Loading...
Pre-Application - 2000 MEMORANDUM CITY OF CAMPBELL PUBLIC WORKS DEPARTMENT TO: Tim J. Haley, Project Planner DATE: Bill Helms, Land Development Manager 1 ~ Harold Housley, Land Development EngineerM~ - May 5, 2000 FROM: Site Address: For File No(s): Project Description: Applicant: 1760 Whitwood Lane and Various Others PRE 2000-30 (ZC/PD/Ts) Redevelopment of Kirkwood Village Apartments Banducci Associates/Kirkorian Developments RE CEGVED HAY 0 S 2000 CITY OF C Pl.ANNIN~~~~:L PUBLIC WORKS DEPARTMENT COMMENTS AND PRELIMINARY CONDITIONS OF APPROV AL . It is not clear if the applicant intends to record subdivision maps. . The applicant should prepare a master plan showing the proposed phasing. Tentative Parcel Maps: The applicant shall submit Tentative Parcel Maps for review by the City for all projects of 4 lots or less. The current application processing fee is $2,257.50 per map. Parcel Map: Prior to issuance of any building permits for the project, the applicant shall submit Final Parcel Maps for recordation upon approval by the City. The current plan check fee is $1,125.00 plus $25 per parcel. Tentative Map: The applicant shall submit Tentative Tract Maps for review by the City for all projects of 5 lots or more. The current application processing fee is $3,375.00. Final Tract Maps: Prior to issuance of any grading or building permits for all projects, the applicant shall submit Final Maps for review by the City and recordation, upon approval by the City Council. The current plan check fee is $1,450.00 plus $25 per lot. Preliminary Title Report: Prior to recordation of maps, the applicant shall provide a current Preliminary Title Report for the project. Public Easements: Upon recordation of the Parcel Maps/Final Maps, the applicant shall grant new easements as necessary for the project and vacate easements that are no longer needed. The applicant shall cause all documents to be prepared by a registered civil engineer/land surveyor, as necessary, for the City's review and recordation. .. Private Easéments: !?rior to issuance of any grading or building permits for the site or recordation of the Parcel Maps/Final Maps, the applicant shall cause Easements to be recorded for private utilities, private storm drains, reciprocal ingress and egress, etc. Page 1 of 3 Site Address: For File No(s): Project Description: Applicant: 1760 Whitwood Lane and Various Others PRE 2000-30 (ZC/PD/Ts) Redevelopment of Kirkwood Village Apartments Banducci Associates/Kirkorian Developments Monumentation for Final Maps and Parcel Maps: Prior to recordation of the Maps, the applicant shall provide security guaranteeing the cost of setting all Monuments shown on the map, as determined by the City Engineer. Street Improvements: Prior to issuance of any grading or building permits for the site or recordation of the Parcel Maps/Final Maps, the applicant shall execute a street improvement agreement and shall cause plans for public Street Improvements to be prepared by a registered civil engineer, pay fees, post security and provide insurance necessary to obtain an encroachment permit for construction of the public improvements, as required by the City Engineer. Examples of proposed improvements include: . Removal of existing driveway approaches, as necessary, and construction of new ADA compliant approaches. . Removal of existing pedestrian handicap ramps and construction of new ADA compliant pedestrian ramps. . Removal of existing curb, gutter and sidewalk, as necessary, and construction of new curb, gutter and sidewalk. . Construction of new tree wells with irrigation, as necessary, and installation of street trees. . Construction of traffic control signs and stripes, as necessary. . Conversion of existing overhead public street light power service from the rear of lots to new underground service from the street public right-of-way, including pull boxes, conductors, conduits, and related improvements. . Installation of existing and proposed water meter(s) and sewer cleanout(s) behind the public right-of-way line. . Installation of AC pavement overlay depending on scope of utility work and related street damage. Soils Report: Prior to issuance of any grading or building permits for the site, applicant shall provide a Soils Report prepared by a registered geotechnical or civil engineer. Traffic Mitigation: Prior to issuance of any grading or building permits for the site or recordation of the Parcel Map/Final Map), the applicant shall satisfy Traffic Mitigation measures, as determined by the City. Utilities: All new on-site Utilities shall be installed underground per Section 20.36.150 of the Campbell Municipal Code for any new or remodeled buildings or additions. Applicant shall comply with all plan