HomeMy WebLinkAboutENC2014-00164 141._\_\_,- O--I >a_r
p , ' Print Form
-A.L� � "� Permit No �� �c�(� — ��-
CITY OF CAMPBELL ENCROACHMENT PERMIT
DEPT.OF PUBLIC WORKS $EP 09 2014 (for working within the public X-Ref.File 70 North First Street right-of-way) Application Date 1 {%(- I _
Campbell,CA 95008 Gj Application Expiration Date 3-'l"i S
Ph. (408)866-2150`20bIIC Works AdmifllSl& ll / _ is---114.
APN 2,`13%0-dS S'
Fx. (408)376-0958 Of1_/f_—I S`'
Permit Expiration Date lC�
APPLICATION-Application is hereby made for a Public Works Permit in accordance with Campbell Municipal Code,Section 11.04. (Application expires in six
(6) months if the permit is not issued. Application Fee is non-refundable.)
A. Work Address or Tract No.: FRONT OF 1262 HAMILTON AVE.
„�� cif" rench Location:-IDB. f Work: REPLACING LEAKY TRANSFORMER
�j
C ur(4)copies of an engineered plan showing the location and extent of the work,and four(4)copies of the preliminary Engineer's
Esti e of work. The plans shall show the relation of the proposed work to existing surface and underground improvements. When approved
by the City Engineer,said plan becomes a part of this permit.
D. All work shall conform to the City of Campbell Standard Specifications and Details for Public Works Construction;the General Permit Conditions
listed on the reverse side;and the Special Provisions for this permit,listed below. Failure to abide by these conditions and provisions may result
in job shutdown and/or forfeiture of Faithful Performance Sureties and cash deposits. (See General Permit Conditions 1 and 2.)
E. The Contractor must have this permit and approved plans at the site and must notify the Public Works Department at least two days before
starting work. Notice must be given to Public Works at least 24 hours before restarting any work.
Name of Applicant: PG&E (CAROLINE CARTER) Telephone: 559.347.5017
Address: 8 RIVERPARK PL.E.FRESNO
E-Mail Address: C6U@PGE.COM 24-HOUR EMERGENCY PHONE NUMBER:
Is this work being done by the property owners at their own residence? r YES r NO
The Applicant/Permittee hereby agrees by affixing their signature to this permit to hold the City of Campbell,its officers,agents,and employees free,safe
and harmless from any claim or demand for damages resulting from the work covered by this permit.
The Applicant/Permittee hereby acknowledges that they have read and understand both the front and back of this permit, and they will inform their
contractor(s) of the information. Applicant is advised that upon issuance of this permit, property owner, or property owner's successors, shall be
responsible for y and all damages arisin t of the condition of any private improvements in the public right-of-way.
Accepted: a(�� 67: eh"/�7
( pplicant Permittee) (sign) Date
(Contractor) (Print Name) Date
SPECIAL PROVISIONS:
1. Street shall not be open cut for underground installations. Minimum cuts may be allowed for connections or exploration holes. Such cuts may be
specifically approved by the Inspector prior to cutting.
2. Pavement may be cut for underground installations and must be restored in accordance with the Standard Details Trench Restoration Method
"A",unless otherwise approved by the Engineer.
3. Work to be staked by a licensed Land Surveyor or Civil Engineer and two(2)copies of the cut sheets sent to the Public Works Department
before starting work.
4. Per Section 4215 of the Government Code this permit is not valid for excavations until Underground Service Alert(USA)has been notified and
the inquiry identification number has been entered hereon. USA Phone: 1-800-227-2600. USA TICKET NO.
5. Prior to any work,the property owner shall execute an Agreement for Private Improvements in the Public Right-of-Way,which shall be
recorded.
6. Public Notification Requirements:
7.
SEE PUBLIC WORKS FEE SCHEDULE FOR CURRENT FEES AMOUNT RECEIPT N O.
