Pre-Application - 2005
PYRAMID AUTO SALES
20 Harold Ave # 23
San Jose, CA 95117
408-244-0084
03/22/05
To: City of Campbell Planning Dept.
From: PYRAMID AUTO SALES
RE: 1627 S. Bascom Ave. Campbell, CA 95008
Zone Verification As a CAR LOT
This letter from Pyramid Auto Sales to obtain the eligibility and zoning verification
regarding the following address;
1627 S. Bascom Ave. Campbell CA 95008.
Weare an Auto RetailerlWholesaler and we would like to use this location as a used car
Lot. It will be used for selling used cars/trucks retail and wholesale to the public and
other dealers.
This Lot is approx. 159' X 61' 4" and has a building on it with 1700 SF that will be used
as the main office building. There will be 2 partners and no employees.
Citi's Florist, VerizonWireless, America's Tires on the left hand side and on the right
MiMi's Bikini and others.
Attached is 6 copies for a proposed schematic for this Lot with the existence
construction. If you have any question please contact us at 408-690-5584 Ash or
510-673-2391 Eddie.
DEVELOPMENT REVIEW COMMENT SHEET
PRE-APPLICATION
Distri bution:
Comments:
March 28, 2005
April 11, 2005
ROUTE TO:
Architectural Advisor
X Fire Department
Police Department
Redevelopment Agency
X Land Development Engineer
Traffic Engineer
Service Center
X Building Division
PROJECT DESCRIPTION
Pre-application for the establishment of an auto retailer/wholesaler in an existing
commercial building and parking lot.
File No.: PRE2005-23
APN: 288-02-007
Applicant:
Property Owner:
Project Address:
Zoning:
General Plan Designation:
PROJECT PLANNER:
Pyramid Auto Sales (Ashraf)
Gene Francis
1627 S. Bascom Avenue
P-D
Residentia I/Com mercia I/Professiona I Office
Stephanie Willsey
DEPARTMENTAL RECOMMENDATION:
If it can be determined that this project will require minimal or no comments by
your department/agency, please return this comment sheet with your initials to
the Project Planner as soon as possible.
Status
Initial
Comments
v'
No Comments
:fi:) 3~~)O?
DEVELOPMENT REVIEW COMMENT SHEET
PRE-APPLICATION
Distri bution:
Comments:
March 28, 2005
April 11, 2005
ROUTE TO:
Architectural Advisor
X Fire Department
Police Department
Redevelopment Agency
X Land Development Engineer
Traffic Engineer
Service Center
X Building Division
RECEIVED
MAR 2 3 2005
CITY OF CAMPBELL
BUILDING DIVISION
PROJECT DESCRIPTION
Pre-application for the establishment of an auto retailer/wholesaler in an existing
commercial building and parking lot.
File No.: PRE2005-23
APN: 288-02-007
Applicant:
Property Owner:
Project Address:
Pyramid Auto Sales (Ashraf)
Gene Francis
1627 S. Bascom Avenue
Zoning: P-D
General Plan Designation: Residential/Commercial/Professional Office
PROJECT PLANNER: Stephanie Willsey
DEPARTMENTAL RECOMMENDATION:
If it can be determined that this project will require minimal or no comments by
your department/agency, please return this comment sheet with your initials to
the Project Planner as soon as possible.
Status
~ - 5 . ()> Comments
In~&
No Comments
CITY OF CAMPBELL
BUILDING INSPECTION DIVISION - COMMENTS TO THE DEVELOPMENT REVIEW COMMITTEE
DRC: April 8, 2005
ADDRESS: 1627 S Bascom Ave.
Project Application: PRE2005.00023
RECOMMENDATION:
Note: No building code issue has been reviewed at Development Review Committee; it will be reviewed in the
Building Permit process. Please be aware that building codes are changing constantly; plans submitted for building
permit shall comply with the code in effect at that time. Submit permit application together with required
documents to the Building Inspection Division to obtain a building permit. No construction can be commenced
without an appropriate building permit.
It is recommended that this item be forwarded to the Planning Commission for review, with the following
conditions.
TO THE SATISFACTION OF THE BUILDING DIVISION MANAGER/BUlLDING OFFICIAL:
I. PERMITS REQUIRED: A building permit application shall be required for any proposed
modifications to the ( e) structure. The building permit shall include
Electrical/Plumbing/Mechanical fees when such work is part of the permit.
2. CONSTRUCTION PLANS: The conditions of Approval shall be stated in full on the cover sheet
of construction plans submitted for building permit.
3. SIZE OF PLANS: The minimum size of construction plans submitted for building permits shall
be 24 in. X 36 in.
4. PLAN PREPARATION: This project requires plans prepared under the direction and oversight
of a California licensed Engineer or Architect. Plans submitted for building permits shall be "wet
stamped" and signed by the qualifying professional person.
5. SITE PLAN: Application for building permit shall include a competent site plan that identifies
property and proposed structures with dimensions and elevations as appropriate. Site plan shall
also include site drainage details. Site address and parcel numbers shall also be clearly called out.
Site parking and path of travel to public sidewalks shall be detailed.
6. SPECIAL INSPECTIONS: When a special inspection is required by U.B.C. Section 1701, the
architect or engineer of record shall prepare an inspection program that shall be submitted to the
Building Official for approval prior to issuance of the building permits, in accordance with U.B.C
Section 106.3.5. Please obtain City of Campbell, Special Inspection forms from the Building
Inspection Division Counter.
J:\Building DRe Comments\1627sbascomave pre.doc
7. The City of Campbell, standard Santa Clara Valley Non-point Source Pollution Control Program
specification sheet shall be part of plan submittal. The specification sheet (size 24" X 36") is
available at the Building Division service counter.
8. TITLE 24 ACCESSffiILITY - COMMERCIAL: On site general path of travel shall comply with
the latest California Title 24 Accessibility Standards. Work shall include but not be limited to
accessibility to building entrances from parking facilities and sidewalks.
9. TITLE 24 ACCESSffiILITY - COMMERCIAL: Projects seeking to use the Title 24 Hardship
exemption clause shall blue-line completed, City of Campbell "20%" exemption form on
submitted construction plans. Form is available at Building Division service counter.
I O. APPROVALS REQUIRED: The project requires the following agency approval prior to issuance
of the building permit:
a. Santa Clara County Fire Department
11. P.G.& E.: Applicant is advised to contact Pacific Gas and Electric Company as early as
possible in the approval process. Service installations, changes and/or relocations may require
substantial scheduling time and can cause significant delays in the approval process. Applicant
should also consult with P.G. and E. concerning utility easements, distribution pole locations and
required conductor clearances.
J:\Buildinl!. DRC Comments\1627sbascomave pre.doc