Loading...
Pre-Application - Four Units - 2016", CITY of CAMPBELL Community Development Department via electronic mail October 7, 2016 Gordana Paylovic Gordana, LLC 602 Hawthorne Ave. Palo Alto, CA 94301 Re: File No: PRE2016-05 Address: 1323 Elam Ave. Application: Preliminary Application Dear Applicant: Thank you for submittal of a preliminary application for a small -lot single-family planned development project on property located at the above referenced address. This letter provides feedback on the preliminary proposal, but is limited to the overall project design concept and should not be construed as a substitute for formal project review. 1. Development Permit and Fee Requirements: This proposal would require an application for a Zoning Map Amendment (to rezone to Planned Development), Planned Development Permit, and Tentative Parcel Map. The current review fees are listed below (fees are subject to change at the beginning of each fiscal year, July 1). A fee credit of 50% of the preliminary application cost will be provided. Development Permit Fees • Zoning Map Amendment: • Planned Development Permit: • Tentative Parcel Map: • Fire Dept. Project Review Fee: • NPDES Permit ("C-3") Review Fee: CEQA Related Fees • CEQA - Initial Study: • County CEQA Filing Fee (if required): (Due prior to public hearing) • Mitigation Monitoring Fee: $8,887 $9,958 $9,412 $265 (P-D Permit) + $180 (Parcel Map) $704 $10,000 deposit (charged at actual time) $ 2,260 (Mitigated Negative Declaration) $2,500 deposit (charged at actual time) PRE2016-05 — 1323 Elam Ave. Pg. 2 of 4 (Due prior to building permit issuance) • Fire Dept. CEQA Review Fee: $479 Park Impact Fee (CIVIC § 20.24) • Park Impact Fee (6 to 13 units/acre): $42,380 ($10,595 x 3) Existing Unit Credit (>6 units/acre): - $17.796 $24,584 (Estimated Total) 2. San Tomas Area Neighborhood Plan: Development of a planned development project is subject to the San Tomas Area Neighborhood Plan (STANP). Specifically, section 'M', Low Medium Density Projects (Pg. 18), restated below, governs this type of project. A formal project submittal should very carefully address these design requirements (please note that the preliminary plans do not provide the required 15-foot setback along the westerly property line). 1. Low -Medium density developments in PD zones shall be compatible with the existing neighborhood. To integrate new projects with the neighborhood, low - medium density developments should conform to the following criteria: a. To the extent possible, the public street elevation of any unit or building group shall foster the appearance of single family residential design. The width of the individual units should be expressed architecturally on the exterior elevation. b. Building design shall contain traditional single family architectural elements. These elements may include, but are not limited to, defined entries, porches, projecting eaves and overhangs. The intent of this criteria is to provide a single-family residential scale and help reduce building mass. c. The entry way of units adjacent to a public street shall be oriented to the public street and should not be walled -off or inward oriented. The backs of units and privacy fences should not face public streets. d. The appearance of attached garages shall be minimized by incorporating the measures listed below, or other similar measures as approved by the Community Development Director: (1) Limit garage doors to no more than 50% of the linear front elevation of a unit or building group, with the remainder of the elevation devoted to living area or porch. (2) Garages which exceed 50% of the front elevation shall either: • Provide an entry porch with a porch roof or trellis extending in front of the face of the garage. • Recess the garage from the front wall of the house a minimum of five feet. 70 North First Street • Campbell, CA 95008-1423 • TEL (408) 866-2140 • FAx (408) 866-5140 • E-MAIL planning@cityofcampbell.com PRE2016-05 — 1323 Elam Ave. Pg. 3 of 4 2. The maximum height for a low -medium density development shall be 28 feet and not exceed 2-1/2 stories. 3. Buildings shall be setback 15-feet from the property line of adjacent parcels and the public right- of -way, except that garages or carports shall be 25' from any public right-of-way. 3. Project Considerations: In addition to the above, the following issues should be considered: a. Lot Area: As part of this project, the City will require the right-of-way (Elam Avenue) to dedicated in fee, which will reduce the property's lot size. Please ensure that all area calculations are taken from the "net lot" area, exclusive of the right-of-way. However, "gross lot" area, inclusive of the right-of-way, should be used to calculate project density (units/gr. lot size) b. Open Space: Each unit should include 300 square -foot of open space with minimum dimensions of 10-feet (length and width). c. Common Driveway Setback: The 20-foot-driveway along the easterly property line should be shifted over to provide a 5-foot setback improved with landscaping. d. Interior Setbacks: The parking stalls between the buildings appear to be within the common parcel, which means that the adjoining residences would be located on property line (zero setback). This should be revised such that interior setbacks are at least 5-feet. e. Parking: The project appears to provide the required number of parking spaces (3 per unit). However, stall #4 should be oriented perpendicular as with stalls 1-3 to ensure adequate functionality. 4. Departmental Review: In addition to the Planning Division, the preliminary projects plans were reviewed by the Building Division, the Public Works Department, and the County Fire District. Comments, in the form of conditions of approval and post -entitlement requirements, are enclosed for your reference. Please note that the Public Works Department conditions of approval describe the necessary public improvements that will need to be performed as part of this project. Please ensure that all project materials (i.e., site plan, grading plan, landscaping plan etc.), reflect these required improvements. 5. Application Submittal: The enclosed application checklist indicates the materials required for project submittal. The following is additional information must be provided: a. Environmental Review Documents: Preparation of an Initial Study would be required to analyze the project's possible environmental impacts. Pursuant to CMC 21.38.050.C, the following additional materials, prepared by qualified professionals to applicable industry standards, will be required as part of the environmental review. 70 North First Street • Campbell, CA 95008-1423 • TEL (408) 866-2140 • FAX (408) 866-5140 • E-MAIL planning@cityofcai-npbel1.com cityofcampbel1.com PRE2016-05 — 1323 Elam Ave. Pa. 4 of 4 ■ Environmental Site Assessment Report (Phase 1) ■ Geotechnical Report ■ Arborist Report/Tree Survey ■ Utility "will -serve" letters following agencies from (1) West Valley Sanitation District, (2) San Jose Water Company, (3) PG&E ■ Photometric Plan ■ Acoustic Analysis b. Grading and Drainage Plan: A preliminary grading and drainage plan indicating existing and proposed grades and showing management of on -site drainage will be required. The plan must include calculations indicating the impervious surface created by the development and also specify the types of stormwater controls to be used. Preliminary sizing and design showing stormwater controls shall meet the City's requirements. c. Landscaping Water Efficiency Requirements: The project will require submittal of a landscaping plan prepared by a licensed landscape architect, in compliance with Chapter 2.7, Division 2, of Title 23 of the California Code of Regulations — Water Efficient Landscape Requirements and with the City's Landscaping Requirements (CMC Sec. 21.26.030). The landscaping plan shall indicate that all proposed plantings will be consistent with the required water usage allowance for the site. Maintenance of landscaping areas in private open space areas in conformance with these regulations will require specific provisions and enforcement mechanisms in the community's CC&Rs. If you should have any questions regarding these comments, I may be contacted at (408) 866- 2193 or by email at danielf@cilyofeampbell.com . Sincerely, Daniel Fama Senior Planner encl: Application Forms Public Works Comment Sheet Building Division Comment Sheet Fire Department Comment Sheet cc: Paul Kermoyan, Community Development Director 70 North First Street • Campbell, CA 95008-1423 • TEL (408) 866-2140 • FAx (408) 866-5140 • E-MAIL planning@cityofcampbell.com