Loading...
PC Res 4718RESOLUTION NO. 4718 BEING A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CAMPBELL APPROVING A SITE AND ARCHITECTURAL REVIEW PERMIT TO ALLOW THE DEMOLITION OF AN EXISTING 1,656 SQUARE-FOOT HOME AND CONSTRUCTION OF A NEW 4,560 SQUARE- FOOT 2-STORY HOME ON PROPERTY LOCATED AT 725 Kenneth Avenue. PROJECT FILE NO. PLN-2024-12 After notification and public hearing, as specified by law and after presentation by the Community Development Director, proponents and opponents, the hearing was closed. The Planning Commission finds as follows with regard to the approval of a Site and Architectural Review Permit: 1. The Project Site is zoned R-1-10 (Single Family Residential) on the City of Campbell Zoning Map. 2. The Project Site is designated Low Density Residential (4.5 units/gr. acre) on the City of Campbell General Plan Land Use diagram. 3. The Project Site is a 10,689 square-foot parcel located along the west side of Kenneth Avenue between Waldo Road and Budd Avenue. 4. The Proposed Project is an application for a Site and Architectural Review Permit to allow the demolition of an existing 1,656 square-foot home and construction of a new 4,560 square-foot 2-story home. There are no protected trees proposed for removal. 5. The project site is located in the San Tomas Area Neighborhood Plan (STANP), and therefore, is subject to the regulations contained therein, including the maximum building height, floor area ratio, lot coverage, and setbacks. The project site complies with these development standards. 6. The Proposed Project will result in a lot coverage of 29% and a Floor Area Ratio (FAR) of .426, where a maximum 35% lot coverage and .45 FAR are allowed in the R-1-10 Zoning District in the San Romas Area Neighborhood Plan. 7. The proposed project proposes a building height of 26 (a maximum of 28’ and 2 ½ stories is allowed), a front setback of 60’-9” (25’ is required), a first floor side setback of 8’ and 12’-3” (where 8’ and 12’-3” are required), a first floor side setback of 15’-4” and 27’ (where 10’ and 12’-3” are required, and a rear setback of 25’ (where 25-feet is required). 8. The proposed project will provide 2 covered parking spaces and 2 uncovered parking spaces, satisfying the applicable parking requirement. 9. The Proposed Project is a "housing development project" under State law, which limits the City in its capability to "deny, reduce the density for, or render infeasible" the project under the Housing Accountability Act (HAA) (Government Code Section 65589.5) unless: 1) the proposal is found to be in violation of an objective general plan/zoning standard (other than those waived/reduced through use of the Density Bonus law); or 2) the project will result in a specific adverse impact to public health and safety. Planning Commission Resolution No. 4718 Page 2 of 3 PLN-2024-12 ~ 725 Kenneth Avenue – Site and Architectural Review Permit 10. Senate Bill 9 (SB-9; Government code § 65852.21) requires the ministerial approval of either one or two residential units, which includes single-family residences. Ministerial review means a process for development approval involving no personal judgment by the public official as to the wisdom of carrying out the project. The public official merely ensures that the proposed development meets all the applicable objective standards for the proposed action but uses no special discretion or judgment in reaching a decision. 11. The Proposed Project adheres to the relevant design guidelines and development frameworks, particularly the General Plan's focus on creating "attractive residential neighborhoods" with "consistent development patterns" and the STANP’s design guidelines. 12. The Proposed Project is consistent with the Considerations in Review of Applications (CMC Section 21.42.040) for Site and Architectural Review. 13. In review of the proposed project, the Planning Commission considered the site circulation, traffic congestion, and traffic safety effects of the project, including the effect of the site development plan on traffic conditions on abutting streets; the layout of the site with respect to locations and dimensions of vehicular and pedestrian entrances, exit driveways, and walkways; the arrangement and adequacy of off-street parking facilities to prevent traffic congestion; the location, arrangement, and dimensions of truck loading and unloading facilities; the circulation patterns within the boundaries of the development, and the surfacing and lighting of the off-street parking facilities. 14. The Planning Commission further considered the landscaping design of the proposed project, including the location, height, and material of fences, walls, hedges, and screen plantings to ensure harmony with adjacent development or to conceal storage areas, utility installations, and other unsightly aspects of the development; the planting of groundcover or other surfacing to prevent dust and erosion; and the preservation of existing healthy trees. 15. The Planning Commission further considered the proposed project's architectural and site layout, including the general silhouette and mass, including location on the site, elevations, and relation to natural plant coverage, all in relationship to the surrounding neighborhood; the exterior design in relation to adjoining structures in terms of area, bulk, height, openings, and breaks in the facade facing the street; and appropriateness and compatibility of the proposed uses in relation to the adjacent uses and the area as a whole. 