Loading...
Grading & Drainage __7 American Soil Testing, Inc. Soil, Foundation and Environmental Engineers UNDER ALL IS THE SOIL 2734 Bascom Avenue,San Jose,CA 95124 • (408)559-6400 • Fax(408)559-6688 File No. 05-2602-S' July 26, 2006 06 AA �0 Mr. Hamid Adelparvar 650 Los Altos Rancho Los Altos, CA 95024 Subject: Proposed two single family residence 1819 West Hacienda Avenue, APN: 403-12-027 Campbell, California... Grading & Drainage Plan Review Gentlemen Per your request, we are presenting herein our comments regarding the Grading and Drainage Plan for the above-mentioned project. The following plan was submitted to our office for our review and comments: Grading and Drainage Plan Sheets 1 through 8 prepared by the office of SMP Company of Los Altos, California. Job No. 2450 dated 6-8-2006. We have determined that the above-mentioned plan substantially complies with the recommendations contained in our soil and foundation investigation report File No. 05- 2602-S dated December 27, 2005 `File No. 05-2602-5 Amer; Soil Testing, Inc. Our Firm should be notified at least 48 hours prior to commencement of any grading operations in order that our Project Engineer can coordinate the work in the field with your grading contractor. We highly recommend that our firm representative be present during foundation excavation to ensure that the foundation complies with the recommendations contained in Soil and Foundation Investigation report prepared for this project. Upon satisfactory completion of work, a letter of compliance will be issued. We are pleased to have been of service to you in this matter. Should you have any question or require additional information, please feel free to call our office at your convenience. Very truly yours, AMERICAN SOIL TESTING, INC. Ben Rahimi, C.E.S. ,�DFESS/p REA 1- 03 843 �04 . .M�l< DREW A. Project Engineer ' OFRANI dNO. 38159 D EXR 3/31/0 7 �•�n,�c�" �� s ' CIVIL P �,9T�OF CAL�F�2` Andrew A. Ghofrani, P. R.C.E. # 38159 Expire: 3-31-07 2 CITY OF CAMPBELL N0. DEPARTMENT OF PUBLIC WORDS IN A,. DIVISION NN sf"J< WA APPLICATION NO(S): ADDRESS: 1 P51 q N-a e I to cLo- ke Instructions: This checklist provides advance notification to applicants of the City of Campbell's final on-site grading and drainage plans and submittal requirements. Using this checklist will expedite your application through the City's review process. Prior to submitting a final on-site grading and drainage plan list to the City Engineer, please place an "X" .in the space to the right of each item below to indicate you have complied,place "N/A" to indicate that the particular item does not apply. Review applicable sections, which are referenced in parentheses,before checking off each item. SEAL AND SIGNATURE OF ENGINEER OF WORK. I HEREBY DECLARE THAT I AM THE ENGINEER OF WORK FOR THIS PROJECT, THAT I HAVE EXERCISED RESPONSIBLE CHARGE OVER THE DESIGN OF THE PROJECT AND COMPLETION OF THIS CHECKLIST AS DEFINED IN SECTION 6703 OF THE BUSINESS AND PROFESSION CODE, AND THAT THE DESIGN IS CONSISTENT WITH CURRENT STANDARDS. QsofES60 SIpNq Signature Date 2 c� No 52124 m 6mrwrJ �l3 PrintedQ' C- -� RCE# G272 Expiration Date 171/ 3( /o P (SEAL) CITY ITEMS OIL N/A COMMENTS L GENERAL 1. City standard on-site title sheet with applicable notes. 2. 24"X 36" sheet size used, including City standard \/ borders an lueprint) r a clean bay plan sheet. JALandDev\Forms\G&D\GD checklist.doc 1 CITY ITEMS OK N/A COMMENTS 3 Title Block/scale/north arrow shown. ✓ 4. Plans must be clearly readable before and after microfilm reproductions. V 5. Engineer's name, number, expiration date and j 1 signature included on all sheets. V / 6. Vicinity Map shown(must be microfilmable). V ✓ 7. Sheet Index and key map included for 3 or more / sheets. ✓ Y 8. Cross sections as needed for clarity. ✓ 9. All adjacent streets labeled correctly. ✓ a% 10. Reference to City benchmark. Iv 11. Existing and proposed property easement lines. 1/ V/ 12. Streets dimensioned(existing right-of-way, pavement, curb, gutter, sidewalk and parkways). 13. Adjacent properties labeled as to use. II. GIIADING 14. 1' contour lines (existing and proposed). ✓ (`� �tlC.' 15. Existing and proposed building locations and pad / elevations. 16. Proposed elevations at high points,grade breaks, and ✓ / other significant locations. t/ 17. Finished grade elevations at building corners. 18. Lot corner elevations and the elevation at the high / point in the yard. 19. Side and rear yard topography extending a sufficient distance beyond property line(20'minimum)to determine that proposed grading will not impede existing drainage patterns. 20. Existing and proposed fences or retaining walls. ✓ `� 21. Quantities of cut and fill in cubic yards. ` 22. Lots numbered and dimensioned per final map. J:\LandDev\Fonns\G&D\GD checklist.doc 2 CITY ITEMS OK N/A [COMMENTS 23. Grading conforms to approved preliminary plans. ✓ ✓ . 24. Sufficient elevations on adjacent parcels must be indicated to demonstrate that proposed grading will not impede existing drainage patterns. III. DRAINAGE 25. Location and elevation of overland release to public ✓ - storm system shown. 26. Roof drainage outlets shown. 27. Interior drainage facilities identified(catch basin, pipes, swales, etc.). V✓ 28. Size, grate elevation and invert elevation of all inlets shown an cross section of drainage swa es s 29. Pipe materials, slopes and sizes shown. 30. Channelization of flows to adjacent properties will not VI/ be allowed. ✓ 31. Construction of french drains will not be allowed. 32. Sheet flow across public property will not be allowed. ✓ 33. Runoff from impervious areas should be channeled to pervious areas.Direction of flow from impervious to pervious areas shown. 34. Amount of proposed pervious area and proposed impervious area (in square feet). 35. Drainage calculations using the numeric sizing criteria,if applicable. 36. Calculations sizing the selected BMP based on results from the numeric sizing criteria,if applicable. 