2941 Del Loma Dr. (1981)
1tJ ?:> - /9- Oip cJ
TO: ' C!TY CLERK
Please collect and receipt
for the following monies:
P.W. FileNo.~-
~ IY
Acct.
3372
ðffV
@
3372
3372
3372
3372
3372
3372
3372
3372
3372
3373
3373
3373
3372
3372
3521
3521
3521
Name tj",; t~
Address 3
Items
Prel iminary Environmental Imprlct Report Fee ($70.00)
Storm Drainage Area Fee per acre ($1,500 R-l;
$1,650 Multi-Res.; $1,800 all other)
Plan Examination and Construction Inspection Fee
(3-1/2% of value
Tentative Parcel Map Filing Fee ($60.00)
Tentative Tract Map Filing Fee ($120.00)
Final Parcel Map Filing Fee ($120.00)
Final Tract Map Fil ing Fee ($100.00)
Vacation of Public Streets and Easements
($270.00)
($250.00
Assessment Segregation or Reapportionment
for first plus $80.00 each additional)
Lot Line Adjustment Fee ($160.00)
Certificate of Compliance ($180.00)
Map Revisions to Map Companies ($10.00)
Copies of Engineering Maps and Plans ($0.50/SF)
Work Area Traffic Control Handbook ($2.00)
Project Plans and Specifications ($10.00)
Excavation Permit Application Fee ($25.00)
Excavation Permit Fee (3-1/2% of value)
Cash Deposit
Faithful Performance Deposit
Maintenance Bond Deposit
TOTAL
Amount
"2.
:s ro. ()()
2.. 0 '30 , 0-0
$
4 4/0. °'t?_-
Phone 9 tt,. 7....?' to
Zip "roro
~~t
Au
FOR
C !TY
CLERK
ONLY
Rece i pt No. d.... (:f ~ /
Amount Pa i d &5 'T: L,L / CJ. °.5!.
Received by a.;4/
S-c2 9- 57 /
Date
Janua,rv. 1
TO:
Acct.
351
365
351
351
351
~
~1
351
351
351
351
352
352
352
351
351
380.1
380. 1
380.1
Name
C!TV CLERK
Please collect and receipt
for the following monies:
P . W . F i 1 e No. .s I (I % / )
'Y"'. ~G.S'r4
Items
Prel iminary Environmental. Impt'lct Report Fee ($50.00)
Storm Drainage Area Fee ($765/acre--$170/1ot minimum)
Plan Examination and Construction Inspection Fee
(3-1/2% of value
Tentative Parcel Map Filing Fee ($50.00)
Tentative Tract Map Filing Fee ($100.00)
Final Parcel Map Filing Fee ($100.00)
Final Tract Map Filing Fee ($100.00)
Vacation of Public Streets and Easements ($200.00)
Assessment Segregation or Reapportionment ($200.00
for first plus $60.00 each additional)
Lot Line Adjustment Fee ($100.00)
Certificate of Compliance ($100.00)
Map Revisions to Map Companies ($10.00)
Copies of Engineering Maps and Plans ($0.50/SF)
Work Area Traffic Control Handbook ($2.00)
Project Plans and Specifications ($10.00)
Excavation Permit Application Fee ($25.00)
Excavation Permit Fee (3-1/2% of value less $25.00)
Cash Deposit
Faithful Performance Deposit
Maintenance Bond Deposit
\1\1 (
TOTAL
\/V ) I, <:... Phone
S l:ot f 7J I vi 512/1 t~ C /4Ve.. (c.. Zip
Address 3 2. I I
FOR
CITY
CLERK
ONLY
Rece i pt No. doss D <0
Amount Paid S /00 r!2
Rece i ved by (;;> / W
Date "'ì ~;;¿, '1- ç¿ Q
~
Amount
V 10C> - 00
$ ~ IDO., t) 0
7..4'-- £79'0
77"Oß""1
February, 1980
TO: CITY CLERK
Ple..e çollect and receipt
for the following 8DIIles:
P.W. File No.
ST(I2')
Moun t
Acct.
Items
379
351
Fire Hydrant llantal Fee
Prell.lnary Envlr0ft88ntal l8Pact llaport Fee
StOI'll Drainage Area Fee
365
351
Plan ba.lnatlon and Construction Inspection Fee
353
353
Tentative Map FIling Fee
FInal Map FIling Fee
351
351
351
Vacation of PublIc Streets and Eas...nts
AS18ss-nt Segregat Ion or llaapport lon.nt
Lot LIne AdJust.nt F..
CertlflClte of to.pllance
351
352
CopIes of EngIneerIng Maps and Plans
352
351
~rk Area Traffic Control Handbook
Project Plans and Specifications
351
Excavation Pel'llllt Fee
]80.1
Faithful Perfor_CI DeposIt
~ "2 .5"", n ()
x< -z.,S: OV
Namejl ~
Address "3 2 1
s 50, CJð
W I h L Phone 2. 4 ,- Zf 7 fv
SCd.¡r-1>("'~ ~.....t(I~""zIP 9'f"oI/ .
TOTAL
FOR
CITY
CLERK
ONLY
pëëe'lpt No.
1 Amount P.ld
I ~~;, ..
O.te
J~
JII(Jd No.
~ 8 sC¡
RESOLUTION NO.
6944
BEING A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF CAMPBELL APPROVING AN ADJUSTMENT TO
THE 1984-85 FISCAL YEAR BUDGET
WHEREAS, there has been presented to the City Council a request
for funds not originally authorized in the 1984-85 fiscal year
budget; and
WHEREAS, funds are available in the Unappropriated Storm Drain Fee
Fund balance to support the transfer of these funds to the City of
San Jose, as these funds were inadvertently collected by the City
of Campbell in connection with development of Tract No. 6854;
NOW, THEREFORE, BE IT RESOLVED that the City Council authorize
transfer of $2,380.00 from Unappropriated Storm Drain Fee Fund
balance to Account No. 705.438, Other Charges.
