Loading...
14a. Final Design & Specifications u � 0 0 •ORCHP1 0• CITY OF CAMPBELL PUBLIC WORKS DEPARTMENT DATE: April 22,2014 SUBJECT: Addendum#3 Project 08-0413: Hacienda Avenue Green Street Improvement Project NUMBER OF PAGES TRANSMITTED(INCLUDING COVER PAGE): 16 If you have any questions regarding this e-mail,please call Joy Francois at(408)866-2150. Page 1 of 16 OF CA4U u � 0 0 A A ti •ARCH^Ro• . Project No. 08-0411: Hacienda Avenue Green Street Improvement Project ADDENDUM NO. 3 Issued April 22,2014 Consisting of 16 pages (including the cover sheet) Addendum No. 3 to the project plans and specifications for Project 08-04B: Hacienda Avenue Green Street Improvement Project is hereby made a part-of the Contract.Documents, and as indicated,the bidder shall acknowledge receipt thereof on Page BP-2 of the Bid Proposal Forms. Revisions are to be made to the Plans and Specifications as described below: 1. In Section 10, TECHNICAL PROVISIONS, subsection 10-23 "Street Lighting Poles & Fixtures" on page SP-121 of the project specifications, in the second paragraph delete item number 4 which begins "4. The installation of monitoring stations..." and replace with the following: 4. The installation of a monitoring station and hard wire onto a street lighting standard per detail as shown on the plans and as indicated per manufacturer's installation details. The City shall provide the following to the Contractor for its installation: rain gauge (Campbell Scientific TE-525WS-L-PT), solar panel (Campbell Scientific SP10R solar panel, regulated 1OW), metal lock box, data logger (Campbell Scientific CR800-ST-SW), battery (12volt), and pressure transducer/piezometer (Campbell Scientific CS-451-L-SA-2). The Contractor shall provide all remaining items, including but not limited to mounting equipment, hard wire, conduit&pull rope,and pull box per monitoring station location. 2. In Section 10, TECHNICAL PROVISIONS, subsection 10-23 "Street Lighting Poles & Fixtures"on page SP-123 of the project specifications, add the following paragraph: Relocate Existing Streetlight w/New Foundation Relocation of existing streetlights shall include the removal of the existing streetlight standard from the existing foundation, removal of the existing foundation (including backfill and compaction), removal of the existing fixture from the standard, installation of new foundation, and the installation of the existing standard onto the new foundation. Adiust Existing Streetlight to Grade Adjust existing streetlight to grade shall include the removal of the existing streetlight standard from the existing foundation, the removal of the existing foundation (including backfill and compaction), installation of new foundation, adjustment to grade, and the installation of the existing standard onto the new foundation. Page 2 of 16 Removal of Existing Streetlight Foundation Removal of existing streetlight foundation shall include the complete demolition, removal and disposal of the existing streetlight foundation including, but not limited to all concrete and reinforcement, and the backfilling and compaction of any created voids in accordance with these plans and special provisions. 3. In Section 10, TECHNICAL PROVISIONS, subsection 10-23 "Street Lighting Poles & Fixtures" on page SP-123 of the project specifications, delete the third paragraph which begins"Contractor shall use a 30"Diameter ..."and replace with the following: Contractor shall use a 30" Diameter, 8 FT height Sonotube Finish Free Form column to pour the circular foundation for the new street lights placed-in the bio-infiltration areas. Refer to Detail shown on Plan Sheet SL-1. All other streetlights shown on the plans shall be per city standard streetlight foundation details. All foundations shall have appropriate bolt pattern for the street lighting standards used. 4. In Section 10,TECHNICAL PROVISIONS, subsection 10-23 "Street Lighting Poles & Fixtures"on page SP-125 of the project specifications, delete the section under the heading "Measurement and Payment" and replace with the following: Measurement and Payment Full- compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for doing all of the work in compliance with the Plans, Specifications and Special Provision Section 10-23, "Street Lighting Poles &Fixtures" shall be paid for in the appropriate bid item listed below: REMOVE EX. STREETLIGHT POLE, FIXTURE & FOUNDATION (EA) BID ITEM #83 REMOVE EX. STREETLIGHT POLE & FIXTURE (EA) BID ITEM #84 REMOVE EX. STREET LIGHT FIXTURE ON EX.WOOD POLE (EA) BID ITEM #85 REMOVE EX. STREET LIGHT FIXTURE ON EX. METAL POLE (EA) BID ITEM #86 RELOCATE EX. STREETLIGHT W/ NEW FOUNDATION (EA) BID ITEM #87A ADJUST EXISTING STREETLIGHT TO GRADE (EA) BID ITEM #87B FURNISH.& INSTALL NEW TYPE 15 STREETLIGHT POLE AND FIXTURE (EA) BID ITEM #88A FURNISH & INSTALL NEW TYPE 15 STREETLIGHT POLE, FIXTURE & FOUNDATION (EA) BID ITEM #88B FURNISH AND INSTALL NEW STREETLIGHT FIXTURE ON EX.WOODEN POLE (EA) BID ITEM #89 FURNISH AND INSTALL NEW STREELIGHT FIXTURE ON EX. METAL POLE (EA) BID ITEM #90 INSTALL STREETLIGHT PULL BOX(EA) BID ITEM #91 INSTALL 2" SCHEDULE 40 PVC CONDUIT (LF) BID ITEM #92 INSTALL 2" SCHEDULE 80 PVC CONDUIT (LF) BID ITEM #93 INSTALL BIOINFILTRATION MONITORING STATION (EA) BID ITEM #94 5. Replace the Table of Contents found on pages i to v of the project specifications with the following: Page 3 of 16 Table of Contents NOTICEINVITING BIDS....................................................................................................................................NIB-1 BIDPROPOSAL FORMS......................................................................................................................................BP-1 FORMALBID PROPOSAL.......................................................................:................................................BP-1 BIDSCHEDULE OF QUANTITIES..........................................................................................................BP-3 (Continued)BID SCHEDULE OF QUANTITIES....................................................................................BP-4 (Continued)BID SCHEDULE OF QUANTITIES....................................................................................BP-5 (Continued)BID SCHEDULE OF QUANTITIES....................................................................................BP-6 (Continued)BID SCHEDULE OF QUANTITIES....................................................................................BP-7 (Continued)BID SCHEDULE OF QUANTITIES....................................................................................BP-8 ADDITIVE ALTERNATE SCHEDULE«A"............................................................................................BP-9 