37. Dimensions,cross sections and slopes, if applicable, / of the selected BMP to treat the site shown. 38. Vegetated drainage swales, filter strips and/or other treatment devices shall be designed to store runoff and drain when at capacity.Elevations of swale features (i.e. top of swale, basin of swale, top of overflow grate, etc.) shown. JALandDev\Forms\G&D\GD checklist.doc 3 V IV. NOTES 30. City of Campbell GENERAL GRADING AND ✓ DRAINAGE NOTES are included on the plans. V. SEAL OF ENGINEER OF WORK 40. Seal of Engineer of Work shown on plans as follows: SEAL OF ENGINEER OF WORK: I hereby declare that I am the Engineer of Work for this project, that I have exercised responsible charge over the design of the project as defined in Section 6703 of the Business and Professions Code, and that the design is consistent with current standards. The design shown hereon is necessary and reasonable and does not restrict any historic drainage flows from adjacent properties nor increase drainage to adjacent properties. I understand that the check of project drawings and specifications by the City of Campbell is confined to a review only and does not relieve me, as Engineer of Work, of my responsibilities for project design. Engineer of Work, P.E. Date (Firm) (Address) (Telephone) RCE# Exp. Rev 5/04 JALandDev\Forms\G&D\GD checklist.doc 4 American Soil Testing, Inc. Soil, Foundation and Environmental Engineers UNDER ALL IS THE SOIL 2734 Bascom Avenue,San Jose,CA 95124 • (408)559.6400 • Fax(408)559-6668 File No. 05-2602-5 �M e 1?006 Mi tti® December 27, 2005 Mr. Hamid Adelparvar 650 Los Altos Rancho Los Altos, CA 95024 Subject: Proposed two single family residence 1819 West Hacienda Avenue, APN: 403-12-027 Campbell, California. SOIL AND FOUNDATION INVESTIGATION Gentlemen In response to your authorization, our firm has performed a Soil and Foundation Investigation for the above-mentioned project. The site is located at .1819 West Hacienda Avenue in Campbell, California. Our findings indicated that the proposed two wood framed single-family residences may be constructed on the above-mentioned property provided the recommendations contained in this report are carefully followed and implemented during construction. This report presents our findings on the surface and subsurface soil investigation, laboratory test results, field and office studies. File No. 05-2602-S American Soil Testing, Inc. We are pleased to have been of service to you in this matter. Should you have any question or require additional information, please feel free to call our office at your convenience. Very truly yours, American Soil Testing, Inc. 2 Ben Rahimi, C.E.S. REA 1- 03843 Project Engineer h. FEs S ... 'MDREW A. Andrew A. Ghofrani, P.E. GH®FFIANI w NO.38159 R.C.E. # 38159 EXP. 3/31/07 CIVIL Expire: 3-31-07 ��gTFOF Cf1�1For�'�� 2 Soil and Foundation Investigation of Proposed two Single Family Residence 1819 Hacienda Avenue Campbell, California Prepared for Mr. Hamid Adlparvar 630 Los Altos Rancho Los Altos, CA 94024 American Soil Testing, Inc. 2734 S. Bascom Avenue San Jose, CA 95124 (408) 559-6400 File No. 05-2602-S American Soft Testing, Inc. TABLE OF CONTENT DESCRIPTION PAGE Introduction 4 Site Description and Location of Project 4 Field Investigation 4 Laboratory Investigation 5 Subsurface Conditions 5 Liquefaction 5 Seismic Design Criteria 6 Secondary Seismic Hazards 7 Recommendations, Grading Specifications 8 Trench Backfill & Water Wells 10 Foundations Design Criteria 11 Concrete Slabs-on-Grade Construction 13 Garage Slab Construction 14 Retaining Walls 15 General Construction Requirements 16 Plan Review, Observation and Conclusions 17 Limitations and Uniformity of Conditions 18 Appendix A , Physiography 19 Vicinity Map F-1 Site Plan F-2 Appendix B , Subsurface Data 20 Logs of Borings F-1-2 Plasticity Index F-3 Key to Exploratory Borings Logs F-4 Appendix C , Guide Specifications for Grading & Rock under Floor Slabs 21-26 3 '- File No. 05-2602-S American Soil Testing, Inc. SOIL INVESTIGATION Introduction The purpose of the soil investigation was to gather sufficient . data to provide recommendations for foundation engineering. This report presents an explanation of how we conducted that investigation, the results of the testing program, our conclusions based upon their results, and our recommendations for earthwork and foundation design to best suit the proposed development to the existing natural conditions. Our investigation did not include an environmental assessment or any field or laboratory testing for hazardous materials in the soil, air or groundwater at the project site. Site Description and Location of Project The site is located at the site is located at 1819 West Hacienda Avenue in Campbell, California. APN: 403-12-027 At the time of our investigation the subject property was a vacant lot. The structure was demolished previously. The lot was approximately 19,200 sq. ft., rectangular shaped parcel of land, flat and almost level with the adjacent street. The proposed two single family residences will be constructed at designated area, which will be located at the later date. At the time of our site visit, the property access was through Hacienda Avenue venue. Field Investigation After consideration of the nature of the proposed development, review of available data on the area, and discussion with the client, a field investigation was conducted at the project site. It included a surface site reconnaissance to detect any unusual surface features and drilling of two borings on 12-13-2005 to determine subsurface soil characteristics. 