.
· Agreed with the comments made by her neighbors regarding this proposal.
Mr. Omid Shakeri, 3131 S. Bascom Avenue, Campbell:
· Identified himself as the project representative.
· Said that he has worked closely with staff to design this project and took privacy issues into
consideration when designing these homes.
Planning Commission Minutes of January 22, 2002
· Pointed out that for the two homes on either side (Lots 1 and 3), the elevation facing the
existing homes have but two windows, one of which is a frosted bathroom window and the
other of which is a shower window without any visibility.
· Clarified that his company builds custom homes not tract home, including two homes at
Pecan and Hazelwood as well as homes on Sunnyside.
· Stated that they changed the elevations so they do not look alike, including varied
materials.
· Added that with so many trees, these houses will not be very visible from the street and
therefore will not be intrusive to the neighborhood.
· Said that, without counting the covered porches, these houses are only developed at 25
FAR.
· Said that the large setbacks were provided at staff request to conform with the townhome
project to the left but that they are willing to bring the homes forward if necessary.
· Advised that an oak tree needs to be trimmed and that the large walnut tree will be saved.
· Agreed to install a taller fence if the neighbor would prefer.
· Pointed out that a second story is a matter of right for all neighbors as it is permitted
through the Zoning Ordinance. They have tried to make the two story structures less
intrusive through design, including articulation.
· Said that he has worked in Campbell before, has been a Campbell resident for the last five
to six years and cares about Campbell.
· Concluded by saying this is a viable project for Campbell.
Commissioner Alderete asked Mr. Omid Shakeri if he has had an opportunity to see the
pictures provided by the residents.
Mr. Omid Shakeri replied no. After looking at them he said that one house is even larger than
they are proposing and another has a flush second story while theirs are set back. He added
that two of his homes have large porches that wrap around to be compatible with the
neighborhood. Additionally, they have matched colors to the surrounding area.
Mr. Mitchell Stermer:
· Added that there are only three two-story houses in the immediate area and that the home
on Chapman is on an L-shaped lot.
· Suggested that a two-car garage would be less massive than the proposed three-car garages.
· Said that these homes are nice but too massive and therefore they detract from the
neighborhood.
· Pointed out his concern for privacy with a two story looming over his yard and encroaching
on the privacy from his master suite's large picture window.
· Asked that the removal of the healthy oak tree be reconsidered.
Mr. Craig Simmons said that while residents would work together to ensure that any second
story additions are compatible to the neighborhood, these are spec homes for which such
consideration is less likely. Added that these homes do not have to be that big.
Ms. Lisa Herbert, 1295 Walnut Drive, Campbell:
· Said that she has lived in the family home since 1961.
Planning Commission Minmes of January 22, 2002
· Disagreed that this project would not be intrusive to the neighborhood.
· Begged the Commission to reconsider this plan.
· Pointed out that this is not a neighborhood of million dollar homes.
· Stated that the neighborhood is predominately single level homes and that monster homes
would look weird in this neighborhood.
Chairman Francois closed the Public Hearing for Agenda Item No.3.
Commissioner Hernandez asked for reasons to have 35 foot setbacks instead of 25 foot.
Planner Stephanie Willsey replied that the minimum required front setback is 25 feet. Staff
decided to set these homes back further to try to maintain the predominate block pattern and to
give a transitional and more open space look in the front.
Commissioner Gibbons:
· Stated that these issues are not unexpected in that the San Tomas Neighborhood is unique.
· Agreed that the points raised have relevance, particularly the fact that the three homes do
look a lot alike despite the use different materials.
· Added that the dominance of these proposed three-car garages is not consistent with the
neighborhood.
· Said that the Commission has not supported projects in the past that did not fit into the
neighborhood.
· Said that the front setback issue is not much of a problem. However, side yard setbacks are
an important issue in a community.
· Pointed out that 5 of 12 on site trees are proposed for removal and that she did not find it
acceptable to remove the oak tree.
· Added that the applicant may have to increase its landscaping.
· Stated that these homes reflect a cookie cutter design rather than being diverse in
architectural style like is typical in this neighborhood.
· Said that these are big lots and that the project is consistent with the San Tomas
Neighborhood Plan but that there may be other ways to design including having the
garages placed at the back, if possible.
· Stated that she is not supportive.
Commissioner Hernandez asked Commissioner Gibbons to rank the top two to three reasons
why this project does not fit into the neighborhood.
Commissioner Gibbons replied the similar redundant massing, SIze versus design and the
dominance of the three-car garages.
Commissioner Leonard said that she agreed with Commissioner Gibbons that the rendering
shows that the three proposed homes look alike and that she would like to see them developed
with more diversity and more in keeping with the neighborhood.
Commissioner Doorley:
· Said that the three homes are appropriate and that he does not have a problem with two
story homes.
Planning Commission MinUtes of January 22, 2002
· Agreed that the project has a cookie cutter approach.
· Added that the oak tree issue is an important one.
Commissioner Alderete said that the applicant and community have things to work out so he
will not support the application as presented.
Vice Chairman Hernandez said that infill development is what is prevalent these days. The
applicant has tried to create a project that falls within the guidelines provided. Agreed that an
opportunity to involve the neighbors is needed.
Chairman Francois:
· Agreed that the guidelines are established.
· Supported the suggestion to move the garages to the rear.
· Asked staff for a suggestion at this point.
Director Sharon Fierro said that staff has taken notes and can come up with a compromise with
the applicant.
Chairman Francois asked for a suggested continuance date.
Commissioner Gibbons stated that the applicant has made an effort to make a quality project
and they are to be commended.
Commissioner Doorley asked if there is a way to include the community.
Director Sharon Fierro:
· Said that staff would notify those neighbors who spoke this evening, using the Speaker
Cards for addresses. The question is not whether three homes can be constructed but rather
what design changes need to be incorporated to make them fit better into the neighborhood
such as looking at more architectural diversity, preserving the oak tree and moving the
garages.
· Suggested February 26, 2002, as the best meeting date to continue this hearing.
Motion:
Upon motion of Vice Chairman Hernandez. seconded by Commissioner
Gibbons, the Planning Commission continued consideration of the project
at 1274 Walnut Drive (PLN2001-1411142 & PLN2002-001) to the Planning
Commission meeting of February 26, 2002. (6-0-1; Commissioner Jones
was absent)
***
REPORT OF THE COMMUNITY DEVELOPMENT DIRECTOR
The written report of Ms. Sharon Fierro, Community Development Director, was accepted as
presented with the following additions:
· Announced that Council took second reading for the townhome project on Apricot.
· Advised that the next Commission meeting is on February 12th and will include a
modification to the commercial building under construction at 368 E. Campbell A venue.
ITEM NO.3
..\,,~O<i. CA-11À<S'
!::: ~
U r
o 0
.- "-
"So", ~
. <-
o~CH"'''o'
STAFF REPORT - PLANNING COMMISSION MEETING OF
JANUARY 22, 2002
Shakeri, o.
Public Hearing to consider the applications of Mr. Omid Shakeri, on behalf
of The Ridgecrest Group, to allow the following on property located at 1274
Walnut Drive in an R-I-IO (Single-Family Residential) Zoning District:
a) A Tentative Parcel Map to allow the creation of three lots;
b) A Site and Architectural Review Permit to allow the construction of three
new single-family residences; and
c) A Tree Removal Permit to allow the removal of five trees.
PLN2001-141
(TPM)
PLN2001-142 (8)
PLN2002-1 (TRP)
STAFF RECOMMENDATION
That the Planning Commission take the following actions:
1. Adopt a Resolution, incorporating the attached findings, approving a Tentative Parcel Map
(PLN2001-141) to allow the creation of three lots, subject to the attached Conditions of
Approval.
2. Adopt a Resolution incorporating the attached findings, approving a Site and Architectural
Review Permit (PLN2001-142) to allow the construction of three single-family residences,
subject to the attached Conditions of Approval.
3. Adopt a Resolution incorporating the attached findings, approving a Tree Removal Permit
(PLN2002-1) to allow the removal of five trees, subject to the attached Conditions of
Approval.
ENVIRONMENTAL DETERMINATION
This project is categorically exempt under Section 15303, Class 3 (a) of the California
Environmental Quality Act (CEQA) pertaining to the construction of three single-family
residences in an urbanized area and Section 15315, Class 15 of the California Environmental
Quality Act (CEQA) pertaining to the division of property in urbanized areas into four or fewer
parcels when the division is in conformance with the City's General Plan and Zoning Code;
therefore, no environmental action is required.
