Admin PD and Master Sign Plan - 2015Community Development Department via electronic mail December 10, 2015 Lloyd Square Associates, LLC Attn: Bruce Bowen 393 E. Campbell Ave., Ste. 2 Campbell, CA 95008 Re: File No: PLN2014-316 / PLN2015-366 Address: 501-533 E. Campbell Ave. (Lloyd Square) Application: Administrative Planned Development Permit /Master Sign Plan Status: Approved Dear Mr. Bowen, The Community Development Director has approved your Administrative Planned Development Permit and Master Sign Plan applications for the above referenced property, subject to the enclosed Conditions of Approval. This action is effective in ten calendar days, unless appealed in writing to the Community Development Department by 5:00 p.m. on December 21, 2015. If an appeal is received, you will be immediately notified of its receipt. If you should have any questions regarding this approval, I may be contacted at (408) 866- 2193 or by email at danielf(a~cityofcampbell.com. Sincerely, Daniel Fama Associate Planner Encl: Conditions of Approval - PLN2014-315/PLN2015-366 cc: Paul Kermoyan, Community Development Director CONDITIONS OF APPROVAL - PLN2014-316/PLN2015-366 Pg. 1 501-533 E. CAMPBELL AVENUE CONDITIONS OF APPROVAL FOR FILE NO. PLN2014-316/PLN2015-366 SITE ADDRESS: 501-533 E. Campbell Ave. APPLICANT: Lloyd Square Associates OWNER: Lloyd Square Associates DATE: December 8, 2015 The applicant is hereby notified, as part of this application, that he/she is required to meet the following conditions in accordance with the ordinances of the City of Campbell and the State of California. Where approval by the Community Development Director, City Engineer, Public Works Director, City Attorney, or Fire Department is required, that review shall be for compliance with all applicable Conditions of Approval, adopted policies and guidelines, ordinances, laws and regulations, and accepted engineering practices for the item under review. Additionally, the applicant is hereby notified that he/she is required to comply with all applicable Codes or Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified: COMMUNITY DEVELOPMENT DEPARTMENT Planning Division Approved Project: Approval is granted for an Administrative Planned Development Permit (PLN2014-316) and Master Sign Plan (PLN2015-366) to allow building facade and parking lot improvements, and a new signage scheme, for an existing shopping center (Lloyd Square) located at 501-533 E. Campbell Avenue. The project shall substantially conform to the revised project plans and revised color/material board, stamped as received by the Community Development Department on July 2, 2015, and November 2, 2015 except as may be modified by the Conditions of Approval contained herein. 2. Permit Expiration: The approval shall be valid for one (1) year from the date of final approval. Within this one-year period an application for a building permit must be submitted. Failure to meet this deadline or expiration of an issued building permit will result in the approval being rendered void 3. Planning Final Required: Planning Division clearance is required prior to Building Permit final. Construction not in substantial compliance with the approved project plans shall not be approved without prior authorization of the necessary approving body. 4. Construction Drawings Requirements: The construction drawings submitted for a building permit shall include the following revisions: a. Parking Stall Dimensions: All modified parking stalls shall meet the "uni-stall" dimension of 8 ''/2-ft and 18-ft. Existing parking stalls shall also be resized to meet this standard where feasible and when a reduction in the number of spaces will not occur. t b. Motorcycle Parking: Motorcycle parking shall be included where feasible within the parking lot. 70 North First Street • Campbell, CA 95008-1423 • Tel, (408) 866-2140 • FAX (408) 866-5140 • E-nano, planning@cityofcampbell.com CONDITIONS OF APPROVAL - PLN2014-316/PLN2015-366 Pg. 2 501-533 E. CAMPBELL AVENUE Bicycle Parking: Bicycle racks shall be placed adjacent to store entrances where feasible. 5. Alley Access: The property owner shall install control access doors to secure the rear service alley for use by tenant employees. 6. Parkin: All parking and driveway areas shall be maintained in compliance with the approved plans and Chapter 21.30 (Parking and Loading) ofthe Campbell Municipal Code. The parking lot shall maintain a minimum of 87 parking stalls. 7. Sign Permit Required: All tenant wall signs and the monument sign permitted under the Master Sign Plan shall require a Sign Permit prior to installation. Sign Maintenance: The signs shall be maintained in good condition at all times and shall be repaired or replaced as necessary. 