Loading...
Staff Report - Admin (2020-05-05) ADMINISTRATIVE ACTION OF THE COMMUNITY DEVELOPMENT DIRECTOR May 7, 2020 PLN2019-230 Shahabi, R. Application of Raymond Shahabi, for an Administrative Site and Architectural Review Permit (PLN2019-230) for construction of a 3,020 square-foot two-story single-family residence on property located at 1113 Erin Way within the R-1-8 (Single-Family Residential) Zoning District in the Campbell Village Neighborhood Plan area. STAFF RECOMMENDATION That the Community Development Director take the following action: 1. Approve the Administrative Site & Architectural Review Permit, incorporating the attached findings, to allow construction of a 3,020 square-foot two-story single-family residence, subject to the attached conditions of approval. ENVIRONMENTAL DETERMINATION Staff recommends that the Community Development Director find that this project is Categorically Exempt per Section 15303, Class 3 of the California Environmental Quality Act (CEQA), pertaining to the construction of single-family dwellings. PROJECT DATA Type Proposal Allowance/Requirement Compliance(Y/N) General Plan Designation 3.8 units/gr. acre 4.5 units/gr. acre Y Zone District Designation R-1-8 - N/A Net Lot Area 9,785 sq. ft. 8,000 sq. ft. (Min) Y Gross Lot Area 11,405 sq. ft. 9,680 sq. ft. (Min.) Y Building Area Proposed First Floor Living: Proposed Second Floor Living: Proposed Attached Garage: Proposed Total Building Area: Covered Porch 1,485 sq. ft. 1,135 sq. ft. 400 sq. ft. 3,020 sq. ft. 25 sq. ft. 4,403 sq. ft. (45%) Y Site Utilization Building Coverage: Private Open Space: Front Yard Paving: 1,910 sq. ft. (20%) 6,000 sq. ft. 565 sq. ft. (44%) 3,914 sq. ft. (40%) 750 sq. ft. (minimum) 650 sq. ft (50%) Y Setbacks Front (east): Side (north) (1st): Side (north) (2nd): Side (south) (1st): Side (south) (2nd): Rear (west): Garage: 20 Feet 8 Feet, 4 Inches 12 Feet, 4 Inches 6 Feet 10 Feet 135 Feet 26 Feet, 10 Inches 20 Feet 5 Feet (or 50% wall height) 5 Feet (or 50% wall height) 5 Feet (or 50% wall height) 5 Feet (or 50% wall height) 20 Feet or 15% of the lot depth 25 Feet Y Floor Area Ratio (FAR) .30 .45 Y Parking 2 covered 1 covered, 1 uncovered Y Landscape/Trees Front & Back Yard Front Yard Y Administrative Site and Architectural Review Permit Page 2 PLN2019-230 ~ 1113 Erin Way ANALYSIS Considerations in review of application (CMC § 21.42.040) Y/N 1. Will the traffic generated from the development avoid adverse affects on traffic conditions on abutting streets? Y 2. Does the layout of the site provide adequate vehicular and pedestrian entrances, exit driveways, and walkways? Y 3. Will the arrangement of off-street parking facilities prevent traffic congestion and adequately meet the demands of the users? Y 4. Will the location, height, and material of walls, fences, hedges and screen plantings ensure harmony with adjacent development and/or conceal storage areas, utility installations, or other potentially unsightly elements of the project? Y 5. Does the project maximize open space around the structures, for access to and around structures, and the establishment and maintenance of landscaping for aesthetic and screening purposes? Y 6. Does the project minimize the unnecessary destruction of existing healthy trees? Y 7. Will the project enhance the overall appearance of the city by improving the appearance of individual development projects within the city? Y 8. Will the project complement the surrounding neighborhoods and produce an environment of stable and desirable character? Y 9. Does the project enhance the city’s character and avoid an adverse aesthetic impact upon existing adjoining properties, the environment, or the city in general? Y 10. Will the project promote the use of sound design principles that result in creative, imaginative solutions and establish structures of quality design throughout the city and which avoid monotony and mediocrity of development? Y 11. Will the project promote maintenance of the public health, safety, general welfare, and property throughout the city? Y 12. Is the project consistent with the city’s general plan and all applicable design guidelines and special plans? Y If the answer is “No” to any of the above, list the number and provide a response as to why the proposed project does not comply as required pursuant to CMC § 21.42.040. If the project can be supported with minor modifications, provide a recommendation on how the project may be modified to comply with the stated Considerations and Findings. Number Response Project Description The proposed home is shown in a contemporary residential style incorporating gabled rooflines, flat tile and metal roofing, stucco walls with a stacked stone wainscot, and a well-defined entryway treated with stacked stone (reference Attachment 3 – Project Plans), along with a color scheme consisting of a cream body