PROJECT DATA
Cate 0
Gross Lot Area:
Net Lot Area:
Lot Width:
Densit :
Pro osed Residence:
1 st Floor:
Pro osed - Parcell
15,239 s . ft. (.35 acres)
12,626.6 s . ft. (.29 acres)
87.08 feet
2.9 units/ oss acre
Re uired/ Allowed
N/A
10,000 s . ft. (.23 acres)
80 feet minimum
Less than 3.5 units/ oss acre
2,162 s uare feet
N/A
Staff Report - Planning COl1UI1Íssion Meeting of January 22, 2002
PLN2001-141 and -142 & PLN2002-1- 1274 Walnut Drive
Page 2 of5
Pro osed - Parcel 1
1,451 s uare feet
626 s uare feet
4,239 s uare feet
537 s uare feet
3,325 s uare feet (26%)
4,239 s uare feet (34%)
3 covered, 3 uncovered
26 feet, 6 inches
Re uired/ Allowed
N/A
N/A
N/A
N/A
35% maximum
45% maximum
1 covered, 1 uncovered
28 feet maximum
Catelwrv Pro Dosed - Parcel 2 Reouired/ Allowed
Gross Lot Area: 15,240.7 sq. ft. (.35 acres) N/A
Net Lot Area: 12,628 sq. ft. (.29 acres) 10,000 sq. ft. (.23 acres)
Lot Width: 87.09 feet 80 feet minimum
Density: 2.9 units/gross acre Less than 3.5 units/gross acre
Proposed Residence:
1 st Floor: 2,162 square feet N/A
2nd Floor: 1,451 square feet N/A
Garage: 626 square feet N/A
Total Unit Area: 4,239 square feet N/A
Porch Area: 295 square feet N/A
Building Coverage: 3,083 square feet (24%) 35% maximum
Floor Area Ratio: 4,239 square feet (34%) 45% maximum
Parking: 3 covered, 3 uncovered 1 covered, 1 uncovered
Building Height: 26 feet, 6 inches 28 feet maximum
Catelwrv ProDosed - Parcel 3 Reouired/ Allowed
Gross Lot Area: 15,239 sq. ft. (.35 acres) N/A
Net Lot Area: 12,626.6 sq. ft. (.29 acres) 10,000 sq. ft. (.23 acres)
Lot Width: 87.08 feet 80 feet minimum
Density: 2.9 units/gross acre Less than 3.5 units/gross acre
Proposed Residence:
1 st Floor: 2,162 square feet N/A
2no Floor: 1,451 square feet N/A
Garage: 626 square feet N/A
Total Unit Area: 4,239 square feet N/A
Porch Area: 571 square feet N/A
Building Coverage: 3,359 square feet (27%) 35% maximum
Floor Area Ratio: 4,239 square feet (34%) 45% maximum
Parking: 3 covered, 3 uncovered 1 covered, 1 uncovered
Building Height: 26 feet, 6 inches 28 feet maximum
Staff Report - Planning Corumission Meeting of January 22,2002
PLN2001-141 and -142 & PLN2002-1- 1274 Walnut Drive
Page 3 of5
DISCUSSION
Applicant's Proposal: The applicant is requesting approval of a Tentative Parcel Map
(PLN2001-141) to allow the creation of three lots, a Site and Architectural Review Permit
(PLN200l-142) to allow the construction of three single-family residences, and a Tree Removal
Permit (PLN2002-1) to allow the removal of five trees on property located at 1274 Walnut
Drive.
The subject property is located on the east side of Walnut Drive, directly across from Wendell
Drive. Single-family residences surround the subject property on three sides and a commercial
office building is located to the east.
Background: Historically the project site was a fruit orchard and is currently developed with a
single-family home and in-ground swimming pool. Many of the old orchard trees remain on site
as well as some new trees such as Palm trees and Oaks trees. The home would be demolished
for this project and the swimming pool is proposed to remain and be incorporated into the new
development on Parcel 2.
ANALYSIS
General Plan Designation: The General Plan land use designation for the project site is Low
Density Residential (less than 3.5 units per gross acre.) The proposed project has a density of2.9
units per gross acre, which is within the density range allowed for the site. Therefore, the
proposed project is consistent with the General Plan.
The project site is located in the San Tomas Neighborhood and is subject to the San Tomas Area
Neighborhood Plan (ST ANP). Staff finds that the proposal is consistent with the policies and
design guidelines of the STANP.
Zoning Designation: The zoning designation for the project site is R-I-I0 (Single-Family
Residential, 10,000 square foot minimum lot size.) The proposed project is consistent with this
zoning designation and meets the minimum lot size requirements, lot width, setbacks, height
requirement, building coverage, floor area ratio, and parking requirements of the R-l-1 0 Zoning
District. Therefore, the proposed project is consistent with the Zoning Ordinance.
Subdivision Design: The proposed Tentative Parcel Map divides the existing 37,881.25 square
foot lot into three individual lots. Two of the proposed lots are 12,626.6 square feet, with a lot
width of 87.08 feet, and the third lot is 12,626 square feet, with a lot width of 87.09 feet. All
three lots would take access from Walnut Drive.
Street Improvements: The project site does not have standard street improvements (curb, gutter
or sidewalks) and none are required by the STANP along Walnut Drive.
Site Plan: The site plan proposes the construction of three single-family homes each on
individual lots. The proposed homes have a front yard setback between 30 and 33 feet in order
to match the predominant front yard block pattern and large rear yard setbacks between 48 feet
and 51 feet. The decoratively paved driveways bottleneck down from 30 feet at the garage
Staff Report - Planning COlllll1ission Meeting of January 22, 2002
PLN2001-141 and -142 & PLN2002-1-1274 Walnut Drive
Page 4 of 5
entrance to 20 feet at the right-of-way in order to reduce the amount of impervious surface on
site and allow for more landscaping.
Architecture: The proposed homes each have a distinctive design and well-articulated features.
Although the same floor plan is used for all three homes, the exterior elevations have varied
rooflines, front entry treatments, window styles, window trim treatments, and exterior materials
and colors. The applicant uses a horizontal design emphasis to limit the perceived scale and
mass of the homes and breaks up the three-car garages by setting one of the garage doors back
two feet.
The proposed home on Parcel 1 has a wrap around porch with decorative columns, exterior
horizontal wood siding, and a single front door flanked with side windows. The proposed home
on Parcel 2 has exterior stucco siding with a ledgestone wainscoting treatment across the front
elevation, a double-door front entrance, and large arched windows. The proposed residence for
Parcel 3 has a wrap around porch, gabled porch entranceway, large divided windows, and
decorative shutters and window boxes.
The applicant proposes a different color scheme for each home comprised of contrasting natural
toned body and trim colors with a different accent color for the door. Composition shingle
roofing will be used for all three homes, each roof different in various shades of dark gray and
dark brown.
Staff finds that the proposed design is well articulated and meets the development standards set
forth in the STANP.
Landscaping: The conceptual landscape plan shows a mixture of trees, shrubs, and groundcover
in the front yard and side yards areas of the homes. Pursuant to the ST ANP, the applicant is
required to provide a total of seven trees on each lot - one tree per 2,000 square feet of net lot
area. Condition of Approval #7 (PLN2001-142) requires the submittal of a revised landscape
plan indicating the required trees on site and the effective landscaping of the front and side yard
areas.
Tree Removal: Five trees are proposed to be removed as part of this project to accommodate the
new homes. The applicant is proposing to remove four Walnut trees, varying in size from 12
inches to 17 inches in diameter, and one Coast Live Oak tree which is 16 inches in diameter. An
arborist report was prepared by Blair Glenn, an I.S.A. Certified Arborist from Saratoga Tree
Service, and it was concluded that the Walnut trees proposed for removal suffer from structural
decay. The Coast Live Oak tree is located two feet from the proposed right elevation of the
home on Parcell. The Coast Live Oak tree was found to be in good health, except for an
imbalance due to the location of the adjacent tree, according to the arborist report. The tree is
proposed to be removed because the health of the tree and the structural integrity would be
significantly compromised if constructed occurred around the tree due to the severity of root
pruning and soil compaction required to facilitate development.
Staff Report - Planning COl111nission Meeting of January 22,2002
PLN2001-141 and -142 & PLN2002-1- 1274 Walnut Drive
Page 5 of5
The applicant has shown the required five 24-inch box replacement trees on the conceptual
landscape plan as required by Section 21.56.100 of the Tree Protection Ordinance. Condition of
Approval #2 (for PLN2002-1) requires that the applicant submit a landscape plan, which shows
the required replacement trees, and shall be reviewed and approved by the Community
Development Director prior to the issuance of a building permit.
There are several other trees on the project site that are proposed to be removed as part of this
project but due to their size and species they are not protected under the Tree Protection
Ordinance and are therefore not included in the Tree Removal Permit application.
Site and Architectural Review Committee: The Site and Architectural Review Committee
reviewed this development project at its meeting of January 8, 2002. The Committee was
supportive of the application as proposed and had no additional comments or Conditions of
Approval.
Attachments:
1. Findings Recommending Approval ofPLN2001-141 (Tentative Parcel Map)
2. Findings Recommending Approval ofPLN2001-142 (Site and Architectural Review Permit)
3. Findings Recommending Approval ofPLN2002-1 (Tree Removal Permit)
4. Conditions of Approval for PLN2001-141 (Tentative Parcel Map)
5. Conditions of Approval for PLN2001-142 (Site and Architectural Review Permit)
6. Conditions of Approval for PLN2002-1 (Tree Removal Permit)
7. Site Plan, Floor Plan, and Elevations
8. Tentative Parcel Map and Preliminary Grading Plan
9. Arborist Report
10. Location Map
Prepared by:
~w~
Stephanie Willsey, Planner I
Approved by:
Attachment # 1
FINDINGS RECOMMENDING APPRO V AL OF FILE NO PLN2001-141 (TENTATIVE
PARCEL MAP)
SITE ADDRESS:
APPLICANT:
P.C. MEETING:
1274 Walnut Drive
Omid Shakeri, on behalf of The Ridgecrest Group
January 22, 2002
Findings for the Planning Commission to approve a Tentative Parcel Map to allow the creation
of three lots.
