Pre-Application - Townhome Project - 2015Community ®evelopment Department
August 6, 2015
Mike Payday
299 Redding Road
Campbell, CA 95008
112e: File hio: PRE2015-08
Address: 180 Redding Road
Applicattion: Pre-Application
Dear,Mr. Payday,
Via e-mail and LISPS
Thank you for your submittal of a preliminary application proposal to allow the demolition of an
existing residence with an attached garage to construct five two-story townhomes. The purpose
of this letter is to provide staff comments in anticipation of a formal project submittal. Please
note that this review letter is limited to the overall project design concept and should not be not
construed as a substitute for formal project review.
1. Development Permit and Fee Requirements: This proposal would require, at a minimum,
an application for a done Change, a Planned Development Permit and a Tentative
Subdivision Map. Additional permits required may include a Tree Removal Permit,
Parking Modification Permit, dependent on the design of your specific project.
Application forms for these permits can be found online as follows:
http://www.cityofcampbell.corn./1.66/zoning-and-Land-Use. Preparation of an Initial
Study pursuant to the California Environmental Quality Act (CEQA) will also be required
(for five developable lots and a sixth common lot). If the application is reduced to four-
units, instead of five, the development may be found Categorically Exempt under CEQA,
and may only require a Parcel Map (instead of a Subdivision Map). Assuming afive-unit
subdivision, the current review fees are listed below. Please note that these fees are
subject to change at the beginning of each fiscal year (July 1) and are due upon
application submittal (unless otherwise noted).
Development Permit Fees
• Zone Change:
• Planned Development Permit:
~ Su'odivisioii I'v1ap:
• Fire Dept. Project Review Fee:
• NPDES Permit ("C-3") Review Fee
CEQA Related Fees
• CEQA -Initial Study:
$8,713
$13,790
$9,GG 7
$255
$690
$10,000 deposit (charged at actual time) +
PRE2015-08 ,., 180 Redd Koad
• County CEQA Filing Fee (if required):
(Due prior to public hearing)
• Mitigation Monitoring Fee:
(Due prior to building permit issuance)
• Fire Dept. CEQA Review Fee:
• Traffic Impact Analysis
2 of 6
Special Study Costs
Cost Based on Environmental Determination
$8,000 deposit (charged at actual time if required)
$488
Cost plus 20% Administrative Fee
2. Park in-lieu Fee: As required by the CMC Ch. 20.24, payment of a park in-lieu fee for
this project will be required. The fees owed are calculated as follows:
$50,925 -Cost of five (5) proposed units x $10,185 (6 to < 13 units per gross acre)
- $17 447 -Credit for one (1) existing units x $17 105 (<6 units per gross acre)
$33,478 -Estimated Park In-Lieu fees Owed
Seventy-five percent of this fee will be due at final map recordation, with the remaining
twenty-five percent due of final occupancy.
3. Project Considerations: Based on a review of the preliminary project plans, the following
issues should be considered prior to application submittal:
a. General Plan: The subject property has aLow-Medium Density Residential (6-13
units/gross acre) General Plan Land Use designation.
b. Zonin :The property is in an R-M (Multiple-Family Residential) zoning district. The
project requires a zone change to "Planned Development:" because the. subdivision
creates lots which do not have frontage on the public street.
c. Lot Size: The property is estimated to have a 17,262 gross lot size and 15,462 net lot
size.
d. Proposed Densi~: The project has an estimated density of 12.62 units per gross acre,
whereas the existing single family residence has an estimated density of 2.52 units per
gross acre.
e. Development Standards: Whereas the P-D zoning district does not provide a list of
general development standards for guidance, the R-M (Multi-family Residential)
zoning district anticipates a comparable density range (6=13 units/gross acre) is
generally recommended to be considered in the development of a new project. The P-
Dzoning district is intended to provide a degree of flexibility that is not available in
other zoning districts so as to allow developments that are more consistent with site
characteristics, provided that the intent of that flexibility is to not allow more
residential than would normally be allowed by other residential zoning districts that
are deemed consistent with the General Plan.
As the subject property is rectangular in shape, relatively flat, and lacks any otherwise
discernable site constraints, deviations from the R-M development standards should
70 North First Street • Campbell, CA 9008-1423 ° TEL (408) 866-2140 • Fnx (408) 866-5140 • E-MAIL planning a,cityofcampbell.com
PRE2015-08 ~ 180 Reddi. Zoad
Pg. 3 of 6
be considered to create larger/more functional open space between units, protect
existing trees, and/or result in better site circulation or design compatibility with the
surrounding community.