PASSED AND ADOPTED thi s 16th day of
1985, by the following vote:
April
AYES: Councilmen: Chamberlin, Kotowski, Doetsch, Podgorsek, Ash\\Drth
NOES: Councilmen: None
ABSENT: Councilmen: None
APPROVED:
þ~
Jf£fu J. AslmDrth,
Mayor
ATTEST:
~,ð
Anne G. c~ne.~
""- FOREGOING INSTRUM'õ,r; 13 A TfiL'E
AND CORRECT COpy 0" J:.:c O;,IGINAL
ON FILE IN THIS OFFICE.
ATTEST: ANNE G. COYNE. CITY CLERk
CITY 0 CAMPBELL, C~RNJA
BY" ' ". (}[t!;"
DATED
/1 /!;) ~'
/-("i..-ð~
tlTV OF CAMPBELL
REQUEST FOR BUDGET ADJUSTMENTS
Department/Program
Division
Date
,"! C'7"t'""'"
Request No.
PUBLIC WORKS
To be Reduced 0 e ncrease
Acct, 1{0. Budaet Item Amount Acct. No. Budaet Item Amount
Account 06-229\ Unappropriated $2,380.00 705.438 Des; gn Engi neeri n, $2,380.
Stonn Drain Fee Other Charges
Fund Balance
Budget Transfer
II
, ' ,
.. ',,' . .
,-- ,.,_. ._,.,;:-'
T b I
d
00
.
Reason for Request (be specific):
In connection with the development of Tract No. 6854, funds were
inadvertently collected from the City of San Jose by the City of
Campbell.
Finance Director
Appropriation Requested:
De
','"
CITY OF
, :l /!.~ Jif
ðì¡i~J.~ ~/
f;(~-) ..
¿Þ.
SAN .JOSE, CALIFORNIA
~
~ L..6: ~~4-
801 NORTH FIRST STREET
SAN JOSE, CALIFORNIA 95110
(408) 277-4333
S- 'T' () '2>-)
DEPARTMENT OF PUBLIC WORKS
D. KENT DEWELL, DIRECTOR
Aug US t 16, 1984
,RECEIVED
AUG 2 3 1984
PUBL.'C' ,',
VvUIt;\~
ENGINEERING
Mr. Joseph Elliott
Director of Public Works
Ci ty of Camp be 11
75 North Central Avenue
Campbell CA 95008
Attention:
Mr. David Valkenaar
Dear Mr. Elliott:
In response to your request of June 27,1984, for investigation and resolution
of a "standing water problem" at 2942 Del Loma Way (APN 403-19-60), we have
made the following determinations:
1)
Our field investigation reveals that a street tree located at 2940 Del Lorna
Way (APN 403-19-37), twenty feet north of and downstream from parcel 60,
has apparently raised the curb and gutter.
We spoke with Ms. Sharon Blunt who resides at 2940 Del Lorna Way. She told
us that the curb and gutter were in the raised condition before the
improvements to the extension of Del Lorna, including the frontage of
parcel 60, were constructed with the City of Campbell Tract No. 6854 about
two years ago. She stated that this condition did not pose much of a
problem before the construction of Tract No. 6854 as the water percolated
into the then adjacent orchard.
2)
3) Tract No. 6854 was graded in a manner such that the curb and gutter in
front of parcel 60 were placed below the existing curb and gutter elevations
twenty feet to the north.
The City of San Jose does not have a program to repair curb and gutter or sidewalk
which has been altered by the growth of street trees. As necessary remedial work
of this type is considered to be the property owner's responsibility, resolution
of the problem should normally be between the two property owners.
The existing situation, however, is unique in that the raised curb and gutter
existed before Tract No. 6854 was constructed and that improvements plans for
this tract apparently aid not consider the fact that a problem would be created
downstream. The engineer for the Tract should have brought this situation to
the attention of the City of Campbell during the preparation of the improvement
plans and recommended either the installation of a catch basin at the Tract
boundary or reconstruction of the misaligned curb and gutter.
Mr. Jogeph Elliott
August 16, 1984
Page Two
We regret that the City of San Jose will not be able to perform the work necessary
to resolve this problem. If the City of Campbell wishes to undertake the
reconstruction of the curb and gutter we will expedite the issuance of the
necessary encroachment permit.
s~rCerelY. ,
l~tt £4~, ~4
It'. Kent Dewe 11
Director of Public Works
~'-'
Dt~U:DHK:if
cc:
Mr. Hen ry \~ong
2942 Del Loma Court
Campbell CA 95008
tHEcae
-----
R~OUEST
TO: FINANCE DIRECTOR
City of CalDpbe11
-.
Please issue check payable to: ~ iLl. - 2:L - ~ ~!!. _:L!L ~.l- - - - (20 spaces)
Address: Street: 8 01 NFl R S T S T (20 spaces)
--------------------
City: 1~!-:!.!~I------- (15 spaces)
State: 1 ~ (2 spaces)
Zip: 12,ll.2. (5 spaces)
Description: j 1..2.ß.tl-.Q.ß ~ l!! - £ I!. - - - - - (20 sRices)
Exact Amount Payable: $2.380.00
Account Number:
(s +. p ,; - p...... . .<, ;:<A../ r'7 - ...?~ )
Purpose:
Storm drain fee payment for Tract No. 6854. Re:San Jose Invoice No. 78188.
.
I .
Vf1J
Requested by:' D. Valkenaar
~~~K ~:~ ~~
/
SPECIAL INSTRUCTIONS FOR HANDLING CHECK RE~:
.
Associate
Title: C i viI Enaine~r Date: 10/24/84
Di rector of .,
Title: Þllhl;,.. I'/Qr/i Oate: 10/24/84
.
Man as is
Matl in attached envelope
x
Return to:
Department
.:
Name
Other:
See Campbell Receipt #2861 dated 5/29/81.
-
Attach invoice.
or. -'
INVOICE
CITY OF SAN JOSE
PHONE 277-4000
TO City of Campbell
75 N. Central Avenue
Campbell, CA. 95008
Attn: David N. Valkenaar
Assoc. Civil Engr.