The Planning Commission finds as follows with regard to File No. PLN2001-141:
1. The proposed density of 2.9 units per gross acre is consistent with the allowable density
permitted under the General Plan.
2. The proposed map is consistent with the development standards (including lot size and
minimum lot width) of the R-I-10 Zoning District and the San Tomas Area Neighborhood
Plan (STANP.)
3. The proposed subdivision layout allows for access to sunlight.
4. Each new lot created has adequate access to a public right-of-way.
5. The project qualifies as a Categorically Exempt project per Section 15315,Class 15 (Minor
Land Divisions) of the California Environmental Quality Act (CEQA.)
Based upon the foregoing findings of fact, the Planning Commission further finds and concludes
that:
1. The proposed subdivision is consistent with the General Plan and the Zoning Ordinance.
2. The proposed Tentative Parcel Map does not impair the balance between the housing needs
of the region and the public service needs of its residents and available fiscal and
environmental resources.
3. The design of the Tentative Parcel Map provides, to the extent feasible, for future passive or
natural heating and cooling opportunities.
4. The proposed development will aid in the harmonious development of the immediate area.
5. There is a reasonable relationship and a rough proportionality between the Conditions of
Approval and the impacts of the project.
6. No substantial evidence has been presented which shows that the project, as currently
presented, and subject to the required conditions of approval, will have a significant adverse
impact on the environment.
Attachment #2
FINDINGS RECOMMENDING APPROVAL OF FILE NO PLN2001-142 (SITE AND
ARCHITECTURAL REVIEW PERMIT)
SITE ADDRESS:
APPLICANT:
PoCo MEETING:
1274 Walnut Drive
Omid Shakeri, on behalf of The Ridgecrest Group
January 22,2002
Findings for the Planning Commission to approve a Site and Architectural Review Permit to
allow the construction of three single-family homes.
The Planning Commission finds as follows with regard to File No. PLN2001-142:
1. The proposed residential project is consistent with the R-l-1 0 (Single-Family Residential,
10,000 square foot minimum lot size) Zoning District, as required per the Zoning Ordinance
and the San Tomas Area Neighborhood Plan.
2. The density of the proposed project site is 2.9 units per gross acre, which is consistent with
the General Plan land use designation of Low Density Residential (less than 3.5 units per
gross acre.)
3. The proposed project is well designed and is architecturally compatible with the surrounding
neighborhood.
4. The project provides 18 on-site parking spaces, where 6 spaces are required.
5. The project will have a floor area ratio of34%.
6. The proposed homes have a front yard setback between 30 and 33 feet in order to match the
predominant front yard block pattern and large rear yard setbacks between 48 feet and 51
feet.
7. The proposed project is consistent with the San Tomas Area Neighborhood Plan.
8. The proposed project is surrounded by other residential uses to the north, south, and west and
a commercial office building to the east.
9. The project qualifies as a Categorically Exempt project per Section 15303, Class 3 (New
Construction or Conversion of Small Structures) of the California Environmental Quality Act
(CEQA.)
Based upon the foregoing findings of fact, the Planning Commission further finds and concludes
that:
1. The proposed project is consistent with the General Plan and Zoning Ordinance.
2. The proposed project, as conditioned, will aid in the harmonious development of the
immediate area.
3. There is a reasonable relationship between the use of the fees imposed upon the project and
the type of development project.
4. There is a reasonable relationship and a rough proportionality between the Conditions of
Approval and the impacts of the project.
Attachment #3
FINDINGS RECOMMENDING APPROVAL OF FILE NO PLN2002-1 (TREE
REMOVAL PERMIT)
SITE ADDRESS:
APPLICANT:
P.c. MEETING:
1274 Walnut Drive
Omid Shakeri, on behalf of The Ridgecrest Group
January 22, 2002
Findings for the Planning Commission to approve a Tree Removal Permit to allow the removal
of five trees.
The Planning Commission finds as follows with regard to File No. PLN2002-1:
1. The proposed Tree Removal Permit is consistent with the R-I-10 (Single-Family
Residential, 10,000 square foot minimum lot size) Zoning District and the Low Density
Residential (less than 3.5 units per gross acre) General Plan Designation.
2. The proposed tree replacement requirement of five 24-inch box size trees is consistent with
the requirements of the Tree Protection Ordinance.
3. The proposed replacement trees will be a sufficient replacement for the trees to be removed
and will continue the diversity of tree species found in the community.
4. The health of the Coast Live Oak tree and the structural integrity would be significantly
compromised if constructed occurred around the tree due to the severity of root pruning and
soil compaction required to facilitate development.
5. The Walnut trees have been determined to have structural decay according to an LS.A.
Certified Arborist.
Based upon the foregoing findings of fact, the Planning Commission further finds and concludes
that:
1. The retention of the Coast Live Oak tree and four Walnut trees restricts the economic
enjoyment of the property or creates an unusual hardship for the property owner by severely
limiting the use of the property in a manner not typically experienced by owners of similarly
zoned and situated properties and the applicant has demonstrated, to the satisfaction of the
Planning Commission, that there are no reasonable alternatives to preserve the trees.
2. The Coast Live Oak tree can potentially cause substantial damage to the proposed residential
buildings and the applicant has demonstrated, to the satisfaction of the Planning Commission,
that this potential damage cannot be controlled or remedied through reasonable relocation or
modification of the structure or utility services.
3. The four Walnut trees are irreparably diseased and the applicant has demonstrated, to the
satisfaction of the Planning Commission, that this cannot be controlled or remedied through
reasonable preservation and/or preventative procedures and practices such that the public
health and safety requires its removal.
4. There is a reasonable relationship and a rough proportionality between the Conditions of
Approval and the impacts of the project.
Attachment #4
CONDITIONS OF APPRO V AL FOR FILE NO. PLN2001-141 (TENTATIVE PARCEL
MAP)
SITE ADDRESS:
APPLICANT:
P.c. MEETING:
1274 Walnut Drive
Omid Shakeri, on behalf of The Ridgecrest Group
January 22, 2002
The applicant is hereby notified, as part of this application, that (s)he is required to meet the
following conditions in accordance with the ordinances of the City of Campbell and the State of
California. The lead department with which the applicant will work is identified on each
condition where necessary. Where approval by the Director of Community Development, City
Engineer, Public Works Director, City Attorney, or Fire Department is required, that review shall
be for compliance with all applicable conditions of approval, adopted policies and guidelines,
ordinances, laws and regulations, and accepted engineering practices, for the items under review.
Additionally, the applicant is hereby notified that (s)he is required to comply with all applicable
Codes or Ordinances of the City of Campbell and the State of California that pertain to this
development and are not herein specified:
COMMUNITY DEVELOPMENT DEPARTMENT
Plannine Division
1. Approved Permit: Approval is granted for a Tentative Parcel Map to create three lots. The
Final Parcel Map shall substantially conform to the Tentative Parcel Map prepared by
Kirkeby Engineering submitted on December 21, 2001.
2. Park Impact Fee: A park impact fee of $10,990 per unit, or the fee in effect at the time, is
due upon development of the site. Credit in the amount of $10,990 will be given for the
existing single-family residence. Prior to recordation of the Final Parcel Map, 75% of this
fee is due. The remaining 25% is due prior to issuance of a certificate of building occupancy.
3. Property Maintenance: The property is to be maintained free of any combustible trash,
debris, and weeds until the time that actual construction commences. All existing structures
shall be secured by having windows boarded up and doors sealed shut, or be demolished or
removed from the property (Section 11.201 and 11.414, 1985 Ed. Uniform Fire Code.)
PUBLIC WORKS DEPARTMENT
4. Parcel Map: Prior to the issuance of any building permits for the project, the applicant shall
submit a Parcel Map for recordation upon approval by the City. The current plan check fee
is $1,215 plus $25 per parcel.
5. Preliminary Title Report: Prior to the recordation of the Parcel Map, the applicant shall
provide a current Preliminary Title Report.
6. Public Service Easement: Upon recordation of the Final Parcel Map, the applicant shall
grant a to-foot Public Service Easement on private property contiguous with the public
right-of-way along Walnut Drive frontage. The applicant shall cause all documents to be
Conditions of Approval- Planning Commission Meeting of January L2, 2002
PLN2001-141 -1274 Walnut Drive
2
prepared by a registered civil engineer/land surveyor, as necessary, for the City's review and
recordation.
7. Monumentation for Parcel Map: Prior to the recordation of the Parcel Map, the applicant
shall provide security for setting all monuments shown on the map.
8. Stonn Darin Area Fee: Prior to the recordation of the Parcel Map, the applicant shall pay
the required storm drain area fee which is $2,000 per acre.
9. Demolition: Prior to the recordation of the Final Parcel Map, the applicant shall obtain a
Demolition Permit from the Building Division to remove any nonconforming structures.