ADDITIVE ATERNATE SCHEDULE«B.................................................................................................BP-9 ADDITIVE ATERNATE SCHEDULE«C................................................................................................BP-10 ADDITIVE ATERNATE SCHEDULE«D................................................................................................BP-10 STATEMENT OF SUBCONTRACTORS.................................................................................................BP-12 NONCOLLUSIONAFFIDAVIT................................................................................................................BP-13 BIDBOND....................................................................................................................................................BP-18 CONTRACTDOCUMENTS.................................................................................................................................CD-1 CONTRACT.................................................................................................................................................CD-1 BOND FOR FAITHFUL PERFORMANCE..............................................................................................CD-5 BOND FOR LABOR AND MATERIAL....................................................................................................CD-6 BOND FOR FAITHFUL PERFORMANCE OF ONE-YEAR MAINTENANCE PERIOD.................CD-7 BOND FOR FAITHFUL PERFORMANCE OF THREE-YEAR ROADWAY MAINTENANCE PERIOD.........................................................................................................................................................CD-8 SPECIALPROVISIONS...................................................................................:.....................................................SP-1 SECTION 1. SPECIFICATIONS AND PLANS................................................................................................SP-2 General...........................................................................................................................................................SP-2 Special Provisions Section I—Section 9.......................................................................................................SP-2 SECTION 2. PROPOSAL REQUIREMENTS AND CONDITIONS................................................................SP-2 General...............................................................................................................................................:...........SP-2 ProposalGuaranty.........................................................................................................................................SP-3 Pre-Bid Site Inspection..................................................................................................................................SP-3 MandatoryPre-Bid Meeting.........................................................................................................................SP-3 SECTION 3. AWARD AND EXECUTION OF CONTRACT..........................................................................SP-3 DeterminationOf Low Bid.............................................................:...............................................................SP-3 Pre-Construction Conference.......................................................................................................................SP-4 SECTION 4. BEGINNING OF WORK,TIME OF COMPLETION AND LIQUIDATED DAMAGES.......SP-4 General...........................................................................................................................................................SP-4 Timeof Completion.......................................................................................................................................SP-4 LiquidatedDamages...............................................:.......................................................................................SP-4 SECTION 5. GENERAL REQUIREMENTS.....................................................................................................SP-4 Licenses..........:.............................:..................................................................................................................SP-5 Workers'Compensation................................................................................................................................SP-5 Insurance Requirements................................................................................................................................SP-5 PublicSafety...................................................................................................................................................SP-6 LaborNondiscrimination..............................................................................................................................SP-6 Prompt Pay Enforcement Mechanism.........................................................................................................SP-9 PrevailingWage...........................................................................................................................................SP-10 PayrollRecords............................................................................................................................................SP-10 Claims...........................................................................................................................................................SP-10 SECTION6. PERMITS.............................................................................................................................:......SP-13 Table of Contents i GeneralRequirements......................................................:..........................................................................SP-13 Rightof Entry.............................:....:...........................................................................................................SP-13 SECTION 7. PUBLIC UTILITY COORDINATION.......................................................................................SP-14 General.........................................................................................................................................................SP-14 SECTION 8. MATERIALS AND SUBMITTALS............... .........................................................................SP-15 CityFurnished Materials............................................................................................................................SP-15 MaterialsSubmittal