CC Ordinance 2226ORDINANCE NO. 2226
BEING AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF CAMPBELL ADOPTING A
CITY-INITIATED ZONING CODE AMENDMENT (PLN2017-124) REPEALING AND REPLACING
CHAPTER 21.34 (WIRELESS TELECOMMUNICATIONS FACILITIES) OF THE ZONING CODE
TO COMPLY WITH NEW REGULATIONS FOR THE DEVELOPMENT OF WIRELESS
TELECOMMUNICATIONS FACILITIES.
After notification and public hearing, as specified by law and after presentation by the Community
Development Director, proponents and opponents, the hearing was closed.
After due consideration of all evidence presented, the City Council of the City of Campbell does
ordain as follows:
SECTION 1: The City Council finds and determines that the adoption of the proposed Zoning Code
Amendment is exempt from the California Environmental Quality Act (CEQA) pursuant to Sections
15060(c)2 (the activity will not result in a direct or reasonably foreseeable indirect physical change
in the environment), 15060(c)3 (the activity is not a project as defined in Section 15378), and
Section 15378(b)(5), (a project does not include administrative activities of governments that will
not result in direct or indirect physical changes in the environment).
SECTION 2: The proposed Zoning Code Amendment (PLN2017-124) is a Citywide Ordinance.
SECTION 3: The proposed Zoning Code Amendment _ (PLN2017-124) may be approved
concurrently, and subject to, the adoption of Wireless Facility Design Requirements (PLN2017-
127).
SECTION 4: Rescinding of Wireless Telecommunications Provisions: Campbell Municipal
Code Section 21.34 (Wireless Telecommunications Facilities) is hereby deleted in its entirety
from Article 3 (Development and Operational Standards) of Title 21 (Zoning Code) of the
Campbell Municipal Code.
SECTION 5: Adopting of Wireless Telecommunications Chapter: Chapter 21.34 (Wireless
Telecommunications Facilities) is hereby added to Article 3 (Development and Operational
Standards) of Title 21 (Zoning Code) of the Campbell Municipal Code as set forth in attached
Exhibit A-1.
SECTION 6: This Ordinance shall become effective thirty (30) days following its passage and
adoption and shall be published, one time within fifteen (15) days upon passage and adoption in
the Campbell Express, a newspaper of general circulation in the City of Campbell, County of Santa
Clara.
PASSED AND ADOPTED this 19th day of September, 2017 by the following roll call vote:
AYES: Councilmembers: Waterman, Cristina, Landry, Resnikoff, Gibbons
NOES: Councilmembers: None
ABSENT: Councilmembers: None
ABSTAIN: Councilmembers: None
Council Ordinance No. 2226
paling and Replacing Chapter 21.34 (PLN2017-124)
~2of2
n~
"Liz" Gibbons,
ATTEST:
Wendy o d, City Clerk
Exhibit A-1
Chapter 21.34 -Wireless Communications Facilities
Sections:
21.34.010 -Purpose.
21.34.020 -Applicability.
21.34.030 -Exemptions.
21.34.040 -Permits required.
21.34.050 -Application procedures.
21.34.060 -Submittal requirements.
21.34.070 -General requirements; standard conditions of approval.
21.34.080 -Regulations for facilities subject to a zoning clearance.
21.34.090 -Location of wireless communications facilities.
21.34.100 -Design requirements.
21.34.110 -Special findings for wireless communications facilities.
21.34.120 -Failure to act and remedies.
21.34.130 -Prohibited grounds for denial.
21.34.140 -Revocation of permit.
21.34.150 -Temporary wireless communications facilities.
21.34.160 -Limited exemption from standards.
21.34.170 -Independent consultant review.
21.34.180 -Changes in law.
21.34.190 - Severability.
21.34.200 - Def nitions.
21.34.010 -Purpose.
The purpose and intent of this chapter is to provide a uniform and comprehensive set of
standards for the orderly development of wireless communications facilities and to reasonably
regulate, to the extent permitted by California and federal law, the placement, affixing,
attachment, mounting, construction, erection, installation, siting, collocation, modification,
relocation, development, use, operation, maintenance, and removal of wireless communications
facilities in the City of Campbell in a manner that protects and promotes public health, safety and
welfare, and balances the benefits that flow from robust wireless services with the unique and
historic character, aesthetics and local values of the City. The standards contained in this chapter
are designed to minimize the adverse visual impacts and operational effects of these facilities
using appropriate design, siting and screening techniques while providing for the communications
needs of residents, local business and government of the City and the region.
These regulations are not intended to, and shall not be interpreted or applied to:
A. Prohibit or effectively prohibit personal wireless services; or
B. Unreasonably discriminate among providers of functionally equivalent personal
wireless services; or
C. Regulate the installation, operation, collocation, modification or removal of
wireless facilities on the basis of the environmental effects of RF emissions to the
extent that such emissions comply with all applicable FCC regulations; or
D. Prohibitor effectively prohibit any collocation or modification that the City may not
deny under California or federal law; or
E. Preempt any applicable California or federal law.
21.34.020 -Applicability.
This chapter applies to all wireless communications facilities including, without limitation, all
new facilities, existing facilities, modifications to existing facilities, wireless transmission devices,
support structures and related accessory equipment, unless exempted by Section 21.34.030
(Exemptions).
21.34.030 -Exemptions.
The following uses shall be exempt from the provisions of this chapter:
A. Any non-commercial communication service as defined in Section 21.34.200.
B. Facilities in public rights-of-way which are regulated by Title 11 of the Campbell
Municipal Code.
C. Public safety communications facilities owned and operated by the City, County,
State, or Federal Government.
D. Facilities owned and operated by the City for its use.
E. Over-the-air reception devices ("OTARDs") as defined in 47 Code of Federal
Regulations (C.F.R.) Section 1.4000 et seq., as may be amended or superseded,
which include without limitation, direct-to-home satellite antennas smaller than
three feet in diameter.
F. All antennas and wireless communications facilities identified by the FCC or the
California Public Utilities Commission (CPUC) as exempt from local regulations.
21.34.040 -Permits required.
A. Permit required. Wireless communications facilities shall not be installed or
erected except upon approval of a use permit, an administrative site and
architectural review permit, or zoning clearance.
B. Conflicting provisions. Use permits, administrative site and architectural review
permits, and zoning clearances shall be processed in compliance with CMC
Chapters 21.46 (Conditional Use Permits), 21.42 (Site and Architectural Review),
and 21.40 (Zoning Clearances) of this title, respectively, and in compliance with
the provisions of this chapter. In the event of any conflict between the provisions
of this chapter and the provisions of CMC Chapters 21.46, 21.42, or 21.40, the
provisions of this chapter shall govern and control.
C. Other Permits. A permit issued under this chapter is not in lieu of any other
permit required under the CMC, except as specifically provided in this chapter. It
does not create a vested right to occupy any particular location, and a permittee
may be required to move, relocate and remove facilities at its expense consistent
with other provisions of the CMC and applicable law.
D. Community development director's discretion. In any instance where a
communications facility requires an administrative site and architectural review
permit under this chapter, the community development director shall have the
discretion to alternatively require a use permit.