submittals, permitting, and fee requirements of the serving utility companies. Page 2 of 3 Site Address: For File No(s): Project Description: Applicant: 1760 Whitwood Lane and Various Others PRE 2000-30 (ZC/PD/Ts) Redevelopment of Kirkwood Village Apartments Banducci Associates/Kirkorian Developments Utility Installation Plan: Prior to issuance of building permits for the site, the applicant shall submit a Utility Installation Coordination Plan and Schedule for approval by the City Engineer for installation of street improvements and/or abandonment of all utilities. Streets which have been resurfaced within the previous 5 years will require boring and jacking for all new utility installations. Applicant shall also prepare pavement restoration plans for approval by the City Engineer prior to any utility installation or abandonment. Grading and Drainage Plan: Prior to issuance of any grading or building permits for the site, the applicant shall conduct hydrology studies based on a 10 year storm frequency, prepare an engineered Grading and Drainage Plan, and pay fees required to obtain necessary grading permits. The plans shall comply with the 1997 edition of the UBC including Chapters 18, 33, and Appendix Chapter 33. Storm Drain Area Fee: Prior to issuance of any grading or building permits for the site or recordation of the Parcel Maps/Final Maps, the applicant shall pay Storm Drain Area fees which are $ 2000 per acre unless previously paid. Storm Water Pollution Prevention Measures: Prior to issuance of any grading or building permits, the applicant shall comply with the National Pollution Discharge Elimination System (NPDES) permitting requirements and the California Storm Water Best Management Practices handbook prepared by the Storm Water Quality Task Force, Santa Clara Valley Water District and the City of Campbell Municipal Code regarding Storm Water Pollution Prevention. Covenants. Conditions. and Restrictions: CC&Rs for review by the City. Prior to recordation, provide copies of Demolition: Prior to recording the Final Maps/Parcel Maps the applicant shall obtain a Demolition permit to remove non-conforming structures. Site Plan: The applicant shall submit a complete and accurate Site Plan in accordance with the Planning Division's check list. H: \landdev\ 17 6Owhitwood( mp) Page 3 of 3 CITY OF CAMPBELL BUILDING INSPECTION DIVISION - COMMENTS TO THE DEVELOPMENT REVIEW COMMITTEE DRC: May 1, 2000 ADDRESS: 1760 Whitwood Lane Project Application: PRE-2000-00030(ZC/PDITS) RECOMMENDATION: Note: No building code issue has been reviewed at Development Review Committee; it will be reviewed in the Building Permit process. Please be aware that building codes are changing constantly; plans submitted for building permit shall comply with the code in effect at that time. Submit permit application together with required documents to the Building Inspection Division to obtain a building permit. No construction can be commenced without an appropriate building permit. It is recommended that this item be forwarded to the Planning Commission for Approval, with the following conditions. TO THE SATISFACTION OF THE BUILDING DIVISION MANAGER/BUILDING OFFICIAL: 1. PERMITS REQUIRED: A building permit application shall be required for each proposed detached structure. The building permit shall include Electrical/Plumbing/Mechanical fees when such work is part of the permit. 2. CONSTRUCTION PLANS: The conditions of Approval shall be stated in full on the cover sheet of construction plans submitted for building permit. 3. SIZE OF PLANS: The maximum size of construction plans submitted for building permits shall be 24 in. X 36 in. 4. SOILS REPORT: Two copies ofa current soils report, prepared to the satisfaction of the Building Official, containing foundation and retaining wall design recommendations shall be submitted with the building permit application. This report shall be prepared by a licensed civil engineer specializing in soils mechanics. 5. SITE PLAN: Application for building permit shall include a competent site plan that identifies property and proposed structures with dimensions and elevations as appropriate. Site plan shall also include site drainage details. 6. FOUNDATION INSPECTIONS: A pad certificate prepared by a licensed civil engineer or land surveyor shall be submitted to the project building inspector upon foundation inspection. This certificate shall certify compliance with the recommendations as specified in the soils report and the building pad elevation and on-site retaining wall locations and elevations are prepared according to approved plans. Horizontal and vertical controls shall be set and certified by a licensed surveyor or registered civil engineer for the following items: a. pad elevation b. finish floor elevation (first floor) c. foundation corner locations 7. TITLE 24 ENERGY COMPLIANCE: California Title 24 Energy Compliance forms CF-IR and MF-IR shall be blue-lined on the construction plans. 