Loading...
HomeMy WebLinkAboutENC2014-00150 Print Form Permit No i I 5 CITY OF CAMPBELL ENCROACHMENT PERMIT �' DEPT.OF PUBLIC WORKS (for working within the public X-Ref.File 70 North First Street right-of-way) Application Date 5/I 5 j Campbell,CA 95008 Issued 1 /��I L Application Expiration Date Ph. (408)866-2150 APN 3oS3OUa-5 Fx. (408)376-0958 ?,)/1115 Permit Expiration Date APPLICATION-Application is hereby made for a Public Works Permit in accordance with Campbell Municipal Code,Section 11.04. (Application expires in six (6) months if the permit is not issued. Application Fee is non-refundable.) A. Work Address or Tract No.: 333 3 W.Rincon Avenue.Campbell,California 95008 (Utility Trench Location: Middle of the Street.Two trenches 6 and 10 feet long,3 feet wide,6 feet deep. B. Nature of Work: [Replace two short sections of damaged 6"Vitrified Clay sewer mainline C. Attach four(4)copies of an engineered plan showing the location and extent of the work,and four(4)copies of the preliminary Engineer's Estimate of work. The plans shall show the relation of the proposed work to existing surface and underground improvements. When approved by the City Engineer,said plan becomes a part of this permit. D. All work shall conform to the City of Campbell Standard Specifications and Details for Public Works Construction;the General Permit Conditions listed on the reverse side;and the Special Provisions for this permit,listed below. Failure to abide by these conditions and provisions may result in job shutdown and/or forfeiture of Faithful Performance Sureties and cash deposits. (See General Permit Conditions 1 and 2.) E. The Contractor must have this permit and approved plans at the site and must notify the Public Works Department at least two days before starting work. Notice must be given to Public Works at least 24 hours before restarting any work. Name of Applicant: Jorge Picado/on behalf of West Valley Sanitation District Telephone: (408)385-3009 Address: 100 E.Sunnyoaks Avenue.Campbell,California 95008 E-Mail Address: jpicado@westvalleysan.org 24-HOUR EMERGENCY PHONE NUMBER: (408)378-2407 Is this work being done by the property owners at their own residence? r- YES r NO The Applicant/Permittee hereby agrees by affixing their signature to this permit to hold the City of Campbell,its officers,agents,and employees free,safe and harmless from any claim or demand for damages resulting from the work covered by this permit. The Applicant/Permittee hereby acknowledges that they have read and understand both the front and back of this permit,and they will inform their contractor(s) of the information. Applicant is advised that upon issuance of this permit, property owner, or property owner's successors, shall be responsible for any and all damages arising out of the conditon of any private improvements in the public right-of-way. Accepted: Jorge L. Pihdo crt bet Wu of f V.111.1 S'R.i'14,1im Disk/el- --- Av,q sl- 15, 20/4- ! (Applicant Perraittea, ,sign, Date All Hatypt4/ (P4cihc Under room Consliroclim) Au usl• 15;aol¢ (Contractor) 1 ,Print Name) Date SPECIAL PROVISIONS. 1. Street shall not be open cut for underground installations. Minimum cuts may be allowed for connections or exploration holes. Such cuts may_be specifically approved by the Inspector prior:o cutting. _2. Pavement may be cut for underground installations and must be restored in accordance with the Standard Details Trench Restoration Method "A",unless otherwise approved by the Engineer. 3. Work to be staked by a licensed Land Surveyor or Civil Engineer and two(2)copies of the cut sheets sent to the Public Works Department before starting work. 4. Per Section 4216 of the Government Code this permit is not valid for excavations until Underground Service Alert(USA)has been notified and the inquiry identification number has been entered nereon. USA Phone: 1-800-227-2600. USA TICKET NO. 5. Prior to any work,the property owner shall execute an Agreement for Private Improvements in the Public Right-of-Way,which shall be recorded. 