Loading...
HomeMy WebLinkAboutENC2014-00114 RECEIVE CITY OF CAMPBELL ENCROACHMENT PERMITJUN 02 2014 Permit No Ei C)' 4 Lk DEPT.OF PUBLIC WORKS (for working within the public X-Ref.File 70 North First Street right-of-way)Public Works Adfilltil5ti8PBllcation Date Campbell,CA 95008 �/r. Application Expiration Date 1 Z- �t —1' Ph. (408)866-2150 Issued 7!/ APN btD 3t LAO\p Fx. (408)376-0958 /I S Permit Expiration Date APPLICATION-Application is hereby made for a Public Works Permit in accordance with Campbell Municipal Code,Section 11.04. (Application expires in six (6) months if the permit is not issued. Application Fee is non-refundable.) A. Work Address or Tract No.: 1106 thru 1126 Abbott ave Utility Trench Location: 4 locations in the center of Abbott ave B. Nature of Work: drop 3 gas lines and one electric line below proposed new storm drain. C. Attach four(4)copies of an engineered plan showing the location and extent of the work,and four(4)copies of the preliminary Engineer's Estimate of work. The plans shall show the relation of the proposed work to existing surface and underground improvements. When approved by the City Engineer,said plan becomes a part of this permit. D. All work shall conform to the City of Campbell Standard Specifications and Details for Public Works Construction;the General Permit Conditions listed on the reverse side;and the Special Provisions for this permit,listed below. Failure to abide by these conditions and provisions may result in job shutdown and/or forfeiture of Faithful Performance Sureties and cash deposits. (See General Permit Conditions 1 and 2.) E. The Contractor must have this permit and approved plans at the site and must notify the Public Works Department at least two days before starting work. Notice must be given to Public Works at least 24 hours before restarting any work. Name of Applicant: PG&E PM 42107391 Telephone: 408-725-2153 Address: 1106 thru 1126 Abbott Ave E-Mail Address: JJGJ@PGE.COM 24-HOUR EMERGENCY PHONE NUMBER: 800-743-5000 Is this work being done by the property owners at their own residence? n' YES NO The Applicant/Permittee hereby agrees by affixing their signature to this permit to hold the City of Campbell,its officers,agents,and employees free,safe and harmless from any claim or demand for damages resulting from the work covered by this permit. The Applicant/Permittee hereby acknowledges that they have read and understand both the front and back of this permit, and they will inform their contractor(s) of the information. Applicant is advised that upon issuance of this permit, property owner, or property owner's successors, shall be responsible for any and all damages arising out of the condi 'on of any private improvements in the public right-of-way. Accepted: .< 05/28/14 (Applicant Permittee) (sign) Date PG&E John Gambucci 05/28/14 (Contractor) (Print Name) Date SPECIAL PROVISIONS: 1. Street shall not be open cut for underground installations. Minimum cuts may be allowed for connections or exploration holes. Such cuts may be specifically approved by the Inspector prior to cutting. 2. Pavement may be cut for underground installations and must be restored in accordance with the Standard Details Trench Restoration Method "A",unless otherwise approved by the Engineer. 