Loading...
Marriott Courtyard Hotel - 2002CITY OF CAMPBELL Community Development Department February 13, 2006 Walter Brosch District Manager Campbell Townplace Suites 700 E. Campbell Avenue Campbell, CA 95008 Re: Limit on Extended Stay -700 E. Campbell Avenne - Campbell Townplace Suites Dear Hotel Manager: Please accept this letter as a reminder of conditions of approval associated with the occupancies of the Campbell Townplaces Suites and the need to pay a hotel transient occupancy tax. The City Council on June 17, 2003, adopted Ordinance No. 2032 approving the hotel at 690/700 East Campbell Avenue. Condition No.2 of that approval stated the following: 2. Limitation on Hotel Stay: The use of the property is for transient occupancy as a hotel. No one shall occupy the hotel for a continuous period of more than nine (9) months. As I understand, Kirk Heinrichs from the City Manager's Office has informed you that Chapter 3.34 of the Campbell Municipal Code establishes the hotel occupancy tax for the stay of occupants for the first thirty days of a hotel stay. Therefore, all guests are required to pay the transient occupancy tax for the first 30 days. Guests who stay longer in the same room continuously may do so for only 9 months. Transient tenancy is established by the individual who registers for the room and not by a corporation that may be paying for the room. Should you have any questions regarding this information, please contact me at (408) 866-2144 or via e- mail at timh@cityofcampbell.com. Associate Planner Encl: City Council Ordinance No. 2032 cc: Sharon Fierro, Community Development Director Jesse Takahashi, Interim Finance Director Campbell Suites Group LLC, 8100 E. 22nnd Street Building 1800-2, Wichita, KS 67226 d . CAIl1/> .:.... 6> !:::: ~ u r ". "- 1- '- <' G' ORCHARD CITY OF CAMPBELL Community Development Department December 8, 2005 Libby Glass Barry Swenson Builder 777 North First Street, Fifth Floor San Jose, CA 95112 Re: Building Final- Marriot's Townplace Suites 690-700 East Campbell A venue Dear Libby: The City of Campbell Planning Division has conducted a final inspection of the above referenced development on December 7, 2005. Based upon a review of the City Council approval the following items need to be addressed prior to a Planning Division final release to the Building Division: I. Complete the painting of the perimeter metal fencing. It was noted that three areas had not been painted at the time of inspection. 2. Complete and paint the roof cover over the entries. 3. Paint all roof mounted venting and flashings. It was noted the metal cap over the rounded activity area was not painted. 4. It is recommended that the chimney cap be repainted the dark taupe color the current light color looks unfinished. 5. Complete the painting of the trash enclosure area. 6. Paint the sprinkler back flow valves the dark taupe color. 7. Install benches adjacent to the drinking fountain. 8. Increase the height of the wood railing adjacent to the creek along the creektrail. 9. Complete the signing and designation of disabled parking spaces, please ensure that tow-away notice signs are installed. These items only identify those items noted by the Planning Division. If you have any questions regarding these items, please feel free to phone me at (408) 866-2144 or via email timh@ci.campbe1I.ca.us. /(Z>t u.r Tim J. Haley Associate Planner cc: Jackie Young Lind, Senior Planner Bill Bruckart, Building Official J:\Plan Check Letters\BLD 690-700 East Campbell - FinaLdoc 70 North First Street Campbell, California 95008-1436 TEL 408.866.2140 FAX 408.866.838\ TI1U 408.866.2790 Page 1 of 1 Jackie C. Young Lind From: Jackie C. Young Lind Sent: Tuesday, November 01, 200512:11 PM To: Tim Haley; Edward Arango; Michelle Quinney; Bill Bruckart; Bob Kass; Syed Wahidi; Sharon Fierro; Kirk Heinrichs Subject: Marriott's Update - GOOD NEWS Tim and I visited Marriott's today and spoke with Ted Winskowski, Barry Swenson, Superintendent. A good amount of progress has been made since our last site visit. Upon our return, Tim, Ed A. and I had a conference call with Jim, Barry Swenson, Project Manager. THE GOOD NEWS IS: MARRIOTT'S HAS TRANSFERRED THEIR 11/18 ARRIVAL DATE GUESTS TO SAN JOSE**. Here's a schedule for upcoming work: 1. Demo Pac Bell boxes at vehicular entrance to site: Friday, 11/4. 2. Install differential pavement at entrance: Friday, 11/4 pm. 3. Install median in Campbell Avenue (saw cut, forms and pour): 6 days of work beginning Monday, 11/7. 4. State elevator inspection: Tuesday, 11/8 (Great news! A long lead item!) 5. Fire inspection: Wednesday, 11/9. 6. Overlay street (Union to project frontage): 3 days/side beginning Wednesday 11/9 (!! ... hmmm ... really? Seems unrealistic...) Jim understands that DPW will not sign off until improvements are complete. This is the party line, although we continue to work on a cash deposit agreement in the event that there is a last minute flip out. FYI: 1. Building inspections of suites are underway. 2. On-site landscaping and drinking fountain work underway. 3. Need to remove staged building materials at rear of building and erect fence. 4. SBC pulled in lines yesterday. Punch down to be completed. 5. Transition from public sidewalk to the creek trail seems overly steep to me (ADA compliant??) Action Item: Ted needs a contact for the "finding posts"? for the creek trail railing. Bill? Ed? 6. We talked about the possibility of a DPW extension to off-site work hours over the course of the next few weeks (e.g. nights and/or weekends). Ed and Jim will discuss this further. DPW would need to agree and Swenson would need to cover the costs of overtime for any needed inspections (right now off-site work is limited to weekday, 8am-4?pm). ** Marriott's takes three weeks for their corporate inspections (punch and Iife/safety) once the project receives "final occupancy". (Jim will check with the owner to see if Marriott's will begin their corporate inspections ahead of a Final Certificate of Occupancy. We discussed the possibility of issuing a Temporary Certificate of Occupancy. A TCO could create a win/win situation: If a TCO is acceptable to Marriott's, they could begin their corporate inspections AND the City could withhold guest occupancy (this would not "hold up" Marriott's because they still need their three weeks.) 111112005 '76 166 ~. ~~~\.l.., 5750 ALMADEN EXPWY SAN JOSE, CA 95118-3686 TELEPHONE (408) 265-2600 FACIMILE 1408) 266-0271 www.vall eywater. 0 rg AN EQUAL OPPORTUNITY EMPLOYER File: 2606 Los Gatos Creek X-Fac: Central Pipeline August19,2005 Mr. Jim Shydlowski Barry Swenson Builder 777 North First Street, Fifth Floor San Jose, CA 95112 RECEIVED AUG 2 3 2005 CITY OF C PLANNIN~~~ELL T. Subject: Extension for Permit No. 04367-Campbell Towne Place Suites Dear Mr. Shydlowski: The Santa Clara Valley Water District (District) does hereby extend Permit No. 04367 for an additional three months, until November 17, 2005. This extension is to be kept with the original permit and a copy of both the original permit and this extension must be kept at the construction site during construction of this project. The special provisions associated with the previously issued permit shall apply for all identified improvements. Please reference District File No. 2606 on further correspondence regarding this matter. If you have any questions, or need further information, you can contact me at (408) 265-2607, extension 2253. Sincerely, lU~. Ct~, ~ Sue Tippets, PE Engineering Unit Manager Community Projects Review Unit cc: Mr. Geoff Bradley, Community Development Department, City of Campbell R. Blair, S. Tippets, V. Stephens, D. Honda, F Baronessa, D. Chesterman, B. Cane, C. Haggerty, File (2) ch:jl 0819c-pl.doc The mission of the Santo Claro Volley Water District is 0 healthy, safe and enhanced quality of living in Santo Claro County through watershed stewardship and comprehensive management of water resources in a practical, cost-effective and environmentally sensitive manner. .JAN. 11.2005 4:53AM BARRY SWENSON BLDq ~O.3615 P. < rlJ-,t:Z [E3~[Rj~W ~WlE:rNl$(Q)1M BUILDER 777 N.. FIRST STPE!:='I, 5-1:-: F:"L~OM 0 ;.")/J\! J:J5E. ;:',/\ 951 i 2--8303 ~ (408j ;:~~:/ n:'.~~j u ::,L\.~( {4GB] 898-'17:3/ lID" lIF""1O.a~)IUl"'lL~,,_!~,.~.^?,:~~,.l~.,.~ . .....~~.- ~ ,..r,'!"-:~"'''~_,,:.....~M-'";:F~.~JII(~::-:-~~~,!';;~-.~~~ :i.:'.:{i: ':.{,::o".!io;"'-"~~~--,~.' :.... ..~":'r:~~~~""f~~~~~"""!>'~-s:.':"l :-". ....-~.'.......-Jr;:; ..,r "~,".,' January 10, 2005 ~:~C"'CO C. 1 200'/:' rrYQ J I3LJ1/..