9. Refuse. Enclosure: New and/or modified refuse enclosures shall comply with all applicable standards of Section 21.18.110 of the Campbell Municipal Code, and shall include a roof covering, sanitary drain connection, and fire sprinkler protection. Refuse receptacles shall be kept within the enclosures except during collection in compliance with Chapter 6.04 of the Campbell Municipal Code. 10. Location of Mechanical Equipment: No roof-mounted mechanical equipment (i.e. air conditioning units, ventilation ducts or vents), shall be added to the existing buildings without providing screening of the mechanical equipment from public view and surrounding properties. The screening material and method shall be architecturally compatible with the building and requires review and approval by the Community Development Director and Building Division prior to installation of such screening. 11. Landscape Maintenance: All landscaped areas shall be continuously maintained. Landscaped areas shall be watered on a regular basis so as to maintain healthy plants. Landscaped areas shall be kept free of weeds, trash, and litter. Dead or unhealthy plants shall be replaced with healthy plants of the same or similar type. 12. Fences/Walls: Any newly proposed fencing and/or walls shall comply with Section 21.18.060 of the Campbell Municipal Code and shall be submitted for review and approval by the Community Development Department. 13. Property Maintenance: The property owner shall maintain the property free from graffiti, trash, and rubbish. l4. Construction Activities: The applicant shall abide by the following requirements during construction: a. The project site shall be posted with the name and contact number of the lead contractor in a location visible from the public street prior to the issuance of building permits. 70 North First Street • Campbell, CA 95008-1423 • TeL (408) 866-2140 • Fax (408) 866-5140 • e-mAf[,planning@cityofcampbell.com CONDITIONS OF APPROVAL - PLN2014-316/PLN2015-366 Pg. 3 501-533 E. CAMPBELL AVENUE b. Construction activities shall be limited to weekdays between 8:00 a.m. and 5:00 p.m. and Saturdays between 9:00 a.m. and 4:00 p.m. No construction shall take place on Sundays or holidays unless an exception is granted by the Building Official. c. All construction equipment with internal combustion engines used on the project site shall be properly muffled and maintained in good working condition. . d. Unnecessary idling of internal combustion engines shall be strictly prohibited. e. All stationary noise-generating construction equipment, such as air compressors and portable power generators, shall be located as far as possible from noise- sensitive receptors such as existing residences and businesses. f. Use standard dust and erosion control measures that comply with the adopted Best Management Practices for the City of Campbell. - Building Division: 15. Permits Required: A building permit application shall be required for the building and site improvements. The building permit shall include Electrical/Plumbing/Mechanical fees when such work is part of the permit. 16. Construction Plans: The Conditions of Approval shall be stated in full on the cover sheet of construction plans submitted for building permit. 17. Size of Plans: The minimum size of construction plans submitted for building permits shall be 24 in. X 36 in. 18. Plan Preparation: This project requires plans prepared under the direction and oversight of a California licensed Engineer or Architect. Plans submitted for building permits shall be "wet stamped" and signed by the qualifying professional person. l9. Site Plan: Application for building permit shall include a competent site plan that identifies property and proposed structures with dimensions and elevations as appropriate. Site plan shall also include site drainage details. Site address and parcel numbers shall also be clearly called out. Site parking and path of travel to public sidewalks shall be detailed. 20. Title 24 Energ~pliance: California Title 24 Energy Compliance forms CF-1 R and MF- 1 Rshall be blue-lined on the construction plans. 8'/2 X 11 calculations shall be submitted as well. 21. Special Inspections: When a special inspection is required by C.B.C. Chapter 17, the architect or engineer of record shall prepare an inspection program that shall be submitted to the Building Official for approval prior to issuance of the building permits, in accordance with C.B.C Section 106. Please obtain City of Campbell, Special Inspection forms from the Building Inspection Division Counter. 