Loading...
HomeMy WebLinkAboutCC Resolution 26-13384 - Adopt a Resolution Authorizing the use of FY26/27 RMRA Funds for the Annual Street Maintenance Project 27-BBRESOLUTION NO. 26-13384 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CAMPBELL AUTHORIZING THE USE OF FY26/27 ROAD MAINTENANCE AND REHABILITATION ACCOUNT (RMRA) FUNDS FOR THE ANNUAL STREET MAINTENANCE PROJECT 27-BB: COLLECTOR AND RESIDENTIAL STREET RESURFACING PROGRAM WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and signed into law by the Governor in April 2017 to address the significant multi -modal transportation funding shortfalls statewide; and WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of the City of Campbell (City) are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; and WHEREAS, the City must adopt by resolution a list of projects proposed to receive fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, which must include a description and the location of each proposed project, a proposed schedule for the project's completion, and the estimated useful life of the improvement; and WHEREAS, the City, will receive an estimated $1,226,915 in RMRA funding in Fiscal Year 2026-27 from SB 1; and WHEREAS, this is the 10t" year in which the City is receiving SB 1 funding and will enable the City to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1; and WHEREAS, the City has undergone a robust public process to ensure public input into our community's transportation priorities/the project list; and WHEREAS, the City used StreetSaver, a Pavement Management System to develop the SB 1 project list to ensure revenues are being used on the most high -priority and cost-effective projects that also meet the communities priorities for transportation investment, and WHEREAS, the funding from SB 1 will help the City maintain and rehabilitate approximately 2.0 centerline miles of streets/roads in the City of Campbell; and WHEREAS, the 2023 California Statewide Local Streets and Roads Needs Assessment found that the City's streets and roads are in an "At Lower Risk" condition and this revenue will help us increase the overall quality of our road system and over the next decade will bring our streets and roads into a "good" condition; and WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting -edge technology, materials and practices, will have significant positive impacts to the community. NOW, THEREFORE IT IS HEREBY RESOLVED, ORDERED AND FOUND by the City Council of Campbell, State of California, as follows: 1. The foregoing recitals are true and correct. 2. The following newly proposed project will be funded in -part or solely with Fiscal Year 2026-27 Road Maintenance and Rehabilitation Account revenues: • Project Title: Annual Street Maintenance Project 27-BB: Collector And Residential Street Resurfacing Program • Project Description: The project will resurface various streets using various methods depending on locations. These methods include performing asphalt concrete repairs, applying crack seal, installing slurry seal and rubberized cape seal, and installing asphalt concrete overlay. • Project Location: Various locations within the City of Campbell. See Exhibit A. • Estimated Project Schedule: Start (03/27) — Completion (09/27) based on the component being funded with RMRA funds. • Estimated Project Useful Life: 20 years, 10 years, and 5 years, for hot mix asphalt overlay, rubber cape seal and slurry seal, respectively. PASSED AND ADOPTED this 19th day of May 2026, by the following roll call vote: AYES: Councilmembers: Lopez, Hines, Bybee, Furtado NOES: Councilmembers: None ABSENT: Councilmembers: Scozzola APPROVED: s Daniel E. urtado, Mayor ATTEST. - Andrea Sand, City Clerk CITY OF CAMPBELL ANNUAL STREET MAINTENANCE -COLLECTOR RESIDENTIAL STREET RESURFACING, PROJECT 27-BB EXHIBIT A: PROPOSED CANDIDATE STREET LIST SEC. ID STREET NAME I BEGIN LOCATION END LOCATION LENGTH (LF) 20 White Oaks Road HWY 17 On/Off Ramp Redding Road 1,451 10 Bracebridge Court Pollard Road End 649 30 Capri Drive N/O Hacienda Avenue COP 511' N/O Hacienda Avenue 511 10 Century Drive Virginia Avenue 85' E/O Wren Way at CL Line 1,196 10 DeCarli Court Capri Drive End 454 10 Glenn Avenue Kenneth Avenue End 148 10 Jones Way Linda Drive End 477 10 Nello Drive Hollis Avenue Adler Avenue 652 20 Nido Drive Adler Avenue Hollis Avenue 720 10 Payne Avenue Almarida Drive Central Avenue 575 20 Payne Avenue Central Avenue 110' W/0 Monica Lane @ City Limits 503 10 Rose Court Salice Way West End 570 10 Salice Way Rincon Avenue Rose Court 426 80 San Tomas Aquino Road Vanderbilt Drive at Pvmt Change Harriet Avenue 365 10 Waldo Road Virginia Avenue Kenneth Street 1,420 10 Woodard Road Holmes Avenue White Oaks Road 290 10 Century Court Century Drive End 99 10 Ginden Court Ginden Drive End 109 SUM (length of treated streets LF): 10,615 SUM (centerline miles)- 2.01 Pg1of1