Loading...
Site & Arch - Wireless - 2004July 13, 2004 Mr. Philip Thomas AT&T Wireless Services 2729 Prospect Park Drive Rancho Cordova, CA 95670 Re: Site and Architectural Review Permit File No.: PLN2004-61 42 W. Campbell Avenue Dear Mr. Thomas: The Community Development Director has conditionally approved your Site and Architectural Review Permit application for the installation of six telecommunications antennas, five equipment cabinets, and two cupolas located at 42 W. Campbell Avenue. The project meets the requirements of the Zoning Ordinance for a stealth telecommunications facility, utilizes a preferred mounting technique, and is located in a preferred location. If you should have any questions, please feel free to contact me at (408) 866-2142 or by email at mel indad@cityo[campbell.com. Sincerely, Melinda M. Denis Planner I end: Site and Architectural Review Permit Approval, July 13, 2004 cc: Geoff Bradley, Senior Planner Forty- Two West Investments, 106 W. Campbell Avenue, Campbell, CA 95008 70 North First Street. Campbell, California 95008-1436 . TEL 408.866.'2140 . FAX 408.871.5140 . TnD 408.866.'2790 CITY OF CAMPBELL ADMINISTRATIVE ACTION OF THE COMMUNITY D EVELO PMENT D IRECTO R JULY 13, 2004 PLN2004-61 Thomas, P. Application of Philip Thomas, on behalf of AT&T Wireless Services, for approval of a Site and Architectural Review Permit to allow the establishment of a new stealth wireless telecommunications facility located at 42 W. Campbell Avenue in a P-D (Planned Development) Zoning District. PROJECT DESCRIPTION The project consists of the installation of six telecommunications antennas inside two new cupolas on the roof of the existing office building located at 42 W. Campbell Avenue. The proposal also includes the installation of new equipment cabinets within the building. The proposed wireless telecommunications facility would be unmanned and would require a site maintenance visit approximately twice a month. LOCATION The subject property is located on the south side of West Campbell Avenue, west of the Winchester Boulevard and Campbell Avenue intersection. The property is surrounded by the Campbell Community Center to the north, mixed commercial to the south, gas station to the east, and professional office to the west. DISCUSSION The facility consists of six new panel antennas, five equipment cabinets, and two new cupolas. The panel antennas measure four feet two inches tall and will be mounted inside the cupolas on the roof of the building, at six feet above the parapet of the building. The cupolas will be painted to match the existing building and will include a roofline and roof materials that match the existing building. The antennas will not be visible from the exterior of the cupolas. The proposed equipment cabinets would be housed in a 168 square foot storage unit within the existing building. The cabinets would be located entirely within the existing building and would not be visible from the exterior. The facility will be unmanned and operate 24 hours a day, seven days a week. The facility will be serviced approximately twice a month by a technician, except in the event PLN2004-61 ~ 42 W. C.pbell Avenue Site and Architectural Review Permit Page 2 of 2 of an emergency. The operation of the facility will not have an effect on the existing parking for the office building and no additional parking is required for this project. The applicant submitted a report prepared by Hammett & Edison, Inc. to evaluate the facility for compliance with Federal Standards limiting human exposure to radio frequency electromagnetic fields. The report concluded that the proposed location site will be within the Federal Standards and will not have a detrimental effect on the environment. The Community Development Director has found that the proposed facility is a stealth facility as defined in the Wireless Telecommunications Facilities Ordinance. Attachments: 1. Findings for Approval of PLN2004-6l 2. Conditions of Approval for PLN2004-6l 3. Project Plans 4. Location Map ~?11 ' Prepared by:' ;' ..~. 'r.¿¿~ elinda M. Denis, Planner I Attachment # I FINDINGS FOR APPROVAL OF FILE NO. PLN2004-61 SITE ADDRESS: APPLICANT: DATE: 42 W. Campbell Avenue Philip Thomas on behalf of AT&T Wireless Services July 13,2004 Findings for approval of a Site and Architectural Review Permit to allow the installation of a stealth wireless telecommunications facilitv located at 42 W. Campbell Avenue. The Community Development Director finds as follows with regard to File No. PLN2004-61 : 1. Wireless telecommunication facilities are permitted in the P-D (Planned Development) Zoning District. Projects that meet the definition of a stealth facility may be approved by the Community Development Director with the granting of a Site and Architectural Review Permit. 2. The installation of the new panel antennas inside the cupolas will result in less visual clutter in the long term and reduce overall visual impacts. 3. The facility consists of six panel antennas, five equipment cabinets, and two new cupolas. 4. The panel antennas measure four feet two inches tall and would be mounted inside two new cupolas on the roof of the building at six feet above the parapet of the building. The antennas would not be visible from the exterior of the cupola. 