PERMIT APPLICATION FEE $ 3 P5
PLAN CHECK DEPOSIT $
SECURITY FOR FAITHFUL PERFORMANCE/LABOR&MATERIALS $
CONSTRUCTION CASH DEPOSIT $
PLAN CHECK&INSPECTION FEE ` $ 2 j a
APPROVED FOR ISSUANCE 7 ((S it -t
or ity Engineer Date
Permit Expires 12 Months After Date of Issuance
GENERAL PERMIT CONDITIONS
1. A Construction Cash Deposit is required. Charges will be made against this deposit if there is an emergency call-out,overtime inspection or when City
ordered barricading is required. Any such costs in excess of the deposit will be billed to the Permittee.
2. A one-year maintenance period and surety are required. Such period will begin on date of written acceptance by the City.
3. Refund or the cash deposit balance and refund or cancellation of the Faithful Performance Surety will be initiated by the written acceptance of the work
by the City.
4. The Permittee must request in writing a final inspection and acceptance of the work upon completion. Acceptance by the City will be made in writing
to the Permittee.
5. Maintain safe pedestrian and vehicular crossings and free access to private driveways,bus stops,fire hydrants,and water valves.
6. A Construction Traffic Control Plan and a Construction Schedule are required for all lane closures,detours,and street closures.This plan must be
reviewed and approved prior to any lane closures.
7. A Construction Traffic Control Plan shall conform to the Caltrans Manual of Traffic Controls for Construction and Maintenance Work Zones,dated
1990,available at Caltrans.Traffic control equipment shall include Type II flashing arrow signs if required.
8. Replace as directed by the City Engineer any damaged or removed improvements in accordance with City Standards and Specifications at the sole
expense of the Permittee.
9. Sawcut for all PCC or AC removals. All PCC removals shall be to the nearest scoremark and shall be doweled to existing improvements.
10. Prior approval of inspector is required for any work done after normal working hours,on weekends or holidays and may require reimbursement of
inspection costs at the current overtime rate.
11. Adequate signing and barricading is required on the job site. Failure to provide such signing and barricading may result in the City's providing signing
and barricades and charging the cost(including all labor and materials)against the cash deposit.
12. Compaction testing of subgrade,base rock,and asphalt concrete by Permittee is required unless otherwise stated by the City Engineer.
13. The Contractor or Permittee will have a supervisory representative available for contact on the project at all times during construction. Contractor or
Permittee shall provide a phone number at which they can be contacted outside the hours of 8:00 a.m.to 4:00 p.m.
14. No storage of materials or equipment will be allowed near the edge of pavement,the traveled way,or within the shoulderline which would create a
hazardous condition to the public.
15. This permit shall not be construed as authorization for excavation and grading on private property adjacent to the work or any other work for which a
separate permit may be required,nor does it relieve the Permittee of any obligation to obtain any other permit required by law.
16. This permit does not release the Permittee from any liabilities contained in other agreements or contracts with the City and any other public agency.
17. This permit is not transferable. Work must be performed by the Permittee or his designated agent or contractor as specified thereon.
18. Call back(call out)due to emeregencies regarding this permit shall be at the current overtime rate with a three(3)hour minimum charge per
occurrence.
19. Pursuant to Chapter 14.02 of the Campbell Municipal Code,applicant shall not cause to be discharged any material into the municipal storm drain
system other than storm water. Applicant shall adhere to the BEST MANAGEMENT PRACTICES established by the Santa Clara Valley Urban Runoff
Pollution Prevention Program.
20. If the public interest requires a modification of,or a departure from the plans and specifications,the City shall have the authority to require or approve
any modification or departure and to specify the manner in which the same is to be made for City-owned or maintained facilities.
21. Permitttee must provide advance notification to all parties that may be affected by the permit activities. Notification shall be reviewed by the City prior
to distribution and include dates of work and a contact name and phone number.
Applicant shall be responsible for ensuring that all those providing services under the applicant are aware and understand all of the above conditions.
CLAEOtt E CP- -TES f 14'Il1
Applicant Date:
Contractor (Print Name) Date:
J:\FORMS\Templates\Encroachment Permits\Encroachment Permit STATIC form2.pdf
Rev.3/08
Sn \ J S F DE- \ VALI-
264 _ TO S.S.D. SW 815 - A V I L T \ A V L I
`. ` 3-715A. 12KV 6305 I X
-- 85' -1245' 232' --- I
-496- I
33209 2
-498- � -499- •
-- -497- 10 15 LAT:37.294240
C.S.D.= 110A LONG:-121.926740
315853129239
-487- ` �1��
-456- -489 RO LEAKY
RANSFANSFORMER
N
- I CITY OF CAMPBELL
-473- PERMIT AND TRAFFIC
LAT:37.293750 40'
TRANSFORMER Y CONTROL REQUIRED.