3. Work to be staked by a licensed Land Surveyor or Civil Engineer and two(2)copies of the cut sheets sent to the Public Works Department before starting work. 4. Per Section 4216 of the Government Code this permit is not valid for excavations until Underground Service Alert(USA)has been notified and the inquiry identification number has been entered hereon. USA Phone: 1-800-227-2600. USA TICKET NO. 5. Prior to any work,the property owner shall execute an Agreement for Private Improvements in the Public Right-of-Way,which shall be recorded. 6. Public Notification Requirements: 7. SEE PUBLIC WORKS FEE SCHEDULE FOR CURRENT FEES AMOUNT RECEIPTJJO. PERMIT APPLICATION FEE $ 377 ` PLAN CHECK DEPOSIT $ SECURITY FOR FAITHFUL PERFORMANCE/LABOR&MATERIALS $ CONSTRUCTION CASH DEPOSIT $ PLAN CHECK&INSPECTION FEE $ 3 7 7 EMERGENCY PERMIT FEE $ APPROVED FOR ISSUANCE � 6/5/(it For City Engineer Date Permit Fvr,irnc 1)nn.,ntkc Affray r'tn of imy,.ra GENERAL PERMIT CONDITIONS A Construction Cash Deposit is required. Charges will be made against this deposit if there is an emergency call-out,overtime inspection or when City ordered barricading is required. Any such costs in excess of the deposit will be billed to the Permittee. 2. A one-year maintenance period and surety are required. Such period will begin on date of written acceptance by the City. 3. Refund or the cash deposit balance and refund or cancellation of the Faithful Performance Surety will be initiated by the written acceptance of the work by the City. 4. Submit project schedule 10(ten)days prior to proposed start of work.Special provisions may be required for work within City facilities and downtown Campbell. 5. The Permittee must request in writing a final inspection and acceptance of the work upon completion. Acceptance by the City will be made in writing to the Permittee. 6. Maintain safe pedestrian and vehicular crossings and free access to private driveways,bus stops,fire hydrants,and water valves. 7. A Construction Traffic Control Plan and a Construction Schedule are required for all lane closures,detours,and street closures. This plan must be reviewed and approved prior to any lane closures. 8. A Construction Traffic Control Plan shall conform to the Caltrans Manual of Traffic Controls for Construction and Maintenance Work Zones,dated 1990,available at Caltrans. Traffic control equipment shall include Type II flashing arrow signs if required. 9. Replace as directed by the City Engineer any damaged or removed improvements in accordance with City Standards and Specifications at the sole expense of the Permittee. 10. Sawcut for all PCC or AC removals. All PCC removals shall be to the nearest scoremark and shall be doweled to existing improvements. 11. Prior approval of inspector is required for any work done after normal working hours,on weekends or holidays and may require reimbursement of inspection costs at the current overtime rate. 12. Adequate signing and barricading is required on the job site. Failure to provide such signing and barricading may result in the City's providing signing and barricades and charging the cost(including all labor and materials)against the cash deposit. 13. Compaction testing of subgrade,base rock,and asphalt concrete by Permittee is required unless otherwise stated by the City Engineer. 