Loading...
Pre-App - 6-unit apts - 2010CITY of CAMPBELL Community Development Department January 11, 2011 Robert Hicks, General Manager Ainsley Plaza, LLC 43 Harrison Ave. Campbell, CA 95008 Re: File No: PRE2010-OS Address: 43 Harrison Avenue Application: Pre-Application (6-unit Apartment Building) Dear Mr. Hicks, Thank you for submittal of a preliminary application fora 6-unit apartment building on property located. at the above referenced address. The preliminary project plans were reviewed by the Planning Division as well as the Building Division, the Public Works Department, and the Count}~ Fire Department. Comments from these departments are summarized below (comment sheets are attached for your reference). Please note that this review letter is limited to the overall project design concept and should not be not construed as a substitute for formal project review. Permit and Fee Requirements: This proposal would require an application for a Conditional Use Permit with Site & Architectural Review and likely preparation of an initial study pursuant to the California Environmental Quality Act (CEQA). The current review fees are listed below. Please note that these fees are subject to change at the begiruiing of the fiscal year and are due upon application submittal. • Conditional Use Permit: • Site & Architectural Review: • Initial Study (CEQA Review): • Fire Dept. Review Fee: • County CEQA Filing Fee: (Due prior to public hearing) $3,536 $6,347 $10,000 deposit (charged at actual time) $ 235 $2,094 2. Post Entitlement Fees: In addition to the above application fees, and building permit fees, the following fees will be due following approval of the project: • Mitigation Monitoring Fee: (Due prior to building permit issuance) • Park in-lieu Fee: (Due prior to building permit final) $8,000 deposit (charged at actual time) $39,540 ($6,590 per unit x 6) PRE2010-OS ~ 43 Harrison Ave. Page 2 of 5 3. ;Development Standards: The project site is located in the Central Business District (C-3) ;zoning District and subject to the development standards listed below. Additionally, the project site is also subject to the City's Downtown Development Plan which specifies City policies for development in the Downtown. Development Feature Central Business District (C-3) Zoning District Up to 1.25 The Planning Commission or City Council may approve a F.A.R. of up to 1.5 if it makes all of the following findings: a. The scale and intensity of the development does not create adverse traffic and parking impacts on the Downtown. Maximum b. The balance of land uses emphasizes retail and restaurant uses consistent Floor Area Ratio (FAR) with the goals and objectives of the Redevelopment Agency Implementation Plan. c. The design, scale, and context of the project are consistent with the goals and objectives established in the Downtown Development Plan. d. A finding of community benefit be established stating how the development furthers the goals and objectives of the Redevelopment Agency in the Downtown area that otherwise could not be achieved with a lesser F.A.R. Setbacks Required Front Side (each) Non t b i d b th Sit d A hit ct l R i P it e, excep as may e requ re y e e an rc e ura ev ew erm . Street side Rear Maximum Height Limit 45 ft. 4. Enviromnental Review: As indicated above, this project may require an initial study in compliance with CEQA. An initial study reviews a project proposal for possible environmental impacts and will be prepared by the Planning Division staff. A formal application will remain incomplete until completion of the initial study. Supplemental reports (e.g., historical assessment, acoustical analysis, etc.) and other documents will be required as part of this process. 5. ;Below Market-Rate Housing: The City's Inclusionary Housing Ordinance requires that projects with 10 or more units set aside 15% of the units as affordable. Although this project, as currently presented, has fewer than 10 units, some number of affordable units nay still be required because the project site lies within the City's Redevelopment Project .Area. Projects within the Project Area are required to provide affordable housing units commensurate with the Redevelopment Agency's obligation to ensure that 15% of new l:~ousing within the Project Area is affordable. The exact number and level of affordability will be determined by negotiation with the Redevelopment Agency. PRE2010-O5 - 43 Harrison Ave. Pg. 3 of 5 6. Project Considerations: Based on a review of the preliminary project plans, staff has identified the following issues that should be considered prior to application submittal: a. Site Circulation: The project proposes to allow vehicular access through the Ainsley Park parking lot and out the adjacent alley. Although staff is not unsupportive of this circulation pattern it presents several issues that must be addressed: • When regularly scheduled Downtown events (e.g., Big Bands and BBQ, Oktoberfest, etc.) are held, as well as during the weekly farmer's market, Campbell Avenue is blocked to vehicle traffic. This street closure would restrict inbound access into the apartment building through the Ainsley Park parking lot. It is not clear from the project plans if the vehicular opening along the alley would provide egress and ingress, but due to the Campbell Avenue street closures, two- way vehicular access from the ally would be required. • Although it will be necessary to allow alley access for egress and ingress, its use by residents may be problematic should other users of the alley be traveling in the opposite direction or double park vehicles. Please note that the alley is not an accepted City right-of--way and no parking or traffic restrictions on its use apply. It would be the responsibility of the property management to work with. other users (business owners) to ensure adequate access for residents. This situation would need to be disclosed to residents of the apartment through the leasing process. b. Fire