Attachment #5
CONDITIONS OF APPROVAL FOR FILE NO. PLN2001-142 (SITE AND
ARCHITECTURAL REVIEW PERMIT)
SITE ADDRESS:
APPLICANT:
PoCo MEETING:
1274 Walnut Drive
Omid Shakeri, on behalf of The Ridgecrest Group
January 22,2002
The applicant is hereby notified, as part of this application, that (s)he is required to meet the
following conditions in accordance with the ordinances of the City of Campbell and the State of
California. The lead department with which the applicant will work is identified on each
condition where necessary. Where approval by the Director of Community Development, City
Engineer, Public Works Director, City Attorney, or Fire Department is required, that review shall
be for compliance with all applicable conditions of approval, adopted policies and guidelines,
ordinances, laws and regulations, and accepted engineering practices, for the items under review.
Additionally, the applicant is hereby notified that (s)he is required to comply with all applicable
Codes or Ordinances of the City of Campbell and the State of California that pertain to this
development and are not herein specified:
COMMUNITY DEVELOPMENT DEPARTMENT
Plannin2 Division
1. Approved Permit: Approval is granted for a Site and Architectural Review Permit to
construct three new single-family homes on property located at 1274 Walnut Drive. The
completed project shall substantially conform to the project plans and material/color samples
submitted by Omid Shakeri, dated as submitted on January 7,2002.
2. Property Maintenance: The property is to be maintained free of any combustible trash,
debris, and weeds until the time that actual construction commences. Any vacant existing
structures shall be secured, by having windows boarded up and doors sealed shut, or be
demolished or removed from the property (Section 11.201 and 11.414, 1985 Ed. Uniform
Fire Code.)
3. Parking and Driveways: All parking and driveway areas shall be developed in compliance
with the standards in Chapter 21.50 of the Campbell Municipal Code.
4. Fences: Any existing or proposed fencing shall comply with Section 21.59.090 of the
Campbell Municipal Code.
5. Utility Boxes and Back-Flow Preventers: The applicant shall submit a plan prior to
installation of PG&E utility (transformer) boxes and San Jose Water Company back-flow
preventers, indicating the location of the boxes and screening (if the boxes are above ground)
for approval by the Planning Division.
6. Building Elevations, Details, and Colors: The applicant shall submit detailed building
elevations depicting architectural details. Detailed elevations shall be reviewed and approved
by the Community Development Director prior to the issuance of building permits and shall
include the following:
Conditions of Approval- Plulming Commission Meeting of January L.2, 2002
PLN2001-142 -1274 Walnut Drive
2
a) Provision of building elevations and details illustrating architectural features such as
porches and railings, window boxes, shutters, or stone veneers.
b) Provide variation in the roof materials throughout the project. Composition roof
materials shall be 40-year quality or higher. Submit brochures or roof samples of the
color and material of the proposed roofing.
c) Windows shall have significant insets to create shadow lines and shall be detailed with
trim and sill details. The applicant shall submit elevations with window schedules
depicting high quality windows.
d) Garage doors shall have automatic opening devices and shall have decorative features
such as windows and panels.
e) The driveways, walkways, and porches shall use decorative pavement treatments such as
banding, colored concrete, brick courses, or other alternative pavement enhancements.
f) Architectural details shall be carried throughout all four elevations of the homes.
7. Landscape and Irrigation Plan: The applicant shall submit four sets of landscape and
irrigation plans indicating type and size of plant material including trees, shrubs, ground
cover, planting details, and automatic irrigation system to the Planning Division for review
and approval by the Community Development Director prior to the issuance of building
permit and shall include:
a) Five 24-inch box replacement trees for the protected trees removed.
b) A combination of trees, shrubs, and groundcover to effectively landscape the front yard
and side yard areas.
c) The seven required trees on each lot (existing trees may be included.)
d) Landscape and irrigation plans shall be consistent with the City's Water Efficient
Landscaping Standards (WELS.)
Buildin2 Division
8. Permits Required: A building permit application shall be required for each proposed new
structure. The building permit shall include Electrical/Plumbing/Mechanical fees when such
work is part of the permit.
9. Construction Plans: The Conditions of Approval shall be stated in full on the cover sheet of
construction plans submitted for building permit. Each detached structure shall be submitted
separately.
10. Size of Plans: The minimum size of construction plans submitted for building permits shall be 24 in.
X 36 in.
11. Plan Preparation: This project requires plans prepared under the direction and oversight of a
California licensed Engineer or Architect. Plans submitted for building permits shall be "wet
stamped" and signed by the qualifying professional person.
12. Soils Report: Two copies of a current soils report, prepared to the satisfaction of the Building
Official, containing foundation and retaining wall design recommendations shall be submitted with
Conditions of Approval- P.<dll1ing Commission Meeting of January .Û, 2002
PLN2001-142 - 1274 Walnut Drive
3
the building permit application. This report shall be prepared by a licensed engineer specializing in
soils mechanics.
13. Site Plan: Application for building permit shall include a competent site plan that identifies
property and proposed structures with dimensions and elevations as appropriate. Site plan
shall also include site drainage details.
14. Foundation Inspections: A pad certificate prepared by a licensed civil engineer or land surveyor
shall be submitted to the project building inspector upon foundation inspection. This certificate shall
certify compliance with the recommendations as specified in the soils report and the building pad
elevation and on-site retaining wall locations and elevations are prepared
a) according to approved plans. Horizontal and vertical controls shall be set and certified by a
licensed surveyor or registered civil engineer for the following items:
b) pad elevation
c) finish floor elevation (first floor)
d) foundation comer locations
15. Title 24 Energy Compliance: California Title 24 Energy Compliance forms CF-IR and MF-
lR shall be blue-lined on the construction plans. 8% X 11 calculations shall be submitted as
well.
16. Special Inspections: When a special inspection is required by U.B.C. Section 1701, the architect or
engineer of record shall prepare an inspection program that shall be submitted to the Building
Official for approval prior to issuance of the building permits, in accordance with U.B.C Section
106.3.5. Please obtain City of Campbell, Special Inspection forms from the Building Inspection
Division Counter.
17. Water Pollution Prevention: The City of Campbell, standard Santa Clara Valley Non-point Source
Pollution Control Program specification sheet shall be part of plan submittal. The specification sheet
(size 24" X 36") is available at the Building Division service counter.
18. Approvals Required: The project requires the following agency approval prior to issuance of the
building permit:
a) West Valley Sanitation District (378-2407)
b) Santa Clara County Fire Department (378-4010)
c) Bay Area Air Quality Management District (Demolitions Only)
d) School District:
· Campbell Union School District (378-3405)
· Campbell Union High School District (371-0960)
· Moreland School District (379-1370)
· Cambrian School District (377-2103)
Note: To Determine your district, contact the offices identified above. Obtain the School
District payment form from the City Building Division, after the Division has approved the
building permit application.
Conditions of Approval- PluMing Commission Meeting of January L.l, 2002
PLN2001-142 -1274 Walnut Drive
4
19. Water Pollution Prevention: The City of Campbell, standard Santa Clara Valley Non-point
Source Pollution Control Program specification sheet shall be part of plan submittal. The
specification sheet (size 24" X 36") is available at the Building Division service counter.
PUBLIC WORKS DEPARTMENT
20. Street Improvements: Prior to issuance of any grading or building permits for the site, the
applicant shall execute a Street Improvement Agreement and shall cause plans for public
Street Improvements to be prepared by a registered civil engineer, pay various fees and
deposits, post security and provide insurance necessary to obtain an encroachment permit for
construction of the standard public street improvements, as required by the City Engineer.
The fee for a non-utility encroachment permit application is currently $255.00. The plans
shall include the following:
a) Installation of storm drain improvements on Walnut Drive as determined by the City
Engineer.
b) Construction of conforms to existing public and private improvements, as necessary.
21. Work in the Public Right-of-Way: Prior to doing any work in the public Right-of-Way, the
applicant shall obtain an encroachment permit, provide plans, pay fees and deposits, post
security, and provide insurance.
22. Water Meter(s) and Sewer Cleanout(s): Existing and proposed Water Meter(s) and Sewer
Cleanout(s) shall be installed on private property behind the public right-of-way line.
23. Soils Report: Prior to issuance of any grading or building permits for the site, applicant shall
provide a Soils Report prepared by a registered geotechnical or civil engineer.
24. Utilities: All new on-site Utilities shall be installed underground per Section 20.36.150 of
the Campbell Municipal Code for any new or remodeled buildings or additions. Applicant
shall comply with all plan submittals, permitting, and fee requirements of the serving utility
compames.
25. Utility Installation Plan: Prior to issuance of building permits for the site, the applicant shall
submit a Utility Installation Coordination Plan and Schedule for approval by the City
Engineer for installation of street improvements and/or abandonment of all utilities. Streets,
which have been resurfaced within the previous 5 years, will require boring and jacking for
all new utility installations. Applicant shall also prepare pavement restoration plans for
approval by the City Engineer prior to any utility installation or abandonment.
26. Grading and Drainage Plan: Prior to issuance of any grading or building permits for the site,
the applicant shall conduct hydrology studies based on a 10 year storm frequency, prepare an
engineered Grading and Drainage Plan, and pay fees required to obtain necessary grading
permits. The plans shall comply with the 1998 edition of the California Building Code
including Chapters 10, 11, 18,33, and Appendix Chapter 33.