£ Architectural Design: As an elevation had not been provided with the submittal, the
following comments are in anticipation of the preparation of building elevations:
i. Staff would recommend that the project employ a mixture of different
architectural styles and forms that better integrates the project into the built
environment. This may be done through the incorporation of representative
features, colors, forms, and materials of structures found within the project area.
To demonstrate how this has been achieved, it is recommended to provide a few
representative photos showing which features are complementary to nearby
buildings and an area plan indicating at which properties the photos were taken.
ii. Consider providing several different, but complementary architectural styles,
throughout the project.
iii. Consider offsetting building walls, massing, and features from one another to
break-up long continuous wall planes. Consider how each building wall could be
better articulated to provide enhanced visual interest.
iv. Consider the placement and size of windows, and the resulting privacy impacts.
g. Site Design: The following site design recommendations are in response to the project
plans as presented. When trying to incorporate these comments into a revised site
design, consider how the project could result in a better provision of open space and
site design:
i. Maintain protected tree species onsite (Redwood, Oak, Cedar & Ash). It is unclear
from the project plans if any protected tree species occur on the property. Please
note that a minor reduction of the potential number of residential units or building
size due to the tree location does not represent a sever limit of the economic
enjoyment of the property (CMC 21.32.080.5.). For any protected tree considered
for removal, please indicate which of the required findings are proposed to be
satisfied with a supporting statement from a licensed arborist.
ii. Consider orienting the unit along Redding Avenue towards the street, such that
their front entry creates a more pedestrian friendly and welcoming streetscape.
iii. Consider connecting the front entry way of the unit along Redding Avenue with
walkway paths to the sidewalk.
iv. Consider increasing the yard space to provide larger open space areas to create a
more functional yard area. The design as presented creates two "yard areas", on
separate sides of the units, for Unit 2, 3 & 5, which would be more functional as a
single larger area.
v. Consider the placement of trash, mail, air conditioning units as part the site
design. A mailbox will likely be required in front of Unit 1 based on post-office
requirements, based on the proposed design.
vi. Consider off-setting (staggering) units to break-up long continuous wall planes.
Combining this effort with varying height, architectural design, and massing (see
architectural comments) can result in even better outcomes.
70 North First Street ° Campbell, CA 95008-1423 • TES (408) 866-2140 • FAx (408) 866-5140 • e-NtAIL planning u,cityofcampbell.com
PRE2015-08...180 Redd~h_ '~Zoad
` Ps7.4 of 6
vii. Consider how the building (or landscaping features closest to the entry) could
better serve to better define the property entrance.
viii. Please offset the driveway/parking along the side property lines to provide. a
5' (minimum) separation for buffer/landscaping and to serve as an area to capture
water/runoff. The design of the driveway apron should also not "overhang" into
the right-of--way in front of the adjoining property.
h. Circulation:
i. The on-site driveways are only 20. to 24 feet wide. The. City's standard for 90
degree parking is a 25-foot aisle to allow for sufficient backup/clearance distance.
ii. Please consider a design which results in the least amount. of maneuvers to safety
enter/exit each parking space on site, while assuming every space is full.
i. It is recommended that landscaping be provided to break up the long row of
guest and resident parking spaces'.
iii. Please see Fire Department Comments (attached).
i. Public Improvements: Enclosed are preliminary conditions of approval from the
Public Works Department. Please coordinate with Roger Storz in the Public Works
Department (866-2190), to ensure that the submitted plans includes accurate
depictions of these improvements:
j. Homeowners Association: The private access street requires a homeowners
association to maintain it. Please provide information on how this requirement will be
met.
k. Stormwater Treatment: The project is subject to the National Pollution Discharge
- Elimination System (NPDES) permit requirements, Santa Clara Valley Water District
requirements, and the Campbell Municipal Code regarding stormwater pollution
prevention. Specifically, the project must include source control., site design and
treatment measures to achieve compliance with Provision C.3 of the NPDES Permit.
Measures may include, but are not limited to, minimization of impervious surface
area, vegetated swales, and infiltration areas.
1. Noise Study: The .City will require preparation of an acoustical analysis to
demonstrate conformance with the City's Residential Noise Standards (CMC Sec.
21.16.070.E) for stationary and traffic-related noise sources.
m. Fire Department Access: The enclosed County Fire Department comments pertaining
. to site and building access must be addressed. As such, please contact the Fire
Department to ensure that the submitted site plan configuration will comply with
these requirements.