4 File No. 05-2602-S American Sou Testing, Inc. The approximate boring location is shown on Appendix A, Figure 2. The soil encountered was logged in the field. The boring logs, Figures 1 and 2 (Appendix B) are graphic representation of,the soil profile, showing the depths at which the samples were obtained. Laboratory Investigation A Laboratory testing program was performed to determine the physical and engineering properties of the soil underlying the site. Moisture content and dry density tests were performed on all the relatively undisturbed soil samples in order to determine their consistencies, and the moisture variation throughout the explored soil profile, the laboratory testing performed in accordance with the ASTM (American Society for Testing and Materials) procedure. The expansion characteristics of the near-surface soils were evaluated by means of Atterberg Limits Test performed in accordance with ASTM D-423 and D-424. The results of laboratory tests are summarized on Appendix "B" Subsurface Conditions After reviewing the laboratory test data, boring logs and examination of the soil samples collected in different depths, the subsurface soils underlying the project site appears to be relatively uniform throughout the area. The upper clayey silt has low to moderate expansion potential. The surface and near surface soils consist of very stiff dark brown Clayey Silt with gravel. Liquefaction Liquefaction is saturation of loose sands with less than 15% clay content (cohesionless material) from a solid state to a semi liquid state. This occur under vibratory condition such as those induced by earthquake, the soil tendency to compact is accompanied by 5 File No. 05-2602-S American Soil Testing, Inc. RECOMMENDATIONS Grading Specifications 1. The placement of fill and control of any grading operations at the site shall be done in accordance with the recommendations of this report prepared by American Soil Testing Inc. These recommendations set forth the minimum standards to satisfy all requirements of this report. 2. All existing surface and subsurface structures that will not be incorporated in the final development shall be removed prior to any grading operations. These objects shall be accurately located on the grading plans (prepared by the project Civil Engineer) to assist the Field Engineer in establishing proper control over their removal. This is to include but not be limited to any basements, utility lines, underground tanks, and any other improvements. A representative of American Soil Testing Inc. shall be present during the demolition operation. 3. All organic surface material and debris, including organically rich top soil estimated to be 2-4 inches deep, shall be stripped prior to any other grading operations and transported away from all areas that are to receive improvements or structural fill. These organically contaminated soils may be stockpiled for later use in landscaping areas. This material is not suitable for use as structural fill. In addition, any trees that are not being included in the final development.must be removed. This removal is to include a thorough cleaning of all underground roots. 4. The depressions left by the removal of any surface and subsurface structures shall be cleaned of all debris and backfilled with clean, native, on-site soil. This backfill shall be compacted to not less than 90% relative compaction in accordance with ASTM test procedure D 1557-78. 5. Following the stripping operations, the exposed surface shall be scarified to a depth of not less than 12 inches, conditioned as necessary (3 to 4 percent above optimum 8 File No. 05-2602-S American Soii Testing, Inc. moisture content) and compacted to 90% relative compaction according to ASTM test procedure D1557-78. At this point, the pad area will be in condition to receive compacted fill. Based on exposed field condition if deemed necessary, Soil Engineer may provide additional recommendation in the field. 6. All structural fill whether imported or native soil shall be placed in uniform horizontal lifts of not more than 6 to 8 inches in uncompacted thickness and compacted to not less than 90% relative compaction using the ASTM D 1557-78 procedure. Five feet around the entire perimeter of the building pad shall also be compacted to not less than 90% relative compaction using the above-mentioned procedure. Before compaction begins, the fill shall be brought to a water content that will permit proper compaction by either: 1) Aerating the material if it is too wet, or 2) spraying the material with water if it is too dry. Each lift shall be thoroughly mixed before compaction to assure a uniform distribution of water content. When fill material includes rocks, nesting of rocks will not be permitted, and all voids shall be carefully filled and properly compacted, No rocks larger than 4 inches in diameter shall be used in the construction of the building pad. 7. The Soil Engineer shall be notified at least 48 hours prior to commencement of any grading operations so that he may coordinate the work in the field with the Grading Contractor. 8. All imported fill material must be sampled, tested and approved by the Soil Engineer prior to being brought to the site. Import soil must have a plasticity index no greater than (12) and an "R" value greater than (25). 9. All grading work shall be observed and approved by a Soil Engineer from American Soil Testing Inc. 10. In the event that any unusual condition not covered by the special provisions is encountered during the grading operations, the Soil Engineer shall be immediately notified for further recommendation. 