Clearwire 2009 COA approvalRESOLUTION NO 3980
BEING A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF CAMPBELL APPROVING A CONDITIONAL USE PERMIT
PLN2009139 TO ALLOW INSTALLATION OF CLEARWIRE
WIRELESSDATA WIMAX EQUIPMENT ON AN EXISTING
MONOPOLE ON PROERTY LOCATED AT 1630 W CAMPBELL
AVENUE APPLICATION OF CLEARWIRE LLC FILE NO
PLN2009139
After notification and public hearing as specified by law and after presentation by the
Community Development Director proponents and opponents the hearing was closed
After due consideration of all evidence presented the Planning Commission did find as
follows with respect to application PLN2009139
Environmental Finding
1 The project qualifies as a Categorically Exempt project per Section 15301 Class 1 of the
California Environmental Quality Act CEQA pertaining to minor alterations of existing
private structures
Evidentiary Findings
1 The Zoning District for this property is C1 Neighborhood Commercial
2 The General Plan land use designation for this property is Neighborhood Commercial
3 Nonstealth wireless telecommunication facilities are permitted in the C1 Neighborhood
Commercial Zoning District subject to the approval of a Conditional Use Permit
4 The proposed wireless telecommunications facility consists of new wirelessdata
antennas and related equipment on an existing monopole The installation would include
three 42 panel antennas one 12 microwave dish antenna three BTS units one GPS
unit and an associated 30 cuft equipment cabinet
5 The purpose of discretionary review of wireless telecommunications facilities is to
minimize the adverse visual impacts and operational effects of these facilities using
appropriate design siting and screening techniques while providing for the personal
communications needs of residents local business and government of the city and the
region
Based upon the foregoing findings of fact and pursuant to Section 2146040 of the
Campbell Municipal Code the Planning Commission further finds and concludes that
Planning Commission Resolution No 3980
PLN2009139 1630 W Campbell Avenue Use Permit Clearwire LLC
Paae 2
1 The proposed use is allowed within the applicable zoning district with Conditional Use
Permit approval and complies with all other applicable provisions of this Zoning Code
and the Campbell Municipal Code in that the review of the Planning Commission has
found this project to be satisfy all applicable requirements governing development of
wireless telecommunications facilities pursuant to Chapter 2134 of the Campbell
Municipal Code
2 The proposed use is consistent with the General Plan in that the proposed wireless
telecommunications antennas are integrated into the existing monopole as much as
reasonably possible in compliance the General Plan Land Use Element
Strategy LUT931Wireless Telecommunication Facilities Minimize the visual impact
of wireless telecommunication facilities by designing them as an integral architectural
feature to a structure
3 The proposed site is adequate in terms of size and shape to accommodate the fences
and walls landscaping parking and loading facilities yards and other development
features required in order to integrate the use with uses in the surrounding area in that
associated groundlevel equipment would be fully screened within an existing equipment
enclosure
4 The proposed site is adequately served by streets of sufficient capacity to carry the kind
and quantity of traffic the use would be expected to generate in that the proposed
wireless telecommunication facility will be unmanned and therefore not incur traffic
generation
5 The design location size and operating characteristics of the proposed use are
compatible with the existing and future land uses onsite and in the vicinity of the subject
property in that the proposed wireless telecommunication equipment satisfies applicable
FCC exposure requirements and is therefore compatible with adjacent residential uses
and
6 The establishment maintenance or operation of the proposed use at the location
proposed will not be detrimental to the comfort health morals peace safety or general
welfare of persons residing or working in the neighborhood of the proposed use or be
detrimental or injurious to property and improvements in the neighborhood or to the
general welfare of the city in that the wireless telecommunication facility will provide a
beneficial service to the City in manner harmonious with the community
THEREFORE BE IT RESOLVED that the Planning Commission approves a Conditional Use
Permit PLN2009139 to allow installation of Clearwire wirelessdata WiMax equipment
on an existing monopole on property located at 1630 W Campbell Avenue
Planning Commission Resolution No 3980
PLN2009139 1630 W Campbell Avenue Use Permit Clearwire LLC
Page 3
The applicant is hereby notified as part of this application that heshe is required to meet
the following conditions in accordance with the ordinances of the City of Campbell and the
State of California Where approval by the Community Development Director City
Engineer Public Works Director City Attorney or Fire Department is required that review
shall be for compliance with all applicable Conditions of Approval adopted policies and
guidelines ordinances laws and regulations and accepted engineering practices for the
item under review Additionally the applicant is hereby notified that heshe is required to
comply with all applicable Codes or Ordinances of the City of Campbell and the State of