5. The equipment cabinets will be housed in a 168 square foot storage unit within the existing building. The cabinets would be located entirely within the building and would not be visible from the exterior. 6. The facility will be unmanned and operate 24 hours a day, seven days a week. The facility will be serviced approximately twice a month by a technician, except in the event of an emergency. 7. The operation of the facility will not have an effect on the existing parking and no additional parking is required for this project. 8. The project qualifies as Categorically Exempt under Section 15303, Class 3 of the California Environmental Quality Act (CEQA) pertaining to the installation of new small facilities and structures. Based upon the foregoing findings of fact, the Community Development Director further finds and concludes that: Attachment # I Page 2 of 2 I. The proposed project is consistent with the General Plan and the Zoning Code. 2. The proposed project as conditioned will aid in the harmonious development of the immediate area. 3. The establishment, maintenance or operation of the use, as conditioned, will not be detrimental to the health, safety, peace, morals, comfort, or general welfare of persons residing or working in the neighborhood of such proposed use, or be detrimental or injurious to property and improvements in the neighborhood or to the general welfare of the City. 4. There is a reasonable relationship between the use of the fees imposed upon the project and the type of development project. 5. There is a reasonable relationship and a rough proportionality between the conditions of approval and the impacts of the project. 6. The project is not located in a particularly sensitive environment; and no substantial evidence has been presented to suggest that there is a possibility that significant environmental impacts would result from the proj ect. Attachment #2 CONDITIONS OF APPROV AL FOR FILE NO. PLN2004-61 SITE ADDRESS: APPLICANT: DATE: 42 W. Campbell Avenue Philip Thomas on behalf of AT&T Wireless Services July 13,2004 The applicant is hereby notified, as part of this application, that he/she is required to meet the following conditions in accordance with the ordinances of the City of Campbell and the State of California. Where approval by the Community Development Director, City Engineer, Public Works Director, City Attorney, or Fire Department is required, that review shall be for compliance with all applicable Conditions of Approval, adopted policies and guidelines, ordinances, laws and regulations, and accepted engineering practices for the item under review. Additionally, the applicant is hereby notified that he/she is required to comply with all applicable Codes or Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified: COMMUNITY DEVELOPMENT DEPARTMENT Planning Division: 1. Approved Project: Approval is granted for a Site and Architectural Permit to allow the establishment of a stealth wireless telecommunications facility located at 42 W. Campbell Avenue. Project approval shall substantially comply with project plans prepared by Velocitel Architecture and Engineering Division and stamped as received by the Planning Division on June 29, 2004, except as modified by the conditions of approval contained herein. 2. Development Approval Expiration: All conditions of approval specified herein must be completed and the facility established on the site within one year from the date of approval or the Site and Architectural Review Permit shall be void. 3. Length of Permit Term: This Site and Architectural Review Permit shall expire five years from the date of permit approval, on July 13, 2009. If the use is to continue, the applicant shall apply for a new permit for an additional five-year period. If technological improvements or developments occur which allow the use of materially smaller or less visually obtrusive equipment at this time, the service provider will be required to replace or upgrade the approved facility upon application for a new Site and Architectural Review Permit application to minimize adverse effects related to land use compatibility, visual resources, public safety or other environmental factors. 4. Maintenance of Finish: It is an ongoing obligation of the applicant, assignees and successors in interest to maintain the exterior finish of the structures and equipment approved by this permit in good order. Faded, peeling or damaged paint shall be repainted as soon as practical. Graffiti shall be removed by repainting the surface of the structure or equipment as soon as practical. Attachment #2 Page 2 of 4 5. Cessation of Operations: The service provider shall provide written notification to the Director upon cessation of operations on the site exceeding a 90-day period. The service provider shall remove all obsolete or unused facilities from the site within 180 days of termination of its lease with the property owner or cessation of operations, whichever comes earlier. 6. New Permit Required: If a consecutive period of 180 days has lapsed since cessation of operations, a new Site and Architectural Review Permit or Use Permit shall be required prior to use or reuse of the site. 7. Utilities: All new on-site utilities shall be installed underground per Section 21.18.140 of the Campbell Municipal Code. The applicant shall comply with all plan submittals, permitting and fee requirements of the serving utility companies. 