It
LONG:-121.928190 -461-
25 25
C.S.D.= 30KVA
I j315848829221
iiD
U
U N
3
CL ,-L,
N
�
a
3 CL
0 ._I FIRE AREA NON-EXEMPT EQUIPMENT STAMP
I ,...T, i —i Identify the Subject Pole Fire Area
CL District (per Doc. #072148):
n ®SRA ❑OWF /
Q ❑FRA ❑UWF
QPer the Power Line Fire Prevention Field ll
Guide, the equipment being installed is:
PROJECT CONDITIONS STAMP 0 Exempt O Non—Exempt ®N/A
Type(s) of Work: 0 If Installing Non—Exempt Equipment 12KV
in a Fire Area, verify in SAP that the
❑New Business the CN-25 has been activated.
X❑PG&E Maintenance & Construction PLAT: H1613
By
Project Conditions: CAROLINE CARTER, C6CJ 8/18/14 SSD: VARIOUS
Signature, Name [Corp ID], Date
Q NONE APPARENT (if project design changes, contact ADE) CKT:EL PATIO 1 104
or
❑CONDITIONS APPLY: UNDERGROUND SERVICE ALERT N DESIGN VOLT: 2
❑PERMITS ❑TAILBOARD ❑OTHER 449L'1'1?g, CALL: TOLL FREE INSL DIST: B
* LOADING AREA: LIGHT
(Provide additional information on line below) �4 �i,`��'.
'% �� 81 1 CORR AREA: NON
By,CAROLINE CARTER, C6CJ 8/18/14 o,,��V'°o, TWO WORKING DAYS ARRESTOR DIST: 3
SIGNATURE, NAME, [CORPORATE 10], DATE ���i// BEFORE YOU DIG RAPTOR FRAMING: NO
EST: CAROLINE CARTER 559-347-5017 TRANSFORMER REPLACEMENTS JP#ADE: CYNDY SANDOVAL 559-347-5295 REV: -
SUPV: TOM COPELAND 559-960-1359 HAMILTON AND APRIL D R. SHT: 1 of 1 SHEETS
REP: VICTORIA NGUYEN 408-725-2011 CAMPBELL NOTIF: 107960015
PM:
SCALE: 1°-100' DATE: 8/18/14 PACIFIC GAS AND ELECTRIC COMPANY , 31070566
SIGNS BEING USED
TRAFFIC CONTROL ZONES MAX CONE SPACING
SULD SPEED TAPER BUFFER SIGN SPACING TAPER TANGENT
HO LLgSEoER 48X48" C30A-CA 25 125' 60' 100' 25 50
Q 30 180' 90' 30 60
' 48X48" C24-CA ��� ♦ 35 245' 120' 250' 35 70
40 320' 160' 40 80
"0 48X48" W20-1 X2O 55 660' 330' 500' 55 110
�� a� N
��° WOR AREA �r 1
. .
/8" 10Ib 8 W_ g - E
. ' .
S
EAST HAMILTON AVENUE i
f11
EAST HAMILTON AVENUE // i LOC 2
1.