8. SPECIAL INSPECTIONS: When a special inspection is required by U.R C. Section 1701, the architect or engineer of record shall prepare an inspection program that shall be submitted to the Building Official for approval prior to issuance of the building permits, in accordance with U.B.C Section 106.3.5. Please obtain City of Campbell, Special Inspection forms fÌ'om the Building Inspection Division Counter. 9. The City of Campbell, standard Santa Clara Valley Non-point Source Pollution Control Program specification sheet shall be part of plan submittal. The specification sheet (size 24" X 36") is available at the Building Division service counter. 10. APPROV ALS REQUIRED: The project requires the following agency approval prior to issuance of the building permit: c. West Valley Sanitation District (378-2407) Santa Clara County Fire Department (378-4010) School District: i) Campbell Union School District (378-3405) ii) Campbell Union High School District (371-0960) iii) Moreland School District (379-1370) iv) Cambrian School District (377-2103) a. b. Note: To Determine your district, contact the offices identified above. Obtain the School District payment form fÌ'om the City Building Division, after the Division has approved the building permit application. C:\My Documents\DRC - COMMENTS\1760whitwoodln_doc FIRE D EP ARTMENT SANTA CLARA COUNTY CONTROL NUMBER 14700 Winchester Blvd., Los Gatos, CA 95032-1818 (408) 378-4010 (phone) . (408) 378-9342 (fax) BLDG PERMIT NUMBER PLAN REVIEW NUMBER 00- 0887 FILE NUMBER PRE 2000-30 DEVELOPMENT REVIEW COMMENTS CODE/SEC. I SHEET n REQUIREMENT Pre-application review of a proposed zone change from R-2-S to PD, a Planned Development Permit and a Tentative Subdivision Map to redevelop the existing Kirkwood Village Apartments from 183 apartments to 188 apartments. UFC 903.2 1 Review of this Developmental proposal is limited to acceptability of site access and water supply as they pertain to fire department operations, and shall not be construed as a substitute for formal plan review to determine compliance with adopted model codes. Prior to performing any work the applicant shall make application to, and receive from, the Building Department all applicable construction permits. 2 Automatic Fire Sprinkler System Required: Buildings requiring a fire flow in excess of 2,000 GPM, or in excess of two stories or 35 feet in height, shall be equipped throughout with an automatic fire sprinkler system, hydraulically designed per National Fire Protection Association (NFP A) Standard #13. * see additional additional underground fire service comment * Note specifically the new three story units. 3 A copy of the fire department "approved" underground fire service drawings shall be provided to the appropriate water company for record purposes, prior to installation. To prevent engineering delays, the underground contractor shall submit to the fire department 3 sets of shop drawings designed per NFP A Std. 24, a completed permit application, and applicable fee's for review and approval ASAP. 4 Private On Site Fire Service Mains and/or Hydrants: Installation of private fire service mains and/or fire hydrants shall conform to National Fire Protection Association (NFP A) Standard #24, and Fire Department Standard Details and Specification W-2. A Separate installation permit from this department is required. UFC 1003.2.2 as amended by CMC 17.04.040 City PLANS SPECS NEW RMDL AS OCCUPANCY CONST. TYPE PERMITTEE DATE PAGE CBL 0 0 0 0 0 BANDUCCI ASSOCIATES 4/24/2000 ~OF~ SECJFLOOR I AREA LOAD DESCRIPTION BY Residential Development Iiokanson, VVayne NAME OF PROJECT LOCATION KIRKVVOOD VILLAGE 1760 VVhitwood Ln A California Fire Protection District seruing Santa Clara County and the communities of Campbell. Cupertino. Los Altos. Los Altos Hills. Los Gatos, Monte Sereno. Morgan Hill, and Saratoga FIRE D EP ARTMENT SANTA CLARA COUNTY CONTROL NUMBER 14700 Winchester Blvd., Los Gatos, CA 95032-1818 (408) 378-4010 (phone) . (408) 378-9342 (fax) BLDG PERMIT NUMBER PLAN REVIEW NUMBER 00- 0887 FILE NUMBER PRE 2000-30 DEVELOPMENT REVIEW COMMENTS CODE/SEC. I SHEET n REQUIREMENT 5 Fire Apparatus <Engine) Access Roads Required: Provide access roadways with a paved all weather surface, a minimum unobstructed width of 20 feet, vertical clearance of 13 feet 6 inches, minimum circulating turning radius of 36 feet outside and 23 feet inside, and a maximum slope of 15%. Installations shall conform with Fire Department Standard Details and Specifications sheet A-I. UFC 902.2.2 It is noted that "grass crete" is proposed at certain locations within the project. It is suggested that the applicant meet with the fire department representative to discuss the actual proposed locations of such installations. 