4. Application Submittal: The enclosed application checklist indicates the materials required
for project submittal. The following is additional information must be provided:
a. Environmental Review Documents: As the project has been determined not to be
exempt, preparation of an .Initial Study would be required to analyze the. project's
70 North First Street • Campbell, CA 95008-1423 • Tee (408) 866-2140 • FAx (408) 866-5 (40 • E-tvin~L planning~cityofcampbell.com
PRE2015-08 ~ 180 Reddi°P.. >.oad Pg. 5 of 6
possible environmental impacts. Pursuant to CMC 21,38.OSO.C, the following
additional materials, prepared by qualified professionals to applicable industry
standards, will be required as part of the environmental review.
^ En~ironmerital Site Assessment Report (Phase 1 and Phase 2)
^ Flood Zone Analysis
^ Geotechnical Report
^ Arborist Report/Tree Survey
^ Wildlife Habitat Survey
^Utility "will-serve" letters following agencies from (1) West Valley
Sanitation District, (2) San Jose Water Company, (3) FG&E
^ Traffic Impact Analysis
^ Noise Study
b. Site Plan: With the required site plan, please depict buildings and other improvements
on the abutting properties in order to provide context for the project site. Please also
include the following:
i. Street Centerline: Show the correct distance from the street centerline to the
property line, -dimensions of sidewalk and other relevant information in the public
right of way.
ii. Utilities: All on-site utilities shall be installed underground per Section 21.18.140
of the Campbell Municipal Code for any new or remodeled buildings or additions.
Provide a statement in bold one inch text on the site plan and all electrical plans:
"All new and existing utilities shall be placed underground with no exception."
c. Cross-Section: Iri order to better understand the existing and proposed grade
differences,.please provide additional cross-sections from multiple angles.
d. Parkin :The project would be required to provide 2'/z covered spaces for each unit,
plus t/z space designated guest parking for each unit. As such, the project would be
required to provide a total of 12'/z covered parking spaces and 2'/z uncovered parking
spaces for a total of 15 parking spaces. The design as presented, with uncovered .
parking in lieu of required covered parking would require a Parking Modification.
Permit. As the design does not result in a deficiency in the number of required
parking spaces, but rather a different allocation, staff would be supportive of the
~~ request based on the single-family residential character of~the development.
e. Landscapin; Water Efficiency Requirements: The project will require submittal of a
landscaping plan prepared by a licensed landscape architect, in compliance with
Chapter 2.i, Division 2, of Title 23 of the California Code of Regulations -Water _
Efficient Landscape Requirements and with the City's Landscaping Requirements
(CMC Sec. 21.26.030). The landscaping plan shall indicate that all proposed plantings
will be consistent with the required water usage allowance for the site. Maintenance
of landscaping areas in private open space areas in conformance with these
70 North First Street • Campbell, CA 95008-1423 • TEL (408) 866-2140 • Fax (408) 866-5140 • E-MaiLplanning~cityofcampbell.com
PRE2015-08 ~ 180 Redds_ _ %Zoad
P~. 6 of 6
regulations will require specific provisions and enforcement mechanisms in the
community's CC~Rs.
It is strongly recommended incorporating native plant species into landscaping plan
where possible. Additionally, the retention of existing native plants should be a
priority.
£ Lighting Details: On the site plan and elevation sheets, ensure that all proposed
fixtures are depicted. Please also provide manufactures' specification 'sheets ("cut
sheets") for all lighting fixtures that depict the design of the fixture and provides
technical specifications (i.e., lighting type, watts, lumens, and materials).
g. Gradin>; and Drainage Plan: A preliminary grading and drainage plan indicating
existing and proposed grades and showing management of on-site drainage will be
required. The plan must include calculations indicating the impervious surface created
by the development and also specify the types of stormwater controls to be used.
Preliminary sizing and design showing stormwater controls shall meet the City's
requirements.
In addition to the Planning Division, the preliminary project plans were reviewed by the Building
Division, the Public Works Department, and the County Fire' Department. The enclosed
comments are in the form of anticipated conditions of approval and post-entitlement
requirements.
If you should have any questions regarding these comments, I may be contacted at (408) 866-
2142 or by email at StephenR(~cityofcampbell.com.
Sincerely.,
_,,.,..
~"°-~
~ ~
~'~ ~ ~`y
~~ ,,~
- -. _.~ _.p_...-~°.
Stephen Rose
Associate Planner
encl: Public Works Comment Sheet
Fire Department Comment Sheet
Building Department Comment Sheet
cc: Paul Kermoyan; Community Development Director
70 North First Street • Campbell, CA 95008-1423 • TEL (408) 866-2140 • FAx (408) 366-~ 140 • E-MAIL planning a,cityofcampbell.com