Conditions of Approval- Pldllning Commission Meeting of January L2, 2002
PLN2001-142 -1274 Walnut Drive
5
27. Storm Water Pollution Prevention Measures: Prior to issuance of any grading or building
permits, the applicant shall comply with the National Pollution Discharge Elimination
System (NPDES) permitting requirements and the California Storm Water Best Management
Practices Handbook prepared by the Storm Water Quality Task Force, Santa Clara Valley
Water District and the City of Campbell Municipal Code regarding Storm Water Pollution
Prevention. The City will provide the applicant with information to assist in complying with
this Condition of Approval. The primary objective is to improve the quality and reduce the
quantity of storm water runoff to the Bay.
Attachment #6
CONDITIONS OF APPROVAL FOR FILE NO. PLN2002-1 (TREE REMOVAL
PERMIT)
SITE ADDRESS:
APPLICANT:
P.c. MEETING:
1274 Walnut Drive
Omid Shakeri, on behalf of The Ridgecrest Group
January 22, 2002
The applicant is hereby notified, as part of this application, that (s)he is required to meet the
following conditions in accordance with the ordinances of the City of Campbell and the State of
California. The lead department with which the applicant will work is identified on each
condition where necessary. Where approval by the Director of Community Development, City
Engineer, Public Works Director, City Attorney, or Fire Department is required, that review shall
be for compliance with all applicable conditions of approval, adopted policies and guidelines,
ordinances, laws and regulations, and accepted engineering practices, for the items under review.
Additionally, the applicant is hereby notified that (s)he is required to comply with all applicable
Codes or Ordinances of the City of Campbell and the State of California that pertain to this
development and are not herein specified:
COMMUNITY DEVELOPMENT DEPARTMENT
Plannin2: Division
1. Approved Permit: Approval is granted for a Tree Removal Permit to allow the removal of
five trees on property located at 1274 Walnut Drive. This permit shall only be valid in
conjunction with an approved Site and Architectural Review Permit (PLN 2001-142.)
2. Replacement Trees: Five 24-inch box size trees shall be required as a replacement for the
five trees to be removed. The location and species of these trees shall be shown on the
detailed landscape and irrigation plans that shall be submitted to the Planning Division, prior
to the issuance of building permits, for review and approval by the Community Development
Director. The proposed replacement trees shall continue the diversity of tree species found in
the community and shall be a species listed in the City's Water Efficient Landscaping
Standards (WELS.)
01/15/2802 1::13
..082552..21
SARATOGA TREE SERIJIe
ATTACHMENT #9
Saratoga Tree Service
13745 Skyline Blvd.
Los Gatos, CA 95033
1-13-02
Omid Shakcra
Ridgecrest Group
3131 S Bascom, Ste. 110
Campbcll, CA 95008
Re. 1274 Walnut Ave
A sIte inspectJon was performed at the above location to detennine the condition of several trees.
To the left of the driveway are two Black Walnut trees. These are old orchard trees that were
grafted for nut producTIon. As is common with many old orchard trees, these are both showing
signs of decay In the grafted sections. There is also significant internal decay in one of these trees.
Facing the front of the house, on the tà.r left side of the property is another Black Walnut tree.
ThlS is showmg similar problems as the above mentioned two trees. None of these three
walnuts arc major trees in age or stature and are not of any heritage tree status.
Adjacent to the single Walnut is a Coast Live Oak. This tree has a diameter of about 16 inches
(D.S.H.). This tree does not show any problems associated with decay or dieback. The tree does
have an imbalance due to the location of the adjacent tree.
Respectfully submitted
~-:)g
Blair Glenn
1.5 A Certified AroorÍst #654
of{ . CA-'I1
. ,0<9
~ ~
_ r""
U r"
.- -'-
1- '-.
"" ,,'
O'?CH p.. v..\J'
-------------
CITY OF CAMPBELL
Community Development Department - Current Planning
April 12, 2002
NOTICE OF PUBLIC HEARING
Notice is hereby given that the Planning Commission of the City of Campbell has set the time of
7:30 p.m., or shortly thereafter, on Tuesday, April 23, 2002, in the City Hall Council Chambers,
70 North First Street, Campbell, California, for a Public Hearing to consider the application of
Mr. Omid Shakeri, on behalf of the Ridgecrest Group, for a Tentative Parcel Map (PLN2001-
141) to allow the creation of three lots, a Site and Architectural Review Permit (PLN200l-142)
to allow the construction of three new single-family residences and a Tree Removal Permit
(PLN2002-01) to allow the removal of four Walnut trees, ranging in size from 12 inches to 17
inches in diameter, on property owned by Mr. Fred Nourzad located at 1274 Walnut Drive in an
R-I-lO (Single Family Residential) Zoning District. This project is Categorically Exempt.
Interested persons may appear and be heard at this hearing. Please be advised that if you
challenge the nature of the above project in court, you may be limited to raising only those issues
you or someone else raised at the Public Hearing described in this Notice, or in written
correspondence delivered to the City of Campbell Planning Commission at, or prior to, the
Public Hearing. Questions may be addressed to the Community Development Department at
(408) 866-2140.
Decisions of the Planning Commission may be appealed to the City Council. Appeals must be
submitted to the City Clerk in writing within 10 calendar days of an action by the Commission.
In compliance with the Americans with Disabilities Act, listening assistive devices are available
for all meetings held in the Council Chambers. If you require accommodation, please contact the
Community Development Department at (408) 866-2140, at least one week in advance of the
meeting.
PLANNING COMMISSION
CITY OF CAMPBELL
SHARON FIERRO
SECRETARY
PLEASE NOTE:
When calling about this Notice,
please refer to File No. PLN2001-141/142 & PLN2002-01
Address: 1274 Walnut Drive
70 North First Street· Campbell, California 95008-1436 . TEL 408.866.2140 . lAX 408.866.8381 . TDO 408.866.2790
d . CAtt¡,o
~. <9
!:: ~
v r-
A
'",
O'?CH ~R<J
-- ------.-----.-.-.....- ----- -
CITY OF CAM.PBELL
Community Development Department - Current Planning
April 2, 2002
Re: PLN2001-141/142 & PLN2002-01 - 1274 Walnut Drive
Dear Applicant:
Please be advised that the above-referenced application has been scheduled for the following
meetings:
Site and Architectural Review Committee Meeting
Date: Tuesday, April 9, 2002
Time: 7:00 p.m.
Location: Planning Conference Room, City Hall, 70 N. First Street, Campbell
Planning Commission Meeting
Date: Tuesday, April 23, 2002
Time: 7:30 p.m.
Location: City Hall Council Chambers, 70 N. First Street, Campbell
Should you have any questions or comments, please do not hesitate to contact me at (408) 866-
2140.
Sincerely,
, ,
It¿f-{úuLL( {¿)lU...J.L~
Stephanie Willsey
Planner I
cc:
Omid Shakeri/The Ridgecrest Group (Applicant)
3131 S. Bascom Avenue, Suite 110
Campbell, CA 95008
Marvin Kirkeby (Engineer)
3249 Stevens Creek Blvd., #101
San Jose, CA 95117
Fred Nourzad (Property Owner)
3131 S. Bascom Avenue, Suite 110
Campbell, CA 95008
Memarie Assoc., Inc. (Designer)
12202 Saratoga-Sunnyvale Rd, #D
Saratoga, CA 95070
;"0 :\orth FIrst Street Campbell. Ca¡tortlla 95008-1436 :11. 408 8ö6 '2140 f.\X 408 866 8381 rrJlJ 408,866.'2790
é
. The
..Ridgecrest
Group
A. Real ~~CoiIIIpUII'
Date February 14, 2002
To: Stephanie Willsey, Planner, City of Campbell
From: John Maesumi
Ref: PLN 2001-141 & PLN 2001-42
Please, continue our application for site and architectural review and parcel map until we
revise our plans.
If you have any questions, please feel free to call me at 408-666-1881.
Sincerel Yours,
John Maesumi
3131 S. Bascom Ave., Ste 110, Campbell, CA. 95008
Tel: (408) 369-6800, Fax: (408) 369-6810
t . d
ess:so 20 S2 qa.::l
.J....~O <i ..CA. -1?,o<5'
/0... . {<'
- r""
V ,r-
. . .
.- .>.
1- '-.
"" ,,'
. 0 .
RCH AI'-l>
CITY OF CAMPBELL
Community Development Department - Current Planning
February 13,2002
Mr. Omid Shakeri
The Ridgecrest Group
3131 S. Bascom Ave.-STE 110
Campbell, CA 95008
Re: PLN2001-141, -142, & PLN2002-1
1274 Walnut Drive
Dear Mr. Shakeri:
Thank you for working with Staff to revise the plans as requested by the Planning Commission at
the meeting of January 22, 2002. The revisions that have followed the meeting have not
addressed all the design concerns that the Planning Commission expressed. I have summarized
the outstanding issues that need to be incorporated on the revised plans:
1. The primary concern is the similarity in design and massing of the three homes. The San
Tomas Neighborhood Plan (ST ANP) requires significant varied exterior elevations of new
homes proposed next to each other. Significant varied exterior variations means substantial
changes in the shape, mass, roofline, and architectural elements. Achieving these design
requirements on three adjacent homes using the identical floor plans cannot be accomplished.