color with a brown accent (reference Attachment 4 – Color/Material Board). This design approach is consistent with the new residences built within the Campbell Village Area that achieve compatibility by eschewing "modern" design elements and materials, and by minimizing out-of-scale features. Based on feedback provided by staff, the design was revised as shown below: Original Design Revised Design Administrative Site and Architectural Review Permit Page 3 PLN2019-230 ~ 1113 Erin Way Public Comments Received Explanation/Response Emails from two abutting neighbors were received (reference Attachment 5). One requests that the AC unit be placed behind the house (rather than the side) and the other that the rear fence include a solid 12” lattice piece. Neither of these requests pertain to the findings necessary for site and architectural approval. Staff has forwarded these emails to the applicant so that he may independently contact his neighbors to address their concerns. Attachments: 1. Findings for File No.: PLN2019-230 2. Conditions of Approval for File No.: PLN2019-230 3. Project Plans 4. Color/Material Sheet 5. Neighbor Emails 6. Location Map Prepared by: Daniel Fama, Senior Planner Approved by: Paul Kermoyan, Community Development Director Attachment # 1 FINDINGS FOR APPROVAL OF FILE NO. PLN2019-230 SITE ADDRESS: 1113 Erin Way APPLICANT: Raymond Shahabi PROPERTY OWNER: Raymond Shahabi DATE: May 7, 2020 Findings for Approval for an Administrative Site and Architectural Review Permit (PLN2019-230) for construction of a 3,020 square-foot two-story single-family residence on property located at 1113 Erin Way: The Community Development Director finds as follows with regard to File No. PLN2019-230: 1. The project site is zoned R-1-8 (Single Family Residential) on the City of Campbell Zoning Map. 2. The project site is designated Low Density Residential (less than 4.5 units/gr. acre) on the City of Campbell General Plan Land Use diagram. 3. The project site is located on Erin Way between Curtner Avenue and Shamrock Drive, within the Campbell Village Neighborhood Plan area. 4. The proposed project consists of a 3,020 square-foot two-story single-family residence with a building coverage of 20% and Floor Area Ratio (FAR) of 0.30. 5. The proposed project, as conditioned, is a conforming lot within the R-1-8 (Single- Family Residential - 8,000 sq. ft. lot size) Zoning District and meets the height restriction, building coverage, floor area ratio, and parking requirements of the R-1-8 Zoning District as specified within the Campbell Village Neighborhood Plan. 6. The proposal incorporates representative architectural features of homes in the Campbell Village Neighborhood including simple rectangular shaped forms and gabled roofs. Based upon the foregoing findings of fact, the Community Development Director further finds and concludes that: 1. The project will be consistent with the General Plan. 2. The project will aid in the harmonious development of the immediate area. 3. The project is consistent with applicable adopted design guidelines. 4. The project is Categorically Exempt under Section 15303, Class 3 of the California Environmental Quality Act (CEQA), pertaining to the construction of single-family dwellings. Attachment #2 CONDITIONS OF APPROVAL FOR FILE NO. PLN2019-230 SITE ADDRESS: 1113 Erin Way APPLICANT: Raymond Shahabi PROPERTY OWNER: Raymond Shahabi DATE: May 7, 2020 The applicant is hereby notified, as part of this application, that (s)he is required to meet the following conditions in accordance with the ordinances of the City of Campbell and the State of California. The lead department with which the applicant will work is identified on each condition where necessary. Where approval by the Director of Community Development, City Engineer, Public Works Director, City Attorney, or Fire Department is required, that review shall be for compliance with all applicable conditions of approval, adopted policies and guidelines, ordinances, laws and regulations, and accepted engineering practices, for the items under review. Additionally, the applicant is hereby notified that (s)he is required to comply with all applicable Codes or Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified: COMMUNITY DEVELOPMENT DEPARTMENT Planning Division 1. Approved Project: Approval is granted for an Administrative Site and Architectural Review Permit (PLN2019-230) to allow the construction of a 3,020 square-foot two- story single-family residence on property located at 1113 Erin Way. The project shall substantially conform to the Revised Project Plans and Color/Material Sheet as received by the Planning Division on February 11, 2020 and December 3, 2019, respectively, except as may be modified by the Conditions of Approval herein. 