DESCRIPTION OF ARTICLE OR SERVICES
~
Storm drainage fee - for connection to the
1an Jose storm drainage system in Del Loma Court,
for Tract No. 6854
(Se~emo from City of Campbell attached)
REC~!"~')
~
0 It- 1'> (j,... !
~~./~
PUBLIC WUtÜ\..}.
EKGlN EE.RU-4G
AUG 2 8 l::Jó4
cc:
Don Pabst,
277-5161
DIRECT ANY QUESTIONS TO THE
ORIGINATING DEPARTMENT ~
REFERENCE (FILE OR ACCOUNT NO.)
DKD:DP:VM:mf
QUANTITY
TO CUSTOMER
MAKE CHECKS PAYABLE TO "CITY OF SAN JOSE" FOR AMOUNT INDICATED
MAIL YOUR REMITTANCE WITH ONE COpy OF THIS INVOICE TO:
FINANCE DEPARTMENT. TREASURY DIVISION
ROOM 217. CITY HALL
SAN JOSE. CALIF. 95110
FORM 142-41 REV i7-72)
UNIT PRICE
TOTAL
)
AMOUNT
TERMS NET - BILL BECOMES DELIN-
QUENT 30 DAYS AFTER INVOICE DATE
UNLESS OTHERWISE NOTED.
INVOICE
NUMBER
DEPARTMENT
78188
DEPT. NO.
Public Works
DATE
FUND
2,380.001413
$ 2,380.00
Â
57
8/27/84
ACCOUNT CODE
PRIME
DETAIL
030010
01
1-
\ l~ITY OF CAMPBELL
I
I
1
75 NORTH CENTRAL AVENUE
CAMPBELL. CALIFORNIA 95008
(408) 378-8141
Department: Pub 1 i c Works
Mahmoud M. Gahrahmat & Marie B. Gahrahmat
3476 Edward Avenue
Santa Clara, CA 95050
Subject:
One Year Maintenance Acceptance
2941 Del Lama Drive, Permit 81-275 (S.T. 18) TR 6854
Dear Mr. & Ms. Gahrahmat:
We have made a one year maintenance inspection of subject public
works improvements and find that no maintenance is required.
By copy of this letter, we hereby release your maintenance bond.
Very truly yours,
JOSEPH ELLIOTT
Director of Public Works
v~
DAVID N. VALKENAAR
Project Engineer
DNV: j c
cc: Norm Samson
Develc~ers Insurance Company, 6006 Salida Del Sol, San Jose 95123
Bond Nu. 102540
r:> -
~ ~ '"
0: ~: ,'~ ".,
-"
[oj ro
r, .
F; ;.
~ :; I"
-. C
ë_; > '--1
:'; (j ~-' --.
;~~t~
om::::;--I
00 -<:z
CJ
C
n
.þ
EX C A V A T ION PER M I T
-,;¿JI
Permit No. ?
Ref. file
App. date
Issue date
Expi res
~
...,
CITY OF CAMPBELL
DEPARTMENT OF PUBLIC WORKS
75 N. Centra 1 Avenue
Campbell. CA. 95008
(408) 378-8141, ext. 220
APPLICATION
g)
So
z:
~
~
u
...,
VI
VI
:r
I--
Application is hereby made for an excavation permit in accordance with Campbell Municipal Code~ Section 11.04.
A. Location of work: L.-E..L LOMA DiZ. S/"ÇYALie.to.1DÂ A\JF-.. í~ ~ßS4--
B. Nature of work: i N~í AI.-\-A.T ION OF l.<.~" ~Â.\.l. ~E::-I.J£t2. 1-\"-\ ~ ~ APP,""tZ.Te.N"'t\I'-~
Foe.T.z bðo'.A-,
C. Attach three (3) copies of a drawing Showing the location, extent and dimensions of the work. The drawing
shall show the relation of the proposed work to existing surface and underground improvements. When ap-
proved by the City Engineer, said drawing becomes a part of this permit.
O. The General Conditions for all permits are listed on the reverse side. Special Provisions for this permit
are listed below. Failure to abide by these conditions and provisions may result in Job shut-down and/or
forfeiture of Faithful Performance and Cash Bonds. (See General Conditions 1 and 2.)
...,
I--
...,
-'
i:
0
u
0
I--
I--
E
<
U
-'
0-
0-
<
E. An application fee of $25 must accompany this application. This is non-refundable and will be applied toward
the total permit fee if the permit is consunmated.
F. See General Condition 5 regarding completion and acceptance of the work.
Name of Applicant érHANí,>' Sþ..,¡...l ,-rAT' ON С...T +4-
Address , Of) ~~- -;-ÒLu...1t..l1t't"-IL~ A..,¡;¿.
'*Name of Contractor ..j ,,^. .'[ N t-'\ AN
Address 4q~ ~ nr..:.~ I W Av
74'::; I ,,\
Telephone: ':þ78 2.4°1
Telephone:
.;;l ~ 7 - '57t 2Ý
C' -
.~ ..1.
qö?\\e:,
State Contractor License No.
City Business License No.
....:0
*NOTE: The Contractor IllUSt have a current State Contractor's License and City of CUlpbell Business License.
SPECL~L PROVISIONS
,.."
-- 1. Street ~hall not be open cut for underground installations. "inb",n cuts NV ~ .1l0\</c: for
conn,.ctinn~ or exploration holes. Such cuts IllUSt be specifically ~'!provcd by the Ins'JCctor.
2. Pavement construction or restoration shall be:
II. As shown on plans.
b. Existing section plus 2-inches A.C. with 4-inches A.C. on 12-inches R-78 base rock or
9-inches A.C. held as a minimum section.
c.
Note - Existing chip seals shall be replaced to conform with the surrounding pavement surface.
3. The hours of work are limited to outside the hours of 7-9 a.m. and 3-6 p.m.
4. Work to be staked by a licensed Land Surveyor or Civil Engineer and two (2) copies of the
cut sheets sent to the Public Works Department before starting work.
z:
0
-
I--
u
...,
VI
VI
%
I--
...,
I--
...,
-'
i:
0
u
5.