[);tGCi/.1P8ELL ~1t1810tv City of Cafll)bell Building Department Attn. Jim Hinckell 70 N. First St Campbell, CA 95008 RE: Campbell Towne Place Suites Hotel 100 E. Campbell Ave. Campbell, CA Erosion Control Installation Review Report Jim, The erosion control installed at the Campbell Towne Place Suites Job Site was reviewed on January 3, 2005. The following is a detailed report of the findings as well as the repairs done. The rock entry had been removed In the previous month and is not needed, since the parking lot in its entirety has been paved. The silt fence at the west property Rne was found not to be installed with the fabric Into the soil the required 12" in a number of areas, and a ten foot area of the silt fence near the redwood tree, approximatelY 100. from Campbell Avenue, was loose and ready to fall over. On January 5, 2005 these items were repaired. The silt fence was properly installed by means of trenching, with a trenching machine, a one foot deep ditch the entire length of the west side of the property and then installing properly the silt fence. During this process the 10' section of fence that needed repair was also fIXed. The fence is now completely In compliance. In review of the fiber rolls on the North, South and East property lines, Fiber roll had been found disturbed or missing near the main entrance an in the south east comer of the lot. Both areas were repaired and the fiber rolls are installed per plans. The fiber rolls around the catch basins were not instaDed at the time of inspection, since the storm drain systems were not tied into the street storm drain line. However, after the review the fiber rolls were installed in anticipation of the finishing of the storm drain lines. The street area drain protection is not installed per plans, since the area drain has not yet been installed. In its place the next Inlet down hili has been protected and was deaned out The construction site currently has all pertinent erosion control measures in place and functioning correctly. If you have any questions, please call me at (408) 811-0327. Very truly yours, wmJ. barrvswerosonbuilde". cor T: A DIVISiON OF 13Ro-:EN VALLEY CCI~r'D;:J~" nO;\! -\.~.o<r.' CA-11p6> f:: ~ u r- o 0 ... " .,. ~ ~ ,,' .ORCHA....Q. City of Campbell -- Community Development Department 70 N. First Street, Campbell, CA 95008 MEMORANDUM From: Site and Architectural Review Committee Tim Haley, Associate Pla4't- Date: September 28, 2004 To: Subject: 690-700 E. Campbell Avenue -- PLN 2004-103 Landscaping and Irrigation Plan PROPOSAL Two conditions of approval of the hotel project on the subject property required the applicant to submit plans for the Committee's review. The project site is located on the south side of East Campbell Avenue adjacent to Highway 17. The following conditions applied: 1. Landscaping plans shall include the following: a. Fifty percent of trees planted on site shall be a minimum 24-inch boxed size and twenty-five percent shall be 36-inch boxed tree sizes. All shrubs shall be a minimum of 5- gallon size. b. All trees planted on the westerly side of the building shall half 24 inch and half 36 inch boxed tree sizes. c. Installation of riparian species of plant materials along the Los Gatos Creek frontage shall be required. d. Removal of any trees shall require replacement of trees on site in accordance with replacement standards of the City's Water Efficient Landscape Standards (WELS) and the Tree Protection Ordinance. e. All landscaping installed as required per the approved landscape plan shall be maintained in good health. f. Applicant shall obtain encroachment permits from the City of Campbell for all work performed within the right-of-way. g. The landscape plan shall illustrate appropriate quantities and sizes of plant materials to ensure buffering of buildings and parking areas. h. All on-site landscaping shall be installed prior to building occupancy. Landscaping in the Santa Clara Valley Water District property shall be installed prior to building occupancy unless otherwise approved by the Community Development Director. i. The applicant shall protect existing trees during construction to ensure their continued health. Protective fencing shall be installed around the drip line of the trees and the recommendations of a certified arborist shall be followed to ensure the safety of the trees. Plans for the protective fencing and the recommendations of a certified arborist shall be reviewed and approved prior to the issuance of building permits. Damaged trees shall be replaced according to the provisions of the Tree Protection Ordinance. SARC Memorandum - SepLt::nlUcr 28, 2004 690- 700 East Campbell Avenue page 2 of2 J. Landscape Plan to include landscape and irrigation installation between the project site and the creek trail (enhancement planting) along the project frontage. Landscaping to be consistent with Santa Clara Valley Water District requirements. 2. Fences and Retaining Walls: A fencing and wall plan shall be submitted for review and approval of the Community Development Director. a. Landscape treatment along East Campbell Avenue to include the installation of a decorative treatment that creates architectural interest through use of the decorative stone proposed on the building in the landscape treatment along the street edge. Final design to be reviewed and approved by the Site and Architectural Review Committee. Staff Recommendation: Staff has reviewed the submitted plans and recommends their approval. Attachment: Reduced Plans Location Map o~ . CAIl1 . /><5> t: ':<' -. l'" U r CAMPBELL ~. /1' -' ," G ,- '1,-----" O!i'CHARO .I CITY OF CAMPBELL ~:..: ~- i ._, - ! Community Development Department September 21, 2004 Re: PLN2002-96 - Landscape Plan for 690-700 E. Campbell Avenue Dear Applicant: Please be advised that the above-referenced application has been scheduled for the following meetings: Site and Architectural Review Committee Meeting Date: Tuesday, September 28, 2004 Time: 7:10 p.m. Location: Doetsch Conference Room, City Hall, 70 N. First Street, Campbell Should you have any questions or comments, please do not hesitate to contact me at (408) 866- 2140. ~ \~\~ Tim J. Haley Associate Planner cc: Libby Glass/Campbell Suites Group, LLC (Applicant) 777 N. First Street, 5th Floor San Jose, CA 95112 John Davis Family Trust (Property Owners) 381 A Stockton Street San Jose, CA 95126 70 North First Street Campbell, California 95008-1436 . TEL 408.866.2140 . FAX 408.871.5140 TJ)f) 408.866.2790 ~W[E[M~(Q)[M BUILDER MEMORANDUM 1l;:E1JlEO C!7Y 9 2004 PLAgk~~41P8fJ.J.. [)fpr. . TO: City of Campbell Libby Glass, Development Project Manager ~ FROM: DA TE: September 8, 2004 RE: 700 E. Campbell Avenue This is to inform you that we are aware that notwithstanding issuance of the building permit our final Lanscape Plan is pending approval by the Parks and Rec Board and SARC. Please contact me if you need anything further from me in this regard. 0'( . CA/I-L . /(9 .:... ':<' !:::: l'" U r CAMPBELL ~. ~-" v''':- OR.CHARD CITY OF CAMPBELL / U Community Development Department August 27,2004 Luce, Forward, Hamilton & Scripps LLP 121 Spear Street, Suite 200 San Francisco, CA 94105 Attn: Ms. Trang M. Van Re: Zoning Verification for 690 & 700 East Campbell Avenue, Campbell, CA Dear Ms. Van: In connection with the above referenced properties, I hereby certify and represent the following statements are true as of the date of this letter: 1) The Zoning Designation of the properties is P-D (Planned Development). The General Plan Designation is Central Commercial. 2) The following use or uses are allowed within this Zoning District, subject to approval of a Planned Development Permit: See Campbell Municipal Code section 21.12.030. 3) The approved Planned Development Permit for the property indicates 96 parking spaces. This number of parking spaces was found to be adequate for the proposed hotel use. Please do not hesitate to contact me at (408) 866-2140, if you should have any questions regarding the above information. Sincerely, ~~ Tim J. Haley Associate Planner end: Section 21.12.030 Campbell Municipal Code Ordinance No. 2032 70 North First Street. Campbell, California 95008-1436 . TEl. 408.866.2140 . FAX 408.871.5140 . mD 408.866.2790 R.lilcon Gcnter II 12"1 Spear Stre(~t Suite 200 San Fr8nC!5GO, CA 94105~1S82 415256-4600 415.3504010 fax LueE FORWARD LUCEr FORWARD, HAM1UON & SCRIPPS l.lY V'.(\;'i'N.!UC8.cmn TRANG V AN, PARALEGAL DIRECT DIAL NUMBER 415356.4630 DIRECT FAX NUMBER 4153563884 EMAIL ADDREsstvan@luce.com August 23, 2004 32012-3 VIA U.S. MAIL City of Campbell Planning Department 70 N. First Street Campbell, CA 95008 Re: Request for Letter of Determination 690 & 700 E. Campbell Avenue, CampbelL CA 95008 APN: 412-09-051: 412-09-053 To Whom It May Concern: Please issue a Letter of Determination for the property located at 690 & 700 E. Campbell Avenue, Campbell. Enclosed please find a check in the amount of $60 for fees regarding same. Also enclosed for your convenience is a self addressed stamped envelope. In the Letter of Determination, please include clarification with respect to the following: 1. Zoning 2. Use 3. Parking If you need any further information to complete the Letter of Determination, please feel free to call me directly at (415) 356-4630. Thank you in advance for your assistance. cc: Allan E. Low, Esq. Luen Lam, Esq. 166437.1 CARMEL V ALLEY!DEL MAR . Los ANGELES . SAN DIEGO . SAN FRANCISCO di . CA'h ..::..... /><5' !:: <; U r CAMPBELL '> r '- " c.,' GRCIl ",\,to CITY OF CAMPBELL / I V Community Development Department August 5, 2004 J[j'j.:l Till (>rd'd/,I (It) 2002 Colleen Haggerty, Assistant Engineer Community Projects Review Unit Santa Clara Valley Water District 5750 Almaden Expressway San Jose, CA 95118-3686 RE: District File No. 2606 -700 E. Campbell Avenue, Campbell, Calif. PLN2002-96. Dear Colleen: As you are aware, the project proponent for