2. Permit Expiration: The Administrative Site and Architectural Review Permit approval shall be valid for one year from the date of final approval (expiring May 16, 2021). Within this one-year period, an application for a building permit must be submitted. Failure to meet this deadline or expiration of an issued building permit will result in the Administrative Site and Architectural Review Permit being rendered void. 3. Planning Final Required: Planning Division clearance is required prior to final Building Permit clearance. Construction not in substantial compliance with the approved project plans shall not be approved without prior authorization of the necessary approving body. 4. On-Site Lighting: On-site lighting shall be shielded away from adjacent properties and directed on site. The design and type of lighting fixtures and lighting intensity of any proposed exterior lighting for the project shall be reviewed and approved by the Community Development Director prior to installation of the lighting for compliance with all applicable Conditions of Approval, ordinances, laws and regulations. Lighting fixtures shall be of a decorative design to be compatible with the residential development and shall incorporate energy saving features. Attachment #2 Page 2 of 8 5. Water Efficient Landscape Standards: The California Model Water Efficient Landscape Ordinance (MWELO) provides two sets of requirements based on the square footage of the project landscape area (greater than 2,500 sf vs. equal to or less than 2,500 sf). Depending on the final amount of landscaping area, one of the following standards will apply: a. With a total project landscape area equal to or greater than 2,500 square feet, this project is subject to the updated California Model Water Efficient Landscape Ordinance (MWELO). This document is available at: http://www.cityofcampbell.com/DocumentCenter/View/176 or on the Planning Division’s Zoning and Land Use webpage through www.cityofcampbell.com. The building permit application submittal shall demonstrate compliance with the full MWELO requirements and shall include a Landscape Documentation Package prepared by an authorized and licensed professional demonstrating compliance with the full MWELO requirements with the following required elements: i. Project Information per Section 492.3. ii. Water Efficient Landscape Worksheet per Section 492.4 (Appendix B of the MWELO). 1. Include the worksheet within the plan set AND 2. Provide a separate 8.5x11 hard copy or pdf via email to the project planner. iii. Soil Management Report per Section 492.5. iv. Landscape Design Plan per Section 492.6. v. Irrigation Design Plan per Section 492.7. vi. Grading Design Plan per Section 492.8. **Note that a Certificate of Completion will be required prior to permit final. b. If the landscape area is less than 2,500 square feet, the project may comply with the Prescriptive Compliance Option in Appendix D of the MWELO. This document is available at: http://www.cityofcampbell.com/DocumentCenter/View/176 or on the Planning Division’s Zoning and Land Use webpage through www.cityofcampbell.com. The building permit application submittal shall demonstrate compliance with the Prescriptive Compliance requirements and shall include the following: i. Planting and Irrigation Plans that meet all requirements of the Prescriptive Compliance Option in Appendix D. Note: If the project landscape area increases during the course of the project, additional requirements will apply. Attachment #2 Page 3 of 8 6. Fences/Walls: Any newly proposed fencing and/or walls shall comply with Campbell Municipal Code Section 21.18.060 and shall be submitted for review and approval by the Community Development Department. 7. Contractor Contact Information Posting: The project site shall be posted with the name and contact number of the lead contractor in a location visible from the public street prior to the issuance of building permits. 8. Construction Activities: The applicant shall abide by the following requirements during construction: a. The project site shall be posted with the name and contact number of the lead contractor in a location visible from the public street prior to the issuance of building permits. b. Construction activities shall be limited to weekdays between 8:00 a.m. and 5:00 p.m. and Saturdays between 9:00 a.m. and 4:00 p.m. No construction shall take place on Sundays or holidays unless an exception is granted by the Building Official. c. All construction equipment with internal combustion engines used on the project site shall be properly muffled and maintained in good working condition. d. Unnecessary idling of internal combustion engines shall be strictly prohibited. e. All stationary noise-generating construction equipment, such as air compressors and portable power generators, shall be located as far as possible from noise-sensitive receptors such as existing residences and businesses. f. Use standard dust and erosion control measures that comply with the adopted Best Management Practices for the City of Campbell. Building Division 9. Permits Required: A building permit application shall be required for the proposed new residential dwelling structure. The building permit shall include Electrical/ Plumbing Mechanical fees when such work is part of the permit. 