NOTICE MUST BE GIVEN TO THE CITY AT LEAST 48 HOURS BEFORE BEGINNING WORK. PHONE 378-8141, ext. 220.
0
I--
~
~
u
Amount
Receipt No.'s
¥O .s-c¡
~(r-
4ft[)
TI&
S 25.00
$ 1r,j
S 1,,10 ".
bond) !u -)£ $ (J w
2Ý1 q 't l--------
- r City Engi neer
PERMIT APPLICATION FEE
BOND FOR FAITHFUL PERFORMANCE
w
CASH DEPOSIT REQUIRED
PERMIT FEE (3Iã% of F. P.
¿--~, t) --cf I
Date
....;
Approved for issuance
ACCEPTED
ß! 4/g¡
Date
g-Lj-Y) lit-
TO:
Acct.
3372
3370
3372
3372
3372
3372
3372
3372
3372
J372
3372
3372
3373
3373
3373
3372
3372
3521
3521
3521
CITY CLERK
Please collect and receipt
for the following monies:
P.W. File No.
Items
Preliminary Environmental Impt'lct Report Fee ($70.00)
Storm Drainage Area Fee per acre ($1,500 R-l;
$1,650 Multi-Res.; $1,800 all other)
Plan Examination and Construction Inspection Fee
(3-1/2% of value
Tentative Parcel Map Filing Fee ($60.00)
Tentative Tract Map Filing Fee ($120.00)
Final Parcel Map Filing Fee ($120.00)
Final Tract Map Filing Fee ($100.00)
Vacation of Public Streets and Easements ($270.00)
Assessment Segregation or Reapportionment ($250.00
for first plus $80.00 each additional)
Lot Line Adjustment Fee ($160.00)
Certificate of Compliance ($180.00)
Map Revisions to Map Companies ($10.00)
Copies of Engineering Maps and Plans ($0.50/SF)
Work Area Traffic Control Handbook ($2.00)
Project Plans and Specifications ($10.00)
Excavation Permit Application Fee ($25.00)
Excavation Permit Fee (3-1/2% of value)
Cash Deposit
Faithful Performance Deposit
Maintenance Bond Deposit
TOTAL
Name ~ . I nVVL (Lv\- Cø .
Address fqS-S- Cð¡¿bìn 4vê :)/L-11 ... f rJ'iJ! -
./
FOR
CITY
CLERK
ONLY
Receipt No, L/-12i Ô
Amount Paid ~/ðÔ Ð-éI
Rece i ved by c2- N
<g -/J - ~/
Date
~/-.;) 8' /
Amount
#/00-00
$ /OO-ðO
Phone
.:2lo Î - ç t.þ3 Ý
9~ JIg
Zip
January, 1981
/
TO:
Acct.
3372
3370
3372
3372
3372
3372
3372
3372
3372
3372
3372
3372
3373
3373
3373
3372
3372
3521
3521
3521
~~f?~
P . W. F i 1 e No. ¿:; I -;;L ? /
CITY CLERK
Please collect and receipt
for the following monies:
Items
Preliminary Environmental Impact Report Fee ($70.00)
Storm Drainage Area Fee per acre ($1,500 R-l;
$1,650 Multi-Res.; $1,800 all other)
Plan Examination and Construction Inspection Fee
(3-1/2% of value
Tentative Parcel Map Filing Fee ($60.00)
Tentative Tract Map Filing Fee ($120.00)
Final Parcel Map Filing Fee ($120.00)
Final Tract Map Filing Fee ($100.00)
Vacation of Public Streets and Easements
($270.00)
($250.00
Assessment Segregation or Reapportionment
for first plus $80.00 each additional)
Lot Line Adjustment Fee ($160.00)
Certificate of Compliance ($180.00)
Map Revisions to Map Companies ($10.00)
Copies of Engineering Maps and Plans ($0.50/SF)
Work Area Traffic Control Handbook ($2.00)
Project Plans and Specifications ($10.00)
Excavation Permit Application Fee ($25.00)
Excavation Permit Fee (3-1/2% of value)
Cash Deposit
Faithful Performance Deposit
Maintenance Bond Deposit
TOTAL
Name Q ¡2{ ~ ~
Addrefs </9 S-5-~ ~
s-' ....r 9 S- / / ð'
Amount
-(ft 25""- ~
$
;2 5~ deJ
Phone
Zip
;;;¿ 6 7-;.c;{/3;t
FOR Receipt No, Lf-ð S c¡
C!TY Amount Paid c2S~
CLERK C¿#
ONLY Received by 1) - L)- !? I
Date 8' - V- - ?I
> January, 1981
EX C A V A T ION PER M I T
~
r-¡
CITY OF CAMPBELL
DEPARTMEN7 OF PUBLIC WORKS
75 N. Central Avenue
Campbell. CA. 95008
(408) 378-8141, ext. 220
APPLICATION
Permit No.
Ref. file
App. date
Issue date
EKpi res
Application is hereby made for an eKcavation permit in accordance with Campbell Municipal Cod~"i Section 11.04.
:: ~:::f::k'~~~~
P Åá'¿; ,
. . J
2.i-/ :J '~~ . f ~-þ~
z
0
;::
u
.....
'"
'"
::z:
I-
.....
I-
.....
-'
i: ~. The General Conditions for all permits are listed on the reverse side. Special Provisions for this permit
8 are listed below. Faflure to abide by these conditions and provisions may result in job shut-down and/or
0 forfeiture of Faithful Performance and Cash Bonds. (See General Conditions 1 and 2.)
I-
!ž /E. An application fee of $25 must accompany this application. This is non-refundable and will be applied toward
5 the total permit fee if the pennit is consumnated.
....-c. Attach three (3) copies of a drawing showing the location, utent and dimensions of the work. The drawing
shall show the relation of the proposed work to eKisting surface and underground improvements. When ap-
proved by the City Engineer, said drawing becomes a part of this permit.
-'
Q.
Q.
""
F. See General Condition 5 regarding completion and acceptance of the work.
Name of Applicantð11! ~rl"'};1 Telephone: 'Z-f8 '17 z "t,
Address /<S'7D N. ~ s(. l 5W tA5é. 1$1/7-
"Name of Contractor ~L.6 I ST/I:ItjÿI../$ . /N¿;' . Telephone: £91 77 oz....-z...