List..............................................................................................................................SP-15 AdditionalSubmittals..................................................................................................................................SP-16 Substitutions.................................................................................................................................................SP-17 Specified"Or Equal'Items........................................................................................................................SP-19 RecordDrawings.........................................................................................................................................SP-19 MaterialsTesting............................:............................................................................................................SP-19 Material Submittal List Table.....................................................................................................................SP-19 Material Submittal List Table(Continued)...............................................................................................SP-20 SECTION 9. DESCRIPTION OF WORK........................................................................................................SP-21 Descriptionof Work....................................................................................................................................SP-21 Locationof Work:........................................................................................................................................SP-21 Workby Others...........................................................................................................................................SP-21 SECTION 10. TECHNICAL PROVISIONS..................................................................................................SP-21 10-1 GENERAL CONSTRUCTION REQUIREMENTS............................................................................SP-21 Mobilization..................................................................................................................................................SP-21 Orderof Work.............................................................................................................................................SP-22 Progress Schedule/Record Drawings.........................................................................................................SP-22 General Measurement and Payment Requirements.................................................................................SP-22 Hoursof Work............................................................................................................................................SP-22 24 Hour Contact Number............................................................................................................................SP-23 Cooperation..................................................................................................................................................SP-23 ProjectCoordination...................................................................................................................................SP-23 UtilityCoordination.....................................................................................................................................SP-23 Obstructions.................................................................................................................................................SP-24 Meetings........................................................................................................................................................SP-24 Advance Public Notification........................................................................................................................SP-25 Waste Haulers and Recycling Operations.................................................................................................SP-26 TreeTrimming.............................................................................................................................................SP-26 LandscapingObstruction............................................................................................................................SP-26 Project Appearance and Street Sweeping..................................................................................................SP-27 Staging/Disposal Areas................................................................................................................................SP-27 Dust/Erosion/Drainage Control..................................................................................................................SP-28 HaulRoutes..................................................................................................................................................SP-28 Sanitation......................................................................................................................................................SP-28 FinishingRoadway......................................................................................................................................SP-28 WaterPollution Control..............................................................................................................................SP-28 Measurementand Payment........................................................................................................................SP-29 Record of Existing Surface Conditions......................................................:...............................................SP-29 Measurement and Payment........................................................................................................................SP-29 10-2 TRAFFIC CONTROL REQUIREMENTS.....................................................................................::...SP-29 General.........................................................................................................................................................SP-29 Traffic Control/Management Plan...........................................................................................................SP-30 NoStopping Signs........................................................................................................................................SP-31 Detours,Temporary Striping,and Barriers..............................................................................................SP-31 Additional Construction Area Signs and Controls...................................................................................SP-32 