10. Plan Preparation: This project requires plans prepared under the direction and oversight of a California licensed Engineer or Architect. Plans submitted for building permits shall be “wet stamped” and signed by the qualifying professional person. 11. Construction Plans: The conditions of Approval shall be stated in full on the cover sheet of construction plans submitted for building permit. 12. Size of Plans: The minimum size of construction plans submitted for building permits shall be 24 in. X 36 in. 13. Site Plan: Application for building permit shall include a competent site plan that identifies property and proposed structures with dimensions and elevations as appropriate. Site plan shall also include site drainage details. Elevation bench marks Attachment #2 Page 4 of 8 shall be called out at all locations that are identified as “natural grade” and intended for use to determine the height of the proposed structure. 14. Title 24 Energy Compliance: California Title 24 Energy Compliance forms shall be blue-lined on the construction plans. 8½ X 11 calculations shall be submitted as well. 15. Special Inspections: When a special inspection is required by C.B.C. Chapter 17, the architect or engineer of record shall prepare an inspection program that shall be submitted to the Building Official for approval prior to issuance of the building permits, in accordance with C.B.C Chapter 1, Section 106. Please obtain City of Campbell, Special Inspection forms from the Building Inspection Division Counter. 16. The City of Campbell, standard Santa Clara Valley Non-point Source Pollution Control Program specification sheet shall be part of plan submittal. The specification sheet (size 24” X 36”) is available at the Building Division service counter. 17. Approvals Required: The project requires the following agency approval prior to issuance of the building permit: o West Valley Sanitation District (378-2407) o Santa Clara County Fire Department (378-4010) o Bay Area Air Quality Management District (Demolitions Only) o San Jose Water Company (279-7900) o School District: ▪ Campbell Union School District (378-3405) ▪ Campbell Union High School District (371-0960) ▪ Moreland School District (379-1370) ▪ Cambrian School District (377-2103) Note: To determine your district, contact the offices identified above. Obtain the School District payment form from the City Building Division, after the Division has approved the building permit application. 18. P.G.& E.: Applicant is advised to contact Pacific Gas and Electric Company as early as possible in the approval process. Service installations, changes and/or relocations may require substantial scheduling time and can cause significant delays in the approval process. Applicant should also consult with P.G. and E. concerning utility easements, distribution pole locations and required conductor clearances. 19. California Green Building Code: This project is subject to the mandatory requirements for new residential structures under the California Green Building Code, 2010 edition. 20. Construction Fencing: This project shall be properly enclosed with construction fencing to prevent unauthorized access to the site during construction. The construction site shall be secured to prevent vandalism and/or theft during hours when no work is being done. All protected trees shall be fenced to prevent damage to root systems. 21. Build It Green: Applicant shall complete and submit a “Build it Green” inventory of the proposed new single family project prior to issuance of building permit. Attachment #2 Page 5 of 8 22. Fire Protection System: This project requires an Automatic Fire Sprinkler System in compliance with Section 903.2.8 California Building Code 2010 ed. 23. Storm Water Requirements: Storm water run-off from impervious surface created by this permitted project shall be directed to vegetated areas on the project parcel. Storm water shall not drain onto neighboring parcels. PUBLIC WORKS DEPARTMENT The scope of this project triggers the requirement for Frontage Improvements as required by Campbell Municipal Code 11.24.040. However, per the Campbell Village Neighborhood Plan, this section of Erin Way has been designated to have rolled curb and gutter with no sidewalk. Please note that the Plan does require the unimproved right-of- way behind the rolled curb to remain pervious (no paving) to allow for stormwater infiltration. 