the above referenced project is required to plant "enhancement plantings" on District owned land adjacent to the property and the Los Gatos Creek Trail. Please accept this letter as notification that the City of Campbell will be responsible for maintenance of this landscaping along with the other landscaping within the Santa Clara Valley Water District lands adjacent to the creek trail. If you should have any questions regarding the City's responsibility for maintenance of these areas, you may contact John Iaquinto, Public Works Supervisor at (408) 866-2127. Thank you for your assistance with this matter. Sincerely, 4f~O~ Geoff 1. Bradley Senior Planner cc: Libby Glass, Project Manager Barry Swenson Builder John Iaquinto, Public Works Supervisor J:\Correspondence\2004\700 E. Campbell Avenue - Mariott.doc 70 North First Street Campbell,California95008-1436. TEL 408.866.:2140 FAX408.871.5140. T1J1)408.866.:2790 b torr AUG 0 4 2004 CIlY OF CAMPBELL PLANNlliG DEPT. File: 2606 Los Gatos Creek 5750 ALMADEN EXPWY SAN JOSE, CA 95118-3686 TELEPHONE (408) 265-2600 FACIMILE 1408) 266-0271 www.valleywater.org AN EQUAL OPPORTUNITY EMPLOYER X-Fac: Central Pipeline July 30, 2004 Mr. Robert Seelenbacher Barry Swenson Builder 777 North First Street, 5th Floor San Jose, CA 95118-3686 Subject: Campbell Gateway Towneplace Suites, Assessor's Parcel Nos. 412-09-051, 412-09-052, and 412-09-053 Dear Mr. Seelenbacher: The Santa Clara Valley Water District (District) has reviewed the following information: · Response letter from Creegan + D'Angelo dated July 8, 2004; revised on-site grading and drainage plans (Sheets C-O thru C-6); and revised plat and description for dedication to the City of Campbell (City). This information was received on July 9, 2004. · Response letter from Barry Swenson Builder dated July 9,2004; response letter from Hill Associates dated October 28, 2003; revised landscape plans Sheets RE-1, RE-2, and RE-3; and copy of a letter from the owner's representative dated June 23, 2004. This information was received on July 12, 2004. The proposed project will require a District permit per Ordinance 83-2, since it is adjacent to Los Gatos Creek and District fee title property, and includes work on District fee title property and over the District's Central Pipeline, a 66-inch-diameter high pressure water line. Based on our review of the proposed project as shown on the above information we have the following comments: 1. The on-site grading plans as submitted are acceptable to the District with one minor change-the elevation of the top of the Central Pipeline is approximately 186.5 feet to 186 feet, not 86.5 feet to 86 feet as indicated on the plans. The District will issue a permit on the final signed plans that are approved by the City (civil, both on-site and off-site improvements, and landscaping). 2. The plat and description submitted are acceptable to the District and will be forwarded to the District's real estate department for processing. The mission of the Santo Clara Volley Water District is a healthy, safe and enhanced quality of living in Santa Clara County through watershed stewardship and comprehensive management of water resources in 0 practical, cost-effective and environmentally sensitive manner. Mr. Robert Seelenbacher Page 2 July 30, 2004 3. Plans showing the ornamental landscaping and irrigation need to be provided. The landscaping plans submitted only show the riparian enhancement plantings proposed on the District's property adjacent to Los Gatos Creek. Please provide landscaping and irrigation plans for the rest of the site. The plans should show all landscaping adjacent to or on District property and any irrigation lines or electrical lines for the irrigation system that will be located on the District's property for the Central Pipeline (Assessor's Parcel No. 412-09-052). 4. As requested previously, the City will need to provide written assurance to the District that the proposed riparian enhancement plantings on District fee title property will be maintained by the City. This will be required to be submitted prior to the issuance of a District permit. Please submit two sets of revised plans based on the above comments to the District for permit review. Reference District File No. 2606 on further correspondence regarding this project. If you have any questions or need further information, you can reach me at (408) 265-2607, extension 2322. Sincerely, 1 .- ,,~L( JVr.{l~ / ;yColleen Hagg~rtYl P.E. () v Assistant Civil Engineer Community Projects Review Unit cc: Mr. David Voorhies, Creegan + D'Angelo Mr. Tim Haley, City of Campbell S. Tippets, V. Stephens, D. Chesterman, C. Haggerty, File (2) ch:lm 0729a-pl.doc f.t 0\. CA'h , . 16<5' 2 .~ u .- CAMPBELL A ~ ^. " v ORCHARD- ,- L-_ CITY OF CAMPBELL u Community Development Department July 30, 2004 I")~ Th( (hdJdll ( I) 'I)():; Libby Glass Barry Swenson Builders 777 N. First Street, Floor 5 San Jose, CA 95112 Subject: 690-700 East Campbell Avenue - Four-story extended stay hotel Building Permit No: BLD2003-1364 (Revised Submittal July 2004) Dear Libby, The Planning Division has reviewed your revised submittal for a building permit application for a four-story hotel based upon the City Council's approval. Based upon the revised plans, the Planning Division requests additional information or has the following comments regarding the building permit submittal: 1. Approved Plans: The approved material board depicted a composite concrete roof tile. The building permit submittal indicates a composition shingle material on some plans and a concrete roof tile on others. Please modify the plans to be consistent with the approved material sample board. 2. Landscape and Irrigation Plans - Condition No.3: Please provide four copies of the plans separate from the Building Division submittal per Condition No.3. These plans need to be reviewed by the Parks and Recreation Commission and the Site and Architectural Review Committee and approved by the Community Development Director. The landscape plans additionally lack information regarding the plant materials between the hotel and the creektrail access. 3. Fencing and Retaining Walls- Condition No.5: Please submit two copies of the plans detailing the perimeter fence and the retaining walls for approval of the Community Development Director. Please note that the pillar details need to be reviewed by the Site and Architectural Review Committee. Condition No. 5 also required the use of a decorative stone material adjacent to the spa area. Fencing details of a good neighbor wood fence are provided that do not related to this project. Additionally, detail of the tubular steel fencing is not provided. J:\Plan Check Letters\2003\BlD 2003-1364 -700 East Campbell Avenue.doc 2nd.doc 70 North First Street. Campbell, California 95008-1436 TEL 408.866.:2140 . FAX 408.871.5140 . 1'1)1) 408.866.:2790 fot Plan Check Comments./vr 700 E. Campbell Avenue Page 2 of2 4. Utility Boxes and Back-Flow Preventers No.7: Please provide a larger section of these areas that illustrate the screening of these utilities via landscaping or architectural screens. Previous developments have used dark paint colors to reduce their visibility. 5. Lighting Condition No.8: Please provide lighting details regarding fixtures (styles) and their location on the building. Details of the lighted bollards do not appear to be provided. 6. Architectural Details Condition 12: Please provide the following: · Color samples of the building · Architectural details of the decorative window railings. · Cultured ledgestone stone on the building base as previously proposed and reviewed by the Community Development Director. Additionally, please provide a detail of the transition between the ledgestone and stucco wall materials. This transition is generally handled through a cap material or stucco transition. Please do not hesitate to contact me at (408) 866-2144 or via e-mail at timh((l),cityofcampbell.com , if you have any questions about these comments. Sincerely, //1-'- \ \ \ '~.,T~- T. J H 1 j {/ 1m . a ey Associate Planner cc: Frank Mills, Senior Building Inspector Geoff Bradley, Senior Planner May 20,2004 C~\,,~O ~e '1 <\ l~~~ ~l~'{ /~d \'4' . . ~V\)t;\-."