CC Ordinance 1737ORDINANCE NO. 1737
BEING AN ORDINANCE OF THE CITY COUNCIL OF
THE CITY OF CAMPBELL APPROVING A MODIFICATION
TO A PREVIOUSLY APPROVED PLANNED DEVELOPMENT
PERMIT TO ALLOW A MODIFICATION IN PROPOSED
PHASING TO ALLOW THE CONSTRUCTION OF A
SECOND OFFICE BUILDING OF 175,000 SQ.FT. AND AN
ADJUSTMENT IN THE PROPOSED PARKING RATIO ON
PROPERTY KNOWN AS 900 E. HAMILTON AVE. IN A
PD (PLANNED DEVELOPMENT/COMMERCIAL) ZONING
DISTRICT (APPLICATION OF PROMETHEUS DEVELOPMENT,
M 88-23/PD 84-06).
The City Council of the City of Campbell does ordain as follows:
SECTION ONE: That the Zoning Map of the City of Campbell is hereby
changed and amended on property known as 900 E. Hamilton Ave. by adopting
the attached Exhibit A entitled Plans and Elevations; Exhibit C entitled
Map of Said Property; and Exhibit D entitled Conditions of Approval, as
per the application of Prometheus Development Company for plans,
elevations, and development schedule to allow the construction of a second
office building in a Planned Development Zoning District. Copies of said
Exhibits are on file in the Planning Department.
SECTION TWO: This Ordinance shall become effective 30 days following
its passage and adoption and shall be published once within 15 days upon
passage and adoption in the San Jose Mercury News, a newspaper of general
circulation in the City of Campbell, County of Santa Clara.
PASSED AND ADOPTED this 7th day of February 19 89, by the
following roll call vote:
AYES: Councilmembers: ROTOWSKI, ASHWORTH, BURR, WATSON
NOES: Councilmembers: NONE
ABSENT: Councilmembers: NONE
ATTEST:
APPROVED:
Barbara Olsasky,
L. 1! � - ,c1;--
J anette Watson, Mayor
CONDITIONS OF APPROVAL - FILE # M 88-23 Revised per City Council
SITE ADDRESS: 900 E. Hamilton Ave. of Jan. 17, 1989.
APPLICANT: Prometheus Development
PC MTG DATE: 11-22-88
The applicant is hereby notified, as part of this application, that he/she is
required to meet the following conditions in accordance with the Ordinances of
the City of Campbell and the Laws of the State of California. Additionally,
the applicant is hereby notified that he/she is required to comply with all
applicable Codes or Ordinances of the City of Campbell and the State of
California which pertain to this development and are not herein specified.
1. Revised site plan addressing concerns indicated in the Staff Report to be
submitted to the Planning Department and approved by the Site and
Architectural Review Committee and/or the Planning Commission prior to
application for a building permit.
2. Property to be fenced and landscaped as indicated and/or added in red on
the plans. Landscaping and fencing shall be maintained in accordance with
the approved plans.
3. Landscaping plan indicating type and size of plant material, protection of
existing trees, hardscape details, and location of irrigation system to be
submitted to the Planning Department and approved by the Site and
Architectural Review Committee and/or Planning Commission prior to issuance
of a building permit.
4. Fencing plan indicating location and design details of fencing to be
submitted to the Planning Department and approved by the Planning Director
prior to issuance of a building permit.
5. Applicant to submit a plan to the Planning Department, prior to
installation of PG&E utility (transformer) boxes, indicating the location
of the boxes and screening (if boxes are above ground) for approval of the
Planning Director.
6. All mechanical equipment on roofs and all utility meters to be screened as
approved by the Planning Director.
7. Building occupancy will not be allowed until public improvements are
installed.
8. All parking and driveway areas to be developed in compliance with Chapter
21.50 of the Campbell Municipal Code. All parking spaces to be provided
with appropriate concrete curbs or bumper guards.
9. Underground utilities to be provided as required by Section 20.36.150 of
the Campbell Municipal Code.
10. Plans submitted to the Building Department for plan check shall indicate
clearly the location of all connections for underground utilities including
water, sewer, electric, telephone and television cables, etc.
CONDITIONS OF APPROVAL - FILE # M 88-23
SITE ADDRESS: 900 E. Hamilton Ave.
APPLICANT: Prometheus Development
Pg. 2
11. Sign application to be submitted in accordance with provisions of the Sign
Ordinance for all signs. No sign to be installed until application is
approved and permit issued by Planning and Building Departments (Section
21.53 of the Campbell Municipal Code).
12. Ordinance No. 782 of the Campbell Municipal Code stipulates that any
contract for the collection and disposal of refuse, garbage, wet garbage
and rubbish produced within the limits of the City of Campbell shall be
made with Green Valley Disposal Company. This requirement applies to all
single-family dwellings, multiple apartment units, to all commercial,
business, industrial, manufacturing, and construction establishments.
13. Trash container(s) of a size and quantity necessary to serve the
development shall be located in area(s) approved by the Fire Department.
Unless otherwise noted, enclosure(s) shall consist of a concrete floor
surrounded by a solid wall or fence and have self -closing doors of a size
specified by the Fire Department. All enclosures to be constructed at grade
level and have a level area adjacent to the trash enclosure area to service
these containers.
14. Applicant shall comply with all appropriate State and City requirements for
the handicapped.
PLANNING DEPARTMENT
15. Lighting plan for plaza and parking areas to be submitted to Planning
Department for approval of Planning Director.
16. Applicant to process amendment to development agreement allowing change in
project phasing and revised development schedule, prior to issuance of a
building permit.
17. Applicant to submit directional signing program for pedestrian and
vehicular circulation.
18. All conditions of previous Ordinance Nos. 1660 and 1560 shall still apply.
PUBLIC WORKS DEPARTMENT
FIRE DEPARTMENT
BUILDING DEPARTMENT
19. Applicant to meet all requirements and conditions of Public Works
Department, Engineering Division and Building Division, and Fire Department
prior to issuance of building permits.
CITY COUNCIL
20. Applicant is to evaluate pedestrian access between the hotel and office
sites prior to issue of a building permit for the hotel. A report of that
evaluation will be provided to the City. The applicant will design and
construct pedestrian facilities deemed necessary by the City.
R 1
M�II.IAOrn.
P-1.r
AVE.
U
M 88-23
900 E. Hamilton Ave.
av
-110
111111A
'OIII
C APT117
1 n
EXHIBIT C —
Public Hearing before the
Planning Commission on
October 24, 1989, adopted
VResolution No. 2633 —
approving amendment to M 82 A