16. No substantial evidence has been presented which shows that the project, as currently presented and subject to the required Conditions of Approval, will have a significant adverse impact on the environment. Based upon the foregoing findings of fact and pursuant to CMC Section 21.42.020 the Planning Commission further finds and concludes that: Site and Architectural Review Permit Findings (CMC Sec. 21.42.060.B): 1. The project will be consistent with the General Plan; 2. The project conforms with the Zoning Code; 3. The project will aid in the harmonious development of the immediate area; Planning Commission Resolution No. 4718 Page 3 of 3 PLN-2024-12 ~ 725 Kenneth Avenue – Site and Architectural Review Permit 4. The project is consistent with applicable adopted design guidelines, development agreement, overlay district, area plan, neighborhood plan, and specific plan(s); and Environmental Findings (CMC Sec. 21.38.050): 5. This project is Categorically Exempt per Section 15303, Class 3 of the California Environmental Quality Act (CEQA), pertaining to the construction of single- family dwellings. THEREFORE, BE IT RESOLVED that the Planning Commission adopts a Resolution approving a Site and Architectural Review Permit to allow the demolition of an existing 1,656 square-foot home and construction of a new 4,560 square-foot 2-story home on property located at 725 Kenneth Avenue, subject to the attached Conditions of Approval (attached Exhibit A). PASSED AND ADOPTED this 13th day of August 2024, by the following roll call vote: AYES: Commissioners: Zisser, Kamkar, Buchbinder, Fields, Majewski NOES: Commissioners: ABSENT: Commissioners: Krey, Ostrowski ABSTAIN: Commissioners: APPROVED: Alan Zisser, Chair ATTEST: Rob Eastwood, Secretary Alan Zisser (Sep 6, 2024 15:42 PDT) EXHIBIT A CONDITIONS OF APPROVAL Site and Architectural Review Permit Project File No.: PLN-2024-12 Where approval by the Director of Community Development, City Engineer, Public Works Director, City Attorney or Fire Department is required, that review shall be for compliance with all applicable conditions of approval, adopted policies and guidelines, ordinances, laws and regulations and accepted engineering practices for the item under review. Additionally, the applicant is hereby notified that he/she is required to comply with all applicable Codes or Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified. PLANNING DEPARTMENT: 1. Approved Project: Approval is granted for a Site and Architectural Review to allow the demolition of an existing 1,656 square-foot home and construction of a new 4,560 square- foot 2-story home on property located at 725 Kenneth Avenue. The project shall substantially conform to the Project Plans, included as Attachment B in the August 13, 2024, Planning Commission Staff Report, except as modified by the Conditions of Approval. 2. Permit Expiration: The Site and Architectural Review Permit approved herein ("Approval") shall be valid for one (1) year from the effective date of Planning Commission approval (expiring August 23, 2025). Within this one-year period a Building Permit for the project must be issued pursuant to CMC Sec. 21.56.030.B.1. Failure to meet this deadline or expiration of an issued Building Permit shall result in the Approval being rendered void. 3. Plan Revisions: Upon prior approval by the Community Development Director, all Minor Modifications to the approved project plans shall be included in the construction drawings submitted for Building Permit. Any modifications to the Building plan set during construction shall require submittal of a Building Permit Revision and approval by the Building Official prior to Final Inspection. 4. Fences/Walls: Any newly proposed fencing and/or walls shall comply with Campbell Municipal Code Section 21.18.060 and shall be submitted for review and approval by the Community Development Department. 5. On-Site Lighting: On-site lighting shall be shielded away from adjacent properties and directed on site in compliance with City of Campbell Lighting Design Standards (CMC 21.18.090). The design and type of lighting fixtures and lighting intensity of any proposed exterior lighting for the project shall be reviewed and approved by the Community Development Director. Lighting fixtures shall be of a decorative design to be compatible with the residential development and shall incorporate energy saving features. 6. Landscape Plans: Prior to issuance of a building permit, landscape plans shall be updated to show the planting of minimum 5-gallon bushes, and removal/retention of trees shall be made consistent between the site plan and landscape plans. 