9 File No. 05-2602-S American Sou Testing, Inc. Trench Backfill Utility and pipeline trenches should be backfilled with compacted structural fill. If on- site soil is used, the material should be placed in lifts not exceeding 8 inches in uncompacted thickness and compacted to at least 90 percent relative compaction by mechanical means only. Imported sand may also be used for backfilling trenches provided the sand is compacted to at list 90 percent relative compaction. In all Building pad areas and pavements, the upper 3 feet of trench backfill should be compacted to at least 95 percent relative compaction where imported sand backfill is used. In addition the upper 8 inches of all trench backfill in pavement area should be compacted to at least 95 percent relative compaction (ASTM D1557, latest edition). All grading and site preparation should be performed in accordance with the " Recommended Grading Specifications" See Appendix "C. Without compliance with these standards, the design criteria in this report will not be valid. Water Wells All water wells (if any) on the site, which are to be abandoned, shall be capped according to the requirements of the Santa Clara Valley Water District. The final elevation of the top of the well casing must be a minimum of 3 feet below any adjacent grade prior to any grading operations. In no case shall a building foundation be placed over a capped well. 10 1 � % File No. 05-2602-S American Safi Testing, Inc. an increase in water pressure within the soil, which results in movement of water from the voids. The resulting upward flow of water will often turn sand into a liquefied condition (loss of density). We consider the liquefaction potential at the site to be low due to the dense nature of the soil. Based on our laboratory and field-testing of the soil, the site is in a "confined state" and it is our opinion that there is a low potential for liquefaction to occur at the site. Seismic Design Criteria The subject site is located in the seismically active San Francisco Bay region, therefore any structure within this area will most likely be subjected to strong ground shaking sometime during its actual lifetime. Major Faults like San Andreas Faults and Hayward Faults have produced large magnitude earthquake in the past and can be expected to do so within the next 50 years. It is reasonable to assume that the proposed building will be subjected to at least one moderate to severe earthquake during the 50 years period following construction. During such an earthquake, severe ground shaking will be occurred at the site. The proposed residence is to be designed in accordance with the applicable provisions set forth in the current edition of the Uniform Building Code (UBC). Design of the proposed structure should consider the potential for severe ground shaking that could result from the maximum probable earthquake generated along the potentially active Monte Vista fault zone (approximately 0.1 kilometers southwest) of the captioned site. The structural engineer is to design the proposed building in accordance with Chapter 16 of the 1997 Uniform Building Code. The following may be used from the UBC, Volume 2, 1997 edition: Soil Profile Type = Sd (stiff soils) Near Source Factor Na = 1.3 Seismic Source Type = B Near Source Factor Nv = 1.6 Seismic Zone Factor Z =0.4 (Zone 4) 6 File No. 05-2602-S American S6ja Testing, Inc. Seismic Coefficient Cv = 0.64 Nv Seismic Coefficient Ca = 0.44 Na Consideration should also be given to anchoring or otherwise stabilizing free-standing appliances or home furnishings, which may be prone to toppling during seismic vibrations. The structure engineer for this project should make his own independent evaluation as to the applicability of the seismic design criteria presented in the UBC. Secondary Seismic hazards Secondary effects of seismic activity, which are normally considered as potential hazard site, include several types of ground failure. Various general types of ground failures, which might occur as a consequence of several ground shaking including land sliding, ground subsidence, ground lurching, shallow ground rupture, and liquefaction. The probability of occurrence of each type of these ground failures depends on the severity of the earthquake, distance from faults, topography, subsurface conditions, ground water elevation, and other factors. File No. 05-2602-5 _ American Soil Testing, Inc. FOUNDATION DESIGN CRITERIA The proposed structures may be supported on continuous perimeter footings with isolated interior spread footings or piers and grade beam type of foundation. 1. All continuous perimeter, and isolated interior spread footings shall be founded a minimum 24 inches below the exterior pad grade. For the above conditions, the footings may be designed for an .allowable bearing value of 2000 p.s.f. For both continuous strip footing and isolated interior spread footings. This bearing value is for dead plus live loads and may be increased by one-third to include short-term seismic and wind effects. All footing located adjacent to utility trenches should have their bearing surfaces below an imaginary 2:1 (horizontal to vertical) plane projected upward from the bottom of the trench. All continuous footing should be designed with adequate top and bottom reinforcement to provide structural continuity and to permit spanning of local irregularities. The final design of the foundations and reinforcing required shall be determined by the project Structural Engineer responsible for the foundation design. It is suggested that American Soil Testing Inc review the foundation design. Prior to construction. 2. Friction piers and grade beam construction is another type of foundation. The friction piers should be at least 12 inches in diameter and should penetrate a minimum of 6 feet below the exterior grade. The upper 24 inches should be ignored when computing pier depth, this is due to seasonal moisture changes in the top layer. The allowable friction value for this.type of foundation is 500 p.s.f. This value is for dead plus live loads and may be increased by one-third to include short-term seismic and wind effects. The .depth and spacing of piers will depend on the structural loads transmitted to the piers. 11 File No. 05-2602-S American Sbu Testing, Inc. The grade beam should be found a minimum depth of 12 inches below adjacent pad grade and should be reinforced with a minimum of four # 4 bars; two near the top and two near bottom. 