24. Storm Drain Area Fee: Prior to issuance of any grading or building permits for the site, the applicant shall pay the required Storm Drain Area fee, currently set at $2,120.00 per net acre, which is $746.00 (set for R-1/multi family/commercial land use). 25. Stormwater Pollution Prevention Measures: Prior to issuance of any grading or building permits, the applicant shall comply with the National Pollution Discharge Elimination System (NPDES) permit requirements, Santa Clara Valley Water District requirements, and the Campbell Municipal Code regarding stormwater pollution prevention. The primary objectives are to improve the quality and reduce the quantity of stormwater runoff to the bay. Resources to achieve these objectives include Stormwater Best Management Practices Handbook for New Development and Redevelopment (“CA BMP Handbook”) by the California Stormwater Quality Association (CASQA), 2003; Start at the Source: A Design Guidance Manual for Stormwater Quality Protection (“Start at the Source”) by the Bay Area Stormwater Management Agencies Association (BASMAA), 1999; and Using Site Design Techniques to Meet Development Standards for Stormwater Quality: A Companion Document to Start at the Source (“Using Site Design Techniques”) by BASMAA, 2003. 26. Utilities: All on-site utilities shall be installed underground per Section 21.18.140 of the Campbell Municipal Code for any new or remodeled buildings or additions. Applicant shall comply with all plan submittals, permitting, and fee requirements of the serving utility companies. Utility locations shall not cause damage to any existing street trees. Where there are utility conflicts due to established tree roots or where a new tree will be installed, alternate locations for utilities shall be explored. Include utility trench details where necessary. 27. Water Meter(s) and Sewer Cleanout(s): Existing and proposed water meter(s) and sewer cleanout(s) shall be relocated or installed on private property behind the public right-of-way line. Attachment #2 Page 6 of 8 28. Utility Coordination Plan: Prior to issuance of building permits for the site, the applicant shall submit a utility coordination plan and schedule for approval by the City Engineer for installation and/or abandonment of all utilities. The plan shall clearly show the location and size of all existing utilities and the associated main lines; indicate which utilities and services are to remain; which utilities and services are to be abandoned, and where new utilities and services will be installed. Joint trenches for new utilities shall be used whenever possible. 29. Pavement Restoration: The applicant shall restore the pavement in compliance with City standard requirements. In the event that the roadway has recently received a pavement treatment or reconstruction, the project will be subject to the City’s Street Cut Moratorium. The applicant will be required to perform enhanced pavement restoration consistent with the restoration requirements associated with the Street Cut Moratorium. The City’s Pavement Maintenance Program website (https://www.ci.campbell.ca.us/219) has detailed information on the streets currently under moratorium and the enhanced restoration requirements. 30. Encroachment Permit, Fees and Deposits: Prior to issuance of any grading or building permits for the site, the applicant shall submit plans for public street improvements, pay various fees and deposits, post security and provide insurance necessary to obtain an encroachment permit for construction of the standard public street improvements, as required by the City Engineer. The plans shall include the following, unless otherwise approved by the City Engineer: a. Show location of all existing and proposed utilities within the existing public right of way. b. Removal of existing driveway approach and necessary rolled curb and gutter. c. Construction of a new City standard driveway approach. d. Show detail D-15 (Residential Driveway Detail) on plan sheet C1. Modify detail to use rolled curb. e. Show detail D-20 (Curb and Gutter Detail) on plan sheet C1. f. Construction of conforms to existing public and private improvements, as necessary. 31. Street Improvements Completed for Occupancy and Building Permit Final: Prior to allowing occupancy and/or final building permit signoff for any and/or all buildings, the applicant shall have the required street improvements installed and accepted by the City, and the design engineer shall submit as-built drawings to the City. 32. Maintenance of Landscaping: Owner(s), current and future, are required to maintain the landscaped area between the rolled curb and the property line in the public right of way. This includes, but is not limited to: trees, lawn, plantings, irrigation, etc. Trees shall not be pruned in a manner that would not allow the tree to grow to a mature height. Attachment #2 Page 7 of 8 33. Utility Encroachment Permit: Separate encroachment permits