Loading...
Pre-App - 2003Community Development Department November 17,2003 Mr, Mark Hersey, Director San Francisco School of Bartending 760 Market Street, Suite 833 San Francisco, CA 94102 Re: Preliminary Application Comments PRE2003-S7 1701 S. Bascom A venue San Francisco School of Bartending Dear Mr. Hersey, Thank you for your submittal of a preliminary application for the establishment of a bartending school within an existing office building on the referenced property. The referenced property is zoned P-D (Planned Development) Zoning District with a mixed land use designation of Commercial/Professional Office/Residential on the General Plan. The establishment of a new use in a P-D (Planned Development) Zoning District requires approval of a Conditional Use Permit. Your proposed use is considered to be similar to a commercial school which is a permitted use in the C-2-S (General Commercial) Zoning District, subject to approval of a Conditional Use Permit. In reviewing a Conditional Use Permit application, planning staff and the Planning Commission will evaluate such items as traffic generation, noise, hours of operation, adequacy of parking, circulation and overall compatibility of the use with adjoining properties. An application has been enclosed for your consideration. The processing time for such an application is 45 to 60 days. Please do not hesitate to contact me at timh@citvofcampbel1.com or (408) 866-2144 to schedule a meeting to discuss these comments or the application process. z~ Tim J. Haley Associate Planner End: Building Division Preliminary Comments, 11/11/2003 cc: Bascom Financial Center, LLC, P.O. Box 2400, Saratoga, CA 95070 Geoff Bradley, Senior Planner 70 North First Street. Campbell, California 95008-1436 . TEL 408.866.2140 . FAX 408.871.5140 . TDD 408.866.2790 CITY OF CAMPBELL BUILDING INSPECTION DMSION - COMMENTS TO THE DEVELOPMENT REVIEW COMMITTEE DRC: November 11,2003 ADDRESS: 1701 S. Bascom Ave. Project Application: PRE-2003-00057 RECOMMENDATION: Note: No building code issue has been reviewed at Development Review Committee; it will be reviewed in the Building Permit process. Please be aware that building codes are changing constantly; plans submitted for building permit shall comply with the code in effect at that time, Submit permit application together with required documents to the Building Inspection Division to obtain a building permit. No construction can be commenced without an appropriate building permit. It is recommended that this item be forwarded to the Planning Commission for review, with the following conditions. TO THE SA TISF ACTION OF THE BUILDING DIVISION MANAGER/BUILDING OFFICIAL: 1. PERMITS REQUIRED: A building permit application shall be required for any proposed modifications to the (e) structure. The building permit shall include Electrical/PlumbinglMechanical fees when such work is part of the permit. 2. CONSTRUCTION PLANS: The conditions of Approval shall be stated in full on the cover sheet of construction plans submitted for building permit. 3. SIZE OF PLANS: The minimum size of construction plans submitted for building permits shall be 24 in. X 36 in. 4. PLAN PREP ARA nON: This project requires plans prepared under the direction and oversight of a California licensed Engineer or Architect. Plans submitted for building permits shall be' "wet stamped" and signed by the qualifying professional person. 5. SITE PLAN: Application for building permit shall include a competent site plan that identifies property and proposed structures with dimensions and elevations as appropriate. Site plan shall also include site drainage details. Site address and parcel numbers shall also be clearly called out. Site parking and path of travel to public sidewalks shall be detailed. 6. TITLE 24 ENERGY COMPLIANCE: California Title 24 Energy Standards Compliance forms shall be blue-lined on the construction plans. Compliance with the Standards shall be demonstrated for conditioning of the building envelope and lighting of the building. J:\Building ORC Comments\170lsbascomave.doc 7. 8. 9. SPECIAL INSPECTIONS: When a special inspection is required by U.B.C. Section 1701, the architect or engineer of record shall prepare an inspection program that shall be submitted to the Building Official for approval prior to issuance of the building permits, in accordance with U.B.C Section 106.3.5. Please obtain City of Campbell, Special Inspection forms from the Building Inspection Division Counter. The City of Campbell, standard Santa Clara Valley Non-point Source Pollution Control Program specification sheet shall be part of plan submittal. The specification sheet (size 24" X 36") is available at the Building Division service counter. TITLE 24 ACCESSIBILITY - COMMERCIAL: On site general path of travel shall comply with the latest California Title 24 Accessibility Standards. Work shall include but not be limited to accessibility to building entrances from parking facilities and sidewalks. 10. TITLE 24 ACCESSffiILITY - COMMERCIAL: Projects seeking to use the Title 24 Hardship exemption clause shall blue-line completed, City of Campbell "20%" exemption form on submitted construction plans. Form is available at Building Division service counter. 11. APPROV ALS REQUIRED: The project requires the following agency approval prior to issuance of the building permit: a. West Valley Sanitation District b. Santa Clara County Fire Department c. Santa Clara County Department of Environmental Health 12. P.G.& E.: Applicant is advised to contact Pacific Gas and Electric Company as early as possible in the approval process. Service installations, changes and/or relocations may require substantial scheduling time and can cause significant delays in the approval process. Applicant should also consult with P.G. and E. concerning utility easements, distribution pole locations and required conductor clearances. J:\Building ORC Comments\1701sbascomave.doc Nov 07 2003 10:32AM 415-3¡:::<-1115 SFSCH Prepared for: Tim Haley Associate Planner Community Development Dept. Fax: 408-871-5140 The proposed use for 1701 S. Bascom Ave. is a satellite campus of the San Francisco School of Bartending est. Aug of2001. This 1,667 square foot facility will provide hands on training for workers in the beverage service industry. This space wilt accommodate approximately the same number of students, as would an office of similar size. We predict that the occupancy of this school at any given time will not exceed ten people including the two employees ofllie extension. The amount of parking provided by Bascom Financial LLC will easily accommodate our staff and students needs. No structural modifications to tbe property will be necessary. AU liquids used on premises are non-toxic "colored water" mixtures made to simulate the alcohols and juices used in the preparation of real cocktails. There will be no alcohol consumed in connection with this business. Hours of Operation: 11:00 am until 1 0:00pm M-F, Sat & Sun II :OOam until 5:00pm Adjacent uses are: Fidelity National Title Co. Health Connection American Cancer Society Dance Spectrum Dance Studio tv1¡;;' ( /Í-'-r,t.- I~ Ø"d 1rrl1 /V (j( .f) (It¡¡till~- ç cJV 6fc u {!vv-r i ~þ:>, k 1f¡::J;ltl~ rv C tft~)/Iþ p. 1