7. Construction Activities: The applicant shall abide by the following requirements during construction: Conditions of Approval Page 2 of 5 PLN-2024-12 ~ 725 Kenneth Avenue – Site and Architectural Review Permit a. The project site shall be posted with the name and contact number of the lead contractor in a location visible from the public street prior to the issuance of building permits. b. Construction activities shall be limited to weekdays between 8:00 a.m. and 5:00 p.m. and Saturdays between 9:00 a.m. and 4:00 p.m. No construction shall take place on Sundays or holidays unless an exception is granted by the Building Official. c. All construction equipment with internal combustion engines used on the project site shall be properly muffled and maintained in good working condition. d. Unnecessary idling of internal combustion engines shall be strictly prohibited. e. All stationary noise-generating construction equipment, such as air compressors and portable power generators, shall be located as far as possible from noise-sensitive receptors such as existing residences and businesses. f. Use standard dust and erosion control measures that comply with the adopted Best Management Practices for the City of Campbell. BUILDING DIVISION: 8. Permit Required: A Building Permit application shall be required for the proposed project. The Building Permit shall include Electrical/Plumbing/Mechanical fees when such work is part of the permit. 9. Conditions of Approval: The Conditions of Approval shall be stated in full on the cover sheet of construction plans submitted for building permit. 10. Construction Fencing: The property shall be properly enclosed with construction fencing to prevent unauthorized access to the site during construction. The construction site shall be secured to prevent vandalism and/or theft during hours when no work is being done. All protected trees shall be fenced to prevent damage to root systems in compliance with the Standards for Tree Protection During Construction. 11. Construction Hours/Fines/Stop Work Notice: Failure to comply with permitted working hours that result in verified complaints may result in the issuance of a Stop Work Notice issued to the project with cessation of work for a minimum of seven (7) days from the date of issuance and an Administrative fine of up to $1,000.00. 12. Timely Completion: Once under construction it shall be the obligation of the property owner and contractor to demonstrate continued progress on the project. In the event the building permit expires, the City may impose fines or exercise administrative remedies to compel timely completion of work. PUBLIC WORKS DEPARTMENT 13. Frontage Improvements: The scope of this project triggers the requirement for Frontage Improvements as required by Campbell Municipal Code 11.24.040. However, per the San Tomas Area Neighborhood Plan, this section of Kenneth Avenue has been designated to remain unimproved and as such the applicant will not be required to construct new curb, gutter or sidewalk. 14. Construction Drawings: The applicant shall submit the following permit applications prior to, or concurrent with the main Building permit application: Conditions of Approval Page 3 of 5 PLN-2024-12 ~ 725 Kenneth Avenue – Site and Architectural Review Permit a. Encroachment Permit for Street Improvement Plans: The frontage improvements for the project shall be shown on a separate street improvement plan as detailed here: https://www.campbellca.gov/187/Street-Improvements 15. Storm Drain Area Fee: Prior to issuance of any grading or building permits for the site, the applicant shall pay the required Storm Drain Area fee, currently set at $2,120.00 per net acre, which is $520.25 (set for R-1 land use). 16. Stormwater Pollution Prevention Measures: Prior to issuance of any grading or building permits, the applicant shall comply with the National Pollution Discharge Elimination System (NPDES) permit requirements, Santa Clara Valley Water District requirements, and the Campbell Municipal Code regarding stormwater pollution prevention. The primary objectives are to improve the quality and reduce the quantity of stormwater runoff to the bay. Resources to achieve these objectives include Stormwater Best Management Practices Handbook for New Development and Redevelopment (“CA BMP Handbook”) by the California Stormwater Quality Association (CASQA), 2003; Start at the Source: A Design Guidance Manual for Stormwater Quality Protection (“Start at the Source”) by the Bay Area Stormwater Management Agencies Association (BASMAA), 1999; and Using Site Design Techniques to Meet Development Standards for Stormwater Quality: A Companion Document to Start at the Source (“Using Site Design Techniques”) by BASMAA, 2003. 17. Water Meter: The project has an existing water meter installed in the public right-of-way. If the water service is required to be upsized as part of the project (i.e. due to fire sprinklers), then the new water meter shall be installed on private property behind the public right-of-way line. 18. Pavement Restoration: The applicant shall restore the pavement in compliance with City standard requirements. In the event that the roadway has recently received a pavement treatment or reconstruction, the project will be subject to the City’s Street Cut Moratorium. The applicant will be required to perform enhanced pavement restoration consistent with the restoration requirements associated with the Street Cut Moratorium. The City’s Pavement Maintenance Program website (https://www.ci.campbell.ca.us/219) has detailed information on the streets currently under moratorium and the enhanced restoration requirements. 