14. The Contractor or Permittee will have a supervisory representative available for contact on the project at all times during construction. Contractor or Permittee shall provide a phone number at which they can be contacted outside the hours of 8:00 a.m.to 4:00 p.m. 15. No storage of materials or equipment will be allowed near the edge of pavement,the traveled way,or within the shoulderline which would create a hazardous condition to the public. 16. This permit shall not be construed as authorization for excavation and grading on private property adjacent to the work or any other work for which a separate permit may be required,nor does it relieve the Permittee of any obligation to obtain any other permit required by law. 17. This permit does not release the Permittee from any liabilities contained in other agreements or contracts with the City and any other public agency. 18. This permit is not transferable. Work must be performed by the Permittee or his designated agent or contractor as specified thereon. 19. Call back(call out)due to emeregencies regarding this permit shall be at the current overtime rate with a three(3)hour minimum charge per occurrence. 20. Pursuant to Chapter 14.02 of the Campbell Municipal Code,applicant shall not cause to be discharged any material into the municipal storm drain system other than storm water. Applicant shall adhere to the BEST MANAGEMENT PRACTICES established by the Santa Clara Valley Urban Runoff Pollution Prevention Program. 21. If the public interest requires a modification of,or a departure from the plans and specifications,the City shall have the authority to require or approve any modification or departure and to specify the manner in which the same is to be made for City-owned or maintained facilities. 22. Permitttee must provide advance notification to all parties that may be affected by the permit activities. Notification shall be reviewed by the City prior to distribution and include dates of work and a contact name and phone number. Applicant shall be responsible for ensuring that all those providing services under the applicant are aware and understand all of the above conditions. 05/28/14 Applicant Date: PG&E John Gambucci 05/28/14 Contractor (Print Name) Date: J:\FORMS\Templates\Encroachment Permits\Encroachment Permit STATIC form2.pdf Rev.02/14 ""_ rof V. AFETY ****PG&E NOTES**** ***'INSTALL*'** * PG&E TO T&B ALL * 3/4" MUELLER H-17190 PCF #022846 * ALTER SERVICE TO CLEAR SERVICE CONFLICT * 1y4" X 1" CTS TRANSITION COUPLING #029436 * INSTALL PCF (M2) * 1" Xy2" CTS REDUCER COUPLING 1/029640 * ABANDON SERVICE CONFLICT IN PLACE ' 145' OF 1" CTS PLASTIC PIPE #016083 * INSTALL 145' OF 1" HP PL SERVICE AND TIE-IN TO * 150' OF #10 COPPER LOCATING WIRE #294414 EXISTING Y2" PL SERVICE TO E ISTING METER * MAINTAIN 3' SEPARATION FR M WET UTILITIES CAW81t r #1180 `�' ��7, 9 Dam' CAW 811 rQQ\' CALL TWO WORKING #1181 \,20+A1 TIDAYS CKET ND YOU DIG DATE' BY, 3/4"HP5Tl 1 ti zIN I }= I 1 1 -- el O _I I I (` • j I S ' 1 1 1 PROPERTY LINE 1 PHPPL I L-1fi \I • i _, 0 3l4'HP5TL / .. 78' PNX #1200 1+/ ',17 T < Q - GOe_4). e.: O �' ?M#42107390 CC) ; _ Q . - ,,6%. 1AP#3474-A1 CO x N Q .1.� 4e) CPA#3412-32 ♦ .. :,' EMERG SD#2 QT o J �� �c,.° �� MLX-NONE 1950 �- Oc. O* c, :,$' CAMPBELL EST: J. MANNINA JR. Q J CO: ADE: J. GAMBUCCI Gas Trench prawipg SD: SUPV: E. STRAUB 1180 ABBOTT AVE. CAM I1111 N0TIF: 106156671 OTHER: REP: S. PONCE Applicant and PG&E Inspector Copy SHT: SHEETS PLNR: SCALE: DATE: �+IE PACIFIC GAS AND ELECTRIC COMPANY Pµ42107390 REV. NONE 5 23 14 p # 1126 �- I I # 1132 I cn W # 1106 # 1118 J ,- Lai IZ _ N IZ 211' in _ o La- - IOW — o o O ~ _ O PROPERTY LINE U N Z O (n Cl- _____ _ =68' 145' >- ___________,.