- ~ Clt C\>-~\>t\'\. C~~~~\~\:,\ 5750 ALMADEN EXPWY SAN JOSE, CA 95118-3686 TELEPHONE (408) 265-2600 FACIMILE (408) 266-0271 www.valleywater.org AN EQUAL OPPORTUNITY EMPLOYER File: 2606 Los Gatos Creek X-Fac: Central Pipeline Mr. David Voorhies Creegan + D'Angelo 1075 North Tenth Street, Suite 100 San Jose, CA 95112-2923 Subject: Campbell Gateway Towneplace Suites, Assessor's Parcel Nos. 412-09-051, 412-09-052, and 412-09-053 Dear Mr. Voorhies: The Santa Clara Valley Water District (District) has reviewed the following information received on May 10,2004: · Response letter from Creegan + D'Angelo dated May 7,2004; response letter from Hill Associates (landscaping) dated October 28, 2003; and two letters from NB Houge Construction (construction loading over pipeline) dated February 4, and February 11, 2004; and a copy of the AES Geotechnical Investigation Report dated October 2002. · Street Improvement Plans sheets 1-5 of 5. · On Site Engineering Grading and Drainage Plans sheets C-O through C-6 dated October 10, 2003. · Plans for the riparian enhancement planting, sheet RE-1, RE-2, and RE-3 dated September 2, 2003. The proposed project will require a District permit per Ordinance 83-2, since it is adjacent to Los Gatos Creek and District fee title property, and includes work on District fee title property and over the District's Central Pipeline, a 66-inch-diameter high pressure water line. Based on our review of the proposed project, as shown on the above information, we have the following comments: 1. On sheet C-1 (on-site improvement plans), note 1, states that the existing sanitary sewer line to be abandoned should be either filled with slurry or crushed in place. The previous The mission of the Santa Clara Valley Water District is a healthy, safe and enhanced quality of living in Santa Clara County through watershed stewardship and comprehensive management of water resources in a practical, cost-effective ond environmentally sensitive manner. Mr. David Voorhies Page 2 May 20, 2004 plans stated it was to be either abandoned in place or removed. All portions of the sanitary sewer located within the District's property should be either removed or filled with slurry to prevent damage to the Central Pipeline. 2. On sheet C-1 (on-site improvement plans), the elevations shown for the top of the Central Pipeline appear to be incorrect. 3. On sheet C-3, the plan should include a note indicating that the fire water line along the westerly property line must be located completely on private property, as the District does not allow longitudinal utility encroachments on the property. 4. On sheet 2 of the off-site improvement plans, a street light and electrical pull box are proposed on District property for the Central Pipeline. These improvements should be placed outside of District property and a minimum of 10 feet from the pipeline. The plans need to show any electrical lines proposed to cross District property and/or the Central Pipeline. Please note that the as-builts for the Central Pipeline show the outside of the pipeline to be approximately 9 feet from the easterly property line, and the improvement plans should accurately show the pipeline location and the approximate outside edge of the pipeline. 5. The landscape plans submitted are the same as the ones submitted previously and no changes have been made to them. Our September 26,2003, comments regarding the landscaping and irrigation for the site still need to be addressed, and are listed below for your information: . Plans showing the rest of the landscaping and irrigation need to be submitted for review, including details for all irrigation lines over the District's property and Central Pipeline, and at the southern end of the building. . The riparian enhancement plans need to clearly show the property lines on all plan view sheets. · On sheet RE-3, the word "mitigation" should be removed from note 1 as none of the proposed planting is mitigation planting; it is voluntary enhancement planting. · Sheet RE-3 shows seven 36 inch and 24 inch box size oak trees are proposed on and directly adjacent to the District's property for Los Gatos Creek, and these trees are listed on the plans as "non-riparian enhancement plants." Oak trees are considered riparian species, and as such, all oaks used need to be grown from local stock just as the shrubs and groundcover. We understand that larger size trees may be desirable, but box size trees should be used on private property only and should be an ornamental variety that is not listed on our prohibited plant list (see enclosure). All riparian plants used on the District's property for Los Gatos Creek are to be grown from local stock to preserve the genetic integrity of the riparian plants. The District will require a copy of the Mr. David Voorhies Page 3 May 20, 2004 nursery contract for the contract grown plants as evidence of origin of the plant material being used. 6. Comments Nos. 14 and 20 through No. 23 from our September 26,2003, letter still need to be addressed. 7. Grading on district fee title property adjacent to Los Gatos Creek is strictly prohibited. Please stake the property line and erect construction fencing to prevent impacts and trespass onto the property. 8. The District shall not be responsible for maintaining, repairing, or replacing any of the identified improvements which are constructed on our fee title property. This includes utilities, curb, gutter, parking lots, or other items. As such, the property owner or developer's representative will need to counter sign the construction and encroachment permit acknowledging this condition. 9. The District requests written confirmation from the owner of the property that acknowledges that this agency shall not be held liable, or compensation be required should it be necessary to repair, maintain, replace, or relocate the Central Pipeline once the site improvements are constructed and the hotel begins operations. Please submit two sets of revised plans based on the above comments to the District for permit review. Reference District File No. 2606 on further correspondence regarding this project. If you have any questions or need further information, you can reach me at (408) 265-2607, extension 2322. .\ nIC~:~:' ~j .~:,. ~lIeVe~Jaggerty,\p.E. '/ Assistant Civil Engineer Community Projects Review Unit cc: Mr. Tim Haley, City of Campbell S. Tippets, V. Stephens, D. Chesterman, C. Haggerty, File (2) ch:lm 0520a-l.doc 0\ . CA'h . ~<5' ;:;. (<' - r-- U r CAMPBELL -' '- '5- "- " (,' ORCHARQ' CITY OF CAMPBELL u Community Development Department May 11, 2004 Libby Glass Barry Swenson Builders 777 N. First Street, Floor 5 San Jose, CA 95112 Subject: 690-700 East Campbell Avenue - Four-story extended stay hotel Building Permit No: BLD2003-1364 Dear Libby, I recently received a note that your office is again pursuing building permits for the above reference hotel project. Consequently, I am sending you an updated plan check letter. Your response to these items would be appreciated with a revised submittal. The Planning Division has reviewed your building permit application for a four-story hotel based upon the City Council's approval granted by Ordinance No.2032, on the referenced property. Based upon the submitted plans, the Planning Division requests additional information or has the following comments regarding the building permit submittal: 1. Approved Plans: The approved material board depicted a composite concrete roof tile. The building permit submittal indicates an asphalt composition shingle material. Please modify the plans to be consistent with the approved material sample board. 2. Landscape and Irrigation Plans - Condition No.3: Please provide four copies of the plans per Condition No.3. These plans need to be reviewed by the Parks and Recreation Commission and the Site and Architectural Review Committee and approved by the Community Development Director. The landscape plans additional lack information regarding the plant materials between the hotel and the creektrail access. 3. Fencing and Retaining Walls- Condition No.5: Please submit two copies of the plans detailing the perimeter fence and the retaining walls for approval of the Community Development Director. Please note that the pillar details need to be reviewed by the Site and Architectural Review Committee. J:\Plan Check Letters\2003\BLD 2003-1364 -700 East Campbell Avenue.doc 2nd.doc 70 North First Street Campbell, California 95008-1436 TEL 408.866.:2140 FAX 408.871.5140 . 1'1)1) 408.866.:2790 Plan Check Commentsfor, _) E. Campbell Avenue Page 2 of2 Fencing details of a good neighbor wood fence are provided that do not related to this proj ect. 4. Utility Boxes and Back-Flow Preventers No.7: Please provide a larger section of these areas that illustrate the screening of these utilities via landscaping or architectural screens. Previous developments have used dark paint colors to reduce their visibility. 5. Lighting Condition No.8: Please provide lighting details regarding fixtures (styles) and their location on the building. 6. Driveways Condition No. 10: Please illustrate a decorative pavement treatment at the entrance driveway as required by this condition. 7. Architectural Details Condition 12: Please provide color samples of the building and architectural details ofthe decorative window railings. Additionally, please provide a detail of the transition between the ledgestone and stucco wall materials. This transition is generally handled through a cap material or stucco transition. 8. Street Improvements Condition 41: The plans do not indicate the installation of a public drinking fountain. Additionally, a recommendation to change the bench type to a manufacturer and style as used along other portions of Campbell Avenue may be forthcoming. 9. Downspouts: The building design has significant eaves that may create awkward downspout locations and designs. It would be helpful to prepare a drainage plan that anticipates these drainage facilities. Please do not hesitate to contact me at (408) 866-2144 or via e-mail at timh@citvofcampbell.com , if you have any questions about these comments. Sin~_ Tiro J. Haley ~ Associate Planner cc: Frank Mills, Senior Building Inspector GeoffBradley, Senior Planner Ed Arango, Associate Engineer o'f. . CA'h/.l ..::..... <5' (::, ~ U r- ... 