Loading...
HomeMy WebLinkAbout1196 Lovell Ave. o�.Cq,y Project Address: ,>.• ��te, City of Campbell ( 1cl o WASTE MANAGEMENT Permit No. 0Rc""Ro' PLAN WMP REQUIRED BECAUSE PROJECT IS A SUBMIT TO: )(Demolition≥500 Sq. Ft. City of Campbell "` ❑ Construction/Remodel≥$250,000 Public Works Dept. 70 N. First St. ❑ Construction/Remodel ≥2000 sq. ft. Campbell, CA 95008 Mon.— Fri. 8:00 am-5:00 pm INFORMATION AND SUPPORT: Public Works Dept. - 408 866 2150 SECTION ONE: PERMIT APPLICATION This Waste Management Plan (WMP) must be completed and approved to obtain a building permit. Separate WMPs must be completed for demolition and construction at the same site unless the Building Department requires only one permit. Step 1: PROJECT INFORMATION - FILL OUT THE FOLLOWING INFORMATION Applicant's Name: l /J p--77 Contact Phone Number: 419(1 ) 71 -7- M.-7-Z- Fax Number: Check one: , Owner 0 Architect. 0 Builder ❑ Owner/Builder Other Contractor: 1` A4 h CQ Jirbe 977Contact Phone Number: I i �"/ b � 7- 6 � Project Type: New 0 Remodel Addition ❑ Demolition Project Square Footage: / 3 S Project Description: C*4-10/i-s1 Estimated Completion Date: Jiff Step 2: WASTE MANAGEMENT REQUIREMENTS REQUIREMENTS: You are required to recycle or re-use 50%of all construction and demolition debris. I understand that I am required by the City of Campbell Municipal Code Section 6.12 to salvage, reuse, or recycle a minimum of 50%of all construction and demolition debris (C&D). (Initial) 11, I understand that failure to meet the requirements of Municipal Code Section 6.12 shall constitute a misdemeanor, and shall be punishable by imprisonment in the county jail for up to 6 months,or by a fine of up to 1 000, or both. In addition, a stop order on the job or a delay of final approval may occur. (Initial) At the completion of this project, or more frequently if required, all receipts or other equivalent documentation from salvage, recycling and waste facilities will be provided to the City of Campbell Public Works Department and I understand that I may not be issued my final inspection unless all rece. is and documentation are submitted to the City of Campbell Public Works Department. (Initial) Step 3: RECYCLING CONSTRUCTION AND DEMOLITION DEBRIS-ANSWER THE QUESTIONS BELOW SALVAGE AND REUSE: What materials will be salvaged? Salvage Company (if applicable): iAr What materials will be reused on site? How will this be documented? MATERIAL TRANSPORTATION: Will you be using a hauling company or hauling the material yourself? (Check one) ❑ West Valley Collection & Recycling Co. (WVCR)* Self Haul * Permit Applicant is required to contact WVCR (408-283-9250) to request construction and demolition debris box service. All original receipts, weight tags and documentation for salvage, recycling, and disposal must be submitted: "�vn Completion of project ❑ Other DPW Approval: Date: S 1 SECTION TWO: FINAL REPORT APPROVAL Please complete this section and have it approved by the Public Works Department no later than 30 days after completion of the demolition or construction project. This section must be completed and signed, and all original receipts or other supporting documentation must be attached in order to receive final project approval. ❑ All original receipts or equivalent documentation for salvage, recycling, and disposal are hereby attached. ❑ This project has recycled at least 50%of all construction and demolition debris generated. Applicant: Date: DPW Approval: Date: (Al> 0, v, cV E Q P AN REVIEW ROUTER CITY OF CAMPBELL - rNew Submittal ❑Resubmittal: (2"d,3rd,4`h, 5th Review) ❑Revision to Existing Per it a_ (.... b& ....,0 ...