CONDITIONS OF APPh ~: S 86-15
APPLICANT: Andarch Associates
SITE ADDRESS: 180 & 198 Kennedy Ave.
P.C. MTG. 7-22-86
The applicant is notified as part of this application that he/she is required
to meet the following conditions in accordance with the Ordinances of the City
of Campbell and the Laws of the State of California.
1.
Property to be fenced and landscaped as indicated and/or added in red on
the plans. Landscaping and fencing shall be maintained in accordance with
the approved plans.
2.
Landscaping plan indicating type and size of plant material, and location
of irrigation system to be submitted to the Planning Department and
approved by the Site and Architectural Review Committee and/or Planning
Commission prior to issuance of a building permit.
3.
Fencing plan indicating location and design details of fencing to be
submitted to the Planning Department and approved by the Planning Director
prior to issuance of a building permit.
4.
Applicant to either (1) post a faithful performance bond in the amount of
$3,000.00 to insure landscaping, fencing, and striping of parking areas
within 3 months of completion of construction; or (2) file written
agreement to complete landscaping, fencing, and striping of parking areas.
Bond or agreement to be filed with the Planning Department prior to
application for a building permit.
5.
Applicant to submit a plan to the Planning Department, prior to
installation of PG&E utility (transformer) boxes, indicating the location
of the boxes and screening (if boxes are above ground) for approval of the
Planning Director.
6.
Applicant to submit a letter to the Planning Department, satisfactory to
the City Attorney, prior to application for building permit, limiting the
use of the property as follows: 450 sq.ft. office use; 7,708 sq.ft.
automotive/warehousing/industrial use.
7.
All mechanical equipment on roofs and all utility meters to be screened as
approved by the Planning Director.
8.
Building occupancy will not be allowed until public improvements are
installed.
9.
All parking and driveway areas to be developed in compliance with Chapter
21.50 of the Campbell Municipal Code. All parking spaces to be provided
with appropriate concrete curbs or bumper guards.
CONDITIONS OF APPR .L: S 86-15
APPLICANT: Andarch Associates
SITE ADDRESS: 180 & 198 Kennedy Ave.
Page 2.
10. Underground utilities to be provided as required by Section 20.16.070 of
the Campbell Municipal Code.
11. Plans submitted to the Building Department for plan check shall indicate
clearly the location of all connections for underground utilities including
water, sewer, electric, telephone and television cables, etc.
12. Sign application to be submitted in accordance with provisions of the Sign
Ordinance for all signs. No sign to be installed until application is
approved and permit issued by Planning and Building Departments (Section
21.68.030 of the Campbell Municipal Code).
13. Ordinance No. 782 of the Campbell Municipal Code stipulates that any
contract for the collection and disposal of refuse, garbage, wet garbage
and rubbish produced within the limits of the City of Campbell shall be
made with Green Valley Disposal Company. This requirement applies to all
single-family dwellings, multiple apartment units, to all commercial,
business, industrial, manufacturing, and construction establishments.
14. Trash container(s) of a size and quantity necessary to serve the
development shall be located in area(s) approved by the Fire Department.
Unless otherwise noted, enclosure(s) shall consist of a concrete floor
surrounded by a solid wall or fence and have self-closing doors of a size
specified by the Fire Department. All enclosures to be constructed at grade
level and have a level area adjacent to the trash enclosure area to service
these containers.
15. Applicant shall comply with all appropriate State and City requirements for
the handicapped.
18. The applicant is hereby notified that the property is to be maintained free
of any combustible trash, debris and weeds, until the time that actual
construction commences. All existing structures shall be secured by having
windows boarded up and doors sealed shut, or be demolished or removed from
the property. Sect. 11.201 & 11.414,1979 Ed. Uniform Fire Code.
FIRE DEPARTMENT
19. Automotive repair occupancies shall meet requirements for an H-4 occupancy.
20. One-hour separations shall be provided between auto repair and warehouse
occupanices.
21. Property line walls shall be constructed as four-hour walls.
22. Provide an automatic sprinkler throughout the building.
BUILDING DEPARTMENT
No comments at this time.
CONDITIONS OF APPI .~L: S 86-15
APPLICANT: Andarch Associates
SITE ADDRESS: 180 & 198 Kennedy Ave.
Page 3.
PUBLIC WORKS DEPARTMENT
23. Process and file a parcel map to combine the two lots.
24. Dedicate additional right of way to widen Kennedy Avenue to 30 feet from
centerline.
25. Submit three copies of the on-site grading and drainage plan to the
Director of Public Works.
26. Obtain an excavation permit, pay fees and post surety to relocate driveway
and any other work in the public right of way.
TO:
ACCT.
JHZ
3370
3372
3372
3372
337~~
~._~
3372
3372
3372
3372
3395
3373
3373
3373
3372
3373
3521
C I TV CLERK -
PLEASE COLLECT ~ECEIPT
Fœ 11iE FOLLOWING MONIES
P.W. FILE NO.
e,
ITEMS
nJllIJDJKNTAl. ~~~~MNT (JaZO J
STORM DRAINAGE ARE~ FEE PER ~CRE (R-I, .'.875;
MULTI-RES" $2,060; ALL OTHER, $2,250)
PLAN EXAMINATION AND CONSTRUCTION INSPECTION FEE
(7% OF VALUE)
TENTATIVE PARCEL MAP FILING FEE ($300)
TENTATIVE TRACT MAP FILING FEE ($290)
FINAL PARCEL MAP FILING FEE ($275)
FINAL TRACT MAP FILING FEE ($275)
VACATION OF PUBLIC STREETS AND EASEMENTS ($455)
ASSESSMENT SEGREGATION œ REAPPORT I OfoNENT ( $420
Fœ FIRST PLUS $130 EACH ADDITIONAL)
LOT LINE ADJUSTMENT FEE/CERTIFICATE OF COMPLIANCE ($300)
PARK DEDICATION IN-LIEU FEE PER UNIT ($I,097.00!)