1- " '" G' ORCHARD' CITY OF CAMPBELL Community Development Department - Current Planning February 17, 2004 Libby Glass Barry Swenson Builders 777 N. First Street, Floor 5 San Jose, CA 95112 Subject: 690-700 East Campbell A venue - (PLN 2002-96) Extended Stay Hotel - Swimming Pool Proposal Dear Libby, The Planning Division has reviewed your preliminary submittal for minor changes to the hotel project on the subject property. The proposed changes are as follows: 1) Reducing the number of suites from 95 to 86 rooms; 2) Minor changes in window locations to accommodate the new room configurations; 3) Reducing the number of parking spaces from 96 to 86; 4) Providing a swimming pool and sports court in the parking area; and 5) Eliminating the spa. Based upon the submitted plans, the Community Development Director is supportive of these changes in concept pursuant to section 21.06.080 of the Campbell Municipal Code, with the exception of the sports court which should be retained as landscaping. Additionally, it is recommended further study and details be provided to address the following issues: 1) Relocate the pool equipment building and trash enclosure area adjacent to the pool; 2) Provide further details of the wall, pillars and fencing around the pool. It is recommended that open ornamental fencing, decorative pillars and solid walls be provided around the pool that have a similar design to other fences and wall u.sed in the project; 3) Please provide clearance from P. G. & E. regarding the pool location and easement at the time of Building Department submittal; 4) Provide accessibility to the swimming pool per building code requirements; and 5) That the proposed changes will need to be reviewed and approved by the Building Division, the Public Works Department and the Santa Clara County Fire Department. J:\Plan Check Letters\BLD Swimming Pool Proposal-700 East Campbell Avenue.doc 70 North First Street. Campbell, California 95008-1436 TEL 408.866.:2!40 . FAX 408.866.8381 TOll 408.866.:2790 Plan Check Comments/a. . JO E. Campbell Avenue Page 2 0/2 Please do not hesitate to contact me at (408) 866-2144 or Via e-mail at timh@citvofcampbell.com, if you have any questions about these comments. ~~ Tim J. Haley Associate Planner cc: Frank Mills, Senior Building Inspector Geoff Bradley, Senior Planner Ed Arango, Associate Engineer Wayne Hokanson, Santa Clara County Fire Department 0\ . CA'h . /><5' t <; U r CAMPBELL -' c\. (' ;>. " G' r-- Of(CH ARO CITY OF CAMPBELL / \...\ ~I Community Development Department November 10, 2003 1 'I .:' TJll ()'l klla (It) ]O()] Libby Glass Barry Swenson Builders 777 N. First Street, Floor 5 San Jose, CA 95112 Subject: 690-700 East Campbell A venue - Four-story extended stay hotel Building Permit No: BLD2003-1364 Dear Libby, The Planning Division has reviewed your building permit application for a four-story hotel based upon the City Council's approval granted by Ordinance No.2032, on the referenced property. Based upon the submitted plans, the Planning Division requests additional information or has the following comments regarding the building permit submittal: 1. Approved Plans: The approved material board depicted a composite concrete roof tile. The building permit submittal indicates an asphalt composition shingle material. Please modify the plans to be consistent with the approved material sample board. 2. Landscape and Irrigation Plans - Condition No.3: Please provide four copies of the plans per Condition No.3. These plans need to be reviewed by the Parks and Recreation Commission and the Site and Architectural Review Committee and approved by the Community Development Director. The landscape plans additional lack information regarding the plant materials between the hotel and the creektrail access. 3. Fencing and Retaining Walls- Condition No.5: Please submit two copies of the plans detailing the perimeter fence and the retaining walls for approval of the Community Development Director. Please note that the pillar details need to be reviewed by the Site and Architectural Review Committee. Fencing details of a good neighbor wood fence are provided that do not related to this project. J:\Plan Check Letters\BLD 2003-1364 -700 East Campbell Avenue.doc 70 North First Street Campbell, California 95008-1436 . TEL 408.866.:2140 lAX 408.871.5140 . TDD 408.866.:2790 Plan Check Comments for ; E. Campbell Avenue Page 2 of2 4. Utility Boxes and Back-Flow Preventers No.7: Please provide a larger section of these areas that illustrate the screening of these utilities via landscaping or architectural screens. Previous developments have used dark paint colors to reduce their visibility. 5. Lighting Condition No.8: Please provide lighting details regarding fixtures (styles) and their location on the building. 6. Drivewavs Condition No. 10: Please illustrate a decorative pavement treatment at the entrance driveway as required by this condition. 7. Architectural Details Condition 12: Please provide color samples of the building and architectural details of the decorative window railings. Additionally, please provide a detail of the transition between the ledgestone and stucco wall materials. This transition is generally handled through a cap material or stucco transition. 8. Street Improvements Condition 41: The plans do not indicate the installation of a public drinking fountain. Additionally, a recommendation to change the bench type to a manufacturer and style as used along other portions of Campbell A venue may be forthcoming. 9. Downspouts: The building design has significant eaves that may create awkward downspout locations and designs. It would be helpful to prepare a drainage plan that anticipates these drainage facilities. Please do not hesitate to contact me at (408) 866-2144 or VIa e-mail at timh@citvofcampbel1.com , if you have any questions about these comments. Silf~ Tim J. Haley Associate Planner cc: Frank Mills, Senior Building Inspector Geoff Bradley, Senior Planner Ed Arango, Associate Engineer 5750 ALMADEN EXPWY SAN JOSE, CA 95118-3686 TELEPHONE (4081 265-2600 FACSIMilE (408) 266-0271 www.valleywater.org AN EQUAL OPPORTUNITY EMPLOYER RECEIVED SEP 3 0 2003 CITY OF CAMPBELL PLANNING DEPT. File: 2606 Los Gatos Creek X-Fac: Central Pipeline September 26, 2003 Mr. David Voorhies Creegan + D'Angelo 1075 North Tenth Street, Suite 100 San Jose, CA 95112-2923 Subject: Campbell Gateway Towneplace Suites, Assessor's Parcel Nos. 412-09-051, -052, and -053 Dear Mr. Voorhies: The Santa Clara Valley Water District (District) has reviewed the following information submitted to the District: · Preliminary plat, description, and closure calculations for the quitclaim to the City dated August 8, 2003, and received on August 11, 2003. · Architectural plan sheet A 1.1 and A3.1 dated April 21, 2003, and received on August 28, 2003. · Civil plan sheets C-O through C-5 dated August 25, 2003, and received on August 28, 2003. Response letter from Creegan + D'Angelo dated August 27,2003, with letter from AES Engineering (slope stability), NB Houge Construction (construction loading over pipeline), and a certificate of insurance from Barry Swenson Builder and received on August 28,2003. · Plans for the riparian enhancement planting, sheet RE-1, RE-2, and RE-3, and specifications dated September 2, 2003, and received on September 4, 2003. · Revised paving plan, sheet C-4, dated August 25,2003, and received September 10, 2003. The proposed project will require a District permit per Ordinance 83-2, since it is adjacent to Los Gates Creek and District fee title property and includes work on District fee title property and over the District's Central Pipeline, a 66-inch-diameter high pressure water line. Based on our review of the proposed project as shown on the above referenced plans we have the following comments: Tne mission of tne Santa Clara Valley Water District is a healthy, safe and enhanced quality of living in Santa Clara County through watershed ^ stewardship and comprehensive management of water resources in a practicol, cost-€ffective and environmentally sensitive manner. .... Mr. David Voorhies Page 2 September 26, 2003 1. The insurance certificate provided is acceptable. Please have renewals sent to the District with the additional insured endorsement for the duration of the project construction. 2. As-built plans showing all work, including all utility installations and abandonments, done on District fee title property will need to be submitted to the District at the completion of the project. 3. Sheet C-1 does not show the extent of removal of the existing District maintenance road located adjacent to the site. Please clearly show the limits of existing pavement removal. 