Loading...
Pre-Application - 2000 MEMORANDUM CITY OF CAMPBELL PUBLIC WORKS DEPARTMENT TO: Tim Haley, Project Planner DATE: 8/16/2000 Bill Helms, Land Development Manager ~/ Harold Housley, Land Development Engine~ Site Address: 290 W. Rincon Avenue For File No(s): PRE 2000-00054 (PD) Project Description: Eleven unit townhouse development Applicant: Jon Nelson & Associates FROM: PUBLIC WORKS DEPARTMENT PRELIMINARY CONDITIONS OF APPROVAL (REVISED*) Tentative Map: The applicant shall submit a Tentative Map for review by the City. The current application processing fee is $3,510.00. Final Map: Prior to issuance of any grading or building permits for the project, the applicant shall submit a Final Map for review by the City and recordation, upon approval by the City Council. The current plan check fee is $1,510.00 plus $25 per lot. Preliminary Title Report: Prior to recordation of the Tract Map, the applicant shall provide a current Preliminary Title Report. Easements: Prior to recordation of the Final Map, the applicant shall cause Easements to be recorded for private utilities, private storm drains, reciprocal ingress and egress, etc. Monumentation for Final Map: Prior to recordation of the Final Map, the applicant shall provide security guaranteeing the cost of setting all Monuments shown on the map, as determined by the City Engineer. Street Improvements: Prior to recordation of the Final Map, the applicant shall execute a street improvement agreement and shall cause plans for public Street Improvements to be prepared by a registered civil engineer, pay fees, post security and provide insurance necessary to obtain an encroachment permit for construction of the standard public street improvements, as required by the City Engineer. The fee for a non-utility encroachment permit is $245.00. The fee for a minor non-utility encroachment permit is $50.00. The plans shall include the following: . Removal of existing driveway approach including curb, gutter, and sidewalk. . Removal of the existing sidewalk and curb/gutter, as necessary, based upon an inspection by the City. . The existing tree in the public right-of-way must be protected pursuant to the requirements of a qualified arborist. . Construction of new detached curb/gutter, and sidewalk. Page 1 of 3 Site Address: 290 W. Rincon Avenue For File No(s): PRE 2000-00054 (PD) Project Description: Eleven unit townhouse development Applicant: Jon Nelson & Associates PUBLIC WORKS DEPARTMENT PRELIMINARY CONDITIONS OF APPROVAL * . Installation of surface treatment or reconstruction of one-half street pavement section as determined by City Engineer based on field testing of existing pavement. . Construction of street trees and irrigation at 40 feet on center. . Construction of new ADA compliant driveway approach. . Installation of signs and stripes, as necessary. . Relocation or removal of "bus" bench as determined by the City. . Relocation and protection of utilities as necessary. . Construction of conforms to existing public and private improvements as necessary. NOTE: See site plan on pg. 3 regarding driveway approach. Water Meter(s) and Sewer Cleanout(s): Existing and proposed Water Meter(s) and Sewer Cleanout(s) shall be installed on private property behind the public right-of-way line. Utilities: All new on-site Utilities shall be installed underground per Section 20.36.150 of the Campbell Municipal Code for any new or remodeled buildings or additions. Applicant shall comply with all plan submittals, permitting, and fee requirements of the serving utility companies. Utility Installation Plan: Prior to issuance of building permits for the site, the applicant shall submit a Utility Installation Coordination Plan and Schedule for approval by the City Engineer for installation of street improvements and/or abandonment of all utilities. Streets which have been resurfaced within the previous 5 years will require boring and jacking for all new utility installations. Applicant shall also prepare pavement restoration plans for approval by the City Engineer prior to any utility installation or abandonment. Grading and Drainage Plan: Prior to issuance of any grading or building permits for the site, the applicant shall conduct hydrology studies based on a 10 year storm frequency, prepare an engineered Grading and Drainage Plan, and pay fees required to obtain necessary grading permits. The plans shall comply with the 1998 edition of the California Business Code including Chapters 10, 11, 18, 33, and Appendix Chapter 33. Storm Drain Area Fee: Prior to issuance of any grading or building permits for the site, the applicant shall pay the required Storm Drain Area fee which is $2,050 based on $2,250 per