for the installation of utilities to serve the development will be required (including water, sewer, gas, electric, etc.). Applicant shall apply for and pay all necessary fees for utility permits for sanitary sewer, gas, water, electric and all other utility work. 34. Additional Street Improvements: Should it be discovered after the approval process that new utility main lines, extra utility work or other work is required to service the development, and should those facilities or other work affect any public improvements, the City may add conditions to the development/project/permit, at the discretion of the City Engineer, to restore pavement or other public improvements to the satisfaction of the City. 35. Private Improvements Agreement: There is an existing retaining wall and raised landscape area in the public right-of-way along Erin Way project frontage, between the rolled curb and the property line. The project has the following options to address the existing private improvements within the public right-of-way prior to issuance of any grading or building permits for the site. a. The owner shall remove all existing private improvements (retaining wall, raised landscape and irrigation) in the City right-of-way and construct City standard improvements, or b. The owner shall execute an “Agreement for Private Improvements in the Public Right of Way”. This agreement would be required to allow the existing private improvements located in the public right of way along the frontage of this property, and any other non-City standard improvements, to remain. FIRE DEPARTMENT 36. Formal Plan Review: Review of this development proposal is limited to accessibility of site access and water supply as they pertain to fire department operations, and shall not be construed as a substitute for formal plan review to determine compliance with adopted model codes. Prior to performing any work the applicant shall make application to, and receive from, the Building Division all applicable construction permits. 37. Fire Sprinklers Required: An Automatic residential fire sprinkler system shall be installed in one- and two-family dwellings as follows: In all new one- and two-family dwellings and in existing one- and two-family dwellings when additions are made that increase the building area to more than 3,600 square feet. Exception: A one-time addition to an existing building that does not total more than 1,000 square feet of building area. NOTE: Covered porches, patios, balconies, and attic spaces may require fire sprinkler coverage. NOTE: The owner(s), occupant(s), and any contractor(s) or subcontractor(s) are responsible for consulting with the water purveyor of record in order to determine if any modification or upgrade of the existing water service is required. A State of California licensed (C-16) Fire Protection Contractor shall submit plans, calculations, a completed permit application and appropriate fees to the this Attachment #2 Page 8 of 8 department for review and approval prior to beginning their work. R313.2 as adopted and amended by CBLMC. 38. Water Supply Requirements: Potable water supplies shall be protected from contamination caused by fire protection water supplies. It is the responsibility of the applicant and any contractors and subcontractors to contact the water purveyor. Such requirements shall be incorporated into the design of any water-based fire protection systems, and/or fire suppression water supply systems or storage containers that may be physically connected in any manner to an applicant capable of causing contamination of the potable water supply of the purveyor of record. Final approval of the system(s) under consideration will not be granted by this office until compliance with the requirements of the water purveyor of record are documented by that purveyor as having been met by the applicant(s). 2007 CFC Sec. 903.3.5 and Health and Safety Code 13114.7 39. Construction Site Fire Safety: All construction sites must comply with applicable provisions of the CFC Chapter 14 and our Standard Detail and Specification SI-7. 40. Premises Identification: Approved numbers or addresses shall be placed on all new and existing buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Numbers shall contrast with their background. CFC Sec. 505. Bassal Architecture, 4912 Bradford Place, Rocklin, CA 95765 Tel/Fax: (916) 435-0605 SHAHABI RESIDENCE 1113 ERIN WAY CAMPBELL, CA MATERIAL BOARD Building Colors by Sherwin Williams Main Body Color: Trim Color & Garage Door Color: SW 7526 Maison Blanch SW 6006 Cargo Stucco Stone by: Eldorado Stone Montecito Cliffstone 199 Charcoal range Flat Tiles Roof by: Eagle Roofing Golden eagle profile 5-30-2019 1 Daniel Fama From:Bruce McCombs <bruce.mccombs@comcast.net> Sent:Sunday, March 15, 2020 10:54 AM To:Daniel Fama Subject:File No.: PLN2019-230/1113 Erin Way, Campbell Dear Daniel,    My name is Bruce McCombs, and my wife and I own the property at 1114 Shamrock Drive, which is located directly  behind the proposed project.     