3. If the grade beam to be cast directly on the compacted pad, grade beams should be constructed on a firm, moist sub grade and all drying cracks in the sub grade must be closed by sprinkling, flooding, or other methods. 4. All pier holes should be inspected by Soil Engineer to ascertain that proper penetration has been achieved, and supporting soils should not be allowed to dry before the hole is filled with concrete. 5. We do not anticipate any appreciable settlement; however slight settlements should considered in the design of foundations and proposed structures. 12 File No. 05-2602-5 American SO-11 Testing, Inc. CONCRETE SLABS-ON-GRADE CONSTRUCTION We recommend the following for all slab-on-grade construction: All slab-on-grade shall be supported on a minimum of 6 inches thick capillary break material such,as 3/4" clean crushed rock or permeable aggregate and 2 inches of sand should be used between the finished Subgrade and concrete slab for all interior slabs along with a minimum of 10 mil thick polyethylene or its equivalent vapor membrane which shall be placed between the crushed rock and the sand. Minimum reinforcement should consist of at least #4 rebar, 18 inches on center both ways for shrinkage control to minimize the impact of expansion. However, slab reinforcing could exceed the minimum requirements depending on the anticipated usage and loading conditions. Proper expansion and contraction joints shall be provided in the slab every 20 feet, to minimize the cracks in the slab. Concrete slabs around the landscaping area should be protected from water seepage. The water seepage from these areas usually creates over-saturation of the base rock and the subgrade, thereby causing unstable conditions. Henceforth, we recommend the following: Provide vertical cut-off or a deep vertical curb section all along the landscaping areas. The vertical cut-off should extend through the base rock and a minimum of six inches into the subgrade. This will limit the water seepage into the adjacent concrete slabs. Positive surface drainage (minimum 2%) shall provided at all times adjacent to the building to direct water away from the foundations and slabs to suitable discharge facility, during and after the construction phase of the project. If deemed necessary by the Soil Engineer, prior to placing the vapor membrane or pouring concrete, the sub grade shall be moistened with water to reduce the swell potential. The sub grade soils under the slabs area should be water conditioned to raise the water content; spraying the water at least a day prior the concrete is poured can do 13 File No. 05-2602-S American Soil Testing, Inc. this. Minor cracking of the concrete slabs on grade should be anticipated due to long- term differential movement of any underlying fill or natural soil. The project Structural Engineer shall determine the exact thickness and reinforcements based on the design live load and dead load. Garage slab Construction Garage slab shall be supported on a minimum of. 6 inches thick Class II Base Rock, crushed rock or permeable aggregate complying with Caltrans Standard Specifications. Slab should be poured structurally independent of the foundations or any fixed members. Expansion joints shall be constructed in the slab at least 10 feet from the interior face of the walls. If deemed necessary by the Soil Engineer, prior to pouring concrete, the sub grade shall be moistened with water to reduce the swell potential. The sub grade soils under the slabs area should be water conditioned to raise the water content; spraying water at least one prior to pouring the concrete may accomplish this. Minor cracking of the concrete slabs on grade should be anticipated due to long-term differential movement of any underlying fill or natural soil. The project Structural Engineer shall determine the exact thickness and reinforcements based on the design live load and dead load. 14 File No. 05-2602-S American S6fi Testing, Inc. RETAINING WALLS LRetaining walls should be designed for a lateral earth pressure (active) of 50 pounds equivalent fluid pressure, plus surcharge loads for sloping surfaces flatter than 4:1. If the retaining walls are restrained from free movement at both ends, or have 2:1 back slopes, they shall be designed for the earth pressure resulting from 65 pounds equivalent fluid pressure, to which shall be added any surcharge loads. 2. For retaining wall design, a coefficient of friction of 0.3 may be used between concrete and sub grade. 3. For design purposes for allowable resistive lateral earth pressure (passive) 250 pounds equivalent fluid pressure may be used with the result acting at the third point. The top foot of native soil shall be neglected for the computation of passive resistance. Gradient of the Unrestrained Passive Coefficient of back slope Equivalent fluid pressure (p.c.f) Resistance friction Flat to 4:1 50 250 0.30 2:1 or 65 250 0.30 Restrained 4. The above values assume a drained condition, and a moisture content compatible with those encountered during our investigation. To promote proper drainage, a layer of at least 12 inches of permeable material or drain rock should be placed between the facility and the retained material. Either weep holes or perforated pipes (perforation down) shall be included in the design to conduct excess water from behind the retaining structure. The recommended allowable bearing capacity in native firm material or compacted fill is 2000 p.s.f. 15 File No. 05-2602-S American.SI6A)Testing, Inc. 5. Sub drain placed behind retaining walls should be approved by American Soil testing representative prior to the placement of fill. 6. We should have the opportunity for a general review of all designs pertaining to facilities retaining a soil mass prepared for this project. General Construction Requirements 1. Where utility lines cross under or through perimeter footings and sand is used as backfill material, the trench shall be completely sealed by at least 3' concrete plug, to prevent moisture intrusion into the areas under the slabs and/or by compacting soil material for 5 feet on both sides of the exterior footings. 