Maintenance of Pedestrian Access and Circulation..................................................................................SP-33 AllowableRoad Closures............................................................................................................................SP-33 Table of Contents H Property Access Requirements...................................................................................................................SP-34 DrivewayClosures.......................................................................................................................................SP-34 LaneClosures...............................................................................................................................................SP-34 Traffic Control System for Lane Closure..................................................................................................SP-35 TemporaryPavement Delineation..............................................................................................................SP-36 TrenchPlating Conditions..........................................................................................................................SP-36 Measurementand Payment........................................................................................................................SP-37 10-3 CONSTRUCTION STAKING LAYOUT AND MONUMENTS......................................................SP-37 General.........................................................................................................................................................SP-37 Benchmarks................:.................................................................................................................................SP-38 Monuments....................................................................................................................................................SP-38 Measurementand Payment........................................................................................................................SP-38 10-4 CLEARING,GRUBBING AND REMOVAL OF OBSTRUCTIONS...............................................SP-39 General.........................................................................................................................................................SP-39 Measurementand Payment........................................................................................................................SP-42 10-5 EXISTING FACILITIES....................................................................................................................SP-42 General.........................................................................................................................................................SP-42 Protect Existing Facilities To Remain........................................................................................................SP-42 Locationof Existing Facilities.....................................................................................................................SP-43 AdjustFacilities to Grade...........................................................................................................................SP-44 PullBoxes.....................................................................................................................................................SP-45 Measurementand Payment........................................................................................................................SP-45 10-6 EARTHWORK...................................................................................................................................SP-45 General........................................................:................................................................................................SP-45 RoadwayExcavation...................................................................................................................................SP-46 SubgradePreparation.................................................................................................................................SP-46 Measurementand Payment........................................................................................................................SP-47 10-7 DRAINAGE PIPE AND STRUCTURES...........................................................................................SP-47 General.........................................................................................................................................................SP-47 Trench Excavation,Bedding and Backfill.................................................................................................SP-48 TrenchDewatering.....................................................................................................................:................SP-48 Reinforced Concrete Pipe(RCP)................................................................................................................SP-49 PolyvinylChloride Pipe(PVC)...................................................................................................................SP-49 DrainageManholes and Inlets...........................................................:........................................................SP-49 Modify Manhole&Adjust to Grade..........................................................................................................SP-50 SDMHCovers..............................................................................................................................................SP-50 Trench Sheeting,Shoring and Bracing......................................................................................................SP-50 CleaningPipelines........................................................................................................................................SP-51 Acceptance for Storm Drain System..........................................................................................................SP-51 Measurement and Payment........................................................................................................................SP-51 10-8 CONCRETE IMPROVEMENTS.......................................................................................................SP-52 General.........................................................................................................................................................SP-52 Pavers............................................................................................................................................................SP-54 