E. Permit type. Table 3-6 identifies the type of permit required for each type of
facility:
Table 3-6
Wireless Communications Facilities Required Permit Matrix
Type of Facility Type of Permit
Concealed Facility; or
Anew wireless communications facility that is Use Permit
not eligible for an administrative site and
architectural review permit or zoning clearance
Stealth Facility; or
A collocation that is not eligible for a zoning Administrative Site and
clearance Architectural Review
Eligible Facility Requests Zoning Clearance
F. Other permit requirements. In addition to any conditional use permit or
administrative site and architectural review permit that may be required, the
applicant must obtain all other required permits and/or other approvals from other
City departments, and/or state or federal agencies. Applicable building, plumbing
or electrical permits (if applicable) will be required prior to construction.
G. Prohibited facilities. Any wireless communications facility that does not comply
with the most current regulatory and operational standards and regulations
(including, but not limited to RF emission standards) adopted by the FCC are
prohibited.
21.34.050 -Application procedures.
An application fora wireless communications facility shall be filed and reviewed in
compliance with CMC Chapter 21.38 (Application Filing, Processing and Fees), as may be
amended from time-to-time, unless otherwise specified in this chapter.
A. Submittal(resubmittal meeting required. Applications for a wireless
communications facility must be made in person by someone with authority to act
on behalf of the applicant during the planning division public counter hours.
Applications and any subsequent resubmittal that are not made in person by
someone with authority to act on behalf of the applicant and during scheduled
times shall not be accepted for filing and will be returned.
B. Pre-application or conceptual review. Apre-application in accordance with CMC
Chapter 21.41 (Pre-Applications) andlor conceptual review are strongly
recommended prior to submitting formal applications for new ground-mounted
monopoles or towers, new building mounted facilities, or projects in less-
preferred locations as set forth in Section 21.34.090 (Location of wireless
communications facilities).
C. Revised applications. Unless waived by the community development director,
resubmitted applications that result in a substantially revised facility design, size,
height, or location such that a new or substantially different project, warranting a
new round of completeness review, is proposed, shall be required to be
withdrawn and a new application shall be filed for the substantially revised
project.
D. Timeline for review. The timeframe for review of an application shall begin to run
when the application is submitted in writing to the community development
department, but may be tolled by mutual agreement or in cases where the City
determines that the application is incomplete. The application processing time for
applications subject to this chapter shall be in conformance with the time periods
and procedures established by applicable FCC decisions, adjusted for any tolling
due to incomplete application notices or mutually agreed upon extensions of
time:
1. For an eligible facilities request, the City will act on the application within
sixty (60) calendar days of the community development department's receipt
of such application packet.
2. For a collocation that does not constitute an eligible facilities request, the
City will act on the application within ninety (90) calendar days of the
community development department's receipt of such application packet.
3. For new facilities (that are not a collocation and/or do not constitute an
eligible facilities request subject to a shorter review period as provided
above), the City will act on the application within one hundred and fifty (150)
calendar days of the community development department's receipt of such
application packet.
E. Incomplete application notices. In the event that City staff determines that a
permit application does not contain all the required materials, City staff may issue
an incomplete notice consistent with this subsection. When applications are
incomplete as filed, the timeframes for review set forth in Section 21.34.050(D)
above do not include the time that the applicant takes to respond to the City's
request for additional information.
1. First notice. City staff shall determine whether an application for a facility
is complete within thirty (30) calendar days of the City's receipt of the
application and shall notify the applicant in writing when additional
information is required to complete the application. The incomplete notice
shall specify the incomplete or missing information and the publically
available information source that requires that missing or incomplete
information. The applicable timeframe for review set forth in Section
21.34.050(D) shall be tolled until the applicant makes a supplemental
submission, responding to the City's request for additional information. The
timeframe for review begins running again when the applicant makes a
supplemental submission in response to the City's notice of incompleteness.
2. One Submittal. The applicant's response and submission of
supplemental materials and information, responding to a notice of
incompleteness must be given to the City in one (1) submittal packet.
3. Subsequent notice(s). After an applicant responds to an incomplete
notice and submits additional information, City staff will notify the applicant
within ten (10) calendar days of the City's receipt of the supplemental
submission if the additional information failed to complete the application. In
the case of second or subsequent notices of incompleteness, the applicable
timeframe for review set forth in Section 21.34.050(D) shall be tolled until the
applicant makes a supplemental submission, responding to the City's request
for additional information.
4. The City may continue to issue notices of incompleteness until the
applicant supplies all requested information required to deem the application
as complete. Following each notice of incompleteness, the applicable
timeframe for review set forth in Section 21.34.050(D) shall be tolled during
time that the applicant takes to respond to the City's request for additional
information.
Withdrawal; Extensions of time. To promote efficient review and timely decisions,
applications deemed incomplete must be resubmitted within one hundred eighty
(180) calendar days after notification of incompleteness, or they shall be deemed
automatically withdrawn. Following the applicant's request, the community
development director may grant aone-time extension in processing time to
resubmit, not to exceed one hundred fifty (150) calendar days. If the application
is deemed automatically withdrawn (and any applicable extension period, if
granted, has expired), a new application (including, fees, plans, exhibits, and
other materials) shall be required in order to commence processing of the
project.
21.34.060 -Submittal requirements.
For all wireless communications facilities, the applicant shall provide the information listed
below. Application for a wireless communications facility shall be made upon a form to be
provided by and shall be submitted to the community development department in person. The
form shall specify the number, size, and format of the project plans and application materials to
be provided. The community development director may waive certain submittal requirements or
require additional information based on specific project factors. Unless an exemption or waiver
applies, all applications shall include all of the following and will not be accepted if any submittal
material is missing or not fully completed:
A. Application. A fully completed and executed City application form for the type of
approval sought (and all information, materials, and fees specified in such City
application form), available on the City's website or from the community
development department, as may be amended from time to time.
B. Application fees. Application fees, in a payment format accepted by the City finance
department, as may be amended from time to time.
D. Written statement; Type of approval sought. A written narrative describing the
project in detail (including a summary of facility equipment) and asserting whether or
not the request is a new facility, a collocation, or an eligible facility request,
specifying the facility design approach (e.g. concealed, stealth, or eligible facility),
and providing reasons why the permit should be granted. The application must also
state what approval is being sought (i.e. use permit, administrative site and
architectural review permit, or zoning clearance). If the applicant believes the
project constitutes an eligible facility request, the applicant must provide a detailed
explanation clarifying how this determination was made.
E. Preliminary title report. A preliminary title report (or other definitive evidence of
property ownership satisfactory to the City) prepared in the last six months.
F. City-owned. If the proposed facility is to be located on a City-owned building, pole,
or other structure, the application must be signed by an authorized representative of
the City and accompanied by the license or other agreement authorizing applicant's
use of such City-owned property. A permit issued under this chapter is not a
franchise, license or other authorization to occupy the public rights-of-way, or a
license, lease or agreement authorizing occupancy of any public property.
G. Independent consultant deposit. A fee deposit, if required, to reimburse the City for
its costs to retain an independent consultant to review the technical aspects of the
application.
H. Site and construction plans. Complete and accurate plans, drawn to scale, signed,
and sealed by aCalifornia-licensed engineer, land surveyor, and/or architect, which
include, at a minimum, the following items.
1. A site plan and elevation drawings for the facility as existing and as
proposed with all height and width measurements explicitly stated.
2. A depiction, with height and width measurements explicitly stated, of all
existing and proposed transmission equipment.