Address 1$7(;> N, ~~ Sï; SW_..JøS6 ' '1>// ~ I
State Contractor License No. So~~¿> City Business License No. r L, 1/6
"NOTE: The Contractor IllUst have a current State Contractor's License and City of campbelt. Business License.
SPECI.~L PROVISIONS
...:.
,..."
-- 1, Street ;;hall not be open cut for underground installations. l1inillU!1 cuts mav :>e allO\<I~: for
connf'ctinn~ or exploration holes. Such cuts .ust be specifically ~')Provcd by the Ins'JCctor.
2. Pavement construction or restoration shall be:
Ð. As shown on plans.
~
b. histing section plus 2-inches A.C. with 4-inches A.C. on 12-inches R-78 base rock or
9-inches A.C. held as a minimum section.
c.
Note - Existing chip seals shall be replaced to conform with the surrounding pavement surface.
3. The hours of work are limited to outside the hours of 7-9 a.m. and 3-6 p.m.
(./'
4, Work to be staked by a licensed Land Surveyor or Civil Engineer and two (2) copies of the
cut sheets sent to the Publ i c Works Department before starti ng work.
z:
0
-
I-
U
.....
'"
'"
~
I-
.....
I-
.....
i
0
u
5.
NOTICE MUST BE GIVEN TO THE CITY AT LEAST 48 HOURS BEFORE BEGINNING WORK. PHONE 378-8141, ext. 220.
0
I-
>-
t:
u
Amount
Receipt No. 's
3q~
$ 25.00
$ foJ..h ¿;( w Tré
$ ;;;..00. () 0
/fJû,¿! LV
PERMIT APPLICATION FEE
BOND FOR FA ITHFUL PERFORMANCE
~+s-
.....;
CASH DEPOSIT REQUIRED
::::::e:E:o: Y::s::n:~P'.:þ~~ $
for City Engineer
7fL
'7 --2!-fi-j
Date
s signature to this permit to hold the City of Campbell, its
ess from any claim or demand for damages resulting
7- 2lJ-19t'/
Date
TO:
Acct.
3372
3370
3372
3372
3372
3372
3372
3372
3372
3372
3372
3372
3373
3373
3373
<,1'"3372 "I
3372
3521'1
3521
3521
CITY CLERK
Please collect and receipt
for the following monies:
P.W. File No.
Items
Preliminary Environmental Impt'lct Report Fee ($70.00)
Storm Drainage Area Fee per acre ($1,500 R-l;
$1,650 Multi-Res.; $1,800 all other)
Plan Examination and Construction Inspection Fee
(3-1/2% of value
Tentative Parcel Map Filing Fee ($60.00)
Tentative Tract Map Filing Fee ($120.00)
Final Parcel Map Filing Fee ($120.00)
Final Tract Map Fil ing Fee ($100.00)
Vacation of Public Streets and Easements ($270.00)
Assessment Segregation or Reapportionment ($250.00
for first plus $80.00 each additional)
Lot Line Adjustment Fee ($160.00)
Certificate of Compliance ($180.00)
Map Revisions to Map Companies ($10.00)
Copies of Engineering Maps and Plans ($0.50/SF)
Work Area Traffic Control Handbook ($2.00)
Project Plans and Specifications ($10.00)
Excavation Permit Application Fee ($25.00)
Excavation Permit Fee (3-1/2% of value)
Cash Deposit
Faithful Performance Deposit
Maintenance Bond Deposit
TOTAL
Name (l ørpLE- 't ~:}~fy'D-c. , ;;JtJ. <
Address_1610 n. + ~+ s~:IO~
)
.
FOR
CITY
CLERK
ONLY
Receipt No,
Amount Paid
Received by
,--1 'lci5 ,-"
~ ) - ~
c/cv . (..ò
('.I A:?
","7Z~
/);)cf / FI
,
Date
-
£J-2'7~
Amount
~ ~. ð ()
#~oo
$
éÀ ().. <f;; , 0 0
Phone
.;;2 8 8 - '17 .,:2::2...
q '511~
Zip
January, 1981
í
CITY OF CAMPBEll
. ~c;tV.. "/"
~----/
75 NORTH CENTRAL AVENUE
CAMPBELL, CALIFORNIA 95008
(408) 378-8141
~:' ¡- i r \
I c'j
Department:
Public Works
February 12, 1982
""'-.....
Pacific Gas & Electric Company
325 Saratoga Avenue
Los Gatos, CA 95030
Attent ion:
Mr. Dennis Tognetti
Subject:
TRACT 6854--NEW ELECTROLIER
Gentlemen:
One street I ight was recently installed on Del Loma Drive. Please
energize it and add it to the billing for Campbell Municipal Light-
ing District. It is wired for 240 volt service. The electrical
contractor was Howard Electric.
Luminaire
Locat ion
~w. H.P.S.
70
East side Del Lorna Drive, 370 feet
south of Hacienda Avenue.
If you have any questions please contact the undersigned.
Very truly yours,
Joseph Elliott
Director of Publ ic Works
by James Penoyer
Engineering Technician
JP/le
attach.
~TCTm{]\L SECTION DES IGN WORK§T-1EET
PROJECT ~V'. 4- ¿f" £" 1- DATE ~ I { - r-I
TI = 5 Y2.- Source: ~rv rr\Af'
,
R = 53 ù~;\-e.J So, \ l~Y\j;Þ\tc."""'i
AC/ROCK ALTERNATE
AC THICKNESS CALCS: GEAC = 0.0032 (TI)
Cl 2 Agg. Base R Value = 78
GEAC (, '3 , ).f GfAC (~ 2...:-_) == 1>. 17ft. thick A. C.