California that pertain to this development and are not herein specified
COMMUNITY DEVELOPMENT DEPARTMENT
Planning Division
Declaration of Acceptance of All Conditions Within
Commission approval the applicant shall sign the final
Approval Until said Conditions are signed the propose
for any permits sought from the City
thirty 30 days of Planning
approved set of Conditions of
d Use Permit shall not be valid
Acknowledged Accepted
Authorized Representative of
Clearwire LLC
Date
2 Approved Project Approval is granted for a Conditional Use Permit PLN2009139 to
allow installation of Clearwire wirelessdata WiMax equipment on an existing
transmission tower The project shall substantially conform to the revised project plans
and project description received by the Planning Division on March 31 2010 except as
may be modified by the conditions of approval contained herein
All antennas will be in anonreflective finish colored to match the transmission
tower
Panel antennas will be flushmounted
All coaxial cabling shall be within the pole
3 Revocation of Permit Operation of the use in violation of the Conditional Use Permit or
any standards codes or ordinances of the City of Campbell shall be grounds for
consideration of revocation of the Conditional Use Permit by the Planning Commission
4 Cessation of Operations The service provider shall provide written notification to the
Director upon cessation of operations on the site exceeding a 90day period The
service provider shall remove all obsolete or unused facilities from the site within 180
Planning Commission Resolution No 3980
PLN2009139 1630 W Campbell Avenue Use Permit Clearwire LLC
Paae 4
days of termination of its lease with the property owner or cessation of operations
whichever comes earlier
5 New Permit Required If a consecutive period of 180 days has lapsed since cessation of
operations a new Site and Architectural Review Permit or Use Permit shall be required
prior to use or reuse of the site
6 Length of Permit Term The Conditional Use Permit approved herein shall be valid for a
period of ten 10 years from the effective date of the resolution adopted by the Planning
Commission consistent with State law Prior to the expiration of the permit the
applicant shall receive a new permit approval or otherwise remove the facility prior to
the permitsexpiration
7 Security Required Within thirty 30 days of Planning Commission approval the
applicant shall provide an irrevocable letter of credit or other reasonable form of
security satisfactory to the city attorney in an amount reasonably sufficient to cover the
cost of removal for the removal of the facility in the event that its use is abandoned or
its use permit or site and architectural review permit expires or is terminated and the
equipment is not voluntarily removed
Upgrading of Facility Required If technological improvements or developments occur
which allow the use of materially smaller or less visually obtrusive equipment the
service provider will be required to replace or upgrade the approved facility upon
application for a new Use Permit application to minimize adverse effects related to land
use compatibility visual resources public safety or other environmental factors
9 Business License Required Each service provider with a wireless telecommunications
facility in the City shall obtain a city business license
10 No Advertising No advertising signage or identifying logos shall be displayed on
wireless telecommunications facilities except for small identification plates used for
emergency notification or hazardous or toxic materials warning
11 Maintenance All maintenance on the antennas is to be performed between the hours of
7 amand 9 pm with the exception of emergency repairs
12 Maintenance of Finish It is an ongoing obligation of the applicant assignees and
successors in interest to maintain all components of the antennas and the exterior finish
of the structures and equipment approved by this permit in good order Graffiti shall be
removed by repainting the surface of the structure or equipment with a matching color
as soon as practical
13 Impact on Parking The installation of wireless telecommunication facilities shall not
reduce required parking on the site
Planning Commission Resolution No 3980
PLN2009139 1630 W Campbell Avenue Use Permit Clearwire LLC
Page 5
Safety
a Public Access Restricted Antennas are to be sited in such a way and barriers and
signage provided to prevent a person from passing within the safety limits
established by the FCCadopted standards for controlled access
b Warning Signs signage shall be maintained at the facility identifying all wireless
telecommunication facility equipment and safety precautions for people nearing the
equipment as may be required by any applicable FCCadopted standards including
the RF radiation hazard warning symbol identified in ANSI C9521982 to notify
persons that the facility could cause exposure to RF emissions
c Emissions Conditions It is a continuing condition of this authorization that the
facilities be operated in such a manner so as not to contribute to ambient RFEMF
emissions in excess of the current FCC adopted RFEMF emission standards
violation of this condition shall be grounds for revocation
d Hazardous Materials If the contents of the equipment cabinetbuilding or base
transceiver station contain toxic or hazardous materials a sign shall be placed on or
around the exterior of the base transceiver station or equipment cabinets and