Department Access: The enclosed Fire Department comment sheet identifies several applicable requirements of the California Fire Code. In summary, the Fire Department has indicated the need for this project to provide suitable vehicular access for fire apparatuses as well as sufficient ground clearance for ground-latter rescue. The use of the alley and adjacent parking lot for vehicular access cannot fulfill State Fire Code access requirements. Further, the placement of the building at the edge of the alley would restrict ground-latter rescue. Although a residential project may work on this site, the insufficient site access will create obstacles that will restrict the current design. However, the Fire Department has indicated that if this project were to include the adjacent Redevelopment Agency owned parcel, that fire apparatus access to the site could be accommodated via Civic Center Drive. c. Interface. with Public Property: Notwithstanding the access issues brought forth by the Fire Department, city staff has concerns about the interface with the adjacent Redevelopment Agency property. At a minimum, the City would require some form of public improvement to this property. The creation of a publicly accessible civic or recreational space (e.g., park, plaza, etc.) could be viewed as a reasonable public improvement. Staff would encourage any ideas that you might offer to improve this parcel. If you are unable to design a project that satisfies Fire Code requirements, the incorporation of this parcel into the project site could be considered. This would PRE2010-OS ~ 43 Harrison ~.~e. P~. 4 of 5 allow the building to be brought forward to front Civic Center drive, increase the number of units that could constructed, and provide more flexibility for site circulation. However, due to traffic safety considerations, the City would not be supportive of taking vehicular access from Civic Center Drive. d. Architecture. Staff is supportive of the architectural design of the proposed apartment building. The building makes good use of brick and wood, complementary to the Ainsley Packing Company building, while maintaining a contemporary appearance. Additionally, the building's form and architectural detailing lend the building a strong presence. With application submittal, it will be necessary to provide project plans that include detailed building elevations and exhibits depicting architectural details. The project details should reflect the use of high-quality durable materials appropriate for an historic downtown setting. 7. :Application Submittal: The following is anon-inclusive listing of items that will be expected with application submittal: ~~. Residential Density: The density of a residential project is determined by the site's gross lot size. Gross lot size is the net lot area plus the lot area to the centerline of adjacent public right(s)-of--way. The project site is adjacent to Ainsley Park, which is a public right-of--way with a 25-foot centerline. Therefore, with application submittal please provide a project density utilizing the gross lot size. Please note that the maximum density for the C-3 Zoning District is 27 units per gross acre. '~. Site Plan: The project site plan should show all parking space, drive aisle, driveway, and setback dimensions. Additionally, the site plan should show all right-of--way improvements (street, sidewalk, curb) and dimensions (including street centerline). ,.. Grading and Draina~: A grading and drainage plan indicating existing and proposed grades, and showing management of on-site drainage (including square- footage area of existing and proposed impervious/pervious surfaces) will be required. d. Landscaping: A landscaping plan prepared by a licensed landscape architect, in compliance with Chapter 2.7, Division 2, of Title 23 of the California Code of Regulations -Water Efficient Landscape Requirements will be required. .,. Open Space: Although the C-3 Zoning District does not specify an open space requirement for residences, it will be necessary to provide a breakdown of private open space (balconies) and common open space for the project. E Cal Green Requirements: This project would be subject to the California Green Building Standards. Any standard(s) that may impact site design must be implemented with application submittal materials. 70 North First Street • Campbell CA 9008-1423 • TF~ (408) 866 ? 140 • Fay (408) 866-5140 • E-n4glt. planningCciryoYcampbell.com PRE20 ] 0-OS ~ 43 Harrison ~ . ~e. P~.SofS g. Utility Connections: New and/or existing utility connections serving the site or within the interior of the project site will need to be placed underground. The site plan will need to indicate the undergrounding of all utilities. h. Refuse and Rec. c~ ham: Please indicate the storage location of refuse/recycling receptacles within the building and verify conformance with requirements of the City's refuse management company, West Valley Collection & Recycling. Walkway Easement: When the office building on the adjacent property (54 N. Central Ave.) was approved in 1999, the City required recordation of an easement to allow a publicly accessibly walkway from Civic Center Drive to the ally. To increase the usability of this walkway, the City will likely require a similar easement on the project site and creation of an expanded walkway. If you should have any questions regarding these comments, 1 may be contacted at (408) 866- 2193 or by email at danielf cr,cityofcampbelLcom . Since , D ~e lama Assistant Planner encl: Public Works Comment Sheet, dated 1/4/2011 Building Division Comment Sheet, dated 12/13/2010 Fire Department Comment Sheet, dated 12/10/2010 cc: Kirk Heinrichs, Community Development Director Paul Kermoyan, Planning Manager Bill Bruckart, Building Official Ed Arango, Land Development Engineer Doug Harding. Fire Department 70 North First Street • Campbell, CA 95008-1423 • TCt. (408) 866-2140 • Fax f.408) 866-5140 • E-main planning~>.cityofcampbell.com