--V41 Q `-' kECEIVED (Ai �'� APN# Q APPLICATION/PERMIT# •/ JOB ADDRESS t iQ Lo k \ ./-\\-4/- . JOB DESCRIPTIONQ\J ) ' ( (-C72101 S p D 0-)( Mt-IL-444-01 C-7 AVM"( ,.." RESIDENTIAL COMMERCIAL _Green-Point Rated Checklis t st ��'S� rtn'ctural Calcs. WVSD. oils/Geotechnical Report School Fee Form russ.Calcs.43 L _Health Department Approval T-24 Calcs. Response Letter Green Specs\)(0 Specifications Initials Building y i lan Che ked By y Date: ik-\(.4)� ❑.APPRO E ) > ❑NOT PROVED 0 ._- (-7 1(20 1 A... (0(A) ..(.5 .__(tei6c___,------ y structural: Date: DAPPROVED ❑NOT APPROVED • ❑Planning Zone: In Plan Checked By: Date: ?i DAPPROVED - ❑NOT APPROVED Public Works ,� than Chec ed By: Date: r1 / 1/ ri [2' 1.1ROVED ❑NOT APPROVED Fire than Checked By: Date: DAPPROVED [NOT APPROVED Application for Building Permit 6t9Applicant:Fill in all applicable areas;please print clearly. Application Number:— "--" Intake Person(office use only)_ Applicantis: Owner - contractor Architect/Designer Agent: ------- lden__.__ti n:---- --- --- •--- -------•---• •---•-----------------------------------------------------•-•---•-------- Project APN: . ® �� Lot#: Suite or Space#: Job Address: 1 I C. ' J 2t ve/ 4Q City: (7704/7 i'7 State: C4 Zip: 9.5-00 r' Pr�t Type (check app ate item) Permit Type(s) (ihec{C appropriate i ---)- - - - - - I - I - - — Commercial Residential BLDG I I MECH PLUMB L� ELEC -.Scope of Work ----•C3•' ,1 J(� l. ---•- -- ---;f.-a---•-•- --- T-,- -•-- ----.- - ---•-•-• -j---<,- 'L Valuation:$ Const.Type: is'i'/ 7/G,/Occupancy: Is Bldg.Sprinklered?_ ( f_Yes �_No Existing Use: Remodel Sq.Ftg. Proposed Use #of Stories: #of Units: Comm.sq.Ftg.Office: Retail: Warehouse: Other: Res.Sq.Ftg. Total Sq.Ftg. Dwelling:F n Garage Sq.Ftg. Patio: Porch: Deck: Are you removing a street tree Yes No Are you doing work in the public right of way? ) 1 Yes (X No —f Owner's Name,Addr ss,Phone Name /J RI C) --ty�' V e_ Home Phone: ( o ) 7 / 7 /‘2- 2_ Address X74 /•a/`jf C( Bus. Phone: Email /Cite �� $I..J c> State Cam!' / Zip Code /37 Z J/ Contractor's Name,Address,Phone&Contractor's Lic.# Check Here if"Owner/Builder"Permit LI Company Name 1 � 'f7.( /-GtL%/7�� Bus Phone: Contact Name Pacia / /tier/a 1 Cell Phone: ( qtb ) 7 6042 Address Cell. Phone: Email City State Zip Code License#: r o co_6)- --------- License Classifications(s): Architect_ Designer f Engineer (please check one) Name ..D64/1/.e-/ (4J(/[/?t7 Phone: Address Bus. Phone: Email` /?/1 /e.,16,?, , City State Zip Code 0/Wrea/eSigi �, G'r-rri Desired contact person: ,.1 Owner Contractor n Architect/Designer _ _Agent If plica t ignature Printed Name Date • I I - • -••• _�•••- GRASSY OR VEGETATED SWALE : FF ELEV:101.50' ��....�- - •• • ! I I PAD: 100.5' +/- I : ti • gill '' I (N) 1 STORY DWELLING >- O PROPOSED STORMWATER INFILTRATION UNIT I e° ~ ��/ FF ELEV:103.0' >> / PAD PAD ELEVATION [ (1V)ELECTRIC PANEL PAD: 100.8' +/- �, o o FACE FF FINISHED FLOOR ELEVATION I I v f I FS FINISHED SLAB ELEVATION 101.30" • i o (N) GAS METER I w °o " !1 +(1 c 'TO RIPRAP TG LP TOP GRATE/LOWP0INT FG d I I -, W� T >I FL FLOW LINE • • DSI I FG1.40 W 100.35' 410 FG FINISHED GRADE I I I 0 ,• (- -. . ._ WATTLE BARRIER FOR N RIP RAP 1o11z I' 101.10• I O -�-W EP SEDIMENT CONTROL DISSIPATOR , • III I I 10E).56' J 1Q1.ot �J �t PER DE.4 /_ 0 101.50' /J ^O: INDICATES RIP RAP DISSIPATOR/BUBBLER / 11 I "/ ' 111O `�� ]�,$Qx I DS �~• FG /�IOW • II I .. d:l 101.03 il X FG DS LS i��/�FG 1oo.a�' �J (N)JOINT TRENCH — / / -1J(i- -UG— FOR GAS,ELECT, 101 7 t :=4(• Y 10»3 + � I / J,,--- /101.30 � PHONE,ETC. • I �I/'I I X I i J ' PI D D D----D D(N)4"SDR GRAVITY OVERFLOW PIPE "486':C 187 I 100'90 I .y.� FG J/J 1 I I J� I � (N)LAWN �J-� 'J - •'' -''' - ''' - STORMWATER CONVEYENCE •I I I oQ s .�•=•,rtr•=.