3. A depiction of all existing and proposed utility runs and points of
contact.
4. A depiction of the leased or licensed area of the site with all rights-of-
way and easements for access and utilities labeled in plan view and
including legal boundaries of the leased, licensed or owned area
surrounding the proposed facility and any associated access or utility
easements.
5. For proposed collocations or modifications to towers, the plans must
include scaled plan views and all four (4) elevations that depict the
physical dimensions of the wireless tower as it existed on February 22,
2012, or as approved if constructed after February 22, 2012. For
proposed collocations or modifications to base stations, the plans must
include scaled plan views and all four (4) elevations that depict the
physical dimensions of the base station as it existed on February 22,
2012, or as approved if constructed after February 22, 2012.
6. A demolition plan (if applicable).
I. Visual simulations. A visual analysis that includes (1) scaled visual simulations that
show unobstructed before-and-after construction daytime and clear-weather views
from the four most prominent angles, together with afull-color map that shows the
location of each view angle; (2) a color and finished material palate for proposed
materials juxtaposed against the existing material it seeks to match (if applicable);
(3) a. photograph of a completed facility of a similar design and setting as the
proposed wireless communication facility (if applicable); and (4) a visual simulation
showing the maximum expansion of the facility which could occur as a result of a
future eligible facility request pursuant to Section 6409(a) and FCC rules
implementing Section 6409 of the Spectrum Act, codified at 47 U.S.C. 1455.
J. Prior permits. True and correct copies of all previously issued permits, including,
without limitation, all required conditions of approval. For eligible facilities requests,
the application must also include a certification by the applicant that the proposal will
not violate any previous permit or conditions of approval or why any violated permit
or conditions does not prevent approval under Section 6409(a) and the FCC's
regulations implementing this federal law.
K. FCC compliance; Affirmation of radio frequency standards compliance. An
affirmation, under penalty of perjury, that the proposed installation will be FCC
compliant and will not cause members of the general public to be exposed to RF
levels that exceed the MPE levels deemed safe by the FCC. The application shall
include an RF report (or other documentation) acceptable to the City, evidencing
that the proposed facility, as well as any collocated facilities, and cumulative
conditions will comply with applicable FCC standards and regulations, (including, but
not limited to, federal RF exposure standards and exposure limits). Documentation
of FCC compliance shall be required for all wireless communications facility permits,
including, without limitation, permit modifications.
L. Required Licenses or Approvals. Evidence that the applicant has all current
licenses and registrations from the FCC, the CPUC, and any other applicable
regulatory bodies where such license(s) or registration(s) are necessary to provide
wireless communication services utilizing the proposed wireless communication
facility.
M. Structural analysis. A structural analysis, prepared, signed, and sealed by a
California-licensed engineer that assesses whether the proposed wireless
communications facility complies with all applicable building codes.
N. Other permits. An application for a wireless facility shall include all permit
applications with all required application materials for each and every separate
permit required by the City including, but not limited to, a building permit and an
encroachment permit (if applicable). A permit issued under this chapter is not in lieu
of any other permit required under the CMC, except as specifically provided in this
chapter. Further, the applicant is hereby notified that all permit submittals are 'at
risk', and that application materials may be required to be modified, and if denied,
shall not be reimbursed application fees.
O. Statement of Purpose. A written statement that includes: (1) a description of the
technical objectives to be achieved; (2) an annotated topographical map that
identifies the targeted service area to be benefitted; (3) the estimated number of
potentially affected users in the targeted service area; and (4) full-color signal
propagation maps with objective units of signal strength measurement that show the
applicant's current service coverage levels from all adjacent sites without the
proposed site, predicted service coverage levels from all adjacent sites with the
proposed site, and predicted service coverage levels from the proposed site without
all adjacent sites.
P. Alternative Sites Analysis. The applicant must provide a list of all existing structures
considered as alternatives to the proposed location, together with a general
description of the site design considered at each location. The applicant must also
provide a written explanation for why the alternatives considered were unacceptable
or infeasible, unavailable or not as consistent with the development standards in this
chapter as the proposed location. This explanation must include a meaningful
comparative analysis and such technical information and other factual justification as
are necessary to document the reasons why each alternative is unacceptable,
infeasible, unavailable or not as consistent with the development standards in this
chapter as the proposed location. If an existing facility is listed among the
alternatives, the applicant must specifically address why the modification of such
existing wireless communications facility is not a viable option. Stealth facilities shall
not be required to provide an alternative site analysis.
O. Noise Study. If the proposed facility (or any portion thereof or equipment thereon)
will generate or omit noise, a noise study prepared and certified by an engineer for
the proposed facility and all associated equipment including, but not limited to, all
environmental control units, sump pumps, temporary backup power generators, and
permanent backup power generators demonstrating compliance with the City's noise
regulations. The noise study must also include an analysis of the manufacturers'
specifications for all noise-emitting equipment and a depiction of the proposed
equipment relative to all adjacent property lines.
R. Other information. Such other information as the City may require, as specified in
publically available materials, including, but not limited to, information required as
stated on the City's website.
S. Construction Staging/Phasing Plan. A construction staging/phasing plan shall be
provided indicating the location and duration of all associated construction activities.
T. Content Exemptions for Eligible Facilities Request Applications. Notwithstanding
subsections (A) through (S) above, applications for an eligible facilities request are
exempt from the requirements in subsections (E), (I), (O), (P), (O), and (S) above.
21.34.070 -General requirements; standard conditions of approval.
In addition to any other conditions of approval permitted under federal and state law and that
the decision-making body deems appropriate, all wireless communications facilities whether
approved through a conditional use permit, an administrative site and architectural review permit,
zoning clearance, or deemed granted by the operation of law, shall include and abide by the
following conditions of approval:
A. All Facilities. The following standard conditions of approval apply to all facilities and
shall be included in all conditional use permits and administrative site and
architectural review permits approved under this Chapter:
Cessation of operations. The service provider shall provide written
notification to the community development director upon cessation of
operations on the site exceeding a 90 calendar day period. The service
provider, permittee and/or property owner shall remove all obsolete or
unused facilities from the site within 180 calendar days of termination of the
lease with the property owner or cessation of operations, whichever comes
earlier.
a.New permit required. If a consecutive period of 180 calendar days
has lapsed since cessation of operations, a new permit shall be
required prior to use or reuse of the site.
2. Length of approval. A validly issued conditional use permit, or administrative
site and architectural review permit shall be valid for a period of ten (10)
years from the effective date of the approval (or date the facility gains a
"deemed granted" status) but may be reduced for public safety reasons or
substantial larid use reasons pursuant to Government Code Section
65964(b). Use permits and site and architectural review permits approved
prior to the effective date of this ordinance shall expire pursuant to the
previously approved permit term. If a request for a renewal of the required
permits(s) is received before the permit expiration, the permit shall remain in
effect until a decision on the renewal is made or the application is withdrawn.