6. Public Notification Requirements: 7. —SEE PUBLIC WORKS FEE SCHEDULE FOR CURRENT FEES AMOUNT C RECEIPT]O. PERMIT APPLICATION FEE $ '3 85 __. UC PLAN CHECK DEPOSIT SECURITY FOR FAITHFUL PERFORMANCE/LABOR&MATERIALS $ CONSTRUCTION CASH DEPOSIT $ p, —_ PLAN CHECK&INSPECTION FEE $ _7Z5_ EMERGENCY PERMIT FEE 5 I 1 Q APPROVED FOR ISSUANCE UPp C� For City ngineer Date Dermit Expires 12 Months After Date of Issuance GENERAL PERMIT CONDITIONS A Construction Cash Deposit is required. Charges will be made against this deposit if there is an emergency call-out,overtime inspection or when City ordered barricading is required. Any such costs in excess of the deposit will be billed to the Permittee. 2. A one-year maintenance period and surety are required. Such period will begin on date of written acceptance by the City. 3. Refund or the cash deposit balance and refund or cancellation of the Faithful Performance Surety will be initiated by the written acceptance of the work by the City. 4. Submit project schedule 10(ten)days prior to proposed start of work.Special provisions may be required for work within City facilities and downtown Campbell. S. The Permittee must request in writing a final inspection and acceptance of the work upon completion. Acceptance by the City will be made in writing to the Permittee. 6. Maintain safe pedestrian and vehicular crossings and free access to private driveways,bus stops,fire hydrants,and water valves. 7. A Construction Traffic Control Plan and a Construction Schedule are required for all lane closures,detours,and street closures.This plan must be reviewed and approved prior to any lane closures. 8. A Construction Traffic Control Plan shall conform to me Caltrans Manual of Traffic Controls for Construction and Maintenance Work Zones,dated 1990,available at Caltrans.Traffic control equipment shall include Type II flashing arrow signs if required. 9. Replace as directed by the City Engineer any damaged or removed improvements in accordance with City Standards and Specifications at the sole expense of the Permittee. 10. Sawcut for all PCC or AC removals. All PCC removals shall be to the nearest scoremark and shall be doweled to existing improvements. 11. Prior approval of inspector is required for any work done after normal working hours,on weekends or holidays and may require reimbursement of inspection costs at the current overtime rate. 12. Adequate signing and barricading is required on the job site. Failure to provide such signing and barricading may result in the City's providing signing and barricades and charging the cost(including all labor and materials)against the cash deposit. 13. Compaction testing of subgrade,base rock,and asphalt concrete by Permittee is required unless otherwise stated by the City Engineer. 14. The Contractor or Permittee will have a supervisory representative available for contact on the project at all times during construction. Contractor or Permittee shall provide a phone number at which they can be contacted outside the hours of 8:00 a.m.to 4:00 p.m. 15. No storage of materials or equipment will be allowed near the edge of pavement,the traveled way,or within the shoulderline which would create a hazardous condition to the public. 16. This permit shall not be construed as authorization for excavation and grading on private property adjacent to the work or any other work for which a separate permit may be required,nor does it relieve the Permittee of any obligation to obtain any other permit required by law. 17. This permit does not release the Permittee from any liabilities containec in other agreements or contracts with the City and any other public agency. 18. This permit is not transferable. Work must be performed by the Permittee or his designated agent or contractor as specified thereon. 19. Call back(call out)due to emeregencies regarding tnis permit shall be at the current overtime rate with a three(3)hour minimum charge per occurrence. 