4. Sheet C-3 shows a fire hydrant located on the east side of the District's fee title property with a fire service line crossing the right of way and continuing north along the west property line for the 66-inch-diameter Central Pipeline. Improvements and utility crossings on the District property are to be minimized. The plan should include a note indicating that the line along the westerly property line must be located completely on private property, as the District does not allow longitudinal utility encroachments on the property. The preferred hydrant located would be west of the District's property. If the hydrant must be located near the currently proposed location, it should be moved to private property on the parking island in the middle of the parking lot. Any required crossing of the service line through District property should be made perpendicular to the alignment of the Central Pipeline. Please revise the plans accordingly. Details and cross sections will be required for any service line located on District property. 5. Cross sections showing the Central Pipeline in relation to the proposed improvements and the foundation excavation for the building need to be included in the civil plans; currently the sections are only shown on the architectural plans. In addition, it doesn't appear that the pipeline is correctly shown on the plans per the as-built drawings we previously transmitted. 6. The civil plans need to include specific notes to ensure the protection of the Central Pipeline during construction of this project, such as the restriction regarding loading in excess of H20. Also, note that the grades on the District's property are to remain generally as they exist currently; demolition for construction of the parking lot is acceptable however no additional excavation on District property is to occur. 7. Sheet C-5 shows that the stabilized construction entrance for the project will be located on the District's property and over the Central Pipeline. In order to protect our pipeline we will require that the construction entrance not be located on District fee title property. In addition, steel plates are to be placed over the pipeline for added protection. 8. Equipment storage and stockpiling of materials should be located outside of the District's fee title property. Mr. David Voorhies Page 3 September 26, 2003 9. More information needs to be provided regarding the construction methods and equipment that will be used on site. Please provide a list and information on the type of equipment that will be used for the building foundation excavation and identify the depth, horizontal extent, dewatering, type of footings to be installed, and shoring for the excavation. Though no excavation is proposed on District property we need details of the proposed excavation to determine if it poses any risk to the pipeline and if so what measure can be taken to mitigate any impacts. 10. Please transmit a copy of the geotechnical report for the foundation subgrade preparation and the structural plans for the foundation. 11. Cross sections showing all utilities crossing the District's property and the Central Pipeline must be included in the civil plans. Cross sections must clearly show the depth of the proposed utility and clearance to the Central Pipeline. Below grade electrical power conduits in the vicinity of the pipeline may require special insulating measures to prevent stray currents from creating corrosive conditions. 12. Please note that about three years ago a joint trench was installed .over the Central Pipeline at Campbell Avenue to provide underground utility service to the project site and an insulating blanket was placed between the joint trench and the Central Pipeline. The insulating blanket is not to be disturbed by the proposed construction, though if this is not possible the blanket will need to be replaced and details showing this will need to be included in the plans. Enclosed is a plan sheet showing the joint trench and insulating blanket installation. 13. Sheet A 1.1 doesn't clearly or correctly show the location of the proposed removable bollards at the District's' maintenance road at Campbell Avenue. 14. As requested in our October 9, 2003 letter, the City should provide written assurance to the District that the proposed riparian enhancement plantings on District fee title property will be maintained by the City. This will be required prior to issuance of the District permit for the project. 15. Plans showing the rest of the landscaping and irrigation need to be submitted for review, including details for all irrigation lines over the District's property and Central Pipeline. 16. The riparian enhancement plans need to clearly show the property line on all plan view sheets. 17. On sheet RE-3 the word "mitigation" should be removed from note No. 1 as none of the proposed planting is mitigation planting; it is voluntary enhancement planting. 18. Sheet RE-3 shows seven 36-inch and 24-inch box size oak trees are proposed on and directly adjacent to the District's property for Los Gatas Creek, and these trees are listed on the plans as "non-riparian enhancement plants." Oak trees are considered riparian species and as such all oaks used need to be grown from local stock just as the shrubs and groundcover. We understand that larger size trees may be desirable, but box size trees should be used on private property only and should be an ornamental variety that Mr. David Voorhies Page 4 September 26, 2003 is not listed on our prohibited plant list (see enclosure). All riparian plants used on the District's property for Los Gatos Creek are to be grown from local stock to preserve the genetic integrity of the riparian plants. The District will require a copy of the nursery contract for the contract grown plants as evidence of origin of the plant material being used. 19. The riparian enhancement plant list is acceptable; however, please note that arbutus menziessi 'marina' must not be substituted for the local grown arbutus menziessi and that the madrone can be difficult to grow container cultures. 20. The plat legend for the street dedication from the District to the City should indicate that the area being dedicated to the City will have a District easement for the pipeline reserved. 21. The description should indicate the area of the property in acres as well as square feet. 22. The description needs the reservation of a District easement for our water pipeline as part of this quitclaim to the City. 23. The final plat and description will need to be signed and stamped by a licensed land surveyor or qualified registered civil engineer. Please submit two sets of revised plans based on the above comments to the District for permit review. Reference District File No. 2606 on further correspondence regarding this project. If you have any questions or need further information, you can reach me at (408) 265-2607, extension 2322. r.el)p Colleen Haggerty, P.E. Assistant Engineer Community Projects Review Unit Enclosure: Prohibited Plant List; Plan Sheet Showing Joint Trench and Insulating Blanket Installation cc: Mr. Tim Haley, Planning Department, City of Campbell S. Tippets, V. Stephens, D. Chesterman, C. Haggerty, File (2) ch:jl 0926c-pl.doc 5750 ALMADEN EXPWY SAN JOSE, CA 95118-3686 TELEPHONE (4081 265-2600 FACSIMILE 14081 266-0271 www.valleywater. org AN EQUAL OPPORTUNITY EMPLOYER FiU6 File: 2606 Los Gatos Creek July 29, 2003 Mr. David Voorhies Creegan + D'Angelo 1075 North Tenth Street, Suite 100 San Jose, CA 95112-2923 Subject: Campbell Gateway Towneplace Suites, 412-09-051, 052, 053 Dear Mr. Voorhies: The Santa Clara Valley Water District (District) has reviewed the Conceptual Grading and Drainage Plan, prepared by Creegan + D'Angelo, dated November 5, 2002, and submitted to the District on June 19, 2003. The proposed project will require a District permit per Ordinance 83-2, since it is adjacent to Los Gatos Creek and District fee title property and includes work on District fee title property and over the District's Central Pipeline, a 66-inch diameter high pressure water line. Based on our review of the proposed project as shown on the above-referenced plans, we have the following comments: 1 . The District has previously provided comments regarding our concerns about the project's mass in relation to the trail and its users. The latest plans submitted show that the building footprint has been modified from the previous plans. The changes include increasing the building length approximately 10 feet and moving the building closer to the property line. Previously, the setback at Section A was 18.5 feet and now it is 18 feet and at the northerly end of the building (closest point to the property line), the building was 14.9 feet from the property line and now it is 10 feet. Placement of approximately 2.5 feet of fill for the building site will further increase the apparent size of the project to trail users. Also, the fencing proposed along the westerly property line may add to the apparent mass of the project from the trail depending on the height and type of fencing used. It is unclear why these changes, though seemingly minor, have occurred considering the fact that the District, the Planning Commission, and various City residents have voiced concern about the size, proximity, and mass of this project in relation to the trail. 