22. Non-Point Source: The City of Campbell, standard Santa Clara Valley Non-point Source Pollution Control Program specification sheet shall be part of plan submittal. The specification sheet (size 24" X 36") is available at the Building Division service counter. 70 North First Street • Campbell, CA 95008-1423 • TEL (408) 866-2140 • FAX (408) 866-5140 • E-MAIL planning@cityofcampbell.com CONDITIONS OF APPROVAL - PLN2014-316/PLN2015-366 Pg. 4 501-533 E. CAMPBELL AVENUE 23. Title 24 Accessibility -Commercial: On site general path of travel shall comply with the latest California Title 24 Accessibility Standards. Work shall include but not be limited to accessibility to building entrances from parking facilities and sidewalks. 24. Title 24 Accessibility -Commercial: Projects seeking to use the Title 24 Hardship exemption clause shall blue-line completed, City of Campbell " 20%" exemption form on submitted construction plans. Form is available at Building Division service counter. 25. Approvals Required: The project requires the following agency approval prior to issuance of the building permit: a. Santa Clara County Fire Department (378-4010) 26. P.G.& E: Applicant is advised to contact Pacific Gas and Electric Company as early as possible in the approval process. Service installations, changes and/or relocations may require substantial scheduling time and can cause significant delays in the approval process. Applicant should also consult with P.G. and E. concerning utility easements, distribution pole locations and required conductor clearances. 27. Stormwater Requirements: Storm water run-off from impervious surface created by this permitted project shall be directed to vegetated areas on the project parcel. Stormwater water shall not drain onto neighboring parcels. 28. California Green Buildin Code: This project shall comply with the California Green Building Code, Chapter 5. PUBLIC WORKS DEPARTIMENT Visit the City's website and follow the submittal requirements for Public Works once this application has received entitlement. The checklist for the various plans required for submittal can be found on the City's Website at City Services-Public Works-Engineering-Land Development-Documents, (or use this link: http://www.cityofcampbell.com/206/Documents). See instructions on: 1. Street Dedication Requirements The building permit will not be issued until all Public Works Conditions of Approval have been satisfied. These Conditions of Approval are a supplement to the plans prepared by Chris Spaulding Architect dated September 23, 2014. The plans are not approved for construction. Further plan checking by Public Works will be required post entitlement. 29. Site Plan: Revise sheet Al to show the existing 20 foot Landscape and Public Service Easements contiguous with the East Campbell Avenue frontage. 30. Sidewalk Easement: Prior to issuance of any building permits for the site, the applicant shall grant a sidewalk easement on private property contiguous with the public right-of--way along the East Campbell Avenue frontage to accommodate the portion of the existing sidewalk currently shown on private property, unless otherwise approved by the City Engineer. The 70 North First Street • Campbell, CA 95008-1423 • Tet. (408) 866-2140 • FAx (408) 866-5140 • e-Mnu, planning@cityofcampbell.com CONDITIONS OF APPROVAL - PLN2014-316/PLN2015-366 Pg. 5 50]-533 E. CAMPBELL AVENUE applicant shall cause all documents to be prepared by a registered civil engineer/land surveyor, as necessary, for the City's review and recordation. 31. Stormwater Pollution Prevention Measures: Prior to issuance of any grading or building permits, the applicant shall comply with the National Pollution Discharge Elimination System (NPDES) permit requirements, Santa Clara Valley Water District requirements, and the Campbell Municipal Code regarding Stormwater pollution prevention. The primary objectives are to improve the quality and reduce the quantity of Stormwater runoff to the bay. Resources to achieve these objectives include Stormwater Best Management Practices Handbook for New Development and Redevelopment ("CA BMP Handbook") by the California Stormwater Quality Association (CASQA), 2003; Start at the Source: A Design Guidance Manual for Stormwater Quality Protection ("Start at the Source") by the Bay Area Stormwater Management Agencies Association (BASMAA), 1999; and Using Site Design Techniques to Meet Development Standards for Stormwater Quality: A Companion Document to Start at the Source ("Using Site Design Techniques") by BASMAA, 2003. 70 North First Street • Campbell, CA 95008-1423 • TEL (408) 866-2140 • Fnx (408) 866-5140 • E-Ntnit,planning@cityofcampbell.com