AccessibilityRamps.....................................................................................................................................SP-54 Asphalt Concrete Pavement Restoration...................................................................................................SP-54 Measurementand Payment.................:......................................................................................................SP-55 10-9 WEDGE GRINDING..........................................................................................................................SP-55 General.........................................................................................................................................................SP-55 Measurement and Payment........................................................................................................................SP-57 10-10 FULL-DEPTH REHABILITATION(FDR)...................................................................................SP-58 Description...................................................................................................................................................SP-58 General.........................................................................................................................................................SP-58 Construction.................................................................................................................................................SP-60 Measurement and Payment........................................................................................................................SP-62 Table of Contents iii 10-11 ASPHALT CONCRETE PAVEMENT..........................................................................................SP-63 General.........................................................................................................................................................SP-63 Measurementand Payment........................................................................................................................SP-65 10-12 TRAFFIC STRIPES,PAVEMENT MARKINGS AND MARKERS............................................SP-65 General.........................................................................................................................................................SP-65 Paint Traffic Stripe and Curbs...................................................................................................................SP-65 RaisedPavement Markers..........................................................................................................................SP-66 Thermoplastic Traffic Stripe and Pavement Marking.............................................................................SP-67 Measurementand Payment........................................................................................................................SP-67 10-13 SIGNS AND POSTS......................................................................................................................SP-67 General.........................................................................................................................................................SP-67 Measurement and Payment........................................................................................................................SP-68 10-14 TREE PROTECTION AND PRUNING.........................................................................................SP-69 Part1—General...........................................................................................................................................SP-69 Part2—Products.........................................................................................................................................SP-69 Part3-Execution........................................................................................................................................SP-69 Part 4—Measurement and Payment.........................:................................................................................SP-70 10-15 IRRIGATION TRENCHING AND BACKFILLING....................................................................SP-71 Part1—General....................................................:......................................................................................SP-71 Part2—Products.........................................................................................................................................SP-71 Part3—Execution........................................................................................................................................SP-71 Part 4—Measurement and Payment..........................................................................................................SP-73 10-16 IRRIGATION.........................................................................................::......................................SP-73 Part1—General................................................................................................:..........................................SP-73 Part2—Products.........................................................................................................................................SP-74 Part3—Execution........................................................................................................................................SP-77 Part 4—Measurement and Payment..........................................................................................................SP-79 10-17 ' SITE FURNISHINGS.........................................................................................................:...........SP-80 PART1—General........................................................................................................................................SP-80 Part2—Products.........................................................................................................................................SP-80 Part3—Execution........................................................................................................................................SP-80 Part 4—Measurement and Payment.......................................................:..................................................SP-80 10-18 LANDSCAPE SOIL PREPARATION..............................:............................................................SP-81 Part1—General...........................................................................................................................................SP-81 