, ~ '-""", / CY /'
Rounding up to 2.. inches (min.3~ inches)A.C. GEAC== j ~ 70.".. g
...,
TOTAL SECTION THICKNESS CALCS: GETot
Native material R Value == >~ '
GETot'( t>. 8 3 -< ) - GEAC ( D." r /
GEAB ( D, / [ ~ ) ~ GfAB ( 1. 1
AC/ROCK ALTERNATE: "3 V2-'- II AC on
(Do not use if A.B. is less than
DEEP STRENGTH ALTEr~ATE
== 0.0032
(lOO-R)
(T I)
(lOO-~)
,
) == GEAB ( D./f'
) == O./-:J' ft. thick A.B.
~ :
~~_II Cl 2 Agg. Base
4 inches.)
--+
4
itA. C.
(Using Asphalt Concrete Thickness Guide attached.)
DEEP STRENGTH ALTERNATE:
Pod 7--Dc~iGíI
PlA:'H~:NG I-/,/....NUAL
---~-"'"'....,.,.,.,.. -"""""""""'---"'--"'~""'-'"
A¡;r, i I c>. 1 (70
~...........,""'"'...-........'-~=-v
7-604,4
TACtE 7-&04.3
Grovel rquivclcnls of Structurol Lc:¡ya1's i:1 fG«t
-'-
ASPHALT CONCn¡';TE
--_.
------- - .---
Traffic Index (TI)
r
..
..rod
1:>::1°'"
6.5
7.0
7.5
8.0
8.5 9.5 10.5 ]1.5 12.5 13.5
9.0 10.0 11.0 12.0 ]3.0 14.0
---- --
5.5
6.0
Actual
l¡'jcknciJ..~
01 layl'r
reet
Gn.vel Equiw.knl Ffl.Ctor (Gr),.¡"
2.~ 2.32 2.14 2.01 1.89 1.79 1.71 1.64 1.57 1.~~
-----. -----
0.10--.--.... 0.25 0.2..1 0.21 0.20 0.]9 O.]F; 0.17 0.10 0.]6 0.]5
0.15..._..___1 0.38 0.35 0.3~ U.~~ 0.28 0.27 V.20 0.25 0.24 0.23
0.20..------- O.~ l1.~(j 0.0 0.;0 0.38 0.3(; 0.31 0.33 0.31 0.;\0
0.25__.__---- O.~\ O.~~ O.:H O.:~ 0.47 O.<~ 0.43 0.41 0.39 0.33
. O.jo--------- 0.75 0.70 0.&4 0.&0 0.57 0.54 0.51 0_49 0.47 O.4G
0.35.....--.. 0.83 O.hl 0.7[.0..0 OJ,t; OJ.] O.C.O 0.57 0.5.5 0.5..1
0.<0__.._--_- 1.00 G.!<I O.fl} O.!'O 0..0 O.'¡~ OJ.:' O.GG O.(-::! O.Gl
(),15----_---- .----- I.(} 0.% 0.90 0.1)5 O.SI 0..7 0.74 0.71 fl.f's
0.50----_--_. ..d_- I.IG 1.07 1.01 0.95 0.9D O.SG 0.$2 0.70 O.7ô
0.5..)---.--..- -......----. 1.18 1.11 1.01 0.93 O.PI O.!,,) 0.1'0 O.,,{
O.f~-------.. ---..---'-----'--' 1.21 1.13 1.07 1.03 O.t'S 0.91 0.91
0.e.5.--_--... ------------------ 1.31 1.2:1 1.]6 1.11 1.07 1.02 0.9:'
0.70.._--..-- ----_...--_..-...------. 1.32 \.25 I.~'O 1.15 I.JlJ I. CO{.
0.'i5_--__---- .-.---..---..--..------------- 1.34 1.2-S 1.2:1 I.]f 1.1-1
O.f-O._._..-_. ....----.'"..-...---------.--- I.~:¡ 1.37 1.:\1 1.26 1.22
(I_f~...----... .----.-....-'.--------..-.-...- 1.5:-' 1.<:. 1.3() 1.:<3 I.Z¡
O.W--....."_- ----"----"----'---".'---'---"'--- 1.51 1.43 1.4\ 1.:0
O.!';'..------. --...----..-'--..---u---.-.-.------------ I.:':; 1.'.9 I.~.:
I.(")----~_..- ------...---.-------.----..---.---.....--. 1.01 1.[,7 1.~.2
I .05 - . - . . . - . - . - . . . . - . - . - - - - - - . . - . . - . - . . - - . - - - - . - - - - . - - . - - . - .. 1 . (>5 I - ..oJ
NOTI.;S: II'!'H ¡, !"tultli""", I I ";I r...l 1o:IS,'.
,..... . .
-;;-.12 ~~.~~.~~~ ~~~~ ~'-~ .'"
I g:~~ --..--------- _--d_.. -- -..-.
g:~~ .-----:::::::::::::::::::::::: ¡'
..------- ._------ --...-..
\
> G ~
I
nTH
..nd
LTB
1.2
0.42
0.4"
0.[-1
O.í/J
I O.C~j
O. 7:~
I 0.76
O_¡;¡
O.9J
0.%
. (12
l.lI';
1.]1
I . :~ II
1.:,0
Gr
Ccmcnt-tr~at.<xl
II!!..""
Al(grc-
C¡""" ^I".¡::f> r,at.e
s-.a(c 5U~
A ß hMC boo_",
----
Gr Gr G,
I'¡S
1.7 1.2 1.\ 1.0
. . -----_.
0.3,'
0.44
O.!~I
0.35
0.40
0.45
0 ~)
O. ,,5
--..--d--.--.
0.71 O.M
O.S:, o.e,~
0.(1.: O.GG
O.~,',
D.G!
J .O:~ O.ì2 O.C,', O.c.o
I. ] 1 0.7S 0.7:' 0.1;.',
1. 19 O.!'-.: 0.77 0.7.)
1. ~;~ n. rlo O.k~ O. ï;,
1.:<0 0.% 0.8S O.¡;O I)
.~:. 1.02 O. f': D.S5
1.5;1 I.(IS 0.\'" 0.\1;)
]. (,2 1.1-1 1.0" 0.9:,
I.~û 1.:>0 1 .11 I.C':I
1 . j~J 1.1(; 1. 10 1.05
----
1~. J <g~{ 4;-.