2. Rain water discharge at down spouts must be directed into solid pipe to carry away the excess water and prevent water from collecting in the soil adjacent to the foundation. The connection could be in a closed conduit which discharges at an approved location away from the structure. 3. If utility trenches are parallel to the sides of the building, they should not extend below a line sloping down and away at a 2 to 1(horizontal to vertical) slope from the bottom outside edge of all footings 4. All trenches may be backfilled with the native material provided they are free of organic material and rocks over 4 inches in diameter or with approved imported granular material with the soil compacted to a 95% minimum relative compaction in paved areas and a 90% in other area. 16 File No. 05-2602-S V American Soil Testing, Inc. Plan Review and Observation We should have the opportunity for a general review of the final grading and foundation plans prepared for this project. Our firm should also be retained to provide testing and inspection services during the grading and foundation installation portion of the work. American Soil Testing, Inc. is not responsible for compliance with design recommendations for grading or foundation plans controlled, inspected and approved by others. CONCLUSIONS 1. The Site covered by this investigation is suitable for the proposed two single family residence, provided the recommendations set forth in this report are incorporated into the design considerations and the project plans and specifications. 2. The native soil with the exception of the organically contaminated surface soil, are suitable for engineered fill. The organically contaminated soil may be used for landscaping only. 3. The native surface and near surface soil at the project site has been found to have low to moderate expansion potential when subjected to fluctuations in moisture. 4. On the bases of our experience during this investigation, it is our opinion that trenches to 5 feet below the existing ground surface do not need shoring; below 5 feet shoring will be required. 17 File No. 05-2602-5 American So-u Testing, Inc. LIMITATIONS AND UNIFORMITY OF CONDITIONS 1. The recommendations presented in this report are based on the soil conditions revealed by our test borings and evaluated for the proposed construction planned at the present time If any unusual soil conditions are encountered during the construction, or if the proposed construction will differ from that planned at the present time, American Soil Testing, Inc. should be notified immediately for the supplemental recommendations. 2. This report is issued with the understanding that it is the responsibility of the owner, or his representative, to ensure that the recommendations and information contained herein are called to the attention of the Architect, Structural Engineer and Civil Engineer for the project and are incorporated into the Plans and Specifications of project. Also to ensure that the necessary steps are taken to see that the contractors carries out the recommendations of this report in the field. 3. The findings of this report are valid as of the present time. However, the passing of the time will change the conditions of the existing property due to natural processes, or works of man. In addition, legislation or the broadening of knowledge may require other recommendations. Accordingly, the findings of this report may be invalid, wholly or partly, by changes outside of our control. Therefore, this report is subjected to review and should not be relied upon after a period of three years. 4.This report has been prepared solely for the purpose of Geotechnical investigation and our firm did not perform toxic contamination studies 5. This report is not a recommendation to purchase or not to purchase the property and shall be for the exclusive use of the client whose name appears above. 6. The conclusions and recommendations contained herein are professional opinions derived in accordance with the current standards of professional practice and no warranty is intended, expressed or implied. 18 File No. 05-2602-5 American S Testing, Inc. APPENDIX " A " PHYSIOGRAPHY VICINITY MAP FIGURE I SITE PLAN FIGURE 2 19 U, File No. 05-2602-S American Soil Testing, Inc. W. r, �+ CT. W r -- >- w AESTMONr HS VIES 1600 osq q� A H�ocK F p,WNT. rT► ; c1': �� WEE TURNER { G �.ON��N Z SON BETH WY s--------: r - � TF,P OUiyOT �F� 4 o pA '90 � U o �, 'PFF818, . a WAFTERS Hacienda HILLER' A J TA vAv R BNxcte AyS� oG�.yy M N w �Aek r Y �!` FISCHE ES]' 3 FyCT SEC r, MID { 2 0 pa W R _ 7o LAS. 1.N ;N d zI20O FDRAS O ELMWO D - Cn ;4O 'y pp :p R 77" C&-F MORE . c J oo boy,: LPG LU ,,.000. .. °r �► � � � :`� MgRGex A N v IL o � pIN T ; CyFRR v o• O Cf►t - _ Q ``�^ � G�I�n : .. nnnnc�oO�n ..., n e Figure: 1 Vicinity Map File No. 05-2602-S J American soil Testing, Inc. i NORTH B-2 SHED v U co B-1 O 4J 4j O Z 1819 WEST HACIENDA AVENUE Figure: 2 Site Plan File No. 05-2602-S American Soii Testing, Inc. APPENDIX " B " SUBSURFACE DATA FIGURE 1-2 Log of test boring FIGURE 3 Plasticity Index FIGURE 4 Key to exploratory boring logs 20 File No. 05-2602-5 American Soil Testing, Inc. EXPLORATORY BORING LOG Dated Drilled: 12-13-2005 Hole No. B -1 Figure No. 1 Project Name: 1819 W Hacienda Boring Ave. Campbell, California Diameter: 4" Logged by: BR L � CL J U. M Q 0 SOIL DESCRIPTION °� Z U V C U O Q m E Q. N 'o A Clayey Silt, dark brown, some 1 organic, fine gravel, damp, firm 2 1-1 2.4 CL 13.5 102.3 Clayey Silt, Brown, Fine gravel, "``" 3 damp, very stiff x 4 1-2 2.8 CL 14.7 110.5 Silty clay, reddish brown larger 5 gravel, damp, very stiff 6 7 Dark brown Silty Clay, larger 8 gravel and cobbles, damp, very 9 stiff 10 Boring terminated @ 10' 11 12 13 14 15 16 17 18 No groundwater encountered 19 20 21 22 23 24 21 File No. 