__.--
v
O £Ai ROAD WORK
1 / Taper 82' c,,flc i2:i'
o
25PH
D M
D
FOR TCP QUESTIONS CALL: * O W20-1 Placed at
ROBERT @ 209-200-3351 D each W20-1
ELEC
D W20-1
SEE SPEC SHEET 2 FOR ADDITIONAL NOT TO SCALE
TRAFFIC CONTROL STIPULATIONS PM 31070566
°"'" CITY OF CAMPBELL
PEDESTRIAN AND BICYCLE ACCESS o
R30 24X24"BARRICADE Project� PM...tab
A cro
TO REMAIN OPEN AT ALL TIMES MOUNTED,PLACED ON E.Hamilton Ave @April Way Campbell,CA
BOTH SIDES OF STREET R'"°°'°'°° T Campbell,
A
PG&E
El SAFETY INC
WORK SHALL NOT EXCEED 12HRS ADDITIONAL TRAFFIC CONTROL 2o'APART72HRPRIOR a..NR n„
PERSON TO MAINTAIN CLOSURE AND ' s TO START OF WORK 209-333-0807 PS-1 8/19/2014
ASSIST BICYCLE,PEDESTRIAN AND DRIVE TOW-AWAY Prepared By ED SAFETY SERVICES,INC
MIN 12' CLEARANCE FOR TRAFFIC WAY TRAFFIC SHOULD NEED ARISE ZONE
HOURS OF WORK SHALL BE DETERMINED BY THE CITY OF CAMPBELL
CLOSURE STIPULATIONS AND SPECIFICATIONS THAT MUST BE FOLLOWED AT ALL TIMES
DRIVEWAY ACCESS SHALL REMAIN OPEN OR ACCESSIBLE AT ALL TIMES
All lane closures shall meet or exceed CA MUTCD 2012 specifications as well as conform to hours of work set forth by the
City. All areas of work when encroaching upon sidewalk access OR pedestrian safety shall have a CA MUTCD 2012 standard sidewalk
closure detour detail in place to ensure pedestrian and public safety.
Pedestrian access or detour will be maintained at all times in the event sidewalks must be closed, all paths of travel shall be similar to one
that is closed.
Pedestrian traffic shall at all times have a minimum 4 feet wide area of travel.
All open excavation areas shall be backfilled or trench plated prior to public usage.
All closures set forth in this TCP are the minimum allowed on project, field conditions may change requiring further traffic safety devices or
traffic control persons to ensure safety of traveling public, pedestrians as well as work forces.
All changes to ensure safety will be made immediately to ensure a safe environment for all parties.
All traffic control devices, vehicles and personnel must be suited for the purpose intended as well as meet or exceed all CA MUTCD 2012
specifications as well as City specifications.
All devices shall be removed when no longer required.
All flaggers shall be certified and all intersections shall be flagged when required as shown on plans.
If work is done at night or encroaches on the hours of darkness all road work ahead signs shall have flashing a beacon, light towers will be
used for flaggers and work areas and all other CA MUTCD 2012 requirements shall be met or exceeded as well.
NOT TO SCALE----SPACING OF SIGNS, TAPER AND TANGENTS WILL BE SPACED AS PER TABLE HAS SET FORTH AS GOVERNED BY
TRAVEL SPEEDS.
All traffic devices shall meet or exceed CA MUTCD 2012. All signs shall be high intensity night time reflective, 48"x48" roll up signs.
All signs shall have a minimum of 2, 18" day time flags attached to sign stands during day time hours and if applicable flashing 12", 12v
beacons for night time work.
Sign stands shall be CA MUTCD 2012 compliant as well allowing for 18" to 7' height for signs as well as spring equipped for windy conditions.
Pavement delineation not exactly as appears in field but traffic plan will still work as shown.All cones shall be 28" 10 lb and shall not be
placed further than 40' apart.
All hours of work shall be dictated by the Cities specified lane closure charts or as directed by the city inspector.
Vehicle path of travel shall never be less than 12' in width. Closures and excavation not to exceed what forces expect to excavate per the daily
shift.
Roadway shall not be opened until safe for public use.All open trenches must be plated or backfilled prior to public usage.
All areas of excavation must have a valid USA dig tag with corresponding dig ticket number, proof must be carried with the excavating forces
at all times.