Part2—Products.........................................................................................................................................SP-82 Part3—Execution........................................................................................................................................SP-87 Part 4—Measurement and Payment..........................................................................................................SP-90 10-19 PLANTING..........:.........................................................................................................................SP-90 Part1—General......................................................................................................................:....................SP-90 PART2-PRODUCTS...........................................................................................................................................SP-95 Part3—Execution........................................................................................................................................SP-96 Part 4—Measurement and Payment..........................................................................................................SP-97 10-20 90-DAY PLANT ESTABLISHMENT AND MAINTENANCE....................................................SP-98 Part1-General........................................:.:.................................................................................................SP-98 Part2-Products..........................................................................................................................................SP-99 Part3—Execution.....................................................................:..................................................................SP-99 Part 4—Measurement and Payment........................................................................................................SP-102 10-21 METAL AND HARDWARE.......................................................................................................SP-103 Part1—General..................................................:......................................................................................SP-103 Part2-Materials.......................................................................................................................................SP-106 Part3-Execution......................................................................................................................................SP-104 Part4—Measurement and Payment........................................................................................................SP-105 10-22 3-YEAR LANDSCAPE AND IRRIGATION MAINTENANCE...............................................SP-105 Part1—General.........................................................................................................................................SP-105 Table of Contents iv Part2-Products(Not Used).....................................................................................................................SP-113 Part3—Execution....................:.................................................................................................................SP-113 Part4—Measurement and Payment........................................................................................................SP-114 10-23 STREET LIGHTING POLES&FIXTURES...............................................................................SP-114 General.......................................................................................................................................................SP-114 Preservation of Existing Street Lighting Systems.......................:...........................................................SP-122 Bondingand Grounding............................................................................................................................SP-122 Disposal of Electrical Equipment.............................................................................................................SP-122 LEDStreet Lighting Fixtures...................................................................................................................SP-122 PhotoelectricCell.......................................................................................................................................SP-122 StreetLighting Standards.................................................................................. ......................................SP-123 Foundations................................................................................................................................................SP-124 Conduits......................................................................................................................................................SP-123 ConduitSealer............................................................................................................................................SP-123 PowerService.............................................................................................................................................SP-123 PullBox.......................................................................................................................................................SP-123 Conduitand Conductor.............................................................................................................................SP-124 Inspection...................................................................................................................................................SP-124 Measurementand Payment......................................................................................................................SP-125 10-24 FENCE AND CHAIN LINK GATE.............................................................................................SP-125 General.......................................................................................................................................................SP-125 Measurementand Payment.......................................................................................................................SP-125 10-25 COORDINATION WITH ADJACENT PROJECTS...................................................................SP-126 General.......................................................................................................................................................SP-126 Measurement and Payment......................................................................:...............................................SP-126 APPENDIX A Miscellaneous