Admin PD - Art Studio - 2005January 5, 2005
Ms. Erinn Turi
670 W. Parr Avenue
Campbell, CA 95008
Re:
Administrative Planned Development Permit
File No.: PLN2004-189 -68 East Campbell Avenue
Dear Ms. Turi:
The Community Development Director has conditionally approved your Administrative Planned
Development Permit application to allow the establishment of an art studio and ceramic school in
a portion of an existing commercial building. The proposed tenant space is comprises of 1,620
square feet in a multi-tenant commercial building located at 68 East Campbell A venue. This
approval is subject to the conditions provided in the enclosed conditions of approval.
If you should have any questions, please feel free to contact me at (408) 866-2144 or via email at
timh@citvofcampbell.com.
Sincerely,
Tim 1. Haley
Associate Planner
Encl: Administrative Planned Development Permit Approval, January 5, 2005
Conditions of Approval
2 Stamped Approved Plans
cc:
Geoff Bradley, Senior Planner
Bruno Marcelic, Architect, 365 East Campbell Avenue, Campbell, CA 95008
Mike Rugani, P.O. Box 873, Los Gatos, CA 95031
70 North First Street
Campbell, California 95008. 436
TEL 408.866.:2140 . FAX 408.871.5140 . Tn!) 408.866.:2790
CITY OF CAMPBELL
ADMINISTRA TIVE ACTION OF THE COMMUNITY
DEVELOPMENT DIRECTOR
JANUARY 5, 2005
PLN2004-189
Application of Ms. Erinn Turi for approval of an Administrative Planned
Development Permit to allow the establishment of a 1,650 square foot ceramics
art studio with classes in an existing commercial building located at 68 E.
Campbell Avenue, in a P-D (Planned Development) Zoning District.
PROJECT DESCRIPTION
The project consists of the establishment of an art studio and ceramics school in an existing
commercial building. The applicant would occupy 1,650 square feet of an existing square foot
commercial building. No alteration to the exterior of the building is proposed as part of the
project.
DISCUSSION
The subject building is currently developed with a single story multi-tenant commercial building
constructed in approximately 1949. The existing building consists of the 1,650 square foot
tenant space in a 5,300 square foot multi-tenant building. The proposed use would occupy a
1,650 square foot tenant space and will be used as an artist studio and ceramics school. This
tenant space was previously occupied by an internet cafe. The applicant description indicates
that classes will be limited to less than 10 students.
The project site is located on the south side of East Campbell Avenue at 4th Street. The project
site is surrounded by commercial and office uses to the north, south, and east, and residential
uses to the west. The project site takes vehicular access from 4th Street.
The submit site plan indicates the provision of 4 parking spaces that access 4th Street via an
alleyway.
The General Plan land use designation for the project site is Central Commercial and the project
is compatible with this land use designation. The zoning designation for the project site is P-D
(Planned Development). An Administrative Planned Development Permit is required for a
change of use within the P-D (Planned Development) zoning district.
PLN2004-189 - 68 E. Campoell Avenue
Administrative Planned Development Permit
Page 2 of 2
The applicant has indicates that the operational hours will be limited to 7:00 a.m. to 11 :00 p.m.
daily.
Attachments:
1. Findings for Approval of PLN2004-189
2. Conditions of Approval for PLN2004-189
Prepared by: ~~ ~
Tim J. Haley, Associate Planner
Approved by:
Geoff I. Bradley, Senior Planner
Attachment # 1
FINDINGS FOR APPROVAL OF FILE NO. PLN2004-189
SITE ADDRESS:
APPLICANT:
DATE:
68 E. Campbell Avenue
Erinn Turi
January 5, 2005
Findings for approval of an Administrative Planned Development Permit to allow the
establishment of a 1.650 square foot artist studio and ceramics school in a 5.300 square foot
multi-tenant commercial building located at 68 E. Campbell Avenue
The Community Development Director finds as follows with regard to File No. PLN2004-189:
1. The proposed project consists of the establishment of a 1,650 square foot art studio and
commercial school in an existing commercial building.
2. The development of the proposed project will result in a use that is consistent with the
General Plan land use designation of Central Commercial for the area.
3. The proposed project is consistent with the P-D (Planned Development) Zoning District.
4. The existing parking will adequately meet the demands generated by the change in use, and
will not be detrimental to the overall parking and circulation in the area.
5. The proposed operational hours of 10:00 a.m. to 10:00 p.m. daily are typical of commercial
uses in the vicinity.
6. Class sizes will be limited to 10 students.
7. The subject property is surrounded by commercial and office uses to the north, south, east,
and west.
8. The project qualifies as a Categorically Exempt project per Section 15301, Class 1 (Existing
Facilities) of the California Environmental Quality Act (CEQA).
Based upon the foregoing findings of fact, the Community Development Director further finds and
concludes that:
1. The proposed project is consistent with the General Plan and the Zoning Code.
2. The proposed project as conditioned will aid in the harmonious development of the
immediate area.
3. The proposed development will not be detrimental to the health, safety or welfare of the
neighborhood or the City as a whole.
4. No substantial evidence has been presented from which a reasonable argument could be
made that shows that the project, as currently presented and subject to the required
Conditions of Approval, will have a significant adverse impact on the environment.
Attachment # 1
Page 2 of2
5. The subject site is adequate in size and shape to accommodate the yards, walls, fences,
parking and loading facilities, landscaping, and other development features required in order
to integrate said use with uses in the surrounding area.
6. The subject site is adequately served by streets of sufficient capacity to carry the kind and
quantity of traffic such use would generate.
7. There is a reasonable relationship between the use of the fees imposed upon the project and
the type of development project.