05-2602-S American Soil Testing, Inc. EXPLORATORY BORING LOG Dated Drilled: 12-13-2005 Hole No. B -2 Figure No. 2 Project Name: 1819 W Hacienda Boring Ave. Campbell, California Diameter: 4" Logged by: BR a� E o LL ._ cc SOIL DESCRIPTION z o o a) U) s A a a E a � 0 A 0 Clayey sandy Silt, reddish brown, 1 damp, stiff 2 2-1 2.6 CL 13.5 1107.2 Clayey Silt, reddish brown large 3 gravel, damp, very stiff 4 2-2 3.0 CL/SC 14.5 112.5 Silty clay, Dark brown, 1-2" 5 dia., cobbles, damp, very dense 6 7 Silty Clay, Dark Brown, gravel, 8 damp, very stiff 9 10 Boring terminated @ 10 11 12 13 14 15 16 17 18 No groundwater encountered 19 20 21 22 23 24 25 File No. 05-2602-5 American Soii Testing, Inc. PLASTICITY CHART 60 `-' 50 W CH z40 CL "A" Line E� 30 HMH 20 Or a • OH a 10 7 CL-ML ML/OL 4 ML 0 0 10 20 30 40 50 60 70 80 90 100 LIQUID LIMIT (%) Key Hole Depth . Liquid Plasticity Unified Soil Symbol P Limit Index Classification No. (ft) (ft) M Symbol* BAG A 0 - 1 35 17 CL Figure 3 American,c ail Testing,Inc. MAJOR DIVIS�j: SYMBOLS JNS GROUP S(.__,'L DESCRIPTION GW Well Graded Gravels, Gravel-Sand COARSE GRAVELS CLEAN Mixtures,little or Fines GRAVEL GP Poorly Graded Gravels or Gravel- GRAINED Less than 5%fines Sand Mixtures,little or No Fines (More than 50% GRAVEL GM Silty Gravels, Gravel-Sand-Silt material larger Mixtures Non-Plastic Fines. SOILS than#4 sieve) With Fines(More � than 12%fines) GC Clayey Gravels,Gravel-Sand-Clay More than half Mixtures,Plastic Fines. material is larger SANDS CLEAN SAND Sw Well Graded Sands, Gravelly Sands, than#200 sieve (Less than Little or No Fines. 5%fines) SP Poorly Graded Sands or Gravelly (More than 50% Sands,Little or No Fines. material smaller SAND SM Salty Sands,Sand-Silt Mixtures,Non- than#4 sieve) with Fines(More than Plastic Fines. 12%fines) SC Clayey Sands, Sand-Clay Mixtures, Plastic Fines. ML Inorganic Silts,Sandy or Clayey Silts, FINE Low to no Plasticity. GRAINED SILTS & CLAYS CL Inorganic Clay, Sandy or Silty Clay, SOILS Liquid Limit is less than 50% Low to Medium Plasticity. More than half OL Organic Silt or Organic Silty Clay, material is Low to Medium Plasticity. smaller than the MH Inorganic Silts, Diatomaceous or #200 sieve Micaceous,Fine Sandy or Silty Soils. SILTS & CLAYS CH Inorganic Clays of High Plasticity, Liquid limit is greater than Fat Clays. 50% OH Organic Clays of Medium to High Plasticity,Organic Silts. HIGHLY ORGANIC SOILS PT Peat and Other Highly Organic Soils. PARTICLE SIZE LIMITS (Sieve Openings in mm.) .074 .425 2.00 4.17 19.0 75.0 300.0 SAND I GRAVEL SILT OR CLAY FINE I MEDIUM COARSE I FINE I COARSE COBBLES BOULDERS (U.S. Standard sieve Sizes) #200 #40 #10 #4 .75 in 3 in I 12 in RELATIVE DENSITY CONSISTENCY SANDS, GRAVELS BLOWS/ AND NON- PLASTIC FOOT * CLAYS AND BLOWS / SILTS PLASTIC SILTS STRENGTH+ FOOT * VERY LOOSE 0 - 4 VERY SOFT 0 - 1/4 0-2 LOOSE 4 - 10 SOFT 1/4 - 1/2 2-4 MEDIUM DENSE 10 - 30 FIRM 1/2- 1 4- 8 DENSE - 30 - 50 STIFF 1 - 2 8— 16 VERY DENSE OVER 50 VERY STIFF 2-4 16— 32 HARD OVER 4 OVER 32 *Numbers of blows of 140 pound hammer falling 30 inches to drive a 2-inch O.D. (1—3/8 inch I.D.) split spoon (ASTM D-1586). +Unconfined compressive strength in tons/sq.ft. as determined by laboratory testing or approximated by the Standard Penetration test(ASTM D—1586),pocket penetrometer,torvane or visual observation. FIGURE NO. 4 KEY TO EXPLORATORY BORING UNIFIED SOIL CLASSIFICATION LOGS SYSTEM(ASTM D-2487) File No. 05-2602-S American Sou Testing, Inc. APPENDIX " C " GUIDE SPECIFICATIONS FOR GRADING & ROCK UNDER FLOOR SLAPS 21 File No. 05-2602-5 American S'61i"Testing, Inc. GRADING SPECIFICATIONS General Description: These specifications have been prepared for grading and site development of the subject project hereinafter described as the Soil Engineer, shall be consulted prior to any site work connected with site development to insure compliance with these specifications. These specifications shall only be used in conjunction with the soil report of which they are a part. This item shall consist of all clearing and grubbing, preparation of land to be filled, filling of the land, spreading, compaction and control of the fill, and all subsidiary work necessary to complete the grading of the filled areas to confirm with the lines, grades, and slopes as shown on the accepted plans. Tests The standard test used to define maximum densities of all compaction work shall be the ASTM test procedure D1557-78, Method C. All densities shall be expressed as a relative density in terms of the maximum density obtained in the laboratory by the foregoing standard procedure. Clearing, Grubbing and Preparing Areas to be filled All existing structures, trees, brush and other rubbish shall be removed, pilled or otherwise disposed of so as to leave the areas that have been disturbed with a neat and finished appearance free from unsightly debris. All depressions resulting from the removal of trees or other existing surface and subsurface structures shall be cleaned, backfilled and recompacted. All existing septic fields (if encountered), and debris must be removed from the site prior to any grading or fill operations. Septic tanks including all connecting drain 22 File No. 05-2602-5 American Soii'Testing, Inc. fields and other lines must be totally removed and the resulting depressions properly reconstructed and filled to the complete satisfaction of the supervising Soil Engineer. All water wells (if encountered in the field) shall be capped according to the requirements of the Santa Clara Valley water District. The final elevation of top of the well casing must be a minimum of 36 inches below any adjacent grade prior to any grading or fill operation. In no case should any structural foundation be placed over the capped well. Organically rich top soil estimated to be 2 to 4 inches deep shall be stripped upon which the structural fill is to be placed, and the surface shall then be scarified to a depth of at least 12 