,;,r,¡,(,/. ~t»
r L)'
RESOLUTION NO.
6114
BEING A RESOLUTION APPROVING FINAL MAP OF TRACT
NO. 6854, DEL LOMA DRIVE, AUTHORIZING THE MAYOR
TO SIGN THE PROPOSED AGREEMENT
WHEREAS, there has been submitted to the City Council of the City of
Campbell a final map of Tract No. 6854, Del Lama Drive, for approval;
WHEREAS, an agreement, approved by the City Attorney as to form, which
covers certain conditions of approval of said map, has been presented;
WHEREAS, the City Engineer has certified that the map conforms to Sub-
division Map Act and City Ordinance;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Campbell that said map be and the same is hereby approved, and that any real
property offered for dedication for public use is accepted on behalf of the
public in conformity with the terms of the offer of dedication.
BE IT FURTHER RESOLVED that the t~ayor be and he is hereby authorized
to execute said agreement on behalf of the City of Campbell.
PASSED AND ADOPTED this
the following vote:
8th
day of
June
, 1 981, by
AYES: Councilmen:
NOES: Councilmen:
ABSENT: Councilmen:
Chamberlin, Podgorsek, Paul, Doetsch
None
Hammer
APPROVED:
ATTEST:
Ralph Doetsch, Sr.,
t.1ayor
Phyllis o.
Acker,
THE FORCGOING INSTRUMENT IS A TRUll
"ND caRr-ECT COpy OF THE ORIGINAlS
ON FilE IN THIS OFFICE.
"TTEST: P US Q. ~CKER. CITY CLERII
el'!"f 01' AM Ll. CAL~N~ (l
. l(~{JL~
IIY ,
Ö""\'H1 .--" .- :!,Æ'> / J / -
City Cl erk
...
Fí\L. .
ST (If)
PACIFIC
GAS
AND
ELECTRIC
COMPANY
III AL,'1ADEN 3JULEV,~RD . 3"'" JOSE, C~~r,o'J,R,'j!~ ',5193 . (~O3) 298.3333
Novemh~r 18, 1980
'RECf
. IVED
NOV?
" 1 l~
PUr--' :;ISO
IJL¡C
£NG/N£~O,?I(S
'lïNr¡
joint trench intent drawing indicating
and telephone facilities for
Del Lorna Associates
1477 De Rose Way ~243
San Jose, C^ 94026
Gentlorr.en:
Enclosed are two copies of the preliminary
the approximate location for gas, electric
tract 6854.
-
This same joint trench intent has been forwarded to Gill CATV for their review
and acknowledgement. In order to meet your construction date, the agreements
from Gill must be signed designating whether you wish to participate or not
and returned to Gill eight weeks prior to our start of construction.
This will allow Gill to return their signed intent to PGandE so that we can
proceed with the necessary engineering for your project. Å joint trench cannot
be designed by our Engineering Department until we know who the joint occupants
\á 11 be.
Firm costs and contracts will be sent to you upon approval of the engineered
gas and electric distribution systems. T~e houses shall be piped and wired to
take gas and electric service from the locations indicated on the intent.
For the past several months, the California Public Utilities Commission has been
holding public hearings on California's gas and electric companies service and
extension rules. It is expected that a decision on the revision of these rules
will be announced in the near future. Service will be provided to you with the
rules that are in effect at the time a service agreement is prepared.
Because of the necessity for energy conservation and the rising costs of all forms
of energy, please consider energy conservation measures in your plans and call
us if we may be of service to you.
If you have any questions, please feel free to call me at 298-3333, ext. 138.
Sincerely,
Arthur A. Pasquinelli
New Building Representative
cc:
~1r. \Vi 11 i am H.
Vice President
Gill Cable TV
1302 N. 4th
San Jose, CA 95112
Schneider
of Operations
City of Campbell
7S N. Central Ave.
Public ~or}:s Dept.
Street Licht Dept.
Campbell, CA 95008
WTW
Ci vil Eng.
3211 Scott Blvd, Suite'
Santa Clara, CA 95051
UNITED SOIL ENGINEERING, INC.
Soil, Foundation a1 Geological Engineers
3476 EDWARD AVENUE. SANTA CLARA, CALIFORNIA 95050 (408) 988-2990
File No. 80-405-53
August 12, 1980
. ,.
Damon Development.
1522 Haddersfield Court
San Jose, CA 95126 .
Attention:
Ms, Kathy Quinn
Subject:
Crows Nest Cluster Homes
Residential Subdivision
Campbell, California
SAMPLE TESTING lOR" VALUE
~
Dear Ms. Quinn:
Persuant to our telephone conversation, we are presenting herein the "RIO value
test.result on the material obtained from the proposed site, located on the
proposed extention of Del Lorna Drive in Campbell, California. Figure 1 is the
Site Plan.
The IIR" value test resul t of near-surface soiJ sampl e for the proposed project
is presented in Figure 2.
~ If you have any questions or require additional information, please feel free
to contact our office at your convenience.
Very truly yours,
UNITED SOIL ENGINEERING, INC.
at ~Q~!Û .
Ali Kassai T
Project Engineer
Th~ Ìì\ ~ ~~~ ~
Max M. Gahrahmat, P.E.
AK:MMG/lm
Copies: 2 to Damon Development
~~.,. .
.~
-1 ~~- ---
File No. 80-405-53
" ,.
-
U")
co
.........
>,
to
~
Q)
Q)
s-
Uo
ir?
..-
..-
to
>-
+J
VI
Q)
:3:
-c
Q) ,
VI
0
0..
0
s-
o..
" ~~
" ~~ ~
¿t-" "
"
~~ Existing
~. ~eSidence
,<',~ . . V .
"R~ - - ~Existing
S aJue . Nursery
ample
.
V.
- I
. - I
.
.
.
.
Figure 1 - Site Plan
Not to Scale
...,
'2
. United Soil E .
oamcerin¡, Inc.
Fi1e No. BO-405-S3
w . ,. -
EXUOATION PftESSURE (?S.I.)