Details and Asphalt Concrete Pavement Thickness Log..................................App A-1 APPENDIXB Construction Workday Calendar..............................................................................................App B-1 APPENDIX C Best Management Practices for the Construction Industry..................................................:....App C-1 APPENDIX D City's Storm Water Pollution Control Requirements................................................................App D-1 APPENDIX E Right-of-Entry Form.................................................................................................................App E-1 APPENDIX F Quality Control Plan............................................................................!....................................App F-1 APPENDIX G Noise Mitigation Plan...........................:.................................................................................:.App G-1 APPENDIX H Waste Management Plan..........................................................................................................App H-1 APPENDIX I Environmental Training Plan......................................................................................................App I-1 APPENDIX J Site Recycling Plan.....................................................................................................................App J-1 APPENDIX K Water Use Tracking.................................................................................................................App K-1 APPENDIX L Construction Equipment Emissions Information......................................................................App L-1 APPENDIX M Interlocking Paving Units.......................................................................................................App M-1 APPENDIX N Debris Recovery Statement and Plan.......................................................................................App N-1 Table of Contents v 6. Replace the Bid Schedule of Quantities found on pages BP-3 to BP-8 of the project specifications with the following: Page 9 of 16. BID SCHEDULE OF QUANTITIES for PROJECT 08-0413: HACIENDA AVENUE GREEN STREET IMPROVEMENT ITEM ESTIMATED UNIT EXTENDED NO. ITEM DESCRIPTION UNITQUANTITY PRICE PRICE 1 Video Survey of Ex. Conditions LS 1 . 2 Traffic Control LS 1 3 Construction Staking and Layout LS 1 4 Reset Benchmark EA 1 5 Reset Monuments EA 9 Clearing, Grubbing and Removal of 6 Obstructions LS 1 7 Tree Removal and Stump Grinding EA 50 8 Potholing/Exposing Utilities LS 1 Adjust Storm Drain Manholes to 9 Grade EA 14 Adjust Storm Drain Catch Basin to 10 Grade EA 2 11 Adjust Detector Handhole to Grade EA 1 12 Relocate/Adjust Pull Box to.Grade EA 2 13 FPQ Roadway Excavation CY 8,471 Class A- 14 0.5' Thick Sub grade Preparation SF 33,600 15 12" RCP Pipe—Class IV LF 1,372 16 12" PVC Pipe—Schedule 80 LF 49 17 8" PVC Pi e—Schedule 80 LF 2,027 18 6" PVC Pipe—Schedule 80 LF 1,072 Bid Proposal BP-3 t (Continued) BID SCHEDULE OF QUANTITIES for PROJECT 08-0413: HACIENDA AVENUE GREEN STREET IMPROVEMENT ITEM ESTIMATED UNIT EXTENDED NO. ITEM DESCRIPTION UNIT QUANTITY PRICE PRICE 19 Storm Drain Manhole EA 5 Modify Storm Drain Manhole and 20 Adjust to Grade EA 6 21 Storm Drain Catch Basin EA 19 22 Storm Drain Field Inlet EA 18 23 Storm Drain Overflow Pie EA 53 Trench Sheeting, Shoring and 24 Bracing LF 1600 25 Case A Accessibility Ramp EA 12 Case C— Modified Accessibility 26 Ramp EA 1 Case F— Modified Accessibility 27 Ramp EA 4 28 PCC Sidewalk SF 15,056 29 6" PCC/6"AB Driveway SF 18,390 30 PCC Curb and Gutter LF 1,183 31 PCC Rolled Curb LF 842 32 PCC Courtesy Strip LF 3,696 33 PCC Edge Band LF 927 34 PCC Curb—Type 1A LF 160 35 Retaining Curb SF 209 36 Pavers SF 464 37 2" Wedge Grind/Conform Grind LF 1,472 Bid Proposal BP-4 0 (Continued) BID SCHEDULE OF QUANTITIES for PROJECT 08-0413: HACIENDA AVENUE GREEN STREET IMPROVEMENT ITEM ESTIMATED UNIT EXTENDED NO. ITEM DESCRIPTION UNIT QUANTITY PRICE PRICE 38 Street Fine Grading SF 208,820 39 Full-Depth Rehabilitation (FDR) SF 208,820 Asphalt Concrete—Type A Y2" Max. 40' Medium TON 6,080 41 Detail 2 Striping LF 1,311 42 Detail 22 Striping LF 3,147 43 Detail 27B Striping LF 6,246 44 Detail 38 Striping—THERMO LF 1,107 45 Detail 39 Striping LF 3,158 46 Detail 39A Striping LF 958 47 Type IV L Arrow—THERMO EA 11 48 Type IV R Arrow—THERMO EA 1 49 Type VII L Arrow—THERMO EA 2 50 Type VII R Arrow—THERMO EA 5 51 Type VIII Arrow—THEMRO EA 2 Railroad Crossing Symbol - 52 THERMO EA 1 53 STOP Legend EA 18 12"White Limit Line/Crosswalk- 54 THERMO LF 571 55 Bike Lane Symbol -THERMO EA 8 Bid Proposal BP-5 0 (Continued) BID SCHEDULE OF QUANTITIES for PROJECT 08-0413: HACIENDA AVENUE GREEN STREET IMPROVEMENT • ESTIMATED UNIT EXTENDED ITEM DESCRIPTION UNIT QUANTITY PRICE PRICE 56 Bike Lane Arrow—THERMO EA 8 '57 Blue Fire Hydrant Marker EA 6 58 Paint Curbs Red LF 22 59 Relocate Signs EA 26 60 Install New Sign Posts EA 26 "BIKE LANE"W/Symbol Sign 61 24"x 18"— R81 EA 6 "BEGIN" Sign 62 12"x 5"— R81 A EA 2 "END" Sign 63 12"x 5" Modified — R81 B EA 2 "ALL WAY" Sign 64 18"x B"—R1-4 EA 4 65 Irrigation LS 1 66 Bench EA 2 , 67 Landsca a Soil Preparation LS 1 68 FPQ Im ort To soil CY 530 69 FPQ Biotreatment Soil CY 759 70 FPQ Drain Rock CY 506 71 FPQ Impermeable Liner SF 14,140 72 Tree—24" Box EA 34 Shrubs, Perennials, and Grasses= 73 5 Gallon EA 545 74 Perennials— 1 Gallon EA 85 Bid Proposal BP-6 (Continued) BID SCHEDULE OF QUANTITIES for PROJECT 08-0413: HACIENDA AVENUE GREEN STREET IMPROVEMENT ESTIMATED UNIT EXTENDED ITEM DESCRIPTION UNIT QUANTITY PRICE PRICE 75 Landscape Boulders EA 51 76 FPQ Bioinfiltration Sod SF 21,155 77 FPQ Mulch SF 7500 78 Root Barrier LF 640 79 Redwood Header LF 60 80 Bay-Friendly Project Sin EA 0 81 Bay-Friendly Practice Sin EA 3 3-YR Extended Plant Establishment 82 R and Maintenance LS 1 Remove Ex. Streetlight Pole, 83 Fixture & Foundation EA 19 Remove Ex. Streetlight Pole & 84 Fixture EA 2' Remove Ex. Streetlight Fixture on 85 Ex. Wood Pole EA 8 Remove Ex. Streetlight Fixture on 86 Ex. Metal Pole EA 1 Relocate Ex. Streetlight w/ New 87A Foundation EA 11 , 87B Adjust Ex. Streetlight to Grade EA 3 Furnish & Install New Type 15 88A Streetlight Pole & Fixture EA 2 Furnish & Install New Type 15 88B Streetlight Pole, Fixture & EA 24 Foundation Furnish & Install New Streetlight 89 Fixture on Ex. Wood Pole EA 3 Furnish & Install New Streetlight 90 Fixture on Ex. Metal Pole EA 12. 