20. Pursuant to Chapter 14.02 of the Campbell Municipai Cooe,applicant snail not cause to be discharged any material into the municipal storm drain system other than storm water. Applicant shall adhere to the BEST MANAGEMENT PRACTICES established by the Santa Clara Valley Urban Runoff Pollution Prevention Program. 21. If the public interest requires a modification of,or a cepa,tore from the clans and specifications,the City shall have the authority to require or approve any modification or departure and to specify the manner in which the same is to be made for City-owned or maintained facilities. 22. Permitttee must provide advance notification to zr pa--.,es:hat may be affected by the permit activities. Notification shall be reviewed by the City prior to distribution and include dates of work and a contact name and pnone number. Applicant shall be responsible for ensuring that all those providing services under the applicant are aware and understand all of the above conditions. �r9e L. Pirado on bel,gg5t oc Ult.4 Valley Sani4.li0l 3)154 -14: ><!S,201+. _ Applicant Date: Bi jl 1Aariaw (Paeis. Vnd rO nql C045,11)(4/.0•1) A trsl- /S, .204. _ Contractor (Print Name) Date: 1:\FORMS\Templates\Encroachment Permits\Encroachment Permit STATIC form2.pdf Rev.02/14 WEST RINCON AVENUE PIPE SEGMENT: Between the upstream vertical riser 3-007-10 and downstream manhole 4-008-04 PIPE LOCATION: Campbell, California. PIPE DESCRIPTION: 391 feet, 6" Vitrified Clay Pipe mainline. The line was televised from the downstream manhole on November 2012 and August 2014. The survey found broken pipe 119 feet from the downstream manhole. The line has severely broken pipe 227 and 233.5 feet from the downstream manhole. The line has more severely broken pipe 256 feet from the downstream manhole. This is a damaged lateral connection to the mainline. The CCTV camera could not pass this point, and the survey was abandoned. The conditions of the rest of the mainline are unknown. The mainline is 6.5 feet deep. PROBLEMS: 1. Broken pipe 119 feet from the downstream manhole. 2. Severel broken .i.e 227 and 233.5 feet from the downstream manhole. Rte. „ fi ..._ ,-x"+'- • *.•,;"'''' ' ' .; y ^s r w ^,r 3. Extremely severely broken pipe 256 feet from the downstream manhole. The CCTV camera could not pass this point, and the survey was abandoned. The co�nditions of the rest of the mainline are unknown.,..,,.,, ,-,,,....,,,.,_ ,,,,,,,....„,,,-,-:,,,,,,,;: ,,,,i+4., .Ni::z F ₹+ t F { #F( v SUGESTED FIXINGS: Perform two point repairs: 1. Perform a 10 feet long point repair on the 6" VCP sewer mainline. Start the repair 225 and end 235 feet from the downstream manhole. 2. Perform a 6 feet long point repair on the same sewer mainline. Start this second repair 253 and end 259 feet from the downstream manhole. Replace damaged lateral connection to the main by installing a new 6" by 4" VCP Wye with one 4-inch clay 45 degrees elbow. For both repairs, use only Vitrified Clay pipe. Use only 4 and 6 inch clay to clay flex-seal adjustable repair couplings with ARC stainless steel shear rings. Place 3/4" crushed rock as pipe bedding and 6 inches around the new pipe. Backfill the rest of the trench with material approved on encroachment permit. Do not leave gaps in between the pipe joints. Note: Footages and distances of the locations of the repairs are approximate. Contractor is responsible for locating the exact location of the repairs. l `� ", g , , #r" ��LEGEND 357 3-007-21 . `t _� Sewer Structures , , isrjir ®' . uE Iv , y , ��3 Manhole i F r t4 3163) S i b / .Q i CI, outside Drop MH ., fir% "`"SO'`'YV1° ... ,, .� �.r'# s.F„« "",.." ._...•s..,,w- Z �� `� Inside Drop MH -r iko, _ s ,,77-.- Z9? 0 CEO Cr vertical Riser ) e ". - . L 152E J 125: ,r uNKNOWN'rt la. Pump Station .. L;."16' ��f52g. 14'SQFNPL - 121 l •U); 1 lie Point '° x 5'N OF S PL, _ w t i if Z,, Stub #�- .