Loading...
120 Kennedy Ave. (1970) ;/(; 76-/0 - ( .J-<-& ~ {!11'Lt- RECEIPT ~(C¡2) CITY OF CAMPBELL -- CAMPBELL. CALIFORNIA 1/~ -f)2 ~ ol!:; NAME () ~al;<-ß¡,~¿ ADDRESS '(/ . ~ Y.. /0 /C/ :æ æ4/é/W{/ FOR ~ dc~t~J d~ { ~ /7ð ~:: ~Ú ¿~~?4~ f (£/1/ / REVENUE ACCOUNT NO. .36' ç FUND NUMBER JII!-- cl:- ~ CH7c/i" 0 MONEY ORDER 0 CASH DATE AMOU NT THIS RECEIPT MUST BE MACHINE VALIDATED AND SIGNED BELOW. APR -]-70 APß -]-70 115 ****170.00 66 11SC *** 170.00 ~ ,Zß f" <em ~ CITY OF CAMPBELL 1699 CITIZEN COpy ~)' C<vY'--Vv-~ (y ¿) PLANNING DEPARTMENT CITY OF CAMPBELL 7S NORTH CENTRAL AVENUE CAMP DELL , CALIFORNIA DATE:~Fch 1~1970 CONDITIONS ATTACHED TO "s" APPROVAL OF PLANS OF J 0 S ~p.h..-L......_.f. i '7. 7. C ------ ---' FOR CONSTRUCTION OF ~.IL_in~~ial l)~ildin¡:. TO BE LOCATED AT: ---- 1:.2 0 Kennedy Avenu~ -------- - --- ----.------- CONDITIONS: conditions of approval attached Section 9316.1 of the Campbell Municipal Code reads as follows! Any approval granted under this section shall expire one hundred eighty (180) clays after the elate upon which such approval was granted, unless an estension for such approval is obtained by making written application for same to the Planning Commission at least fifteen (15) days prior to the expiration date of such approval. No building permit shall be issued after the expiration date of any approval until a ne\\' approval has been obtained in the !flannel' provided for in this Chapter. GRANTED BY THE CITY OF CAi'oIPBELL PLANNING COM~!ISSION AT A REGULAR MEETINC HELD ON THE IGth DAY OF Hareh,1970 ----- ----------_. CI TY OF CAMPBELL PLAN~r I NG Cm.HIII 55 ION ;.::c;(Ení',ineerin¡1, Dept. wIatt. Fire Dept., wIatt. By: ------ ARTTIU}r-KT]~-;-sTCïŒTp][T------ ."s" 70-10 Pizzo, J. L. Conditions of Approval 1. Property to be fenced and landscaped as indicated and as added in "red" on plans. 2. Landscape plan indicating type of bibs or sprinkler system and type approval of the Planning Director building permit. plant material, location of hose of fencing to be submitted for at time of application for 3. Faithful performance- bond in the amount of ~500 to be posted to insure landscaping, fencing and striping of parking area within three (3) months of completion of construction or applicant may file written agreement to complete landscaping, fencing and striping of parking area prior to final building department clearance. 4. Landscaping shall be maintained in accordance with the approved landscape plan. 5 . T r ash con t a in e r ( s) t 0 bel 0 cat e din are a sap p roo v e d by Fir e D e par t - ment. Enclosure shall have a 6' sight-obscuring fence with concrete floor and 6 foot self-closing gates of sufficient size to house all trash containers. 6. Architectural treatment shall be added to the west elevation of the building in accordance with plans approved by the Planning Director. The applicant is notified as part of this application that he is required to meet the following conditions in accordance with Ordinances of the City of Campbell: A. All parking and driveway areas to be developed in compliance with Section 9319 of the Campbell Municipal Code. B. Underground utilities to be provided as required by Section 9110.6 of the Campbell Municipal Code. C. Plans submitted to the building department for plan check shall indicate clearly the location of all connections for underground utilities including water, sewer, electric, telephone and televlsion cables, etc. D. Sign application to be submitted in accordance with provisions of the sign ordinance for all signs. No sign to be installed until application is approved andpermit issued by the building department. E. Roof projection next to east property line shall be protected by block wall. "5" 70-10 Pizzo) J. L. Conditions of Approval Page Two F. Applicant to pay storm drainage fee in the , Jj '! ¡:v '7° [;- ,-- , . /, a~' I / 2 (1 /. / //v <- ~/V amount of $170.00. The applicant is notified that he shall comply Hith all applicable Codes or Ordinances of the City of Campbell which pertain to this application and are not herein specified.