24
8, )() 1 )06 ~O 1I¡ )O4 DO 31 to 2 )0 1 )0
RESISTANCE, R'VALUE TEST l/
/
STATE OF CAL1FORNIA /
TEST METHOD NA CAUFOANIA ;,Qt- F )'
/
V
/ .~ . ......
V " .....
/ '-
/
/ \
V
l/ ,
V
/
/
V
/
/
/
V
/
/
V
.22
w
%
~20
.
1588
...
w
:all
0
...
:14
...
...
~12
¡IO
z
:S.
~
~.
w
>
84
2
0
0 2 4 6 8 10 12 14 16 18 20 22 24 26
COVER THICKNESS BY EXPANSION PRESSURE - INCHES
SAMPLE: A
DESCRIPTION:
Brown Fine Sandy SILT with Gravel Organics
SPECIMEN A B C
EXUOATION PRESSURE (ps.l.) 224 301 441
EXPANSION DIAL LOOOI") 22 30 43
EXPANSION PRESSURE (P.s.F.) 95 130 186
RESISTANCE VALUE. "R" 40 53 66
% MOISTURE AT TEST 11.5 11.0 10.5
DRY DENSITY AT TEST (pc.F.f 123.3 125.5 126.6
",r VALUE AT 300 P. S.I. : ( 53 )
EXUDATION PRESSURE
Figure 2 - Resistance, R-Value Test
3
100
90
80
70
60
w
&0 ~
...
~
40 I
~
50
20
10
0
~
..,
.'
UNITED SOIL ENGINEERING, INC.
Soil. Foundation allli Gl"Olo~icaJ Enginet'rs
3476 EDWARD AVENUE. SANTA CLARA, CALIFORNIA 95050 (408) 988-2990
File No. 81-405~S3
March 18, 1981'.
Paul Nowack & A>sociates
127 Second Street
Los Altos, CA' 94022
Attention: Mr. Paul Nowack
"
Subject:
Crows 'Nest Cl uster Homes
Residential Subdivision
Campbell, California
PAVEMENT DESIGN
Dear Mr. Nowack:
Pursuant to your request, we are presenting herein alternate pavement
sections for Del Lorna Drive located in Campbell, California.
The following alternate sections are based on the traffic indix (T.I.)
of 4 and an uRu value of 53 for Del Lorna Drive. These alternate sections
are shown on Table I.
."
If you have any questions, please feel free to contact our office at
your convenience.
Very truly yours,
UNITED SOIL ENGINEERING, INC.
Ì"v\~ ~ ~~ ~ cJt
Max M. Gahrahmat, P. E. .I L
MMG:cm
Copies: 2 to Paul Nowack & Associates
~,~~~,~~~ ~
! .: 1 J ;:J() ¡
PAUL E NOWACK & AS~""
- .. VIJIJ
. . .
-,t!",
~ File No. 81-405-53
TABLE I
Proposed Alternate Pavement Sections
Location Del Lorna Drive
Design "R" Value 53
Tra ffi c Index. 4
.'
Gravel Equiv~lent 7~
Recommended Alternate
Pavement Sections: A B ~
P.M.S. (asphalt) 2 4
Class III Baserock, R=70
min. compacted to a
minimum 95% relative
compaction 4
Native Soil compacted
to 90% relative
compact; on 8 8
2
United Soil Engineering. Inc.
.1 r
8fi
I
9
- - -,~-..,.T-. ---"" ~- -"--W-"""'-""-~-""'~'
10
"","'pv,-.--
.....,- --":"""~...
.,- r-------
co, ..,.<~-~-~-
6
7
---..,.,...~e-
~ U 3 L
5
4
E
~~
..~
. fD
/'
(,"
e9
l-
of°v
t
qo'
D
r PRELIMINARY INTENT
i .£TURN 10 P G ~ E.
\ ¡C)CO N. BL"-,'I ~';E.
CU?Œ:,::O. C;U,J;,IA
I Po T.4T.(!-þ..A~.011!-E.)
PHONE CO. BY
, C;.TE
S .,). 1.<.1. 1./.
WATER CO. BY
DATE
G,ILL.
. CABLE T_V. BY
I .. DATE
~
ç,
~~
<
~ <0
"?,..
'\. ~~
~
'-
~.
>
/
--
PR£LIM/NA¡t(}I' fH7¡;¡NT
c
þ(;; f' € 70 TIf:~NcH , B14<:I<J'IJ.J
JOINT TlI't'}/CII- GAS,.!::J. E'C'T.. PliO""", TV
LE'6éNÚ
-ê:- .:¿é:CT~/C TRi:/'/Cjf
-5,- Sr. L.. T. C()ND"',CTt:J~ BI'OTflétrs
0 1-:3".x2.y"SP.LICE"ßo/C
fi] , /7";/ 30" SPJ..IC~ ÆOK
fJ] JI{)< 3," SI'.J.IC?t.. BOJ<
----EXIST ar"S
- - - - PR.. Dþ 6- A ß 5?
.." 1 ~""'I\A ~scc.. 2ì'1-20
y-I...V"I , "--
B
'"
A
~
tv
GM
sUPV,
[)S.GN.
CYNN-
CHKD,
~
DÃTE
SCAl£S ,
/". :I,
-=:>éJ. LC)/-/4 D-'?,
CA/'1P8EI.L INC.
- ~
TR,4(T G8SLf
--
I
i
~
"
-..'
MICROflL'I
BIll Of' MATL
~LIST
SUPSDS
~
SHEET NO,
1:1. G-¡i' 7t){,
NIl' DATI
GMISKcl""",C>OO>.I--1 or«J.rrr 1100.1 C<Tt
DfSaIIf'TJON IGaIJ...cIDOOf<ICHKD.lsurw,llhO.rrr
REVISIONS
-SANTA CJ.AI'IÁ CO,
PACIFIC GAS AND ELECTRIC COMPANY
SA" YRANCISCO. CALIFORNIA
DfSaI""""
REVISIONS
----'_-"_~"M- '-N
-..--...-.
¡I
¡I
¡I
SHEETS.J- %
m-~
l I Joe I - ¡