inches, and until the surface is free from roots, hummocks or other uneven features which tend to prevent uniform compaction by the equipment to be used. After the foundation for the fill has been cleared and scarified to a depth of 8 to 12 inches, it shall be bladed until it is uniform and free from large clods, brought to the proper moistures content by adding water or aerating and compaction to a relative compaction of not less that ninety percent (90%). Materials The materials for structural fill shall be approval by the Soil Engineer before commencement of grading operations. Any imported material must be approved for use before being brought the site. The materials used must be free from vegetable matter and other deleterious material. Import soils must have a plasticity index of no greater than 12 and have an "R" value greater than 25. Placing, Spreading and Compacting Fill Material The selected fill material includes rocks, no large rocks will be allowed to nest and all voids must be carefully filled and properly compacted. No large rocks shall be permitted closer than twenty-four (24) inches below the finished grade. 23 File No. 05-2602-S American Son Testing, Inc. When fill material includes rocks, no large rocks will be allowed to nest and all voids must be carefully filled and properly compacted. No large rocks shall be permitted closer than twenty-four (24) inches below the finished grade. When the moisture content of the fill material is below that specified by the Soil Engineer, water shall be added until the moisture content is as specified to insure thorough bonding during the compaction process. When the moisture content of the fill material is above that specified by the Soil Engineer, the fill material shall be aerated by blading or other satisfactory methods until the moisture content are as specified. After each layer has been placed, mixed and spread evenly, it shall be thoroughly compacted to a relative compaction of not less than 90% relative compaction. Compaction shall be by sheepsfoot rollers, multiple wheel pneumatic tired rollers or other types of acceptable compacting rollers. Rollers shall be of such design that they will enable to compact the fill to the specified compaction. Rolling shall be accomplished while the fill material is within the specified moisture content range. Rolling of each layer shall be continuous over its entire area and the roller shall make sufficient passes to insure that the required density has been obtained. Field density tests shall be made by the Soil Engineer of each compacted layer. At least one test shall be made for each 500 cubic yard or fractions thereof placed with a minimum of two tests per layer in isolated areas. Where sheepsfoot rollers are used, the soil may be disturbed to a depth of several inches. Density tests shall be taken in compacting materials below the disturbed surface. When these tests indicate that the density of any layer of fill or portion thereof is below the required 90% density, the particular layer or portion shall be reworked until the required density has been. obtained. The fill operation shall be continued in 8-inch compacted layers, as specified above, until the fill has been brought to the finished slopes and grades as shown on the accepted plans. 24 y T . r File No. 05-2602-5 American So11 Testing, Inc. All earth moving and working operations shall be controlled to prevent water from running into excavated areas. All water shall be promptly removed and the site kept dry. Supervision Supervision by the Soil Engineer shall be made during the fill and compaction operations so that he can certify that the fill was made in accordance with the recommended specifications. Seasonal Limits No, fill material shall be placed, spread or rolled during unfavorable weather conditions. When the work is interrupted by heavy rain, fill operations shall not be resumed until field tests by the Soil Engineer indicate that the moisture content and the density of the fill are previously specified. Irrigation Line Removal (if encountered in field) The methods of removal will be designated by the Soil Engineer in the field depending upon the depth and location of the line. One of the following methods will be used: A. Remove the pipe and fill and compact the soil in the trench according to previously mentioned recommendations. B. Cap the ends of the line with concrete to prevent entrance of water. The length of cap shall not be less than five feet. The concrete mix shall have a minimum shrinkage. Unusual Conditions In the event that any unusual conditions, not covered by the special provisions, are encountered during grading operations, the Soil Engineer shall be immediately notified for directions. 25 File No. 05-2602-5 American Sou °Testing, Inc. GUIDE SPECIFICATIONS FOR ROCK UNDER FLOOR SLABS Definition Graded gravel crushed rock for the use under floor slabs shall consist of a minimum thickness of mineral aggregate placed in accordance with theses specifications and in conformity with the dimensions shown on the plans. The minimum thickness is specified in the accompany report. Material The mineral aggregate for use under floor slabs shall consist of broken stone, crushed or uncrushed gravel, quarries waste or a combination thereof. The aggregate shall be free from adobe, vegetable matter, loam, volcanic tuff and other deleterious substances. It shall be of such quality that the absorption of water at a saturated dry condition does not exceed 3% of the oven dry weight of the sample. Grading The mineral aggregate shall be of such size that the percentage composition by dry weight as determined by laboratory sieves (US. Sieves) will conform to the following grading: Sieve Size Percentage Passim Sieve 3/4 100 No. 4 0-100 No. 200 0-2 Placing Sub grade, upon which gravel or crushed rock is to be placed, shall be prepared as outlined in the "Recommended Grading Specifications." END 26