COPIES OF ENGINEERING MAPS AND PLANS ($,50 PER SQ. FT.)
WORK AREA TRAFFIC CONTROL HANDBOOK ($2); ADDITIONAL ($' .50
3373
PROJECT PLANS AND SPECIFICATIONS (SIO)
MAP REVISIONS TO MAP COMPANIES (SIO)
EXCAVATION PERMIT APPLICATION FEE ($35)
GFNEP-AL CONDITIONS. STD, PROVISIONS & DETAILS
($10; œ $I/PG)
CASH DEPOSIT
3521
FAITHFUL PERFORMANCE DEPOSIT
3521
M.~ I NTENANCE BOND DEPOS I T
3520
FIRE HYDRANT MAINTENANCE ($195/EA)
3510
POSTAGE
O'THER
TOT AL
NAME ~< ~ .s
ADDRESS I 4 ~ S'-
£" 177 t-I-pr:.s t' J
N~'i t A\J-
PHONE
FOR
C I TV CLERK
ONLY
ì'-'t/
s ;;).. 7 5~ 0 t:>
(L:Y>ì
'7 .- Þ ¿... - ¥b
RECEIPT NO.
AMOUNT PAID
RECEIVED BY
DATE
AMOUNT
'2- I r ~LJ
S J--7J
c¡ --, 1-- 77 J'"
ZIP 9' j-/ l. b
..JULY li84
TO:
ACCT.
Jj}l
3370
~j
~
3372
3372
3372
3372
3395
3373
3373
3373
3372
3373
3521
3521
3521
3520
3510
NAME
ADDRESS
3372
3372
3373
CITY CLERK ..
PLEASE COLLECT I PT
Fœ 11iE FOLLOW I NG MON I ES
8 ..w. FILE NO.
ITEMS
~MJlmmmJL JYg~~~NT (1410)
STORM DRAINAGE AREA FEE PER ACRE (R.'. $'.875;
MULTI-RES,. $2,060; ALL OTHER. S2.250)
PLAN EXAMINATION AND CONSTRUCTION INSPECTION FEE
(7"10 OF VALUE)
TENTATIVE PARCEL MAP FILING FEE (8300)
TENTATIVE TRACT MAP FILING FEE (S290)
FINAL PARCEL MAP FILING FEE (8275)
FINAL TRACT MAP FILING FEE (S275)
VACATION OF PUBLIC STREETS AND EASEMENTS (8455)
ASSESSMENT SEGREGATION œ P.EAPPORTIONMENT( SUO
Fœ FIRST PLUS $130 EACH ADDITIONAL)
LOT LINE ADJUSTMENT FEE / CERT I FICA TE OF COMPL lANCE ($ 3 0 0 )
PARK DEDICATION IN-LIEU FEE PER UNIT ($I.O97.00!)
COPIES OF ENGINEERING MAPS AND PLANS ($ .50 PER SQ. FT.)
WORK AREA TRAF'F I C CONTROL. HANDBOCK (82); ADD I T I ONAL ($ I . 5 0 I
PROJECT PLANS AND SPEC I F I CAT IONS (810)
MAP REVISIONS TO MAP caAPANI ES( SI 0)
EXCAVATION PERMIT APPLICATION FEE ($35)
GENERAL COND I T IONS. STD. PROV I S I ONS & DET A I LS
($10; œ $I/PG)
CASH DEPOS I T
FAITHFUL PERFORMANCE DEPOSIT
MA I NTENANCE BOND DEPOS I T
FIRE HYDRANT MAINTENANCE ($195/EA)
POSTAGE
OTHER
TOTAL
JQ~e.s
I q bJ--
(( K -c C'~
AJ,? /r r. Á V
RECEIPT NO. ~ I <g If
~að(J. 00
a~ /;T)
5-bCJ~b
PHONE
~
,-)
FOR
C I TV CLERK
ONLY
AMOlJIIT PAID
RECE rVED BY
DATE
AMOUNT
S
/U/L
(
~oC)
--:r <D 0
oro
97/-/ÞrT<7
ZIP 9' J~ I 2- b
.JULY li84
MEMORANDUM
.
.
CITY OF CAMPBELL
To:
Arthur A. Kee, Planning Director
Date:
JL)n~
4,
I "'t ~l.-
From:
Bill M. Helms, Acting Director of Public Works
Subject:
TENTATIVE PARCEL MAP
LANDS OF Jim R ~~s
A.P.N.41'3-2.-:1.2..L2"3
I .
----------------------------------------------------------
This office recommends approval of the proposal, subject to the following
conditions:
1.
File a parcel map in accordance with the provisions of the State
Subdivision Map Act.
2.
])£ c\ ICa i-.c
C1 J J : to n c< !
n~~d
oJ
\
\
LÙ / +~
Vl.j I'C! (. f?
\
k ¿ n íì e.c\ V
/
AVCIIl)C
i
100
7:.>0
f (~~t
f r ~ 1'1
j /'
('rnl~r In¿