6 At next level of submittal, the applicant is requested to submit an area calculation per proposed building to assist in fire flow assessment. City PLANS SPECS NEW RMDL AS OCCUPANCY CON ST. TYPE PERMITTEE DATE PAGE CBL 0 0 000 BANDUCCI ASSOCIATES 4/24/2000 ~ OF~ BY SECJFLOOR AREA LOAD DESCRIPTION NAME OF PROJECT Residential Development lOCATION Hokanson, Wayne KIRKWOOD VILLAGE 1760 Whitwood Ln A California Fire Protection District serving Santa Clara County and the communities of Campbell. Cupertino. Los Altos. Los Altos Hills, Los Gatos. Monte Sereno, Morgan Hill, and Saratoga 12 April 2000 Job No- 9912 Mr. Tim Haley City of Compbell Planning Department Address Campbell, (A, (j) LJ.J t- <x: Iltc~ 4pq 1 7&reD C/lyO 2 1000 Þ I.A. 'f: C ~1V/IV~PlJ~l D/Ipl: I.. . RE: Kirkwood Village Apartments Pre-Application Submittal 0 z: <x: Tim: The following is a written description of the project per the City of Campbell Submittal Requirements. 1. Proposed Use: The proposed use is two- and three-bedroom apartment units. This is comparable to the existing land use. The proposed development includes 188 units. The existing land houses 183 apartment units. 2. Square footoge:: The exact square footage has not been determined. 3. Number of Employees: As this is not a commercial development, there will not be full-time employees on the site. 4. Hours of operation: Not applicable. 5. Adiacent uses: Residential, except where adjacent to Kirkwood Plaza shopping center. Enclosed are 6 copies of the overall site plan, as well as typical floor plans and elevations. We will appreciate your review and comments. If you have any questions or require additional information, please do not hesitate to contact me. Sincerely, BANDUCCI ASSOCIATES ARCHITEGS, INC ey Steye Krong Project Architect ~ c: John Kirkorian Z:\9912 Kirkwood Villoge\Documents\letters\O4-12-00 letter to city plonning.doc en f- "'" 18 February 2000 u = en en "'" Job No. 9912 Mr. Tim Holey City of Compbell Plonning Deportment Address Compbell, CA, u u ::::> 0 = "'" cc RE: Kirkwood Villoge Aportments Response to Plonning Deportment Comments Tim: The following is our response to the comments made in 0 meeting thot included you, Sharon Fiero ond Dove BonducCÎ on 08/16/99. I hove ottoched 0 copy of the meeting memorondum. 1. Building / street connection: The inward orientotion to outo courts hos been mitigoted on the mojor street frontoges by providing porches ond garoge fronting those streets. Pleose note thot the outo court arrongement is the only feosible woy to provide upgroded living units on most of these properties. As Bucknoll Rood often hos foirly heovy troffic, we hove minimized the number of drivewoys onto Bucknoll for troffjc sofety. The auto court arrongement limits the number of drivewoy occess points, ond ollows vehicles pulling onto Bucknoll to enter forward rother thon bocking onto the street. 2. Three story buildings: Severo I modificotions hove been mode to the overoll development pion thot reduces the visual scole of the 3-story areo. The area north of Whitwood lone thot contoined 3-story buildings in the previous submittol hos been completely revised; the 3-story buildings hove been reploced with 2-story units. The site pion for the remoining areo of 3-story buildings hos been reconfjgured to reduce the overoll moss of the 3-story complex ond to provide parking closer to the units; pleose refer to the revised site pion provided. The design of the 3-story buildings hos been modified with increosed orticulotion. 48 covered parking stolls are provided for the 48 units. Poge 1 of 2 Tim Holey Poge 2 of 2 21 January 2000 3. Alternate layauts; roofinq material: We have reviewed alternate layouts per Sharon's request. Based upon the property line configurotions, no other layout is feasible. At your suggestion, we have also investigated the possibility of designing the project with a variety of roofing materials- We believe that some subtle variation of color within the selected line of asphalt shingle roofing might help distinguish between buildings and add visual interest. We believe that introducing a completely different roofing material would compromise the overall design of the development. Comments 4-6 did not include design issues. Enclosed are revised plans and elevations. We will appreciate your review and comments. If you have any questions or require additional information, please do nat hesitate to contact me. Sincerely, BANDUCCI ASSOCIATES ARCHITEGS, INc. ~ Steve Krong Project Architect