building warning the public
e Periodic Safety Monitoring The wireless telecommunications service provider shall
submit to the Director 10 days after installation of the facilities and every two years
thereafter a certification attested to by a licensed engineer expert in the field of
EMRRF emissions that the facilities are and have been operated within the then
current applicable FCC standards for RFEMF emissions
f Compatibility with City Emergency Services The facility shall not be operated nor
caused to transmit on or adjacent to any radio frequencies licensed to the City for
emergency telecommunication services such that the Citys emergency
telecommunications system experiences interference
g Emergency Contact The service provider shall provide signage as required
including phone numbers of the utility provider for use in case of an emergency
The signs shall be visibly posted at the communications equipment cabinet
14 Li htin The use of lighting shall not be allowed on telecommunication facilities unless
required as a public safety measure Where lighting is used it shall be shielded from
public view and operated only during times of necessity by a maintenance operator
15 Noise The wireless telecommunication facility including power source ventilation and
cooling facility shall not generate noise discernible beyond the property lines
Planning Commission Resolution No 3980
PLN2009139 1630 W Campbell Avenue Use Permit Clearwire LLC
Page 6
16 BackUg Generators Backup generators shall comply with the noise standard
referenced above and shall only be operated during power outages or for testing and
maintenance between the hours of 800 amand 500 pm Monday through Friday
17 Heat Generation The wireless telecommunication facility including power source and
cooling facility shall not be operated so as to cause the generation of heat that
adversely affects any building occupant
18 Odors The testing of backup generators shall not produce odors that adversely affect
persons occupying residential office or commercial uses
19 Implementation and monitoring costs The wireless telecommunications service provider
or its successor shall be responsible for the payment of all reasonable costs associated
with the monitoring of the conditions of approval contained in this authorization
including costs incurred by this department the office of the city attorney or any other
appropriate city department or agency The community development department shall
collect costs on behalf of the city
20 Transfer of Operation Any carrierservice provider authorized by the community
development director or by the planning commission to operate a specific wireless
telecommunications facility may assign the operation of the facility to another carrier
licensed by the FCC for that radio frequency provided that the transfer is made known
to the community development director in advance of the operation and all conditions of
approval for the subject installation are carried out by the new carrierservice provider
However the carrierservice provider may without advance notification transfer
operations of the facility to its general partner or any party controlling controlled by or
under common control with the carrierservice provider
21 Complaints and Proceedings Should any party complain to the wireless
telecommunications service provider about the installation or operation of the facilities
which complaints are not resolved by the wireless telecommunications service provider
the wireless telecommunications service provider or its appointed agent shall advise
the Director of the complaint and the failure to satisfactorily resolve such complaint If
the director determines that a violation of a condition of approval has occurred the
Director may refer the matter to the Planning Commission for consideration of
modification or revocation of the permit
22 Severability If any clause sentence section or any part of these Conditions of Approval
is for any reason held to be invalid such invalidity shall not affect or impair other of the
remaining provisions clauses sentences or sections of these conditions It is hereby
declared to be the intent of the City that these Conditions of Approval would have been
adopted had such invalid sentence clause or section or part thereof not been included
herein
Planning Commission Resolution No 3980
PLN2009139 1630 W Campbell Avenue Use Permit Clearwire LLC
Paae 7
PASSED AND ADOPTED this 13th day of April 2010 by the following roll call vote
AYES Commissioners
NOES Commissioners
ABSENT Commissioners
ABSTAIN Commissioners
Alster Cristina Gibbons and Roseberry
None
Ebner and Rocha
Reynolds
APPROVED
Gibbons Chair
ATTEST
Paul Ker yan Acting Secretary
INTERNATIONAL c.
5 10 Castillo Street
Suite 303
Santa Barbara,CA 93101
Tel 805957.1637
Fax 805 957.1634
www.crowncastle.com
March 24,2009
Mr.Tim Haley,Principal Planner
Planning Division
City of Campbell
70 North First Street
Campbell,CA 95008
RE:Crown Castle "Campbell"Communications Site
Intent to Renew Permit No.PLN 20002-111
1630 West Campbell,Campbell
Dear Mr.Haley:
Background
Crown Castle USA ("Crown")owns,operates and manages telecommunications towers and
infrastructure on behalf of wireless carriers and customers throughout the United States.On
January 12,2007,Crown acquired the assets of Global Signal and consequently is now the
owner and site manager of the stealth telecommunications facility at 1630 West Campbell,
Campbell.
