Loading...
Irrigation ScheduleIrrigation Schedule July Eto:6.50 45.3 Avg Plant Factor Et:0.4 Controller ET SOURCE Soil Type CLAY 0.2 0.81 Zone #Program Plant Type Plant Factor ET Plant Factor Plant Factor x Eto Root Depth " Shade Factor Density Factor Irrigation Type Inches Precip Rate % Dist Unif Irri Water Requirement Inches Total Period Run Time Valve Cycle Time Cycles Totals Days Per July Zone GPM Total GPM Total Run Days/Yr Total Gallons/Yr 1 A Shrub Low High 0.3 2.0 12 1 1 Inline Drip 0.44 0.9 0.33 37 18 2 8 2.4 89 51 4,502.73 2 A Shrub Low High 0.3 2.0 12 1 1 Inline Drip 0.44 0.9 0.33 37 18 2 8 2.5 92 51 4,690.34 3 A Shrub Low High 0.3 2.0 12 1 1 Inline Drip 0.44 0.9 0.33 37 18 2 8 1.2 44 51 2,251.36 4 A Shrub Low High 0.3 2.0 12 1 1 Inline Drip 0.44 0.9 0.33 37 18 2 8 2.3 85 51 4,315.11 5 C Pots Medium 0.5 3.3 12 1 1 Bubbler 1 0.85 0.59 19 5 4 12 14 268 76 20,341.18 6 B Tree Medium 0.5 3.3 18 1 1 Bubbler 0.44 0.9 0.56 62 21 3 8 0.42 26 51 1,313.30 7 A Shrub Low High 0.3 2.0 12 1 1 Inline Drip 0.44 0.9 0.33 37 18 2 8 0.8 30 51 1,500.91 8 A Shrub Low High 0.3 2.0 12 1 1 Inline Drip 0.44 0.9 0.33 37 18 2 8 6.5 240 51 12,194.89 9 B Tree Medium 0.5 3.3 12 1 1 Bubbler 0.44 0.9 0.56 62 21 3 8 10 616 51 31,268.94 10 B Tree Medium 0.5 3.3 12 1 1 Bubbler 0.44 0.9 0.56 62 21 3 8 8 492 51 25,015.15 11 B Tree Medium 0.5 3.3 12 1 1 Bubbler 0.44 0.9 0.56 62 21 3 8 9 554 51 28,142.05 12 A Shrub Low High 0.3 2.0 12 1 1 Inline Drip 0.44 0.9 0.33 37 18 2 8 1.8 66 51 3,377.05 13 A Shrub Low High 0.3 2.0 12 1 1 Inline Drip 0.44 0.9 0.33 37 18 2 8 12.3 454 51 23,076.48 14 A Shrub Low High 0.3 2.0 12 1 1 Inline Drip 0.44 0.9 0.33 37 18 2 8 1.3 48 51 2,438.98 15 A Shrub Low High 0.3 2.0 12 1 1 Inline Drip 0.44 0.9 0.33 37 18 2 8 3.2 118 51 6,003.64 16 B Tree Medium 0.5 3.3 12 1 1 Bubbler 0.44 0.9 0.56 62 21 3 8 4 246 51 12,507.58 Average Site % DU 0.90 172 Estimated Total Water Use: Gallons 176,749.90 IRRIGATION DAYS JANUARY FEBRUARY MARCH APIL MAY JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER TOTAL DAYS 1 2 4 5 7 8 7 5 3 2 1 51 1 2 4 5 7 8 7 5 3 2 1 51 1 3 5 7 10 12 10 8 5 3 1 76 CYCLES 2 MINS MINS 3 MINS MINS 4 MINS MINS MINS MINS MINS MINS 60 = MINUTES ET = EVAPOTRANSPIRATION (DAILY) Kc PLANT COEFFICIENCY PR = PRECIPITATION RATE EA = APPLICATION EFFICIENCY TOTAL SOAK TIME CONTRACTOR TO SET UP CYCLE SOAK ON ALL SCHEDULES OR MULTIPLE START TIMES. THIS WILL ELIMINATE PUDDLING OR RUN OFF. RUN MULTIPLE START TIME TO ACCOMPLISH WATER WINDOW RESTRICTIONS. IT OS THE OPERATORS RESPONSIBILITY TO MANAGE THIS SITE SO AS NOT TO EXCEED THE ESTIMATED. TOTAL WATER USE ETWU 800 600 Program A B C D E 4 START TIMESPOTS NOTES: This irrigation schedule is set up as a base guide only, contractor must adjust irrigation controller so as to irrigate based on plants needs and not to exceed the ETWU usage. Set irrigation controller to maximise Cycle Soak through programming.We are not responsible for overseeing controller scheduling. CLIMATE LOGIC NotesCYCLE RUN 7 LANDSCAPE TYPE SOAK TIME MCE 40 JUNE 8 ESTABLISHED PLANT IRRIGATION SCHEDULE Site Annual Eto: IRRITROL 272 213 % Site Irrigation Effic: Total Run Time SHRUBS DRIP 11 Program B Program C CLIENT:THE CANNERY AT THE WATER TOWER 40 8 TREE BUBBLERS Program A RUN TIM E FORMULA = 60 X ET X Kc/PRXEA The Cannery at The Tower Schedule Work Sheet.xlsx