Another floor plan needs be introduced to achieve the design variation as required by the
ST ANP.
2. The design of the homes should be a partial two-story design or one and a half story design
with dormers.
3. The driveways for the side loading garages need to be located adjacent to the existing
neighbors property line to provide privacy.
4. Two of the homes should have wood siding.
If you have any questions please do not hesitate to contact me at (408) 866-2143 or via email at
stephaniew@ci.campbell.ca.us.
Sincerely,
s~~
Project Planner
cc: Geoff Bradley, Senior Planner
Memarie Associates Inc., 12201 Saratoga-Sunnyvale Rd.-STE D, Saratoga, CA 95070
70 North F,rst Street Campbell, California 95008-1436 TEL 408.866.2140 . F·\X 408.866.8381 TDO 408.866.27QO
Audrey & Perry Kiehtreiber
·l~()9",~ri~f[)rìv~.
. . CäJnPÞCi)i,;:CA\~5()Ü8"
M>glß~+t~.n:i'Pnone,
498.61i~4"~94C~1l '
408.318"7798f~ '
2/5/02
To: Stephanie Willsey
Fax: 871-5140
Hi Stephanie,.
Here are the notes from the neighborhood meeting. I look forward to meeting with
Sharon and Jeff Wednesday night.
Just so you all know, this ends my role as an STNA representative in this matter, 1
am noW able to be "just another neighbor" in the area. The STNA representative to
the Planning Commission is Ms. Meg Stein, (408) 871-2606, and she will also be at
our meeting Wednesday night at 7:30pm in Sharon's office.
Yours sincerely,
Audrey Kiehtreiber
10 391;1d
39~N-' 11;1 S::.HNA8
85LL8LE80Þ
16:61 6006/S0/60
San Tomas
Neighborhood
Association
2/4/02
Attachment:
Audrey & Perry Kiehtreiber
1509 Walnut Drive
Campbell, CA 95008
Hm: 408-866-1411
Wk: 408-974-6031
house@cynic.org
Bill & Laurie Woodfill
550 Chapman
Campbell, CA 95008
Hm: 408-378-5886
Analise & Bill Wrightson
570 Walnut Drive
Campbell, CA 95008
Hm: 408-378-1735
wrightson2000@yahoo.com
David & Maureen Brady (did not attend)
1360 Walnut Drive
Campbell. CA 95008
Hm: 408-866-1101
dbpromo1 @aol.com
Craig Simmons (did not attend)
1305 Walnut Drive
Campbell. CA 95008
Hm: 408-370-2959
EØ 391:1d
39~l:1l 11:1 S:JINA:J
Audrey Kichtreiber
Newsletter Editor
1509 Walnut Drive
Campbell, CA 95008-6838
(408) 866-1411 phone
(408) 378-7798 fax
(408) 691-4194 cell
audrey@stna.campbell.ca.us
Mitchell & Julie Stermer
1 312 Walnut Drive
Campbell. CA 95008
H m: 408-378-3412
Hal & Joanne Carrol
1395 Walnut Drive
Campbell, CA 95008
Hm: 408-370-3142
hal@mysonic.oom
Cricket & George Baker
635 Chapman
Campbell, CA 95008
Hm: 408-378-6400
Lisa Hereford
1295 Walnut Drive
Campbell. CA 95008
408-866-5475
Carmel Hereford
1295 Walnut Drive
Campbell. CA 95008
408-866-5475
86LL8LE80Þ
1l:l1 l00l/~0/l0
Audrey Kiehtreiber
Newsletter Editor
1509 Walnut Ori ye
Campbell, CA 95008-6838
San Tomas (408) 866-1411 phone
Neighborhood (408) 378-7798 fax
. _ (408) 691-4194 cell
Association audrey@stna.campbell.ca.us
2/4/02
Walnut Area Community Meeting February 2,2002
All the neighbors expressed their very sincere appreciation to Ms. Sharon Fierro and Mr. Omid
Shakeri for their willingness to work with us. We feel that this will allow developers such as Mr.
Shakeri to build more aesthetically pleasing houses which will fit better into the neIghborhood, and
which wí1l also sell well.
Purpose: To discuss ways that the Ridgecrest development at 1274 Walnut Drive may be improved
to beller fit in with the overall design of the existing community and its immediate neighbors. This
is a strategy meeting in preparation for a meeting between the developer. Mr. Onúd Shakeri and the
community which will be set up by Ms. Sharon Fierro of the City of Campbell planning
department.
Here is a graphic representation of the three homes with number assignments in order to make it
clear which home we are referring to when making our reconunendations
Conceptual Ideas!
2
1
o
o
D
2 car garage in front
Walnut Drive
2 car garage in front
25' front setback
This is the house closest to
Stenner home. Increase lot size,
2 car garage OR detached garage
in rear (as shown in other
drawing). Increase side setbacks
to IS" on side facing Mitchell
home. Extend length of house to
retain FAR and square footage.
Make a PARTw... second story.
35'frünr serhack
30' front setback
Existing home design, 2 car
garage. Make this middle house
horizontal siding so as to
minimize the "square" look so
often found with stucco. This is
the middle house, the one with the
pool.
Þ0 39\;;1d
39~\;;1l 1\;;1 S:JINA:J
86LL8L£80Þ
1l:l1 l00l/S0/l0
Issues and Community Recommendations
Number of houses: The community agrees Ùlat dividing the property into 3 lots in order to build
one home per lot is fine.
UlÙqueness: This remains a primary concern of Ùle community, and most of Ùle other
recommendations are inrended (Q help preserve Û1t~ uniqueness of the neighborhood and keep it
from looking like an area full of traCt homes and cookie cutter style developments.
· We request that the lots be varied in sizc, with thc lot next to the Stenner home being large
enough to allow for a 15" side setback on the side closest to the Stenner home.
· Vary the home styles and colors of the proposed homes.
· We agree that building two of the homes with horizontal siding, and one with stucco facade
.. ,J bri'IV....-? is acceptable. The middle house, with the pool, which would present the largest front vicw
{jfJU' should NOT be stuccO, we request horizontal siding.
· Massive overall look is a concern. Build homes that are not quite as wide. and increase
fA r.l>fZl depth instead to provide the desired space. These are large deep lots, the houses can have
þr ~ larger setbacks and still retain their FAR.
Front Setbacks: Stagger Ùle house setbacks as shown in the drawing.
House #1 - 25' setback
House #2 - 30' setback
House #3 - 35' setback
~e setbacks: Increase side setbacks if possible to give neighbors more privacy.
House #1 - 15' setback on side closest to Stenner home
vi:rages Attached: Garages should be 2 car if attached to the home.
v 6arages Detached: If 3 car garages are desired, then the community recommends building rhem as
detached garages to the rear. The community also suggests that if a 3 car detached garage is desired
that a drive through carport be built as part of the main house. This will allow for a smaller front to
the house, but still provide support for a second story, as well as additional front parking for the
home owner. This design also firs in better with other homes in the area which also have carports
and detached garages.
~ty Lines: Request that all neW development be required to bury utility lines such as power
and cable.
Landscaping Front: Landscaping for the front should include at lease one evergreen variety of
tree in order to better fit in with other homes in the surrounding area. Recommended trees include:
~COMMENDED
Redwood
Douglas fir
Citrus - such as lemon, orange, grapefruit
Pepper
Nutmeg --Jræwlo1l1Oh' (i l'rt í pj,¡}I
Landscaping Back: Landscaping for the back shoul~e completed with at least a sod coverage
and some additional ~s. We prefer to not leave the back yards undone. ---=- ==:
J
'6 \'
Special Tree's: We request that the Id oak bordering the Stenner property be saved.
~
NOT RECOMMENDED (Hated)
vþrivots
acacias
S0 39\3d
39;j\3l 1\3 S8INA8
86LL8LE80Þ
1G:G1 G00G/S0/G0
San Tomas
Neighborhood
Association
Audrey Kiehtreiber
Newsletter Editor
1509 Walnut Drive
Campbell, CA 95008-6838
(408) 866-1411 phone
(408) 378-7798 fax
(408) 691-4194 cell audrey@cynic.org
Ms. Sharon Fierro
Community Development Director
70 N. First Street
Campbell, CA 95008
Wk: 408-866-2140
1/24/02
RECEIVED
.f i: }¡
U.,< ';1 .... 8
>'-j ./
CITY OF '"
PLANNltG'AMP8ELL
D£PT.
Dear Ms. Fierro,
As a result of the Planning Commission meeting of 1/22/2002 I was asked to facilitate
communication between the Campbell Planning Department and the local residents of the area
surrounding the proposed Ridgecrest Development at 1274 Walnut Drive. Attached is a list of
those residents who have expressed a desire to meet with the Campbell Planning department and
Mr. amid Shakeri, the developer.
I will arrange for a community meeting to take place no later than February 5th, after which time
you may wish to arrange for the meeting with yourself and Mr. Shakeri.
I would like to thank you, Mr. Shakeri and the Planning Commission for working with the
community on this matter.