��: /s , (N) 4' X 12' STORMWATER FURROW PER DETAIL 1 /C 1 JD. (E)OVERHEAD RES I U J - INFILTRATION UNIT PER TO BE RELOCATE OR -� I W 7J DETAIL 6 C-1 •i i /I UPGRADED UNDERgRO D1LSl4 1l0.70 If '-ij I t ,, (N) 12" INLET I I ( CO,CONC DRIVEWAY TG: calm .or_1 J to d U E~ 0 100.50' N INV OUT: C f10d79, tER,DETAIL 5/ve'1---I 96.72J W cn lI 1 J/ J�J LS w U LS 1 I (E) 4" VCP SAN SEWER LATERAL DM / I1oo.7� �/ I I I (INSPECT& REPLACE IF NEEDED J / TG:200.44' I I PER STD. WVSD DETAIL) I• I / /J I 71.50' 0 (E)SSCO cn _ — FIBER ROLLS 8" MIN) J N as°as'.:'E 4-10046' X +nn ge•�• w :— - • • �.— - . .--.t (1 O REMAIN) I 1100.46' �.. -®100.71t / loo/431/�j'/�,� :1< (E)WATER -ET:R d ' ^ f � .69' n n n X n �r n A A - A A A n ' —n n n n n n ^ A n n n (/I �— 1 I / 100.42' +•;lope varies 12 POL 114'0.311 WOOD• EN FIICKET F•ENCE . N 2" WATER METER�� -k. SIGN �I �a (E)OVERH D WII Es 00.19' WITH NEW 2" COPPE�m \AC \ III I I �' -n A 10Q 15'� A A 10A 0.19' A n-!A ��--WATE]. IFRAI ac 9 n n \�n A A A0006=n - A A A I f_�I I t I '� FIRE FLOW CALCS/PER 99"97 ,� / �J1=�--1 '`jr`U= — — — — x I i I STD CITY DETAIL I - _ 1-p1= _ __= J���4 100.08' 100.02 ; (E)EOP 0 99.98' ,-C EI II2 I I lEIIIEII+ %.II— _________li 11I_ till II III I' ���� I I �JI�JL I_L=_J=1= cn CO II� 1=1 (E) WATER MAIN �------ cn W —W— VV— W— W— W-- V- Vim W--" W-- 1#17 -- W-- W— V- V3— W--" W- W-=' W— 111-- V- W— W— Vw w— w W— w w CL li IMMI El IM 3/4"X 3/4" WOOD STAKES I 11 I MAX. 4' SPACING LOVELL AVE I !�� N 89°48'00"E BASIS OF BEARINGS i 60'WIDE I ce_ �� CENTERLINE&MONUMENT LINE X - - X - U) _ (E)SS MAIN 100.36' 100.19' -- 252.09'TO BRASS DISK IN MON WELL FNS -SS- -SS- -SS- -SS- -SS- -Ss SS- -SS- -SS- -SS- -SS- -SS- -SS- -SS- -SS- -SS— —SS— —SS— �FrBC SS— —ss- SCALE ALL DAMAGED RIGHT-OF-WAY INFRASTRUTURE SHALL BE REMOVED AND REPLACEDD AT THE OWNER'S EXPENSE AS DIRECTED BY THE CITY ENGINEER E BARRIER DETAIL �7 _ SITE BENCHMARK: Si NAIL SET= ELEV: 100.00' �c- _ - C 0 10 20 30 -40- 50 60 • of �'�M� 1. ' 11) F Development Review Committee (DRC) ROUTING SHEET X Building Division Police Department X Fire District Economic Development X Land Development Traffic Engineer Project Address: 1196 Lovell Zoning/Area Plan: R-1-6/STANP Presentation: 2/21 File No.: PLN2019-16 Completeness: 2/28 APN: 406-06-049 Conditions: 3/7 Applicant: Alison Love Property Owner: Alison Love Distribution: 2/15 Application Type: Admin Site and Arch Submittal: 1St Project Description: New 4,374 square foot single-story home Planner: CM DEPARTMENTAL RECOMMENDATION: If it can be determined that this project will require minimal or no comments by your department/agency, please return this comment sheet with your initials to the Project Planner as soon as possible. Status Ini • I, Conditions No Conditions Additional information/revisions (see attached) MEMORANDUM • CITY OF CAMPBELL TO: Cindy McCormick, Project Planner DATE: 02/28/2019 FROM: Doris Quai Hoi, Project Engineer SUBJECT: DRC APPLICATION Site Address: 1196 Lovell Avenue For File No(s): PLN2019-016 Project Description: Administrative Site and Architectural Review Permit for a new 4,374 SF single story house. Applicant: Alison Love PUBLIC WORKS DEPARTMENT CONDITIONS OF APPROVAL • 1. The scope of this project triggers the requirement for Frontage Improvements as required by Campbell Municipal Code 11.24.040. However, per the San Tomas Area Neighborhood Plan, the north of Lovell Avenue has been designated to remain unimproved and as such the applicant will not be required to construct new curb, gutter or sidewalk. 