Communication facilities that exist on the effective date of this chapter
without a specified expiration date (e.g. because the governing permit(s)
contained no expiration date or due to non-conforming status), and which
had not otherwise already expired (e.g. due to the previously established
amortization period(s) contained in City Council Ordinance 2070, CMC
§21.34.060(E), and/or CMC §21.58.040(F), as they existed prior to the
effective date of this Chapter), shall expire five, years from the effective date
of this chapter or 10 years from the date of their establishment, whichever is
greater. Nothing contained in this Chapter is intended to revive or extend any
permit or use that expired on or prior to the effective date of this Chapter.
a.The permit may be renewed for subsequent time periods, subject to
the following:
i. The renewal application is filed with the community
development department prior to expiration, but no earlier
than 24 months prior to expiration.
ii. The permit approval may be administratively extended by
the community development director from the initial approval
date for a subsequent ten (10) years and may be extended
by the community development director every ten (10) years
thereafter upon verification that the facility continues to
comply with this chapter (as may be amended from time to
time) and all conditions of approval under which the facility
was approved. All costs associated with the review process
shall be borne by the service provider, permittee and/or
property owner.
iii. This provision shall not apply to conditional use permits or
administrative site and architectural review permits granted
prior to the effective date of this chapter. However,
applications for use permits or site and architectural review
permits to modify existing wireless communications facilities
that are granted on or after the effective date of this chapter
are subject to this subsection 21.34.070(A)(2)(a).
b.lf a request for renewal of the required permit(s) is not timely
received and the permit expires, the City may declare the facility(ies)
abandoned or discontinued in accdrdance with Section
21.34.070(A)(16) (Abandonment).
3. Business license required. Each service provider with a wireless
communications facility in the City shall obtain and maintain a City business
license.
4. Impact on parking. The installation of wireless communication facilities shall
not reduce required parking on the site. For the purposes of this requirement,
routine maintenance activities shall not be considered to result in a
measurable impact on parking. Applications for eligible facilities requests
shall be exempt from this condition provided that any reduction in onsite
parking spaces does not violate a prior condition of approval or applicable
building or safety code.
5. Implementation and monitoring costs. The wireless communications
permittee, service provider or its/their successor shall be responsible for the
payment of all reasonable costs associated with the monitoring of the
conditions of approval, including, but not limited to, costs incurred by the
community development department, the office of the city attorney or any
other appropriate City department or agency, to the full extent such costs are
recoverable or collectible under applicable state and/or federal law. The
community development department shall collect costs on behalf of the City.
6. Development and operational standards. All facilities shall satisfy the
development standards of the district in which they are proposed, as well as
the Development and Operational Standards outlined in CMC 21.16 (e.g.
Electrical Interference, Light and Glare, Noise, Odor, Vibration, Maintenance)
and the Site Development Standards (e.g. as specified in CMC 21.18).
Exceptions to development and operational standards shall only be permitted
for (A) an eligible facility request to the extent required by law, (B) a
subsequent collocation facility to the extent required by California
Government Code section 65850.6(a), or (C) for a stealth facility when such
exception is limited to maximum allowable heights, or minimum setbacks,
and when such exception would not result in a perceivable visual impact.
7. Permits. All permits required for the installation of the facility and associated
improvements, shall be completed prior to operation of the facility (or
component of that facility).
8. Concealment. Every aspect of a stealth and/or concealed facility is
considered an element of concealment including, but not limited to, the
dimensions, bulk and scale, color, materials and texture. For all other
facilities, elements such as dimension, scale, color, materials, and textures
may be considered stealth and/or concealment elements of the facility. Any
future modifications to the facility must not defeat concealment
9. Compliance with Applicable Laws. The permittee and service provider shall
at all times comply with all applicable provisions of the CMC including, but
not limited to, Title 21 (Zoning), any permit or approval issued under the
CMC including, but not limited to, Title 21 (Zoning), and all other applicable
federal, state and local laws, rules and regulations. Failure by the City to
enforce compliance with applicable laws, rules or regulations shall not relieve
any permittee of its obligations under the CMC including, but not limited to,
Title 21 (Zoning), any permit or approval issued under the CMC, or any other
applicable laws, rules and regulations.
10. Compliance with Approved Plans. The facility shall be built in compliance
with the approved plans on file with the community development department.
11. Inspections; Emergencies. The City or its designee may enter onto the facility
area to inspect the facility upon reasonable notice to the permittee in times of
emergency. The permittee shall cooperate with all inspections. The City
reserves the right to enter (or direct its designee to enter) the facility and
support, repair, disable or remove any elements of the facility in emergencies
or when the facility threatens imminent harm to persons or property.
12. Contact Information for Responsible Parties. The permittee shall at all times
maintain accurate contact information for all parties responsible for the
facility, which shall include a phone number, street mailing address and email
address for at least one natural person. All such contact information for
responsible parties shall be provided to the community development director
upon request.
13. General Maintenance. The site and the facility, including but not limited to all
landscaping, fencing, concealment features, 'and related transmission
equipment, must be maintained in a neat and clean manner and in
accordance with all approved plans and conditions of approval.
14. Graffiti Removal. All graffiti on facilities must be removed at the sole expense
of the permittee within 48 hours after notification from the City.
15. FCC (including, but not limited to, RF Exposure) Compliance. All facilities
must comply with all standards and regulations of the FCC and any other
state or federal government agency with the authority to regulate such
facilities.
16. Abandonment.
a.To promote the public health, safety and welfare, the community
development director may declare a facility (or component of a facility)
abandoned or discontinued when: (a) The permittee or service provider
abandoned or discontinued the use of a facility (or component of a
facility) for a continuous period of 90 calendar days; or (b) The permittee
or service provider fails to respond within 30 calendar days to a written
notice from the community development director that states the basis for
the community development director's belief that the facility (or
component of the facility) has been abandoned or discontinued for a
continuous period of 90 calendar days; or (c) The permit expires and the
permittee has failed to file a timely application for renewal.
b.After the community development director declares a facility (or
component of a facility) abandoned or discontinued, the permittee shall
have 60 calendar days from the date of the declaration (or longer time as
the community development director may approve in writing as
reasonably necessary) to: (a) reactivate the use of the abandoned or
discontinued facility (or component thereof) subject to the provisions of
this chapter and all conditions of approval; or (b) remove the facility (or
component of that facility) and all improvements installed in connection
with the facility (or component of that facility), unless directed otherwise
by the community development director, and restore the site to a
condition in compliance with all applicable codes and consistent with the
then-existing surrounding area.
c.lf the permittee fails to act as required in Section 21.34.070(A)(16)(b)
within the prescribed time period, the City may (but shall not be obligated
to) remove the abandoned facility (or abandoned component of the
facility), restore the site to a condition in compliance with all applicable
codes and consistent with the then-existing surrounding area, and repair
any and all damages that occurred in connection with such removal and
restoration work. The City may, but shall not be obligated to, store the
removed facility (or component of the facility) or any part thereof, and
may use, sell or otherwise dispose of it in any manner the City deems
appropriate. The last-known permittee or its successor-in-interest and, if
on private property, the real property owner shall be jointly liable for all
costs and expenses incurred by the City in connection with such
removal, restoration, repair and storage, and shall promptly reimburse
the City upon receipt of a written demand, including, without limitation,
any interest on the balance owing at the maximum lawful rate. The City
may, but shall not be obligated to, use any financial security required in
connection with the granting of the facility permit to recover its costs and
interest. Until the costs are paid in full, a lien shall be placed on the
facility, all related personal property in connection with the facility and, if
applicable, the real private property on which the facility was located for
the full amount of all costs for removal, restoration, repair and storage
(plus applicable interest). The City Clerk shall cause the lien to be
recorded with the County of Santa Clara Recorder's Office. Within 60
calendar days after the lien amount is fully satisfied including costs and
interest, the City Clerk shall cause the lien to be released with the
County of Santa Clara Recorder's Office.
d.After a permittee fails to comply with any provisions of this Section
21.34.070(A)(16) (Abandonment), the City may elect to treat the facility
as a nuisance to be abated as provided in the CMC (including, but not
limited to, Chapter 6.10).