-,_____ _ - T2 ___� z O Q PROPOSED STORM DRAIN 24i 0_ ,„.. . • -- V #1 0 Li 2 3 r 4 U > 0../ / Q TIED- 0 , 0 , o W ° - 7HP6 JTT978 ° ° ° ° ° ° ° ° --1DEADED = WQ I_ I-- i= F- U z �2/2 AXL (22KV) 12 KV CIC PROPERTY LINE • " m J J 0 _ - I I Q co W Lui Cp I- ABBOTT AVE 1 O A_T X '_I .rt "r Z I-1-1 v oN R 45a\,� o Q # 1520 �� �i e�\ �\y O U � e it, plans .... iiiiti.-c LL )-4. o mu0 d��; * DIG 3 TAP HOLES 6' X 10' X 6' @ LOCATION #1 ,#3, #4 f, \2\ 1121 coit,. °b se 0_ PM * DIG TAP HO E 6' X 12' X 6' @ LOCATION #2 (ELECTRIC) MAP 3 42107391 3 4774-4- A1 * SHORING WIL BE NEEDED CPA 3412-32 * 24" STORM DRAIN WLL BE INSTALLED AFTER GAS 8c ELECTRIC RELOCATION 60 MAOP * RELOCATE ALL GAS 8c ELECTRIC SERVICES 2' LOWER CAMPBELL CV PG& E PARTS TEST AT 100-110 PSI FOR MINIMUM OF 5 MIN. PROJECT CONDITIONS STAMP 'ro Typo(o) of Work: W •* EIGHT 1 /2" ELBOWS PRESSURE DURATION INITIALS DATE OF TEST PLASTIC PIPE ❑X New Business a O PG&E Maintenance & Construction V * FOUR 1 " ELBOWS Project Conditions: INSPECTION/DATA E N 0 o * 60' OF #10 LOCATING C A TI N G WIRE 0NONE APPARENT (N project design thongs,, contact ADE) O C. or C7 CD „ ❑CONDITIONS APPLY: C C C * 35' OF 1 /2 PL PIPE PIPE MANUFACTURER ❑PERMITS ❑TAILBOARD ❑OTHER C �O -W (/)` •3 N * 15' OF 1 " PL PIPE PLASTIC PIPE DATA (Provide additional information on line below) ice„ SIZE MANUFACTURED DATE OF MANUFACTURE DATE MANUFACTURED w 5- - J * CAUTION TAPE IN TRENCH �"° SIGNATURE.rte.[[CORPORATE ; o W _I C) W Q V) - a. V) TRAFFIC CON1 0L PLAN - 1108 THRU 1132 ABBOTT AVER.. E, CAMPBELL ROAD ! G I W20-1 WORK f I `j ' ' ! ! m AHEAD I . , CD 100' i ,l i ! I ! Z ! C9A(CA) ! D 11' 11' i < ! m 1 . , 100' . I I ' i N HARRIET AVE (30 MPH) , , ' ' I dO1S ! • I ---__J�__i ! • ! ! 34' i ! ! 1 DRIVEWAY DRIVEWAY ABBOTT AVE (25 MPH) a I DRIVEWAY I I TOW AWAY NO STOPPING I"' P TOW AWAY NO STOPPING DRIVEWAY 201 20' -y. a 10' .10'. o_ • <0., tot •..._.--.-.--.-.--._._._.-._._.--._.--._._._.-._.--.-.--.-.--.-.-.-.--.-._._ • / 250' 250' • 250' it•• TOW AWAY NO STOPPING TOW AWAY NO STOPPING EWAr DM MAY TOW AWAY NO STOPPING I oRW�rAr. sEE xc . WORK ROAD ONE LANE • s xore. se xoM ROAD ` AHEAD AHEAD ■� i i STOP '' W20-1 STOP 1 •' I' 28"TRAFFIC CONES 15'MAX SPACING W20-4 C9A(CA) C 1 G! I ! mi H 1 1 -i i i I E: i I O I Z I ! 250' I; I D` <i I • M „' 1r , ■� C9A(CA) i w „ 0 i , M I 250' -pi i i x i i i I LEGEND: ROAD NOTES: 4I J- WORK W20-1 AHEAD 1 "ii: TEMPORARY SIGN 1.ALL ADVANCED WARNING SIGNS SHALL BE EQUIPPED i , nxu. WITH 2 18"ORANGE FLAGS i I 2. NO PARKING SIGNS SHALL BE PLACED A MIN OF 72HRS I �_, PRIOR TO START OF WORK. CONTRACT SHALL NOTIFY LOCAL AUTHORITIES h • 1ri FLAGGER ONCE SIGNS ARE POSTED. 3.ALL CONFLICTING SIGNS SHALL BE COVERED WHILE TEMPORARY /// SIGNS ARE IN PLACE WORK AREA PREPARED BY: ROBERT SCULLY 4.ACCESS TO RESIDENTS AND LOCAL BUSINESSES SHALL BE MAINTAINED AT ALL TIMES.ACCESS TO BE DETERMINED IN FIELD BASED ON CAL-VET CONSTRUCTION SERVICES DVBE TRAFFIC FLOW ACTUAL EXISTING CONDITIONS 679 SAN MIGUEL AVENUE SANTA CLARA,CA.95050 • " ' ' 28"TRAFFIC CONES 5.CONTRACTOR SHALL MAINTAIN SAFE PEDESTRIAN ROUTES AT ALL TIMES 408-477-6850 408-931-6111 FAX CONTRACTORS LIC.#894938 6.ALL TRAFFIC CONTROL PLANS AND DEVICES SHALL CONFORM TO THE CALIFORNIA MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES DVBE CERT.#1111002 SECTION 6 DATED 2012