2. The District understands the City will be requesting dedication of 10 feet along Campbell Avenue for the new sidewalk and street improvements. The District is agreeable to the quitclaim of the fee title property (approximately 30 feet by 10 feet) along Campbell The mission of the Santa Clara Valley Water District is a healthy, safe and enhanced quality of living in Santa Clora County through watershed stewardship and comprehensive management of water resources in 0 practical, cost-effective and environmentally sensitive manner. (; Mr. David Voorhies Page 2 July 29, 2003 Avenue, with an easement reservation, for the new public improvements. Please submit plats and descriptions for the area to be quitclaimed for our review. 3. The District currently accesses the creek from the paved maintenance road located to the west of the project property. It appears that at the entrance of this road from Campbell Avenue, a driveway is proposed along with sidewalk and curb and gutter improvements. To maintain adequate access to the District maintenance road, a reinforced concrete maintenance road driveway (see enclosed detail) 18 feet wide will need to be constructed in place of the proposed 10-foot-wide driveway. Removable bollards will also need to be installed to prevent unauthorized vehicles from accessing the road. In addition, the footprint of the new paved area should, at a minimum, conform to the existing paved area to provide adequate room for District vehicles to maneuver in and out of the site with equipment (see enclosed plan). Please revise the plans as necessary to maintain the District's access to the maintenance road and creek. 4. All pavement placed on District property needs to be designed for H-20 loading and the driveway approach should be reinforced per the enclosed detail to minimize damage if District access through the site is required. 5. Details for all improvements to be placed on District property must be provided including pavement section, utility crossings, fencing, driveway details, and removable bollard details. 6. Details need to be provided for the proposed retaining wall along the top of bank, including grading required on the slope and footing details. Please note that no portion of the wall, including the footings, is to be located on the District's fee title property. 7. More information is needed on the plans to show that runoff from the street will not be directed to the District's maintenance road and Los Gatos Creek at the new driveway approach and that runoff from the site will not be directed to the District's property (Assessor's Parcel Nos. 412-09-049 and 412-09-050). The plans show that some inlets will be provided between the building and property line; however, there are no swales shown to direct the runoff from the south and the southwest portions of the building to the storm drain system and there is not enough elevation information provided to indicate that the site will be graded to direct all the site runoff to the storm drain system. Please provide adequate drainage facilities and elevations on the plans to ensure that drainage from the site is not directed to Los Gatos Creek. 8. It is unclear if the two gates shown along the easterly fence are proposed to be used for guest access to the trail or if they are only to provide staff access around the fence for maintenance purposes. Private trail access points along the trail are discouraged, and if the purpose is maintenance of the property outside of the fence, the fence could be located at the property line to eliminate the need for the gates. Please clarify the intended use for the gates or modify the plan as necessary. 9. The foundation for the building may require special design considerations and a slope stability analysis for the project should be completed. The slope stability analysis should Mr. David Voorhies Page 3 July 29,2003 include both the 1 OO-year and 1 O-year water surface elevations in Los Gatos Creek as design parameters with rapid drawdown of the water surface in the creek to simulate likely storm events. 10. Cross sections through the District's Central Pipeline and the building foundation, information regarding the construction methods to be used for construction over the Central Pipeline, and information regarding the construction methods to be used for the building foundation need to be provided for District review. Construction of the proposed improvements is not to impact the Central Pipeline and the applicant must demonstrate this by providing the above information and any additional information on how the pipeline will be protected during construction. Enclosed for your use is a copy of the as-built plan for the Central Pipeline. 11. Grading, landscaping, irrigation, utility work, erosion and sediment control measures, etc., and details as necessary need to be shown on the plans and reviewed by the District prior to permit issuance. 12. New, more stringent water quality regulations of the Clean Water Act have recently been triggered because the National Pollutant Discharge Elimination System permits program has failed to protect beneficial uses of the County's creeks and the South San Francisco Bay, as evidenced by such observations as violations of ambient water quality criteria; high concentrations of toxic substances; and fish consumption health advisories. These new regulations require that the Total Maximum Daily Loads (TMDL) of sediment, heavy metals, exotic species, pesticides, and other pollutants are to be calculated for discharges to South San Francisco Bay. It is likely that since the South San Francisco Bay has been identified as an impaired water body that TMDLs for these pollutants will establish load allocations for discharges, which may affect not only direct discharges to the Bay but also those to the creeks and tributaries that flow into the Bay. This site is located within the Los Gatos Creek watershed and runoff from the site discharges to Los Gatos Creek which in turn flows into the Guadalupe River and into the Bay. Therefore, it is highly recommended that postconstruction control measures for storm water quality protection be included in the redevelopment of this site, in an effort to protect the quality of water entering Los Gatos Creek and eventually the Bay. Redevelopment of sites, such as this one, provides the opportunity to include site features to aid in improving water quality in an urban area such as the City of Campbell and Santa Clara County. Such measures may include directing runoff from parking lots and roofs to appropriate landscaping areas to allow pollutants to be reduced in the water that will eventually be discharged to Los Gatos Creek. A good source to reference for information regarding how to include such features in the final site design is the Start at the Source Design Guidance Manual for Storm water Quality Protection, a copy of which can be obtained through the Bay Area Stormwater Management Agencies Association. 13. The project proponent is reminded that the surface use of the District's property does not provide for compensation for the replacement of improvements constructed on District property that must be removed for the maintenance and operation of the District's Mr. David Voorhies Page 4 July 29,2003 Central Pipeline. In addition, in the event that maintenance or repairs are necessary, portions of the proposed parking lot and driveway may be inaccessible. 14. The use of vehicles or equipment that exceeds H20 loading is prohibited on the District's fee title property at all times. Please provide information regarding the equipment that will be used on site to perform activities such as pile driving, grading, and demolition. 15. Prior to issuance of a permit, the District will require that a certificate of insurance from the contractor be provided, to cover construction activities that occur on District fee title property. Enclosed for your use are the requirements for the certificate of insurance. The majority of the above comments were provided previously to the applicant and the City (see enclosed letters dated September 9,2002 and October 9,2002) and have not been addressed by the plan submitted. Please submit two sets of revised plans based on the above comments and all other applicable comments in the enclosed letters to the District for permit review. Reference District File No. 2606 on further correspondence regarding this project. If you have any questions or need further information, you can reach me at (408) 265-2607, extension 2322. Sincerely, ~ Colleen Haggerty Assistant Engineer Community Projects Review Unit Enclosures: 1. District Standard Driveway Detail 2. Red-Lined Plan Sheets 3. District Comment Letter Dated September 9,2002 4. District Comment Letter Dated October 9,2002 5. Certificate of Insurance Requirements 6. Central Pipeline As-Built Plan Sheet CSP 23 cc: Mr. Tim Haley, Planning Department, City of Campbell S. Tippets, V. Stephens, D. Chesterman, C. Haggerty, File (2) ch:fd 0728b-pl.doc .;."