17. Indemnities. The permittee, service provider, and, if applicable, the non-
government owner of the private property upon which the tower and/or base
station is installed (or is to be installed) shall defend (with counsel reasonably
satisfactory to the City), indemnify and hold harmless the City of Campbell its
officers, officials, directors, agents, representatives, and employees (i) from
and against any and all damages, liabilities, injuries, losses, costs and
expenses and from and against any and all claims, demands, lawsuits,
judgments, writs of mandamus and other actions or proceedings brought
against the City or its officers, officials, directors, agents, representatives, or
employees to challenge, attack, seek to modify, set aside, void or annul the
City's approval of the permit, and (ii) from and against any and all damages,
liabilities, injuries, losses, costs and expenses and any and all claims,
demands, lawsuits, judgments, or causes of action and other actions or
proceedings of any kind or form, whether for personal injury, death or
property damage, arising out of, in connection with or relating to the acts,
omissions, negligence, or performance of the permittee, the service provider,
and/or, if applicable, the private property owner, or any of each one's agents,
representatives, employees, officers, directors, licensees, contractors,
subcontractors or independent contractors. It is expressly agreed that the
City shall have the right to approve (which approval shall not be
unreasonably withheld) the legal counsel providing the City's defense, and
the property owner, service provider, and/or permittee (as applicable) shall
reimburse City for any and all costs and expenses incurred by the City in the
course of the defense.
B. Eligible Facilities Requests/Zoning Clearances. In addition to the conditions in
subsection (A) above, all eligible facilities requests shall comply with and all
associated zoning clearances shall include the following standard conditions of
approval:
1. No Permit Term Extension. The City's grant or grant by operation of law of a
zoning clearance for an eligible facilities request constitutes afederally-
mandated modification to the underlying permit or approval for the subject
tower or base station. The City's grant or grant by operation of law of a
zoning clearance for an eligible facilities request will not extend the permit
term for any use permit, administrative site and architectural review permit or
other underlying regulatory permit or approval and its term shall be
coterminous with the underlying permit or other regulatory approval for the
subject tower or base station. If requested in writing by the applicant at the
time of application submittal, the permit term for the underlying conditional
use permit or administrative site and architectural review permit may be
administratively extended by the community development director (at his/her
discretion) from the initial approval date upon verification that the facility
continues to comply with this chapter (as may be amended from time to time)
and all conditions of approval under which the facility was approved. All
costs associated with the review process shall be borne by the service
provider, permittee and/or property owner.
2. No Waiver of Standing. The approval of a zoning clearance for an eligible
facilities request (either by express approval or grant by operation of law)
does not waive, and shall not be construed to waive, any standing by the City
to challenge Section 6409(a), any FCC rules that interpret Section 6409(a) or
any eligible facilities request.
21.34.080 -Regulations for facilities subject to a zoning clearance.
This subsection shall be interpreted and applied so as to be consistent with the
Telecommunications Act of 1996, Section 6409(a), and the applicable FCC decisions and FCC
rules and regulations, and court decisions and determinations relating to the same, including,
without limitation, 80 FR 1238 (January 8, 2015), 47 C.F.R. §§1.1306(c), 1.1307(a)(4)(ii), 1.40001
et seq., In the Matter of Acceleration of Broadband Deployment by Improving Wireless Facilities
Siting Policies, Report and Order, 29 FCC Rcd. 12865 (2014), and In re Petition for Declaratory
Ruling, 24 FCC Rcd. 13994 (2009). In the event that a court of competent jurisdiction invalidates
all or any portion of Section 6409(a) or any FCC rule that interprets Section 6409(a) such that
federal law would not mandate approval for an eligible facilities request, then all modifications to
existing facilities subject to this section that are proposed after such invalidation must be
approved by a conditional use permit or administrative site and architectural review permit, as
applicable, subject to the discretion of the community development director.
A. Findings. The community development director must approve a zoning clearance for
an eligible facilities request when the director finds all of the following:
1. The proposed modification qualifies as an eligible facilities request and does
not constitute a "substantial change" as defined in Section 21.34.200.
2. The applicant has provided all required submittal materials for the proposed
modification.
B. Denial. In addition to any other alternative recourse permitted under federal law, the
community development director may deny a zoning clearance upon finding that the
proposed facility:
1. Defeats the effect of existing concealment elements of the support structure;
2. Violates any legally enforceable standard or permit condition related to
compliance with generally applicable building, structural, electrical and/or
safety codes;
3. Violates any legally enforceable standard or permit condition reasonably
related to public health and/or safety; or
4. Does not qualify for mandatory approval under Section 6409(a) for any lawful
reason.
C. Denial Without Prejudice. Any denial of an application for an eligible facilities request
shall be without prejudice to the applicant, the real property owner or the project.
Subject to the application and submittal requirements in this chapter, the applicant
may submit a permit application (together with all required fees, costs and deposits)
for a use permit, administrative site and architectural review permit, or zoning
clearance, as appropriate.
D. Extensions. The approval of a zoning clearance for an eligible facilities request shall
not automatically extend or renew the length or term of the underlying permit term or
facility build out.
21.34.090 -Location of wireless communications facilities.
A. To the extent feasible and when doing so would not conflict with applicable federal or
state law, wireless communications facilities subject to the review and approval of a
conditional use permit or an administrative site and architectural review permit shall
be located in the most preferred location as described in this section and the General
Plan, according to the following order of priority (ordered from the most preferred to
the least preferred):
More preferred areas:
1. City owned or controlled parcels; then
2. Industrial, research and development & institutional designated parcels; then
3. General commercial, central commercial, professional office, and mixed-use
designated parcels; then
4. Neighborhood commercial and open space designated parcels; then
Less preferred areas: ~
5. Residential, historical, and other designated areas, districts and/or parcels;
then
6. All other areas
B. If an applicant proposes to locate a new facility or substantial change to an existing
facility in a less preferred area, the applicant shall provide an additional alternative
site analysis that, at a minimum, includes a meaningful comparative analysis of all
the alternative sites in the more preferred locations that the applicant considered and
states the underlying factual basis for concluding, and demonstrates, to the
satisfaction of the decision-making body, why each alternative in a more preferred
location(s) is/are (i) not technically feasible, (ii) not potentially available, and/or (iii)
more intrusive. The decision-making body may authorize a facility to be established
in a less preferred location if doing so is necessary to prevent substantial aesthetic
impacts.
C. Notwithstanding any provisions of this Section 21.34.090 (Location of wireless
communications facilities) to the contrary, facilities in the public-right-of way may be
found preferable to a location on private property, to the extent feasible and provided
that the same order of priority, in consideration of the abutting land use(s), is
maintained.
21.34.100 -Design requirements.