Yours sincerely,
A f,<
~rS~eiber
cc: Residents, Mr. Omid Shakeri
Attachement: Resident List
San Tomas
Neighborhood
Association
1/24/02
Attachment:
Audrey & Perry Kiehtreiber
1509 Walnut Drive
Campbell, CA 95008
Hm: 408-866-1411
Wk: 408-974-6031
house@cynic.org
Bill & Laurie Woodfill
550 Chapman
Campbell, CA 95008
Hm: 408-378-5886
Analise & Bill Wrightson
570 Walnut Drive
Campbell, CA 95008
Hm: 408-378-1735
wrightson2000@yahoo.com
David & Maureen Brady
1360 Walnut Drive
Campbell, CA 95008
Hm: 408-866-1101
dbpromo1 @aol.com
Craig Simmons
1305 Walnut Drive
Campbell, CA 95008
Hm: 408-370-2959
Audrey Kiehtreiber
Newsletter Editor
1509 Walnut Drive
Campbell, CA 95008-6838
(408) 866-1411 phone
(408) 378-7798 fax
(408) 691-4194 cell audrey@cynic.org
Mitchel & Julie Stermer
1312 Walnut Drive
Campbell, CA 95008
Hm: 408-378-3412
Hal & Joanne Carrol
1395 Walnut Drive
Campbell, CA 95008
Hm: 408-370-3142
hal@mysonic.com
Cricket & George Baker
635 Chapman
Campbell, CA 95008
Hm: 408-378-6400
Lisa Hereford
1295 Walnut Drive
Campbell, CA 95008
Carmel Hereford
1295 Walnut Drive
Campbell, CA 95008
Good Evening,
My name is Mitchell Stermer. I live at 1312 Walnut Dr., Campbell Ca., adjacent to the
property that is before you for review.
I have lived at this address since 1988. I have a wife and son. My son attends Campbell
Union Schools.
I want to thank the San Tomas Neighbor Associations for providing flyer to my
neighbors. I was fortunate enough to receive notice of this project from the city, but most
of the resident in my area where informed by the San Tomas Neighbor Association.
The streets in the San Tomas area, where I live, can best be described as modest. It is one
ofthe few areas left in the valley that has a rural feel. Most homes are over 30 years olds,
single story ranch style, with 2 car garages on the street or larger garages in the back of
the lot. There are very few two-story homes. Because ofthe types of homes and sizes of
the lots, the residents enjoy a great deal of privacy.
I have several concerns with the project proposed by The Ridgecrest Group. I have
spoken with Mr. Shakeri. He was kind enough to come to my home with the plans of the
houses he proposes to build. I spent more than an hour with him and I discussed several
of my concerns with him. Most of what I want to talk about I have discussed with him.
There are a few items I will speak about that I did not talk to Mr. Shakeri about. Not
because I wanted to surprise him, but because I just did not think of them at the time.
I. Removal of trees
I have an issue with one tree he would like to remove. It is an oak tree next to my
property. A large portion of the tree (almost half) hangs over my property. It provides a
great deal of privacy, especially if a two-story home is built next to my property. The
builder has proposed planting a smaller tree.
There is a large Walnut tree in the South East part of the property that I very
beautiful. I know this tree is not on the list of trees to be removed, but I just wanted to
make my wishes known to protect this tree.
II. Proposed size of homes
I am concerned that a 3500 sq. ft home would dwarf the current homes on the
street. A 3500 sq ft is approximately twice the size of my home.
III Look
I am concerned that the 3 car garages facing the street would significantly change
the character of the street. There is a relatively new home on the corner of Walnut and
Chapman. The side of the home that faces Walnut and it neighbors has a ranch feel, The
Chapman side does not face any home direct entry way. That is the side that has the
garages.
I would prefer that the homes built be single story residents. In the past few days I
have taken several walks in my neighbor. I have found only 3 two-story homes within
three blocks of my home. The proposed three new two-story homes double that number
and significantly change the look of Walnut Dr.
IV. Uniqueness
The San Tomas area is make up of unique homes. There are no two homes in the
area that are identical. This feature enriches he neighborhood. The propose homes are
basically 3 identically houses, two in wood and one in stucco. The proposed new houses
will have the effect of building "track homes" in this unique area.
V. Set back
The builder told me, that the new homes were going to have a 35 ft. setback. This
is much further back than my home. I would like to reduce the differences in the setback
between my home and any new homes built to within 5 ft.
VI. Fence
I am concerned about my privacy. I have a pool in by back yard. Because of the
layout of 1274 Walnut Dr. privacy has never be an issue. When a home is built adjacent
to my home, I would like a six-foot fence with a one-foot lattice. Another proposal would
be to have a fence that is the same height of the fence that separates the properties on
Walnut Dr. with the commercial property facing Winchester Ave, (P-COM). I would like
the fence to be at least six feet with the lattice on my side ofthe property.
VII. Power lines.
Since new homes are going in, I would like to see the builder put power,
telephone, and cable line underground.
VIII. Construction time.
I do not know what limits, times are allowed in Campbell. I would like to reduce
the time construction is underway while I am at home in the evenings and have no
constructions on weekends.
IX. Street
I would like to see the current look of the street remain, no curbs, gutters or
sidewalks.
~~'__~"_~'_''''''''''_''~"''''''''_~~~~_'__'"_'''""_''"~''''~'_'__',,_____.H_".._...__._~~~_______._'~·_____'_·
X. Landscaping
I was told that only the front ofthe homes would be landscaped.
I would like to see the property completely landscaped before anyone could
occupy the homes. I understand that this may not be completely possible. I would like
some time limits to be put on the new owner to begin landscaping.
XI. Frontage
What is the minimal lot width that 1274 Walnut Dr. can be divided?
I have been aware of the possibility of homes being built next to mine since I purchased
it. I would like the charm, character, and uniqueness of this rural area remain. This is
what the San Tomas Neighbor Association has strived to do for so any years.
Knowing that some type of homes is going to be built, I have bought some examples of
two-story homes in the San Tomas area, close to my home.
550 Chapman
1391 Stevens Ct.
645 Chapman
1511 Theresa Ave.
1069 Audrey
If two-story homes have to be built, I believe that the homes, I have shown you, better
represent two-story homes that fit the characteristics of my neighborhood.
In closing, I would like to say that I have a long-term commitment to this neighborhood.
The homes I have shown you were updated or built by people who live in the area. Each
of these homes is unique.
The three houses before you are basically the same home, almost identical, track homes.
The group who propose to build these homes will not be living in them. They are
speculating that they can provide what they think will sell. Their concerns are with
building homes for profit. When the houses are built, I will be there and so will my
neighbors. We will have to live with these new homes and there impact on our
neighborhood.
Please reject the propose plan before. Consider single story homes, smaller two-story
homes or second story homes that have minimal impact on the current residents. Consider
detached garages in the back of the lot or limit them to a two car garages. Work with the
builder to provide homes that we can be proud to add and welcome to your
neighborhood.
Thank you
01/15/2002 12:13
4082552421
SARATOGA TREE SERVIC
Saratoga Tree Service
13745 Skyline Blvd.
Los Gatos, CA 95033
I ~ 13-02
Omid Shakera
Ridgecrest Group
3131 S Bascom, Ste. 110
Campbell, CA 95008
Re: J 274 Walnut Ave
A site inspection was perfonned at tbe above location to detennine tbe condition of several trees.
To the left ofthe driveway are two Black Walnut trees. These are old orchard trees that were
grafted for nut production. As Ìs common with many old orchard trees, these are both showing
signs of decay in the grafted sections. There is also significant internal decay in one of these trees.
Facing the front ofthe house, on the far left side of the property is another Black Walnut tree.
This is showing similar problems as the above mentioned two trees. None of these three
walnuts are major trees in age or stature and are not of any heritage tree status.
Adjacent to the single Walnut is a Coast Live Oak. This tree has a diameter of about 16 inches
(D.ß.H.). This tree does not show any problems associated with decay or dieback. The tree does
have an imbalance due to the location of the adjacent tree.
Respectfully submitted
~)~
Blair Glenn
I.S.A Certified Arborist #654
·-"~
of{ . CA-1?
. /)<9
Ç: ~
-.. ' {'"'"'
U r"
,~
.- -'-
1- '-.
"" ,,'
aRc H" 1'-1>
..--------------
--------
CITY OF CAMPBELL
Community Development Department - Currènt Planning
January 11, 2002
NOTICE OF PUBLIC HEARING
Notice is hereby given that the Planning Commission of the City of Campbell has set the time of
7:30 p.m., or shortly thereafter, on Tuesday, January 22, 2002, in the City Hall Council
Chambers, 70 North First Street, Campbell, California, for a Public Hearing to consider the
application of Mr. Omid Shakeri, on behalf of the Ridgecrest Group, for a Tentative Parcel Map
(PLN2001-141) to allow the creation of three lots, a Site and Architectural Review Permit
(PLN2001-142) to allow the construction of three new single-family residences and a Tree
Removal Permit (PLN2002-001) to allow the removal of five trees on property located at 1274
Walnut Drive in an R-l-lO (Single Family Residential) Zoning District. This project is
Categorically Exempt.