8. Outdoor Storage: No outdoor storage is permitted on the property in conjunction with this permit. 9. Cables: All external cables or equipment shall be obscured from public view by enclosing them in architecturally designed cabinets or cable trays painted to match the structure. 10. Business License Required: Each service provider with a wireless telecommunication facility in the City shall obtain a city business license. 11. Compatibility With City Emergency Services: The facility shall not be operated, nor caused to transmit on or adjacent to any radio frequencies licensed to the City for emergency telecommunication services such that the City's emergency telecommunications system experiences interference. 12. Lighting: The use of lighting shall not be allowed on telecommunication facilities unless required as a public safety measure. Where lighting is used, it shall be shielded from public view and operated only during times of necessity by a maintenance operator. 13. No Advertising: No advertising signage or identifying logos shall be displayed on wireless telecommunications facilities, except for small identification plates used for emergency notification or hazardous or toxic materials warning. 14. Noise: The wireless telecommunication facility, including power source, ventilation and cooling facility, shall not generate noise discernible beyond the property lines. 15. Back-Up Generators: Backup generators shall comply with the noise standard referenced above and shall only be operated during power outages or for testing and maintenance between the hours of 8:00 a.m. and 5:00 p.m., Monday through Friday. Attachment #2 Page 3 of 4 16. Heat Generation: The wireless telecommunication facility, including power source and cooling facility, shall not be operated so as to cause the generation of heat that adversely affects any building occupant. 17. Odors: The testing of back-up generators shall not produce odors that adversely affect the public. 18. Maintenance Hours: Normal maintenance activities shall only occur between the hours of 7:00 a.m. to 5:00 p.m. Monday through Saturday, excluding emergency repairs. 19. Safety: a. Public Access Restricted: Antennas are to be sited in such a way and barriers and signage provided to prevent a person from passing within the safety limits established by the FCC-adopted standards for controlled access. b. Warning Signs: Signage shall be maintained at the facility identifying all wireless telecommunication facility equipment and safety precautions for people nearing the equipment as may be required by any applicable FCC- adopted standards, including the RF radiation hazard warning symbol identified in ANSI C95.2-1982, to notify persons that the facility could cause exposure to RF emissions. c. Emissions Conditions: It is a continuing condition of this authorization that the facilities be operated in such a manner so as not to contribute to ambient RF/EMF emissions in excess of then current FCC adopted RF/EMF emission standards; violation of this condition shall be grounds for revocation. d. Emergency Contact: The service provider shall provide signage as required, . including phone numbers of the utility provider, for use in case of an emergency. The signs shall be visibly posted at the communications equipment cabinet. Building Division: 20. Permits Required: A building permit application shall be required for the proposed antenna structure. The building permit shall include Electrical/PlumbinglMechanical fees when such work is part of the permit. 21. Construction Plans: The conditions of approval shall be stated in full on the cover sheet of construction plans submitted for building permit. 22. Size of Plans: The size of construction plans submitted for building permits shall be 24 inches by 36 inches. Attachment #2 Page 4 of 4 23. Plan Preparation: This project requires plans prepared under the direction and oversight of a California licensed Engineer or Architect. Plans submitted for building permits shall be "wet stamped" and signed by the qualifying professional person. 24. Site Plan: Application for building permit shall include a competent site plan that identifies property and proposed structures with dimensions and elevations as appropriate. Site plan shall also include site drainage details. Site address and parcel numbers shall also be clearly called out. Site parking and path of travel to public sidewalks shall be detailed. 25. Special Inspections: When a special inspection is required by UB.c. Section 1701, the architect or engineer of record shall prepare an inspection program that shall be submitted to the Building Official for approval prior to issuance of the building permits, in accordance with UB.c. Section 106.3.5. Please obtain City of Campbell, Special Inspection forms from the Building Inspection Division Counter. 26. Non-point Source Pollution: The City of Campbell, standard Santa Clara Valley Non-point Source Pollution Control Program specification sheet shall be part of plan submittal. The specification sheet (size 24" X 36") is available at the Building Division service counter. 27. Other Agency Approvals: The project requires the following agency approval prior to issuance of the building permit: a. Santa Clara County Fire Department