All wireless communications facilities subject to a conditional use permit or an
administrative site and architectural review permit shall be designed as a stealth facility, or as a
concealed facility, as defined in Section 21.34.200, and incorporate concealment measures
and/or techniques appropriate for the proposed location and design. All facilities and
modifications thereto (except those facilities which qualify as an eligible facilities request pursuant
to Section 6409(a) or as a subsequent collocation facility that is a permitted use not subject to a
city discretionary permit pursuant to California Government Code section 65850.6(a), for which
these provisions shall serve only as guidelines) shall also comply with the Wireless Facility
Design Requirements that have been adopted by the City. The cost or inconvenience to comply
shall not provide justification to deviate from City design requirements.
21.34.110 -Special findings for wireless communications facilities.
Whenever a conditional use permit or administrative site and architectural review permit
is required for a wireless communications facility, the decision-making body shall first find all of
the following conditions, in addition to those fndings identified in CMC Section 21.46.040
(Findings and decision) and Section 21.42.050 (Action by community development director)
respectively, are satisfied in order to approve the permit application:
A. The proposed facility, or modification to an existing facility, as conditioned will be a
stealth or concealed facility as defined in Section 21.34.200;
B. The proposed facility, or modification to an existing facility, as conditioned will comply
with all requirements of Chapter 21.34 (Wireless Communications Facilities);
C. The proposed facility, or modification to an existing facility, as conditioned will comply
with all applicable design guidelines; and
D. The proposed facility, or modification to an existing facility, as conditioned. will be
consistent with the general plan.
21.34.120 -Failure to act and remedies.
Under federal and/or state law, the City's failure to act on a wireless communications
facility permit application within a reasonable period of time in accordance with the time periods
and procedures established by applicable FCC decisions, accounting for tolling periods, may
result in the permit being deemed granted by operation of law. To the extent federal or state law
provides a "deemed grant" remedy for wireless communications facility applications not timely
acted upon by the City, no such application shall be deemed granted unless and until the
applicant satisfies the following requirements: .
A. For all facility applications
1. Submits a complete application package, pursuant to the application
procedures as specified in this chapter and applicable federal and state law
and regulations.
2. Following the date by which the City must take final action on the application
(as determined in accordance with the time periods and procedures
established by applicable FCC decisions and accounting for tolling), the
applicant must provide notice to the City that the application is deemed
granted by operation of law.
B. For conditional use permits and administrative site and architectural review permit
applications:
1. Completes all public noticing required pursuant to CMC Section 21.64.020
(Notice of hearing).
2. No more than 30 calendar days before the date by which the City must take
final action on the application (as determined in accordance with the time
periods and procedures established by applicable FCC decisions and
accounting for tolling), the applicant must provide the following written notice
to all recipients identified in CMC Section 21.64.020(B)(2) (Mailing) and to
the City.
a. The notice shall be delivered to the City in person or by certified United
States mail.
b. The notice must state that the applicant has submitted an application to
the City, describe the location and general characteristics of the
proposed facility, and include the following statement: "Pursuant to
California Government Code Section 65964.1, state law may deem the
application approved in 30 calendar days unless the City approves or
denies the application, or the City and applicant reach a mutual tolling
agreement."
21.34.130 -Prohibited grounds for denial.
Notwithstanding any other provisions of this chapter, the denial of a conditional use permit,
administrative site and architectural review permit, or zoning clearance may not be based on the
environmental effects of RF emissions for wireless communications facilities that comply with
FCC regulations, standards and guidelines concerning such RF emissions.
21.34.140 -Revocation of permit.
The City may revoke a permit for a wireless communications facility for noncompliance with
any enforceable permit, permit condition, or law applicable to the facility. When the community
development director finds reason to believe that grounds for permit revocation exist, the director
shall notify the permittee that a violation exists and request compliance within a reasonable
amount of time. Upon failure to comply, the community development director may schedule a
public hearing before the planning commission at which the commission may modify or revoke
the permit. A revocation by the planning commission may be appealed to the City Council. All
hearings shall be noticed and conducted in compliance with the proceedings set forth in CMC
Chapter 21.68 (Revocations and modifications).
21.34.150 -Temporary wireless communications facilities.
A temporary wireless communications facility, such as a "cell-on-wheels" (COW) may be
used during public emergencies, including when a local emergency is declared by the City
Manager. A COW or similar temporary wireless communications facility or equipment shall not
be permitted for maintenance activities or while awaiting an expected entitlement or pending plan
review, and the temporary allowance of such equipment or facility during an emergency shall not
be considered to establish a permanent use of such a facility or structure after the emergency has
ended, as declared by the City Manager. Once the emergency has ended, the temporary wireless
communications facility shall be removed.
21.34.160 -Limited exemption from standards.
The applicant always bears the burden to demonstrate why an exemption should be granted.
An applicant may request an exemption from one or more requirements of this chapter on the
basis that a permit denial would effectively prohibit personal wireless services in the City. For the
City to approve such an exemption, the applicant must demonstrate with clear and convincing
evidence all of the following:
A. A significant gap in the applicant's service coverage exists; and
B. All alternative sites identified in the application review process are either technically
infeasible or not potentially available.
21.34.170 -Independent consultant review.
A. Authorization. The City Council authorizes the community development director
to, in his or her discretion, select and retain an independent consultant with
expertise in telecommunications satisfactory to the community development
director in connection with any permit application.
B. Scope. The community development director may request independent
consultant review on any issue that involves specialized or expert knowledge in
connection with the permit application. Such issues may include, but are not
limited to:
1. Permit application completeness or accuracy;
2. Whether and where a significant gap exists or may exist, and whether such a
gap relates to service coverage or service capacity;
3. Whether technically feasible and potentially available alternative locations
and designs exist;
4. The applicability, reliability and/or sufficiency of analyses or methodologies
used by the applicant to reach conclusions about any issue within the scope
of this Chapter; and
5. Any other issue that requires expert or specialized knowledge identified by
the community development director.
C. Deposit. To the full extent such costs are recoverable or collectible under
applicable state and/or federal law, the applicant must pay for the reasonable
cost of such review and for the technical consultant's testimony in any hearing as
requested by the community development director and must provide a
reasonable advance deposit of the estimated cost of such review with the City
prior to the commencement of any work by the technical consultant. Where the
advance deposit(s) are insufficient to pay for the reasonable cost of such review
and/or testimony, the community development director shall invoice the applicant
who shall pay the invoice in full within 10 calendar days after receipt of the
invoice.
21.34:180 -Changes in law.
All facilities shall meet the current standards and regulations of the FCC, the California
Public Utilities Commission, and any other agency of the federal or State government with the
authority to regulate wireless communications providers and/or wireless communications
facilities. If such standards and/or regulations are changed, the permittee and/or wireless
communications provider shall bring its facilities into compliance with such revised standards and
regulations within ninety (90) calendar days of the effective date of such standards and
regulations, unless a more stringent compliance schedule is mandated by the controlling federal
or state agency. Failure to bring wireless communications facilities into compliance with such
revised standards and regulations shall constitute grounds for the immediate removal of such
facilities at the permittee and/or wireless communications provider's expense.
21.34.190 - Severability.