2. Plan Lines: Prior to issuance of any grading or building permits for the site, the applicant shall provide a plan layout showing the correct distance from the street centerline to the property line, building set back lines and other relevant information in the public right of way. 3. Storm Drain Area Fee: Prior to issuance of any grading or building permits for the site, the applicant shall pay the required Storm Drain Area fee, currently set at $2,1200.00 per net acre, which is $570.00. 4. Stormwater Pollution Prevention Measures: Prior to issuance of any grading or building permits, the applicant shall comply with the National Pollution Discharge Elimination System (NPDES) permit requirements, Santa Clara Valley Water District requirements, and the Campbell Municipal Code regarding stormwater pollution prevention. The primary objectives are to improve the quality and reduce the quantity of stormwater runoff to the bay. Resources to achieve these objectives include Stormwater Best Management Practices Handbook for New Development and Redevelopment ("CA BMP Handbook") by the California Stormwater Quality Association (CASQA), 2003; Start at the Source: A Design Guidance Manual for Stormwater Quality Protection ("Start at the Source")by the Bay Area Stormwater Management Agencies Association (BASMAA), 1999; and Using Site Design Techniques to Meet Development Standards for Stormwater Quality: A Companion Document to Start at the Source("Using Site Design Techniques")by BASMAA, 2003. 5. The following conditions only apply if the applicant has a need to install/upgrade utility services (water, sewer, gas, etc.) in the street: a. Utility Encroachment Permit: Separate permits for the installation of utilities to serve the development will be required (including water, sewer, gas, electric, etc.). J:\IandDev\Conditions\Ping\L.ovell 1196.docx Page 1 of 2 1196 Lovell Avenue(PLN2019-16) Applicant shall apply for and pay all necessary fees for utility permits for sanitary sewer, gas, water, electric and all other utility work. b. Utility Coordination Plan: Prior to issuance of building permits for the site, the applicant shall submit a utility coordination plan and schedule for approval by the City Engineer for installation and/or abandonment of all utilities. The plan shall clearly show the location and size of all existing utilities and the associated main lines; indicate which utilities and services are to remain; which utilities and services are to be abandoned, and where new utilities and services will be installed. Joint trenches for new utilities shall be used whenever possible. c. Pavement Restoration: The applicant shall restore the pavement in compliance with City standard requirements. In the event that the roadway has recently received a pavement treatment or reconstruction, the project will be subject to the City's Street Cut Moratorium. The applicant will be required to perform enhanced pavement restoration consistent with the restoration requirements associated with the Street Cut Moratorium. The City's Pavement Maintenance Program website (https://www.ci.campbell.ca.us/219) has detailed information on the streets currently under moratorium and the enhanced restoration requirements. 6. Water Meter(s) and Sewer Cleanout(s): Existing and proposed water meter(s) and sewer cleanout(s) shall be relocated or installed on private property behind the public right-of-way line. Revise the Site Plan to show the locations of the new water meter and sanitary sewer clean out. 7. Grading and Drainage Plan: Prior to issuance of any grading or building permits for the site, the applicant shall prepare an engineered grading and drainage plan, and pay fees required to obtain necessary grading permits. Grading plans should identify the elevations adjoining the neighboring properties. J:\LandDev\Conditions\Ping\Lovell 1196.docx Page 2 of 2