The permit for this facility,PLN 2002-111 was a renewal of the original permit and was granted
for a five (5)year period.Unfortunately,as the new site manager,Crown was not aware of this
fact until the permit had expired.According to our records,the permit expired on April 21,
2008.
Request
Condition No.2 ofPLN 2002-111 requires the applicant to request an extension of the permit in
writing.Because this facility has been determined by the Director to be a "stealth"facility,as
defined by the Wireless Telecommunications Ordinance,and because this is the second renewal
of the original zoning permit (CUP 96-17),Crown hereby requests that the city of Campbell
extend the existing permit for a period of a minimum often (10)years by issuing an
administrative approval.Crown submits to the city that the facility is in fact in compliance with
the original approval and therefore its permit should be extended per this request.
Crown would respectively point out that in January 2007,Senate Bill 1627 became law.Senate
Bill 1627 is codified as Section 65964 and Section 65850.6 of the Government Code.Section
65964(b)stipulates that no wireless permit may be issued for a period of time less than 10-years
unless substantial land use reasons are identified by the public agency.Clearly,Crown's
Campbell site,being a stealth facility,should be granted a minimum 10-year renewal term.
Thank you for consideration of our request.I can be reached at (805)957-1629,or by email at
j on.dohm@crowncastle.com.
Sincerely,
C WNCAST
Cc:Cynthia Qualtire,District Manager,Crown Castle
CITY OF CAMPBELL
SITE AND ARCHITECTURAL REVIEW PERMIT
APPROVAL BY THE COMMUNITY DEVELOPMENT DIRECTOR
APRIL 21, 2003
PLN2002-111 Application of Daniel Burke, on behalf of Sprint PCS, for approval of a Site
Burke, D. and Architectural Review Permit to allow the continued operation of an
existing stealth wireless telecommunications facility located at 1630 W.
Campbell A venue in a C-1 (Neighborhood Commercial) Zoning District.
PROJECT DESCRIPTION
The project consists of the continued use of an existing telecommunications facility consisting of
one ground mounted monopolenightpole and associated ground-mounted equipment located at
1630 W. Campbell Avenue.
The existing facility was approved by a Conditional Use Permit (UP96-17) on January 14, 1997
for a period of five years and expired on January 14, 2002. Since the approval in 1997, the City
has adopted a Wireless Telecommunications Facilities Ordinance to address development
standards and the processing of telecommunications facilities. Under the Wireless
Telecommunications Facilities Ordinance, at the time an application is submitted to allow an
existing facility to remain, the Community Development Director shall determine if the facility
can be reviewed as a stealth facility and approved administratively as a Site and Architectural
Review Permit.
The Community Development Director has found that the existing facility is a stealth facility as
defined in the Wireless Telecommunications Ordinance.
DISCUSSION
The facility consists of one 43-foot, 2-inch tall ground mounted monopolenightpole with a light
fixture mounted 18 feet, 8 inches above grade. Three flush mounted panel antennas are attached
to the top of the pole. The associated ground mounted equipment cabinets are located within an
existing trash enclosure across the driveway from the monopole and are not visible to the public.
The facility is unmanned and operates 24 hours a day, seven days a week. The facility is
serviced approximately once every 4-6 weeks or in the event of an eme!gency, such as a power
outage. The continued operation of the existing facility will not have:an'effect on parking and no
additional parking is required.
PLN2002-111 -1630 W. Campbell Avenue
Site and Architectural Review Permit
Page2
The height of the existing monopole exceeds the maximum height allowed for buildings in the
C-1 Zoning District. The maximum height allowed in the C-1 Zoning District is 35 feet. The
applicant has submitted supplemental documentation to demonstrate how the lowering of the
monopole from 43 feet, 2 inches to 35 feet would result in a compromised coverage area. The
antennas need to maintain their existing height to continue to provide reliable, seamless coverage
in the area due to physical obstacles that would impair the signal if the antennas were lowered.
Attachments:
1. Findings for Approval of PLN2002-111
2. Conditions of Approval for PLN2002-111
Preparedby: s~ µJI//~
Stephanie Willsey, Planner I
r
I