In the event that a court of competent jurisdiction holds any section, subsection, paragraph,
sentence, clause, or phrase in this section unconstitutional, preempted, or otherwise invalid, the
invalid portion shall be severed from this section and shall not affect the validity of the remaining
portions of this section. The City hereby declares that it would have adopted each section,
subsection, paragraph, sentence, clause, or phrases in this section irrespective of the fact that
any one or more sections, subsections, paragraphs, sentences, clauses or phrases in this section
might be declared unconstitutional, preempted, or otherwise invalid.
21.34.200 -Definitions.
As used in this chapter, the following terms shall have the meaning set forth below, unless
the context clearly dictates a different meaning:
"Antenna" means a device or system of wires, poles, rods, dishes, discs or similar devices
used for the transmission and/or receipt of electromagnetic waves.
"Applicable FCC decisions' means the same as defined by California Government Code
Section 65964.1(d)(1), as may be amended, which defines that term as "In re Petition for
Declaratory Ruling, 24 FCC Rcd. 13994 (2009) and In the Matter of Acceleration of Broadband
Deployment by Improving Wireless Facilities Siting Policies, Report and Order, 29 FCC Rcd.
12865 (2014)."
"Applicable law" means all applicable federal, state and local law, ordinances, codes, rules,
regulations and orders, as the same may be amended from time to time.
"Base station" means the same as defined by the FCC in 47 C.F.R. Section 1.40001(b)(1),
as may be amended, which defines that term as follows: a structure or equipment at a fixed
location that enables FCC-licensed or authorized wireless communications between user
equipment and a communications network. The term does not encompass a tower as defined as
in this chapter or in 47 C.F.R. Section 1.40001(b)(9), or any equipment associated with a tower.
(i) The term includes, but is not limited to, equipment associated with wireless
communications services such as private, broadcast, and public safety services, as well as
unlicensed wireless services and fixed wireless services such as microwave backhaul.
(ii) The term includes, but is not limited to, radio transceivers, antennas, coaxial or fiber-optic
cable, regular and backup power supplies, and comparable equipment, regardless of
technological configuration (including Distributed Antenna Systems and small-cell networks).
(iii) The term includes any structure other than a tower that, at the time the relevant
application is filed with the State or local government under 47 C.F.R. §1.40001, supports or
houses equipment described in paragraphs (b)(1)(i)-(ii) of 47 C.F.R. §1.40001 that has been
reviewed and approved under the applicable zoning or siting process, or under another State or
local regulatory review process, even if the structure was not built for the sole or primary purpose
of providing such support.
(iv) The term does not include any structure that, at the time the relevant application is filed
with the State or local government under 47 C.F.R. §1.40001, does not support or house
equipment described in paragraphs (b)(1)(i)-(ii) of 47 C.F.R. Section 1.40001.
"Carefully placed facility" means a facility that is situated in a location which renders a facility
virtually imperceptible to the public. As such, the emphasis for this category of stealth facility is on
its location as opposed to its design. Carefully placed facilities require no camouflaging or
screening, in that existing site features (e.g. buildings, walls, roof parapets, or existing equipment)
render such a requirement unnecessary. Successful examples of carefully placed facilities may
include those proposed within an existing building (requiring no alteration of existing materials),
those sited on the roof of a particularly large or tall building, and those which are flush mounted to
an existing high voltage lattice tower and treated to match.
"Cell site" means a parcel of real property on which a wireless communications facility is to
be located.
"CMC" means the Campbell Municipal Code.
"Collocation" means:
(a) Except as provided in subsection (b), "collocation" means the same as defined in the
Nationwide Programmatic Agreement for the Collocation of Wireless Antennas, 47 CFR pt. 1,
App. B, and applicable FCC decisions (including, but not limited to, In re Petition for Declaratory
Ruling to Clarify Provisions of Section 332(c)(7)(B), 24 FCC Rcd 13994 (2009)).
(b) Notwithstanding subsection (a), with respect to eligible facilities requests, "collocation"
means the same as defined by the FCC in 47 C.F.R. Section 1.40001(b)(2), as may be amended,
which defines that term as "[t]he mounting or installation of transmission equipment on an eligible
support structure for the purpose of transmitting and/or receiving radio frequency signals for
communications purposes." As an illustration and not a limitation, the FCC's definition effectively
means "to add" new equipment to an existing facility and does not necessarily refer to more than
one wireless facility installed at a single site.
"Communications" means any transmission, emission or reception of signals, images and
sound or information of any nature by wire, radio, visual or electromagnetic system that work on a
"line-of-sight" principle.
"Community development director" or "director" means the community development director
of the City of Campbell or his or her designee.
"Community development department" means the community development department of
the City of Campbell.
"Completely integrated facility" means a facility that is incorporated into an existing structure
or site in a manner which does not result in a new feature being added. This stealth category may
result in the removal of existing siding, or materials to achieve RF transparency, provided that the
replacement materials match, to the extent feasible, the existing or abutting material. Where an
equivalent material match cannot be adequately demonstrated, a stealth facility could propose to
completely remove and replace an existing material if doing so serves to achieve a more
cohesive design and does not disrupt the design of the building (e.g. the replacement of all roof
shingles, as opposed to simply removing/replacing a smaller impacted roof or wall section).
"Concealed facility" means any wireless communications facility which results in new site or
architectural features being added to a property in a manner which complements, enhances, or
seamlessly integrates into their surroundings. Examples of concealed facilities include, but are
not limited to the construction of new rooftop, louver, chimney, silo, pole, railing, sign, window,
parapets, dormers, steeples, penthouses, water towers, bell towers, artificial trees, and flag poles.
"Deemed granted" or "deemed granted status" means a wireless communications facility for
which the applicant submitted an application in compliance with the procedures and requirements
of this Chapter that was not acted upon within a reasonable period of time in accordance with the
time periods and procedures established by applicable FCC decisions (accounting for tolling
periods), and satisfied the requirements of CMC Section 21.34.120 (Failure to act and remedies),
and as a result had its permit granted by operation of law in accordance with federal and/or state
law.
"Electromagnetic field (EMF)" means the local electric and magnetic fields that envelop the
surrounding space. The most ubiquitous source of electromagnetic fields is from the movement
and consumption of electric power, (e.g., transmission lines, household appliances and lighting).
"Eligible facilities request" means the same as defined by the FCC in 47 C.F.R. Section
1.40001(b)(3), as may be amended, which defines that term as "[a]ny request for modification of
an existing tower or base station that does not substantially change the physical dimensions of
such tower or base station, involving:
i. Collocation of new transmission equipment;
ii. Removal of transmission equipment; or
iii. Replacement of transmission equipment."
"Eligible support structure" means the same as defined by the FCC in 47 C.F.R. Section
1.40001(b)(4), as may be amended, which defines that term as "[a]ny tower or base station as
defined in [47 C.F.R. Section 1.40001] provided that it is existing at the time the relevant
application is filed with the State or local government under [47 C.F.R. Section 1.40001]."
"Existing" means the same as defined by the FCC in 47 C.F.R. Section 1.40001(b)(5), as
may be amended, which provides that "[a] constructed tower or base station is existing for
purposes of the [FCC rules implementing Section 6409 of the Spectrum Act, codified at 47 U.S.C.
1455] if it has been reviewed and approved under the applicable zoning or siting process, or
under another State or local regulatory review process, provided that a tower that has not been
reviewed and approved because it was not in a zoned area when it was built, but was lawfully
constructed, is existing for purposes of this definition."
