HomeMy WebLinkAboutCC Resolution 13341 - Approving Improvements for the John D. Morgan Park Parking Lot Improvements Project No. 23-DDRESOLUTION NO. 13341 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CAMPBELL TO ACCEPT THE IMPROVEMENTS FOR THE JOHN D. MORGAN PARKING LOT IMPROVEMENTS PROJECT NO. 23-DD AND DIRECT THE CITY ENGINEER TO FILE THE NOTICE OF COMPLETION WHEREAS, the City Council adopted Resolution No. 13212 approving the plans and specifications, and authorizing the advertisement of bids for the John D. Morgan Parking Lot Improvements Project No. 23-DD; and WHEREAS, on November 4, 2024, the City received and opened two bid proposals from Silicon Valley Paving, Inc. of San Jose and QA Constructors, Inc. of San Francisco with base bid amounts of $156,800 and $246,292, respectively; and WHEREAS, the low bid amount of $156,800 was $600 over the authorized construction contract amount of $156,200; and WHEREAS, on November 19, 2024, the City Council adopted Resolution No. 13229 authorizing an increased amount in the construction contract to Silicon Valley Paving, Inc.; and WHEREAS, the City awarded the project to Silicon Valley Paving, Inc. with construction contract fully executed on December 12, 2024; and WHEREAS, construction activities began on March 10, 2025; and WHEREAS, the Project performed asphalt pavement dig outs to replace damaged pavement and installed surface sealant, installed split -rail fence between the parking lot and the existing pedestrian pathway, installed two (2) new collapsible bollards at the entrance of the emergency pathway access point, and reconfigured the parking spaces to a total of, seventy-two (72) parking spaces, three (3) of which are ADA compliant spaces, and replaced the timber berms surrounding the tree planter boxes; and WHEREAS, on April 17, 2025, the Project was completed in accordance with the approved plans and specifications, and final job inspections were conducted by the City Inspector and Engineer; and WHEREAS, the City is withholding $8,600 in retention to ensure work is completed to required standards; and WHEREAS, on September 2, 2025, a Notice of Withholding of Contract Payments was sent in accordance with Labor Code Section 1742 and 1771.6 to the prime contractor advising an estimated maximum wage restitutions to workers, liquidated damages, and penalties equal to $1,523.52 to be deducted and held from the retention amount as security; and WHEREAS, the actual use of funds for construction engineering was less than the budgeted amount by $500; and WHEREAS, the construction contract was completed with $480 remaining; and WHEREAS, the remaining total project savings of $980 is, available; and NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Campbell hereby 1) accept the improvements for the John D. Morgan Park Parking Lot Improvements Project No. 23-DD and 2) direct the City Engineer to file the Notice of Completion. PASSED AND ADOPTED this 21 st day of October 2025, by the following roll call vote: AYES: Councilmembers: Bybee, Hines, Scozzola, Furtado, Lopez NOES: Councilmembers: None ABSENT: Councilmembers: None APPRO ED: Sergio Lopez, Mayor ATTEST: r o Andrea SaVrs, City Clerk Recording Requested by and when recorded, mail to: City of Campbell City Clerk's Office 70 North First Street, City Hall — Upper Level Campbell, CA 95008 (408)866-2150 CITY OF CAMPBELL NOTICE OF COMPLETION AND ACCEPTANCE OF PUBLIC WORKS CONTRACT (C.C.C.3093) This document is for the benefit of the City of Campbell. Request for the Recordation without fee is made in accordance with Section 6103 of the Government Code of the State of California. Contractor's Name: Silicon Valley Paving, Inc. Contract Date:12/12/2024 Surety: InterWest Insurance Services, LLC Final ContractAmount: $172,001.87 Job Title: John D. Morgan Park Parking Lot Improvements Project No. 23-DD Location: John D. Morgan Park parking lot along Rincon Ave adjacent to San Tomas Expressway. Scope of Work: The project performed asphalt improvement measures including dig outs and applying OverKote over the surface. A hammerhead style turn around was installed at the south end of the parking lot and a split rail fence & collapsible bollards were installed along the edge shared with the pedestrian pathway on the eastern edge of the parking lot. Striping and signage were installed in the parking lot. Owner: City of Campbell, City Hall, 70 North Street, Campbell, CA 95008 This work was accepted by me on 10/22/2025, on behalf of the City of Campbell. I certify under penalty of pet jury that the foregoing is true and correct. (C.C.P. 2015.5) Executed on 10/22/2025, at Campbell, California Amy Olay, Public Works Director Department of Public Works City of Campbell Revised 1/23/17