19. Plans / Encroachment Permit / Fees / Deposits: Prior to issuance of any grading or building permits for the site, the applicant shall cause plans for public street improvements to be prepared, pay various fees and deposits, post security and provide insurance necessary to obtain an encroachment permit for construction of the standard public street improvements, as required by the City Engineer. The plans shall include the following, unless otherwise approved by the City Engineer: a. Show location of all existing utilities within the new and existing public right of way. b. Removal of existing AC installed at the roadway shoulder along project frontages and installation of a 6” section of ¾” gravel. AC shoulder paving may be installed for driveway approach and pedestrian walkway to connect the on-site driveway and pedestrian walkway to the edge of roadway. Conditions of Approval Page 4 of 5 PLN-2024-12 ~ 725 Kenneth Avenue – Site and Architectural Review Permit c. Installation of depressed curb at the property line along project frontages. See 705 Kenneth Avenue, neighbor to the north. d. Restoration of the edge of roadway AC. e. Construction of conforms to existing public and private improvements, as necessary. 20. Street Improvements Completed for Occupancy and Building Permit Final: Prior to allowing occupancy and/or final building permit signoff for any and/or all buildings, the applicant shall have the required street improvements installed and accepted by the City, and the design engineer shall submit as-built drawings to the City. 21. Utility Encroachment Permit: Separate encroachment permits for the installation of utilities to serve the development will be required (including water, sewer, gas, electric, etc.). Applicant shall apply for and pay all necessary fees for utility permits for sanitary sewer, gas, water, electric and all other utility work. FIRE DISTRICT 22. Required Fire Flow: The fire flow for this project is 875 GPM at 20 psi residual pressure since an automatic fire sprinkler system will be installed. Note: The minimum required number and spacing of the hydrants shall be in accordance with CFC Table C102.1. a. Provide a fire flow letter from a local water purveyor confirming the required fire flow of 875 GPM @20 psi residual from a fire hydrant located within 600' of the farthest exterior corner of the structure. Contact San Jose Water for details on how to obtain the fire flow letter. i. Fire flow shall be provided with building permit plan set. 23. Fire Sprinklers Required: An automatic residential fire sprinkler system shall be installed in all new one- and two-family dwellings. a. Sprinklers noted on sheet T1. 24. Construction Site Fire Safety: All construction sites must comply with applicable provisions of the CFC Chapter 33 and our Standard Detail and Specification S1-7. Provide appropriate notations on subsequent plan submittals, as appropriate to the project. CFC Chp. 33. 25. Address Identification: New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. Where required by the fire code official, address numbers shall be provided in additional approved locations to facilitate emergency response. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall be a minimum of 6 inches (101.6 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Where access is by means of a private road and the building cannot be viewed from the public way, a monument, pole or other sign or means shall be used to identify the structure. Address numbers shall be maintained. CFC Sec. 505.1. 26. Water Supply Requirements: Potable water supplies shall be protected from contamination caused by fire protection water supplies. It is the responsibility of the applicant and any contractors and subcontractors to contact the water purveyor supplying the site of such project, and to comply with the requirements of that purveyor. Conditions of Approval Page 5 of 5 PLN-2024-12 ~ 725 Kenneth Avenue – Site and Architectural Review Permit Such requirements shall be incorporated into the design of any water-based fire protection systems, and/or fire suppression water supply systems or storage containers that may be physically connected in any manner to an appliance capable of causing contamination of the potable water supply of the purveyor of record. Final approval of the system(s) under consideration will not be granted by this office until compliance with the requirements of the water purveyor of record are documented by that purveyor as having been met by the applicant(s). 2022 CFC Sec. 903.3.5 and Health and Safety Code 13114.7. Resolution 4718 ~ 725 Kenneth Ave Final Audit Report 2024-09-09 Created:2024-09-06 By:Nina Comcai (ninac@campbellca.gov) Status:Signed Transaction ID:CBJCHBCAABAAJQK_4HcYvudmrrRB7hrmaEhHHfr4zeMc "Resolution 4718 ~ 725 Kenneth Ave" History Document created by Nina Comcai (ninac@campbellca.gov) 2024-09-06 - 6:12:07 PM GMT Document emailed to Alan Zisser (alanzisser@gmail.com) for signature 2024-09-06 - 6:12:11 PM GMT Document emailed to Rob Eastwood (robe@campbellca.gov) for signature 2024-09-06 - 6:12:12 PM GMT Email viewed by Alan Zisser (alanzisser@gmail.com) 2024-09-06 - 10:42:24 PM GMT Document e-signed by Alan Zisser (alanzisser@gmail.com) Signature Date: 2024-09-06 - 10:42:57 PM GMT - Time Source: server Email viewed by Rob Eastwood (robe@campbellca.gov) 2024-09-09 - 6:42:54 PM GMT Document e-signed by Rob Eastwood (robe@campbellca.gov) Signature Date: 2024-09-09 - 6:43:00 PM GMT - Time Source: server Agreement completed. 2024-09-09 - 6:43:00 PM GMT