Irrigation ScheduleIrrigation Schedule
July Eto:6.50 45.3
Avg Plant Factor Et:0.4
Controller ET SOURCE Soil Type CLAY 0.2 0.81
Zone #Program Plant Type Plant Factor ET Plant
Factor
Plant Factor x
Eto Root Depth " Shade
Factor
Density
Factor Irrigation Type Inches Precip
Rate % Dist Unif
Irri Water
Requirement
Inches
Total Period Run
Time Valve Cycle Time Cycles Totals Days Per
July Zone GPM Total GPM Total Run
Days/Yr Total Gallons/Yr
1 A Shrub Low High 0.3 2.0 12 1 1 Inline Drip 0.44 0.9 0.33 37 18 2 8 2.4 89 51 4,502.73
2 A Shrub Low High 0.3 2.0 12 1 1 Inline Drip 0.44 0.9 0.33 37 18 2 8 2.5 92 51 4,690.34
3 A Shrub Low High 0.3 2.0 12 1 1 Inline Drip 0.44 0.9 0.33 37 18 2 8 1.2 44 51 2,251.36
4 A Shrub Low High 0.3 2.0 12 1 1 Inline Drip 0.44 0.9 0.33 37 18 2 8 2.3 85 51 4,315.11
5 C Pots Medium 0.5 3.3 12 1 1 Bubbler 1 0.85 0.59 19 5 4 12 14 268 76 20,341.18
6 B Tree Medium 0.5 3.3 18 1 1 Bubbler 0.44 0.9 0.56 62 21 3 8 0.42 26 51 1,313.30
7 A Shrub Low High 0.3 2.0 12 1 1 Inline Drip 0.44 0.9 0.33 37 18 2 8 0.8 30 51 1,500.91
8 A Shrub Low High 0.3 2.0 12 1 1 Inline Drip 0.44 0.9 0.33 37 18 2 8 6.5 240 51 12,194.89
9 B Tree Medium 0.5 3.3 12 1 1 Bubbler 0.44 0.9 0.56 62 21 3 8 10 616 51 31,268.94
10 B Tree Medium 0.5 3.3 12 1 1 Bubbler 0.44 0.9 0.56 62 21 3 8 8 492 51 25,015.15
11 B Tree Medium 0.5 3.3 12 1 1 Bubbler 0.44 0.9 0.56 62 21 3 8 9 554 51 28,142.05
12 A Shrub Low High 0.3 2.0 12 1 1 Inline Drip 0.44 0.9 0.33 37 18 2 8 1.8 66 51 3,377.05
13 A Shrub Low High 0.3 2.0 12 1 1 Inline Drip 0.44 0.9 0.33 37 18 2 8 12.3 454 51 23,076.48
14 A Shrub Low High 0.3 2.0 12 1 1 Inline Drip 0.44 0.9 0.33 37 18 2 8 1.3 48 51 2,438.98
15 A Shrub Low High 0.3 2.0 12 1 1 Inline Drip 0.44 0.9 0.33 37 18 2 8 3.2 118 51 6,003.64
16 B Tree Medium 0.5 3.3 12 1 1 Bubbler 0.44 0.9 0.56 62 21 3 8 4 246 51 12,507.58
Average Site % DU 0.90 172
Estimated Total Water Use: Gallons 176,749.90
IRRIGATION DAYS
JANUARY FEBRUARY MARCH APIL MAY JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER TOTAL DAYS
1 2 4 5 7 8 7 5 3 2 1 51
1 2 4 5 7 8 7 5 3 2 1 51
1 3 5 7 10 12 10 8 5 3 1 76
CYCLES
2 MINS MINS
3 MINS MINS
4 MINS MINS
MINS MINS
MINS MINS
60 = MINUTES
ET = EVAPOTRANSPIRATION (DAILY)
Kc PLANT COEFFICIENCY
PR = PRECIPITATION RATE
EA = APPLICATION EFFICIENCY
TOTAL SOAK TIME
CONTRACTOR TO SET UP CYCLE SOAK ON ALL SCHEDULES OR
MULTIPLE START TIMES. THIS WILL ELIMINATE PUDDLING OR
RUN OFF. RUN MULTIPLE START TIME TO ACCOMPLISH WATER
WINDOW RESTRICTIONS. IT OS THE OPERATORS
RESPONSIBILITY TO MANAGE THIS SITE SO AS NOT TO EXCEED
THE ESTIMATED. TOTAL WATER USE ETWU
800
600
Program
A
B
C
D
E
4 START TIMESPOTS
NOTES: This irrigation schedule is set up as a base guide only, contractor must adjust irrigation controller so as to irrigate based on plants needs and not to exceed the ETWU usage. Set irrigation controller to maximise Cycle Soak
through programming.We are not responsible for overseeing controller scheduling.
CLIMATE LOGIC
NotesCYCLE RUN
7
LANDSCAPE TYPE SOAK TIME
MCE
40
JUNE
8
ESTABLISHED PLANT IRRIGATION SCHEDULE
Site Annual Eto:
IRRITROL
272
213
% Site Irrigation Effic:
Total Run Time
SHRUBS DRIP
11
Program B
Program C
CLIENT:THE CANNERY AT THE WATER TOWER
40
8
TREE BUBBLERS
Program A
RUN TIM E FORMULA = 60 X ET X Kc/PRXEA
The Cannery at The Tower Schedule Work Sheet.xlsx