Interested persons may appear and be heard at this hearing. Please be advised that if you
challenge the nature of the above project in court, you may be limited to raising only those issues
you or someone else raised at the Public Hearing described in this Notice, or in written
correspondence delivered to the City of Campbell Planning Commission at, or prior to, the
Public Hearing. Questions may be addressed to the Community Development Department at
(408) 866-2140.
Decisions of the Planning Commission may be appealed to the City Council. Appeals must be
submitted to the City Clerk in writing within 10 calendar days of an action by the Commission.
In compliance with the Americans with Disabilities Act, listening assistive devices are available
for all meetings held in the Council Chambers. If you require accommodation, please contact the
Community Development Department at (408) 866-2140, at least one week in advance of the
meeting.
PLANNING COMMISSION
CITY OF CAMPBELL
SHARON FIERRO
SECRETARY
PLEASE NOTE:
When calling about this Notice,
please refer to File No. PLN2001-141/142 & PLN2002-001
Address: 1274 Walnut Drive
70 North First Street· Campbell, California 95008-1436 . TEL 408.866.2 40 . FAX 408.866.8381 . Tim 408.866.2790
~~O<i. CA-11,òð
~ ~
U t"'"
o 0
.- ...
-s.~ .t'
. (.
O~CH"..Q·
Public Notice
Trees to be Removed
Site Address: 1274 Walnut Drive
Tree Removal Permit Application (PLN2002-1) in conjunction
with a Tentative Parcel Map (PLN2001-141) and Site and
Architectural Review Permit (PLN2001-142)
THE PROPERTY OWNER OR DEVELOPER IS
REQUESTING APPROVAL TO REMOVE TREES
MARKED WITH FLOURESCENT TAPE ON THIS SITE.
This tree removal request is subject to a public hearing at the
date, location, and time noted below. All interested persons
may comment on the proposed removals in writing or at the
public meeting. Appeals may be made in writing and the
current appeal fee paid to the City Clerk's Office ten (10) days
following the decision of the Planning Commission.
DATE OF POSTING: Januarv 7.. 2002
DATE/TIME/LOCATION OF HEARING: Januarv 22.. 2002
(ii) 7:30 p.m. in the City Council Chambers of City Hall.. 70 N.
First Street.. Campbell.. CA 95008.
IF YOU HAVE QUESTIONS OR COMMENTS, PLEASE
CALL THE CAMPBELL PLANNING DEPARTMENT AT
(408) 866-2140.
o<i . CA-1?
. Þô>
2: «'
...... r""
U r
.- -'-
1- '-.
"" ,,'
°RCH" 1'-1>'
-----------------
CITY OF CAMPBELL
Community Development Department - Current Planning
January 3, 2002
Re: PLN200l-l41/142 - 1274 Walnut Drive - Tentative Parcel Map and Site and
Architectural Review Permit
Dear Applicant:
Please be advised that the above-referenced application has been scheduled for the following
meeting(s):
Site and Architectural Review Committee Meeting
Date: Tuesday, January 8, 2002
Time: 6:50 p.m.
Location: Doetsch Conference Room, City Hall, 70 N. First Street, Campbell
Planning Commission Meeting
Date: Tuesday, January 22,2002
Time: 7:30 p.m.
Location: City Hall Council Chambers, 70 N. First Street, Campbell
Should you have any questions or comments, please do not hesitate to contact me at (408) 866-
2140.
Sincerely,
~~Lu~
Stephanie Willsey
Planner I
cc: Omid Shakeri (Applicant)
The Ridgecrest Group
3131 S. Bascom Avenue-STE 110
Campbell, CA 95008
Reza Norouzi
Memarie Associates Inc. (Architect)
12201 Saratoga-Sunnyvale Road-STE D
Saratoga, CA 95070
70 North First Street· Campbell, California 95008-1436 . TEL 408.866.2140 . FAX 408.866.8381 . 11m 408.866.2790
of{ . CA-1?
. ,oô>
.ò.. .. ;J","~~~ ('
è;~~;~!~~ ~
" ./ f -
~ .t:JILD.,:J<:....--......
"" ,,'
0- .
1';(" H f>.., \,-0
---- --_._~_._..---- -----_..-----------
CITY Of CAM.PBELL
Community Dçvelopment Departmçnt - Currçnt Planning
December 18,2001
Mr. Omid Shakeri
The Ridgecrest Group
3131 S. Bascom Ave.-STE 110
Campbell, CA 95008
RE: PLN2001-141 & PLN2001-142
1274 Walnut Drive
Dear Mr. Shakeri:
The Planning Division has reviewed your applications for a Tentative Parcel Map and
Site and Architectural Review for property at 1274 Walnut Drive. Your application has
been deemed incomplete. The following additional information and details are needed in
order to deem your application complete.
Tentative Parcel Map
Indicate the folowing on the Tentative Parcel Map:
1. Adjacent properties and names of adjoining property owners.
2. The name and address of the current property owner.
3. A section of the existing street as there are no planned improvements for Walnut
Drive.
4. Existing General Plan designation of the property.
5. The previous subdivisions for this property.
Site and Architectural Review Package
I. Preliminary Grading and Drainage Plan.
') Grant Deed.
3. 15 sets of reduced 11 x 17 colored elevations of the street view.
4. Sample Board and Photos - Building materials, paint colors, and photographs of the
subject site and sUlTounding properties.
5. Preliminary Landscape Plan - All new development is required to have one tree per
each 2,000 square feet of net lot area. All landscaping should also comply with
Campbell's Water Efficient Landscape Guidelines (enclosed).
6. Site Plan - The following information needs to be included on the site plan:
a. The variety of the existing Walnut trees.
b. Bottle-neck down the driveways to a maximum width of 20 feet at the right-of-
-.- -_._------~
.~ ._-----~-_._--_.__._._.
---------~------
--
'~" '~;'. r"r'::~ ~:[(\:c,
(~~~!i!'.:~rn¡~; C~';;{)O.ojj ~3ti i"::t 40S.\~{;6 '2l-~O F\,\ ·iOSjÖÒ 83q 1 '-j'¡D 40S rjt,6.2790
PLN2001-141 & PLN2C
,42 1274 Walnut Drive Page 2 oU
...............................................--....................................................................-......................................................................................................
........................................................................
way and show a decorative paving treatment.
c. Show the first floor footprint and the line of the second floor.
d. The minimum setbacks are not provided. At least one side shall be the greater
of 10 feet or 60% of the wall height. The other side shall be the greater of 8 feet
or 60% of the wall height. Enclosed, please find a handout that demonstrates
how we measure wall height for the purpose of calculating setbacks.
e. Fireplaces may encroach a maximum of 18 inches into the required setback
area.
f. Include the covered porches in the lot coverage calculation.
g. Provide a 30-foot front setback in order to match the predominant established
block pattern.
7. Elevations - The following information needs to be included on the elevations:
a. Height of all buildings to roof peak.
b. The massing of the second story continues to be a concern. Staff recommends
that you investigate alternatives to the clear story. By eliminating the clear
story and setting in the second story from the side elevation, the perceived mass
of the second story will be reduced without compromising usable floor area.
Architecture - Parcel One
1. Change the exterior building material to wood siding.
2. Remove the river rock from the column bases.
3. Center the second floor window on the right side of the front elevation.
4. Remove the shutters and planter boxes from all elevations. Replace with wood
trim and window sills on all windows.
Architecture - Parcel Two
1. Remove the shutters from all elevations. Replace with a broad wood trim and
window sills around all windows.
2. Carry the stone veneer to the fireplace on the left elevation and to the door on the
right elevation.
3. Reduce the height of the clear story window to a single-story window.
4. Center the second floor window on the right side of the front elevation.
Architecture - Parcel Three
1. Center the second floor window on the left front elevation.
2. Provide a decorative garage door.
PLN2001-141 & PLN20 42 1274 Walnut Drive Page 3 of3
........................................................................ ................................................-................................................................................ ..........................................................................................
If you have any questions please do not hesitate to contact me at (408) 866-2143 or via
email atstephaniew~ci.campbell.ca.us.
Sincerely,
s~w~
Planner I
encl: Water Efficient Landscape Guidelines
Calculating Wall Height Handout
cc: GeoffBradley, Senior Planner
Memarie Associates Inc., 12201 Saratoga-Sunnyvale Rd.-STE D, Saratoga, CA 95070
of{· CA-1?þ
~. ¢'
!::: ç.
u .-
J
.- -'-
1- '-.
"" ,,'
°RCH A. \to·
------.-----------
CITY OF CAMPBELL
Community Development Department - Current Planning
December 10, 2001
Referral Agencies
Re: PLN2001-141 and PLN2001-142
1274 Walnut Drive, Campbell
APN: 406-21-018
Dear Referral Agency:
The Community Development Department has received the above referenced Tentative Parcel
Map proposing a three-lot subdivision. Please forward any comments to the Planning Division
by December 31, 2001.
If you should have any questions regarding this referral, please do not hesitate to contact the
undersigned at (408) 866-2143
Sincerely,
JhIu~ ~
Stephanie Willsey
Planner I
end: Tentative Parcel Map
dist: Santa Clara County Health Department
United States Post Office
Campbell Union School District
PG&E
Pacific Bell
Santa Clara Valley Water District
San Jose Water Company
W est Valley Sanitation District
Valley Transportation Agency
Green Valley Disposal
TCI