NSafe access for pedestrian shall be
maintained at all times in accordance
with subsection 7-10.1 , Traffic Access,
�T of the City of Fresno Standard
W ' E Specifications. All necessary signage
I. A shall be in accordance with the California
MUTCD and approval by the
City of Fresno Traffic Engineer
W20-1 S
( M
�aoM
ovoa
KEEP
--/ R4-7a
RIGHT IV
axQ
30
E SAN GABRIEL
> Taper 125' Buffer 60'
O
Z
m WORK REA
CROAD
M = W2 0-10 1 28" 10I b
LOC 1
NOT: 107537038
ELEC
SIGNS PLACED @ 100' APART NOT TO SCALE
TRAFFIC PLAN QUESTIONS CALL:
HOURS OF WORK ROBERT BEADLES 209-200-3351
9AM TO 4PM ON °'""" CITY OF FRESNO
Project Name Project Number
ONSITE CONTACT CALL: E.San Gabriel and N.Barton PM 31078862
Prime Contractor Traffic Control Contractor
PG&E ED SAFETY INC
Phone S eeth Numb Date
209-333-0807 PS-1 6/30/2014
Prepared By
PERMIT # ED SAFETY SERVICES, INC
CLOSURE STIPULATIONS AND SPECIFICATIONS THAT MUST BE FOLLOWED AT ALL TIMES
DRIVEWAY ACCESS SHALL REMAIN OPEN OR ACCESSIBLE AT ALL TIMES
All lane closures shall meet or exceed CA MUTCD 2012 specifications as well as conform to hours of work set forth by the
City. All areas of work when encroaching upon sidewalk access OR pedestrian safety shall have a CA MUTCD 2012 standard sidewalk
closure detour detail in place to ensure pedestrian and public safety.
Pedestrian access or detour will be maintained at all times in the event sidewalks must be closed, all paths of travel shall be similar to one
that is closed.
Pedestrian traffic shall at all times have a minimum 4 feet wide area of travel.
All open excavation areas shall be backfilled or trench plated prior to public usage.
All closures set forth in this TCP are the minimum allowed on project, field conditions may change requiring further traffic safety devices or
traffic control persons to ensure safety of traveling public, pedestrians as well as work forces.
All changes to ensure safety will be made immediately to ensure a safe environment for all parties.
All traffic control devices, vehicles and personnel must be suited for the purpose intended as well as meet or exceed all CA MUTCD 2012
specifications as well as City specifications.
All devices shall be removed when no longer required.
All flaggers shall be certified and all intersections shall be flagged when required as shown on plans.
If work is done at night or encroaches on the hours of darkness all road work ahead signs shall have flashing a beacon, light towers will be
used for flaggers and work areas and all other CA MUTCD 2012 requirements shall be met or exceeded as well.
NOT TO SCALE----SPACING OF SIGNS, TAPER AND TANGENTS WILL BE SPACED AS PER TABLE HAS SET FORTH AS GOVERNED BY
TRAVEL SPEEDS.
All traffic devices shall meet or exceed CA MUTCD 2012. All signs shall be high intensity night time reflective, 48"x48" roll up signs.
All signs shall have a minimum of 2, 18" day time flags attached to sign stands during day time hours and if applicable flashing 12", 12v
beacons for night time work.
Sign stands shall be CA MUTCD 2012 compliant as well allowing for 18" to 7' height for signs as well as spring equipped for windy conditions.
Pavement delineation not exactly as appears in field but traffic plan will still work as shown.All cones shall be 28" 10 lb and shall not be
placed further than 40'apart.
All hours of work shall be dictated by the Cities specified lane closure charts or as directed by the city inspector.
Vehicle path of travel shall never be less than 12' in width. Closures and excavation not to exceed what forces expect to excavate per the daily
shift.
Roadway shall not be opened until safe for public use.All open trenches must be plated or backfilled prior to public usage.
All areas of excavation must have a valid USA dig tag with corresponding dig ticket number, proof must be carried with the excavating forces
at all times.
PG&E I ' n
Dependency Management Desk ���
8 River Park Place East SEP 0 8 2014
Fresno CA 93720
Public Works Administration
September 3, 2014
Re: Encroachment Permit Application
To: City of Campbell
Department of Public Works
70 N 1st St
Campbell, CA 95008
Attached is a permit application for the following location:
IN FRONT OF 1262 HAMILTON, CAMPBELL
If you have any questions, please contact Caroline Carter Taylor Estimator- Electric @
(559) 347-5017 or by email: C6CJ(c�pge.com. . Please reference our job order#
31070566 on all communication and approved permit.
Approved permits can be mailed or emailed
Thank you and have a great day,
Pat Nark-with
Operating Clerk/Support Services
,Fresno RJvf C
559 347-5105
PL.M7@PCcE.COJvt