"FCC" means the Federal Communications Commission or any successor to that agency,
which has primary regulatory control over communications providers through its powers to control
interstate commerce and to provide a comprehensive national system in compliance with the
Federal Communications Act.
"MPE" means maximum permissible exposure.
"Non-commercial communication service" includes amateur (HAM) radio facilities licensed
by the FCC, and satellite dish .antennas (see CMC Section 21.36.190 (Satellite dish antennas))
and when used for non-commercial exchange of messages, private recreation and emergency
communication, except when associated with a wireless communication facility.
"RF" means radio frequency.
"Section 6409(a)" means Section 6409(a) of the Middle Class Tax Relief and Job Creation
Act of 2012, Pub. L. No. 112-96, 126 Stat. 156, codified as 47 U.S.C. Section 1455(a), as may be
amended.
"Significant gap" is a gap in the service provider's own wireless communications facilities, as
defined in federal case law interpretations of the Federal Telecommunications Act of 1996.
"Service provider" means a wireless communications provider, a company or organization,
or the agent of a company or organization that provides wireless communications services.
"Site" means the same as defined by the FCC in 47 C.F.R. Section 1.40001(b)(6), as may be
amended, which provides that "[f]or towers other than towers in the public rights-of-way, the
current boundaries of the leased or owned property surrounding the tower and any access or
utility easements currently related to the site, and, for other eligible support structures, further
restricted to that area in proximity to the structure and to other transmission equipment already
deployed on the ground."
"Stealth facility" means facilities which result in no perceptible visual impact. As such,
stealth facilities are generally preferable to concealed facilities except in rare circumstances when
the concealment method serves to improve the aesthetic value or interest to a building or site.
There are two primary categories of stealth facilities, those which are completely integrated into
an existing structure or architectural feature and those which are imperceptible as a result of
careful placement. Both stealth categories require the facility. to remain integrated or
imperceptible, even when the facility may be expanded upon under the provisions of an eligible
facilities request.
"Substantial change" means the same as defined by the FCC in 47 C.F.R. Section
1.40001(b)(7), as may be amended, which defines that term differently based on the particular
facility type and location. For clarity, the definition in this chapter organizes the FCC's criteria and
thresholds for a substantial change according to the facility type and location.
1. For towers outside the public right-of-way, a substantial change occurs when
a. The proposed collocation or modification increases the overall height
more than 10 percent or the height of one additional antenna array not to
exceed 20 feet (whichever is greater); or
b. The proposed collocation or modification involves adding an
appurtenance to the body of the tower that would protrude from the edge
' of the tower more than twenty (20) feet, or more than the width of the
tower structure at the level of the appurtenance (whichever is greater); or
c. The proposed collocation or modification involves the installation of more
than the standard number of equipment cabinets for the technology
involved, not to exceed four (4) cabinets; or
d. The proposed collocation or modification involves excavation outside the
current boundaries of the leased or owned property surrounding the
wireless tower, including any access or utility easements currently
related to the site.
2. For towers in the public rights-of-way and for all base stations, a substantial
change occurs when:
a. The proposed collocation or modification increases the overall height
more than 10 percent or 10 feet (whichever is greater); or
b. The proposed collocation or modification involves adding an
appurtenance to the body of the structure that would protrude from the
edge of the structure by more than six (6) feet; or
c. The proposed collocation or modification involves the installation of more
than the standard number of equipment cabinets for the technology
involved, not to exceed four (4) cabinets; or
d. The proposed collocation or modification involves the installation of any
new equipment cabinets on the ground when there are no pre-existing
ground cabinets associated with the structure; or
e. The proposed collocation or modification involves the installation of any
ground cabinets that are more than ten percent (10%) larger in height or
overall volume than any other ground cabinets associated with the
structure; or
f. The proposed collocation or modification involves excavation outside the
area in proximity to the structure and other transmission equipment
already deployed on the ground.
3. In addition, for all towers and base stations wherever located, a substantial
change occurs when:
a. The proposed collocation or modification would defeat the existing
concealment elements of the support structure as determined by the
community development director; or
b. The proposed collocation or modification violates a prior condition of
approval, provided however that the collocation need not comply with
any prior condition of approval related to height, width, equipment
cabinets or excavation that is inconsistent with the thresholds for a
substantial change described in this section.
4. Interpretation of Thresholds.
a. The thresholds for a substantial change described above are disjunctive.
The failure to meet any one or more of the applicable thresholds means
that a substantial change would occur.
b. The thresholds for height increases are cumulative limits. For sites with
horizontally separated deployments, the cumulative limit is measured
from the originally-permitted support structure without regard to any
increases in size due to wireless equipment not included in the original
design. For sites with vertically separated deployments, the cumulative
limit is measured from the permitted site dimensions as they existed on
February 22, 2012-the date that Congress passed Section 6409(a).
"Support Structure" or "Support Structures" means a structure or structures designed to
support antenna(s) or other wireless transmission equipment to facilitate the transmitting and/or
receiving of radio frequency signals. Support structures include, but are not limited to, masts,
monopoles, guyed structures, lattice towers, and other like structures used to support wireless
transmission devices.
"Temporary wireless communications facility" means a wireless communications facility
located on a parcel of land and consisting of avehicle-mounted facility, a building mounted
antenna, or a similar facility, and associated equipment, that is used to provide temporary
coverage for alarge-scale event or an emergency, or to provide temporary replacement coverage
due to the removal of an existing permitted, permanent wireless communications facility
necessitated by the demolition or major alteration of a nearby property.
"Tower" means the same as defined by the FCC in 47 C.F.R. Section 1.40001(b)(9), as may
be amended, which defines that term as "[a]ny structure built for the sole or primary purpose of
supporting any [FCC]- licensed or authorized antennas and their associated facilities, including
structures that are constructed for wireless communications services including, but not limited to,
private, broadcast, and public safety services, as well as unlicensed wireless services and fixed
wireless services such as microwave backhaul, and the associated site. Examples include, but
are not limited to, monopoles, mono-trees and lattice towers.
"Transmission equipment" or "wireless transmission equipment" means the same as defined
by the FCC in 47 C.F.R. Section 140001(b)(8), as may be amended, which defines that term as
"equipment that facilitates transmission for any FCC-licensed or authorized wireless
communication service, including, but not limited to, radio transceivers, antennas, coaxial or fiber-
optic cable, and regular and backup power supply. The term includes equipment associated with
wireless communications services including, but not limited to, private, broadcast, and public
safety services, as well as unlicensed wireless services and fixed wireless services such as
microwave backhaul."
"Visual impact" means the placement or design of a wireless communications facility such
that it may be noticed by a person of average height when standing on the ground of a street,
sidewalk or private property.
"Wireless communications facility" means a land use facility supporting antennas that sends
andlor receives radio frequency signals, AMIFM, microwave, and/or electromagnetic waves for
the purpose of providing voice, data, images or other information, including, but not limited to,
cellular and/or digital telephone service, personal communications services, and paging services.
Wireless communications facilities include antennas and all other types of equipment for the
transmission or receipt of the signals; towers or similar structures built to support the equipment;
equipment cabinets, base stations, generators, cables, conduit, and other accessory
development and support features; and screening and concealment elements. Also referred to
as a "communication facility" or "facility".
"Wireless communications provider" means any company or organization that provides or
who represents a company or organization that provides wireless communications services.