91 Furnish & Install Streetlight Pull Box EA 56 Furnish & Install 2"'Schedule 40 92 PVC Conduit LF 3,631 Bid Proposal BP-7 (Continued) BID SCHEDULE OF QUANTITIES for PROJECT 08-0413: HACIENDA AVENUE GREEN STREET IMPROVEMENT ESTIMATED UNIT EXTENDED ITEM DESCRIPTION UNIT QUANTITY PRICE PRICE Furnish & Install 2" Schedule 80 93 PVC Conduit LF 1,636 Install Bioinfiltration Monitoring 94 Station EA 1 95 Relocate Ex. Fence LF 224 96 Relocate Ex. Chain Link Gate EA 1 97 Coordination with Adjacent Projects LS 1 $10,000 $10,000 TOTAL BASE BID BID ITEMS #1-97 Note: (FPQ) indicates final pay quantity per SJSS Section 9-1.015 "Final Pay Quantities" (R) indicates revocable bid items per Section 4-1.03E of SJSS Total Base Bid Written in !!!lords: Bid Proposal BP-8 Issued By: - Date: Fred Ho, Se ' r Engineer Page 16 of 16 AdJeAjum oF ' CA41 u r 0 0 A a ti •0RCH A?-' CITY OF CAMPBELL PUBLIC WORKS DEPARTMENT DATE: April 21,2014 SUBJECT: Addendum#2 Project 08-0413: Hacienda Avenue Green Street Improvement Project NUMBER OF PAGES TRANSMITTED(INCLUDING COVER PAGE): 2 If you have any questions regarding this e-mail,please call Joy Francois at(408) 866-2150. Page 1 of 2 qP .01 *CA4t6� u r 0 0 a A. ti A% •0RCH AR10• Project No. 08-0411: Hacienda Avenue Green Street Improvement Project ADDENDUM NO. 2 Issued April 21,2014 Consisting of 2 pages (including the cover sheet) Addendum No. 2 to the project plans and specifications for Project 08-04B: Hacienda Avenue Green Street Improvement Project is hereby made a part of the Contract Documents, and as indicated, the bidder shall acknowledge receipt thereof on Page BP-2 of the Bid Proposal Forms. Revisions are to be made to the Plans and Specifications as described below: 1. On the cover page of the project specifications, delete the words "BID OPENING: 2:00 P.M. APRIL 22, 2014" and replace with the following: BID OPENING: 2:00 P.M. APRIL 29, 2014 2. In the section "Notice Inviting Bids", on page NIB-1 of the project specifications, delete the first paragraph which begins"1. Date of Opening Bids..." and replace with the following: 1. Date of Opening Bids. Notice is hereby given that sealed bids will be received at the Office of the City Clerk of the City of Campbell, 70 North First Street, Campbell, CA 95008-1423 until 2:00 PM, April 29, 2014, for the foregoing project. The bids so submitted will be publicly opened and read aloud at that time. Issued By: Date: Z2-1 Fred Ho,gSeniorgineer Page 2 of 2 _ aevidu,w) oF V r 0 0 ti •DRCiih CITY OF CAMPBELL PUBLIC WORKS DEPARTMENT DATE: April 18,2014 SUBJECT: Addendum#1 Project 08-0413: Hacienda Avenue Green Street Improvement Project NUMBER OF PAGES TRANSMITTED(INCLUDING COVER PAGE): 2 If you have any questions regarding this e-mail,please call Joy Francois at(408)866-2150. Page 1 of 2 .01 •CA4U u r 0 0 �► A. •0RcH AILI • Project No. 08-04B: Hacienda Avenue Green Street Improvement Project ADDENDUM NO. 1 Issued April 18,2014 Consisting of 2 pages (including the cover sheet) Addendum No. 1 to the project plans and specifications for Project 08-04B: Hacienda Avenue Green Street Improvement Project is hereby made a part of the Contract Documents, and as indicated,the bidder shall acknowledge receipt thereof on Page BP-2 of the Bid Proposal Forms. Revisions are to be made to the Plans and Specifications as described below: 1. In Section 10, TECHNICAL PROVISIONS, subsection"Clearing, Grubbing and Removal of Obstructions" on page SP-39 of the project specifications, delete the second paragraph which begins "The work consists of..." and replace with the following: The work consists of the following and as noted on the plans: all soil excavation and off-haul to the grades necessary for the purpose of installing new improvements including, but not limited to: bio-infiltration areas and section, driveways, sidewalks, and planting; removal and disposal of trees and stump grinding; tree trimming; root pruning; removal and disposal of existing thermoplastic striping and pavement markings; removal and disposal of pavement markers; PCC and AC sawcutting; removal and disposal of existing PCC sidewalk, PCC/AC/gravel driveway, PCC/AC/gravel driveway approach, PCC/AC/gravel driveway conform areas, PCC/AC curb and gutter, PCC valley gutter, PCC median island, and miscellaneous asphalt concrete; removal and disposal of abandoned utilities (including but not limited to manholes, drain inlets, conduit line, wires, valve boxes and concrete kick blocks); removal and disposal of bushes, plants, and vegetation. Work shall also include the removal and disposal or relocation/replacement of all other existing obstructions in the way of the improvements indicated on the Plans, Special Provisions or as directed by the Engineer, including, but not limited to, mailboxes, fences (direct attention to Chain Link Fence and Gate section), drain lines, bollards, landscape lighting and hardscape. For the purpose of installing the new roadway section, removal of existing roadway material shall include asphalt concrete, aggregate base, and other roadbed subgrade material. See section 10-6, subsection"Roadway Excavation". Issued By: Date: Michelle Quinney, ity Engineer Page 2 of 2 0F ' CA4U u r 0 0 A. s •0RCH AO ' CITY OF CAMPBELL PUBLIC WORKS DEPARTMENT DATE: May 16,2014 SUBJECT: Addendum#1 Project 08-0413: Hacienda Avenue Green Street Improvement Project-2"d Issue NUMBER OF PAGES TRANSMITTED(INCLUDING COVER PAGE): 2 If you have any questions regarding this e-mail,please call the Public Works Department at(408)866-2150. r F r r Page 1 of 2 .01 . CA4 0 0 A A. ti •0RCH Av-v Project No. 08-04B: Hacienda Avenue Green Street Improvement Project 2nd Issue ADDENDUM NO. 1 Issued May 16,2014 Consisting of 2 pages (including the cover sheet) Addendum No. 1 to the project plans and specifications for Project 08-0413: Hacienda Avenue Green Street Improvement Project-2nd Issue is hereby made a part of the Contract Documents, and as indicated, the bidder shall acknowledge receipt thereof on Page BP-2 of the Bid Proposal Forms. Revisions are to be made to the Plans and Specifications as described below: 1. In Section -10, TECHNICAL PROVISIONS, subsection 10-18 "Landscape Soil Preparation" on page SP-86 of the project specifications, under the heading "3.1 Limits and Grades" replace the last sentence that begins, "Finish grading under this section..." with the following: Finish grading under this section shall be completed in accordance with the grades indicated on the plans. 2. On sheets SG-3, SG-4 and SG-5 of the project plans, replace the note entitled, "Items Not In Contract(Sheets SG-3 to SG-5)"with the following: NOTES (Sheets SG-3 to SG-5) 1. All bio-infiltration fine grading between Virginia Avenue and Winchester Boulevard to be performed by others (Project 08-04A). 2. Contractor shall perform all other work as specified in these drawings and specifications. 3. Contractor to coordinate with Project 08-04A contractor during construction. Issued By: Date: s- /(o — /`f Michelle Quinney, City Engine Page 2 of 2