acre. Page 2 of 3 Site Address: 290 W. Rincon Avenue For File No(s): PRE 2000-00054 (PD) Project Description: Eleven unit townhouse development Applicant: Jon Nelson & Associates PUBLIC WORKS DEPARTMENT PRELIMINARY CONDITIONS OF APPROVAL Storm Water Pollution Prevention Measures: Prior to issuance of any grading or building permits, the applicant shall comply with the National Pollution Discharge Elimination System (NPDES) permitting requirements and the California Storm Water Best Management Practices handbook prepared by the Storm Water Quality Task Force, Santa Clara Valley Water District and the City of Campbell Municipal Code regarding Storm Water Pollution Prevention. Demolition: Prior to recording of the Final Map the applicant shall obtain a Demolition permit to remove any nonconforming structures. Site Plan: Upon submittal of a formal application, the developer shall provide a complete and accurate Site Plan in accordance with the Planning Division's checklist. The proposed driveway approach may have to be relocated to protect the existing tree. j: \landdev\290rinc Page 3 of 3 FIRE D EP ARTMENT SANTA CLARA COUNTY CONTROL NUMBER 14700 Winchester Blvd., Los Gatos, CA 95032-1818 (408) 378-4010 (phone) . (408) 378-9342 (fax) BLOG PERMIT NUMBER PLANREVIEWNUMBER 00- 1871 FILE NUMBER ~_RÉ. 2000-54 D EVELO PMENT REVIEW COMMENTS CODE/SEC. I SHEET fl REQUIREMENT Pre-application review of a proposed Planned Development Permit to allow the development of eleven new townhomes. UFC Appendix III-A UFC 901.4.2 UFC 903.2 1 Review of this Developmental proposal is limited to acceptability of site access and water supply as they pertain to fire department operations, and shall not be construed as a substitute for formal plan review to determine compliance with adopted model codes. Prior to performing any work the applicant shall make application to, and receive from, the Building Department all applicable construction permits. 2 Required Fire Flow: The required fire flow for this project is 1,000 gpm at 20 psi residual pressure. The required fire flow is available from area water mains and fire hydrant(s) which are spaced at the required spacing. 3 Fire Lane Marking Required: Provide marking for all roadways within the project. Markings shall be per fire department specifications. Installations shall also conform to Local Government Standards and Fire Department Standard Details and Specifications A-6. 4 Required Access to Water Supply (Hydrants): Portions of the structure(s) are greater than 150 feet of travel distance from the centerline of the roadway containing public fire hydrants. Provide an on-site fire hydrant OR provide an approved fire sprinkler system throughout all portions of the building. City PLANS SPECS NEW RMDL AS OCCUPANCY CONST. TYPE I PERMITTEE DATE I PAGE 0 0 0 0 0 JOHN NELSON & ASSOCIATES 7/27/2000 --1- OF ~ SECJFLOOR JAREA LOAD DESCRIPTION BY Residential Development Hokanson, Wayne NAME OF PROJECT I LOCATION 290 Rincon A v, W A California Fire Protection District serving Santa Clara County and the communities of Campbell, Cupertino, Los Altos, Los Altos Hills, Los Gatos, Monte Sereno, Morgan Hill, and Saratoga FIRE D EP ARTMENT SANTA CLARA COUNTY CONTROL NUMBER 14700 Winchester Blvd., Los Gatos, CA 95032-1818 (408) 378-4010 (phone) . (408) 378-9342 (fax) BLOG PERMIT NUMBER PLAN REVIEW NUMBER 00- 1871 FILE NUMBER ~~É. 2000-54 DEVELOPMENT REVIEW COMMENTS CODE/SEC. I SHEET PI REQUIREMENT 5 Timing of Required Roadway Installations: Required access roads, up through first lift of asphalt, shall be installed and accepted by the Fire Department prior to the start of construction. Bulk combustible materials shall not be delivered to the site until installation is complete. During construction, emergency access roads shall be maintained clear and unimpeded. Note that building permit issuance may be withheld until installations are completed. 6 Premises Identification: Approved numbers or addresses shall be placed on all new and existing buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Numbers shall contrast with their background. UFC 901.3 UFC 901.4.4 Prior to building permit application, the applicant shall indicate how item #4 above will be mitigated ie; on-site fire hydrant or fire sprinklers being installed. City PLANS SPECS NEW RMDL AS OCCUPANCY CONST. TYPE PERMITTEE DATE PAGE 0 0 0 0 0 JOHN NELSON & ASSOCIATES 7/27 /2000 ~ OF ~ BY SECJFLOOR AREA LOAD DESCRIPTION NAME OF PROJECT Residential Development I ~O:;TlON Rincon A v, W Hokanson, Wayne A California Fire Protection District serving Santa Clara County and the communities of Campbell, Cupertino, Los Altos, Los Altos Hills, Los Gatos, Monte Sereno, Morgan Hill, and Saratoga