- l 0. k U-- X Abandoned MH -'t- „ fT + 4 . ® sr/Cupertino/Private Replace 6 feet of 6"VCP maim, r ?iDli $} a Scarf 253 end T5° From DIc m nh. 63 u x' um Private Pump Station L �1 R '`,� ' Start ve 253 camerad25 lent.m' "Crl`ma,? + .0 r :... _ €. Sewer Mains E i r t ...th r.e„ 6"by r ' 1'.`'.' �F pt, t%% wtr,D � � '0, ,gy p- c D ..74,:-:„s,,..,,,,,,,',." (( San Jose FIE) e°• l;-=4;'.„', i :�v •, F,. !! f Abandoned inactive . .0 ,00* `. , ,: �, rz f r c a N«tA X08 4#� • 9 4 * 22,0 f4=0 08 0� k ", Laterals ��q I'+wF 4.it c, CT L 31 ., E i 3 to t a§' � �t�O�(�c� 43'W �1 E PL y �+I� a a * �" ic, <�� (T � gr° 4 4~ f 01.1.7 + y, . NORTH i• • f '.,,,14, " West Valley. .«r . ‘i,\.'„ IS � " ` ,� Sanitation District _ � nn �p _ - • x e;t: is111.1 ri'p'er. A Le eared n tMannok+n )i ��o �CS� 'ajle'' �aiiitation 1)k rie g 4-QSA-04 IA Tisc l Year 2014-2015 Sewer Repair i�rujecC }} �, �.� .D.. "' WorkOrderNo. 4•t�5'"15pilerWai '° cs) at W t Ztncowenue atsn bit California ,o 1y18e1 .. ,. i '-'...yes ` „4, 12`.N Of°S PL .y w--aw i { Pipe Graphic Report of PSR 5208 for WVSD Setup 14 Surveyor CHAD Certificate# U-1209-9684 System Owner Drainage Survey Customer P/O# Date 2014/08/14 Time 9:06 Street W.RINCON AVE City CAMPBELL Further location details Up 3-007-10 Rim to invert Grade to invert Rim to grade Ft Down 4-008-04 Rim to invert Grade to invert Rim to grade Ft Use Sanitary Direction Upstream Flow control Media No DVS Shape Circular Height 6 Width Ins Preclean J Date Cleaned 2014/08/14 Material Vitrified Clay Pipe Joint length Total length Length Surveyed 255.70 Lining Year laid Year rehabilitated Weather Dry Purpose Pre-Rehabilitation Survey Cat Additional info Structural O&M Constructional Location Main Highway-Suburban/Rural Miscellaneous Hydralic Project 08/11/2014 Work Order 12-1120 Northing Easting Elevation Coordinate System GPS Accuracy Start of Survey 0.0 Ft Manhole [4-008-04] 0 Ft Water Level 0% 41.6 Ft Tap Factory 4.000 09 o'clock O 64.0 Ft Crack Multiple 12 to 12 o'clock ST: 3 102,0 Ft Tap Factory 4.000 03 o'clock 119,0 Ft Broken 08 o'clock ST: 3 D 0 n 149.1 Ft Tap Factory 4.000 03 o'clock 201.0 Ft Tap Factory 4.000 03 o'clock 214.3 Ft Crack Longitudinal 09 o'clock ST: 2 J 214.9 Ft Tap Factory 4.000 09 o'clock " 218.3 Ft Crack Longitudinal 09 o'clock ST: 2 233.4 Ft Broken 09 to 03 o'clock ST: 5 251.2 Ft Tap Factory 4.000 03 o'clock 255.7 Broken Soil Visible 08 to 04 o'clock ST: 5 255.7t° Abandoned Survey [BROKEN PIPE UNABLE TO PASS] WVSD Phone: 408 378-2407 CCTV pictures of 5208 for WVSD , Work Order Video DVS Surveyed On 2014/08/14 Direction Upstream Setup 14 Street Name W.RINCON AVE City Name CAMPBELL Weather Dry Location Main Highway-Suburban/Rural From Manhole 4-008-04 To Manhole 3-007-10 Date: 2014/08/14 ; Date: 2014/08/14 -.? Distance: 119.0 Ft Distance: 233.4 Ft � ae ` 0bs: Broken 0bs: Broken p F Comments: ` w, Comments: . , pditt' " _ } I.. Date: 2014/08/14 ,g Distance: 255.7 Ft = aI.1,14 69'^: '1 0bs: Broken Soil Visible `.. ag Comments: t-. r ' k-) fuErct.,c ,.'1/'.ttC. WVSD Phone:408 378-2407 MetroScant /Santa Clara (CA) )eth D Parcel : 305 30 023 Bldg Id : 1 ail ) Campbell 95008 Land : $281,565 ail ) Campbell Ca 95008 Struct : $48,562 Doc # : 16275680 Other . Deed : Grant Deed Total : $330,127 Loan : %Imprvd : 15 % Owned : 100 IntTy : Exempt : $7,000 ence Type : Homeowners TaxArea : 10005 13-14 Tax : $4,441.16 MLS Area : 15 lock : 2 Phone Owner . 1,552 Units • : Year Built : 1920 3,990 Patio : No E,ffYearBlt : 1920 3,990 Porch Yes Garage Sp : 2 21 Elevator : Garage SF : 480 i2X 145 Lease SF Bldg Cond : 5.5 Flo Office SF . Bldg Class : 5.5 vies Sprinkler : Bldg Shape : Square Y ASSESSOR SANTA CLAAA COUNTY. CA-LIFORNIAROOK PAGE , 305 30 j< Z -1 >- J W o� e as as 23 = U I AMPBELL -1------- .1._ —._._.. ,t -AVE..__- , Kr 14',4 ' 484 tie it LI 1$r —*ME-- a. Q \so, i /+� Sit s+ IJ � �Y�Q i1 fil 25 is tgF-.< 1" _ 100' 1 I-.-.----_..._... alb sr• a x; 04 AC. I 300 AC- x 27 I w bt i ! I ... ... KS_I> i - 03i I 14I A0. '^ V x LI i2 k il 1O14 IL -y CD it }..�.. - `. .... s0 A