My wife and I have no objections to the project, although we do have one request: If approved, the new home will be 2  stories high, and with that in mind, we were hoping that the fence at the rear of the applicant’s property could be  slightly improved in one regard: The current fence is approximately 6’ tall, and the top portion of the fence features a  12” tall “see‐through” lattice panel. We were hoping that the lattice panel could be replaced with something that might  provide us with a bit more privacy.    If the applicant is in agreement with our request, I’ll be happy to assist in the replacement. I was thinking that perhaps  the applicant might consider paying for the materials, which I would be happy to pick up, and I would take care of the  installation, as well.     For the applicant’s reference, we’ve recently replaced the fences on both sides of our property, and I built both fences  myself. If the applicant is interested, he’s welcome to examine the quality of my work. I believe that he’ll find that both  fences have been properly constructed, with attention to detail that I believe meets or exceeds that of the typical  fencing contractor.    As for the design that my wife and I had in mind for the upper panel of the fence: It's similar in design to that of the  lower portion of the fence, with a slight variation which I’ll be happy to discuss with the applicant on a day and time that  is most convenient for him.    Please let me know if you and/or the applicant should have any questions, and I’ll be sure to respond as soon as  possible.    Thanks very much for your help with our request, Daniel, and I hope that you’re having a nice weekend.    Sincerely,   Bruce McCombs 1 Daniel Fama From:dana zhang <danazhang@gmail.com> Sent:Tuesday, January 7, 2020 1:18 PM To:Daniel Fama Cc:tao wang Subject:Re: View the project plan for 1113 Erin Way Dear Daniel, Hope you had a great holiday! Thanks for the opportunity to review the project plan. We have some concerns after reviewing the plan, The main concern is the location of the condenser unit, in the proposed location the unit is very close to our house. We would propose a alternate location, it would be best to relocate the unit to the back of the property. This will minimize any noise made by the air conditioning unit. We are older people and very sensitive to noise... , we hope you will take this under consideration. Thanks, Dana Zhang ( 1101 Erin Way) On Mon, Dec 16, 2019 at 9:44 AM Daniel Fama <danielf@campbellca.gov> wrote: Hello – Please see the attached plans. Daniel Fama Senior Planner City of Campbell | Community Development Department 70 N. First Street | Campbell, CA 95008 www.cityofcampbell.com | 408.866.2193 Drop-In Counter Hours: Mondays, 1:00 PM to 5:00 PM Current applicants may also schedule an appointment. Please note that if you do not have an appointment or do not visit during my scheduled counter hours, I will generally be unavailable. 2 From: dana zhang <danazhang@gmail.com> Sent: Sunday, December 15, 2019 4:44 PM To: Daniel Fama <danielf@campbellca.gov> Cc: tao wang <tawang@gmail.com> Subject: View the project plan for 1113 Erin Way Dear Daniel, Hope you had a great weekend! This is Dana Zhang from 1101 Erin Way, Received letter for courtesy notice. Thank you for the notice. Unfortunately, our home just besides 1113 Erin Way, we are very concern about the " two-story " project and want to view the plan and see if their two-story house could block the natural light into our small house or something else. Could we make an appointment to view the plan? Thanks, Daniel Dana -- Dana Zhang, LUTCF Farmers Topper Insurance Agent Please contact me if you know anyone who needs my services. 3 Tel: 408-377-9199 cell: 408-910-9583 Fax: 408-228-8988 2695 Moorpark Ave. Suite 111 San Jose, CA 95128 To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet.EmailLogo To help protect your priv acy, Microsoft Office prevented automatic download of this picture from the Internet. -- Dana Zhang, LUTCF Farmers Topper Insurance Agent Please contact me if you know anyone who needs my services. Tel: 408-377-9199 cell: 408-910-9583 Fax: 408-228-8988 2695 Moorpark Ave. Suite 111 San Jose, CA 95128 To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet.EmailLogo To help protect your priv acy, Microsoft Office prevented automatic download of this picture from the Internet. 188 This map is based on GIS Information and reflects the most current information at the time of this printing. The map is intended for reference purposes only and the City and its staff is not responsible for errors. 1113 Erin Way 2,257Campbell IT, GIS Services 376 1:WGS_1984_Web_Mercator_Auxiliary_Sphere Feet 3760 Scale