8. There is a reasonable relationship and a rough proportionality between the conditions of
approval and the impacts of the project.
Attachment #2
CONDITIONS OF APPROVAL FOR FILE NO. PLN2004-189
SITE ADDRESS:
APPLICANT:
DATE:
68 East Campbell Avenue
Erinn Turi
January 5, 2005
The applicant is hereby notified, as part of this application, that he/she is required to meet the
following conditions in accordance with the ordinances of the City of Campbell and the State of
California. Where approval by the Community Development Director, City Engineer, Public
Works Director, City Attorney, or Fire Department is required, that review shall be for
compliance with all applicable Conditions of Approval, adopted policies and guidelines,
ordinances, laws and regulations, and accepted engineering practices for the item under review.
Additionally, the applicant is hereby notified that he/she is required to comply with all applicable
Codes or Ordinances of the City of Campbell and the State of California that pertain to this
development and are not herein specified:
COMMUNITY DEVELOPMENT DEPARTMENT
Planning Division:
1. Approved Project: Approval is granted for an Administrative Planned Development Permit
(PLN2004-189) for the establishment of a 1,650 square foot tenant space at 68 East
Campbell Avenue. The site design shall substantially comply with project plans prepared by
Bruno Marcelic, AlA, received by the Community Development Department, dated
December 12, 2004, and the applicant's business description dated October 26, 2004, except
as may be modified by the Conditions of Approval herein.
2. Administrative Planned Development Permit Approval Expiration: The Administrative
Planned Development Permit approval shall be valid for one year from the date of final
approval. Within this one-year period a building permit must be obtained and construction
completed one year thereafter or the use must be established on the property (if no building
permit is required). Failure to meet these deadlines will result in the Administrative Planned
Development Permit being void.
3. Operational Hours: The operational hours shall be limited to 7:00 a.m. to 11 :00 p.m. daily.
The applicant describes the operational hours as 10:00 a.m. to 10:00 p.m.
4. Revocation of Permit: Operation of the use in violation of the Administrative Planned
Development Permit or any standards, codes, or ordinances of the City of Campbell shall be
grounds for consideration of revocation of the Administrative Planned Development Permit
by the Community Development Director.
5. Parking. Driveways. and Maintenance: All parking and driveway areas shall be maintained
in compliance with the approved plans and Chapter 21.28 (Parking and Loading) of the
Campbell Municipal Code. All parking areas shall be regularly swept and cleaned to remove
litter and debris from the parking areas and driveways.
Attachment #2
Page 2 of 3
6. Outdoor Storage: No outdoor storage is permitted on the subject property. No equipment,
materials or business vehicles shall be parked and/or stored outside the building or within the
parking lot.
7. SÜmage: No signage is approved as part of the development applications approved
herein. No sign shall be installed until a Sign Permit is approved as specified in the Sign
Ordinance.
Buildint! Division:
8. Permits Required: A building permit application shall be required for the proposed new
improvements to the existing commercial space. The building permit shall include
Electrical/Plumbing/Mechanical fees when such work is part of the permit.
9. Construction Plans: The conditions of approval shall be stated in full on the cover sheet of
construction plans submitted for building permit.
10. Size of Plans: The size of construction plans submitted for building permits shall be 24
inches by 36 inches.
11. Plan Preparation: This project requires plans prepared under the direction and oversight of a
California licensed Engineer or Architect. Plans submitted for building permits shall be "wet
stamped" and signed by the qualifying professional person.
12. Site Plan: Application for building permit shall include a competent site plan that identifies
property and proposed structures with dimensions and elevations as appropriate. Site plan
shall also include site drainage details. Site address and parcel numbers shall also be clearly
called out. Site parking and path of travel to public sidewalks shall be detailed.
13. Title 24 Energy Compliance: California Title 24 Energy Standards Compliance forms shall
be blue-lined on the construction plans. Compliance with the Standards shall be
demonstrated for conditioning of the building envelope and lighting of the building.
14. Special Inspections: When a special inspection is required by D.B.c. Section 1701, the
architect or engineer of record shall prepare an inspection program that shall be submitted to
the Building Official for approval prior to issuance of the building permits, in accordance
with D.B.c. Section 106.3.5. Please obtain City of Campbell, Special Inspection forms from
the Building Inspection Division Counter.
15. Title 24 Accessibilitv - Commercial: On site general path of travel shall comply with the
latest California Title 24 Accessibility Standards. Work shall include but not be limited to
accessibility to building entrances from parking facilities and sidewalks.
16. Title 24 Accessibility - Commercial: Projects seeking to use the Title 24 Hardship
exemption clause shall blue-line completed, City of Campbell "20%" exemption form on
submitted construction plans. Form is available at Building Division service counter.
17. Approvals Required: The project requires the following agency approval prior to issuance of
the building permit:
a.
b.
West Valley Sanitation District
Santa Clara County Fire Departmen!
Attachment #2
Page 3 of 3
18. P.G.& E.: Applicant is advised to contact Pacific Gas and Electric Company as early as
possible in the approval process. Service installations, changes and/or relocations may
require substantial scheduling time and can cause significant delays in the approval process.
Applicant should also consult with P.G. and E. concerning utility easements, distribution pole
locations and required conductor clearances.
Date: October 26, 2004
Business Name: The Art Beat
Business Owner: Erinn M. Turi
Location: 68 E. Campbell Ave, Campbell, CA
Nature of Business: I will be teaching ceramics and art to children and
adults. I'll also be using the facility for my own personal art studio. My
classes are small, less than 10 students at a time. Hours of operation:
lO:OOam to lO:OOpm.