..O~. CA-11"'<9 !:: <;- u r- o 0 ~ ~ ~~ c,..:: . OJtCH/>."'O' City of Campbell -- Community Development Department 70 N. First Street, Campbell, CA 95008 MEMORANDUM To: Distribution TimJ.4 Date: June 24, 2003 From: Subject: Campbell Suite Group - 690/700 East Campbell Avenue Please find attached a copy of City Council Ordinance No. 2032 which approved a Planned Development Permit for the construction of an extended stay hotel on the subject site. If you should have any questions regarding the City Council action, please do not hesitate to contact me at 866-2144. distribution: Bill Bruckart, Building Official Ed Arango, Associate Engineer Wayne Hokanson, Deputy Fire Marshall II MEMORANDUM Date: Tim Haley A ociate Planner, Comm. Development Department . {;'tJ J Hemsley e uty City Clerk To: From: Subject: Planned Development Permit (PLN 2002-96) - Campbell Suites Group, LLC - 690-700 E. Campbell Avenue At the regular meeting of June 17, 2003, the City Council gave second reading to Ordinance No. 2032 approving a Planned Development Permit (PLN 2002-96) to allow the construction of a new 95 room extended stay hotel for property owned by the John Davis Family Trust located at 690-700 E. Campbell Avenue in a PD (Planned Development) Zoning District. A certified copy of the adopted Ordinance is attached for your records. A certified copy of the Ordinance has been forwarded to the applicant, Ms. Libby Glass, on behalf of Campbell Suites Group, LLC. A Summary of this Ordinance will be published in the Campbell Express dated June 25, 2003. Of'C1At ..\,.. "~ ;.., ~ ... r U r" .... ... 1-", G'" 'O~CHA\\U CITY OF CAMPBELL City Clerk's Office June 20, 2003 Campbell Suites Group, LLC Attn: Ms. Libby Glass 777 N. First Street, 5th Floor San Jose, CA 95112 Dear Ms. Glass: At the regular meeting of June 17, 2003, the City Council adopted the following Ordinance in regard to your project located at 690-700 E. Campbell Avenue: Ordinance No. 2032 approving a Planned Development Permit (PLN 2002-96) to allow the construction of a 95-unit extended stay hotel on property owned by the John Davis Family Trust located at 690-700 E. Campbell Avenue in a P-D (Planned Development) Zoning District. A certified copy of the above mentioned Ordinance is attached for your records. Please be advised that the Ordinance becomes effective 30 days from the date of adoption. Should you have any questions in regard to the City Council's action, please do not hesitate to contact this office (866-2117) or Tim Haley, Associate Planner, Community Development Department. Enc. cc. John Davis Family Trust, 381 A Stockton Street, San Jose, CA 95126 Tim Haley, Associate Planner 70 North First Street. Campbell, California 95008.1423 . TEL 408.866.2117 . FAX 408.374.6889 . TOD 408.866.2790 2. Payment of Bills and Claims This action approves the list of bills and claims for payment as follows: payroll related checks dated May 29,2003 in the amount of $10,003.48; bills and claims checks dated June 2,2003 in the amount of $137,981.47; payroll related checks dated June 5, 2003 in the amount of $196,548.35; and bills and claims checks dated June 9, 2003 in the amount of $135,610.72; for a combined total of $480,144.02 3. Ordinance 2032 Application of Ms. Libby Glass, on behalf of Campbell Suites Group, LLC, for a Planned Development Permit (PLN2002-96) to allow the construction of a new 95 room extended stay hotel for property owned by the John Davis Family Trust located at 690-700 E. Campbell A venue in a PD (planned Development) Zoning District (Second Reading/Roll Call Vote) Second reading of Ordinance 2032 approves a Planned Development Permit (PLN2002- 96) to allow the construction of a new 95 room extended stay hotel for property owned by the John Davis Family Trust located at 690-700 E. Campbell A venue in a PD (Planned Development) Zoning District. 7. Approval of Agreement for Traffic Enforcement Services on Santa Clara County Expressways (Resolution/Roll Call Vote) Resolution 10196 authorized the Mayor to execute an Agreement between the California Highway Patrol, Santa Clara County, and the Cities of Campbell, Milpitas, San Jose, Santa Clara, and Sunnyvale for traffic enforcement services on the San Tomas, Lawrence and Montague Expressways. 8. Accept Donation from Orchard City Grange This action accepts a donation in the amount of $500 from the Orchard City Grange. 9. Accept Donation of $25,000 from the Friends of the Heritage Theatre for the Heritage Theatre Capital Campaign This action accepts a donation of $25,000 from The Friends of the Heritage Theatre as a contribution to the Heritage Theatre Capital Fund. M/S: Kennedy/Burr - to approve the Consent Calendar with the exception of Items 4, 5, and 6. Motion adopted by the following roll call vote: AYES: Councilmembers: Watson, Kennedy, Dean, Burr, Furtado NOES: Councilmembers: None ABSTAIN: Councilmembers: Dean (Item No.1 and Item No.3) Minutes of 6/17/03 City Council Meeting 3 ORDINANCE NO. ---2.Q..32 BEING AN ORDINANCE OF THE CITY COUNCil... OF THE CITY OF CAMPBELL APPROVING A PLANNED DEVELOPMENT PERMIT (pLN2002-96) TO ALLOW THE CONSTRUCTION OF A 95-UNIT EXTENDED STAY HOTEL ON PROPERTY OWNED BY THE JOHN DAVIS FAMILY TRUST LOCATED AT 690-700 EAST CAMPBELL A VENUE IN A P-D (PLANNED DEVELOPMENT) ZONING DISTRICT. APPLICATION OF MS. LIBBY GLASS, ON BEHALF OF CAMPBELL SUITES GROUP, LLC. FILE NO. PLN2002-96 After notification and public hearing, as specified by law, and after presentation by the Community Development Director, proponents and opponents, the hearing was closed. After due consideration of all evidence presented, the City Council did find as follows with respect to application PLN2002-96: 1. The proposed hotel use is consistent with the Central Commercial land use designation of General Plan. 2. The proposal is consistent with General Plan strategy LUT-13.1a: Attract major hotels to Campbell as a convenience for local residents and businesses, as well as a tax generator for the community. 3. The proposed project, as conditioned, is consistent with the Planned Development Zoning Ordinance. 4. The site plan proposes the construction of a four-story 95-suite hotel, 96 parking spaces and associate landscaping. 5. The project provides 96 off-street parking spaces, where 99 spaces are required, however, the proposed parking is consistent with another extended stay hotel recently approved in the City and is found to be adequate. 6. The completed project would consist of a four-story hotel of 50,045 square feet with a building coverage of 21 percent, landscaping coverage of 19 percent and paving coverage of 59 percent. 7. The proposed project will have a floor area ratio of .80. 8. The project includes a Condition of Approval that no one shall occupy the hotel for a continuous period of more than nine (9) months, ensuring that the hotel cannot transition to permanent housing. Transient occupancy tax shall be collected for all occupancies during the first 30 days of any occupancy City Council Ordinance PLN2002-96 - 690-700 E. Campbell A venue - Planned Development Permit -- Hotel Page 2 9. The proposed project is surrounded by hotel uses to the north, a recreational and open space uses to the south, Highway 17 to the east and Los Gatos Creek and Campbell Park to the west. 10. The proposed massing and design of the building is compatible with the surroundings and is reduced in appearance by stepping of the building towards Campbell A venue and use of varied building materials as architectural treatments. 11. The proposed hotel, as conditioned, presents a significant landscape treatment along the Los Gatos Creek Trail. 12. A Mitigated Negative Declaration has been prepared for this project concluding that there are no significant unmitigated impacts associated with this project, pursuant to the California Environmental Quality Act (CEQA). Based upon the foregoing findings of fact, the City Council further finds and concludes that: 1. The proposed development will result in a more desirable environment and use of the land than would be possible under any other zoning classification. 2. The development will be compatible with the General Plan of the City and will aid in the harmonious development of the immediate area. 3. The proposed development will not be detrimental to the health, safety or welfare of the neighborhood or the City as a whole. 4. There is a reasonable relationship and a rough proportionality between the Conditions of Approval and the impacts of the project. 5. There is a reasonable relationship between the use of the fees imposed upon the project and the type of development project. 6. No substantial evidence has been presented from which a reasonable argument could be made that shows that the project, as currently presented and subject to the required Conditions of Approval, will have a significant adverse impact on the environment. The City Council of the City of Campbell does ordain as follows: SECTION ONE: That this Ordinance be adopted to approve a Planned Development Permit (PLN2002-96) to allow the construction of a 95-unit extended stay hotel on property owned by the John Davis Trust located at 690-700 E. Campbell Avenue, together with the attached Exhibit "A" (Conditions of Approval), Exhibit "B" (Project Plans) and Exhibit "C" (Map of Said Property) . Exhibit A - Conditions of A )Val . PLN2002-96 - 690-700 E. Campbell A venue - Planned Development Permit -- Hotel Page 2 a. Fifty percent of trees planted on site shall be a minimum 24-inch boxed size and twenty- five percent shall be 36-inch boxed tree sizes. All shrubs shall be a minimum of 5-gallon SIze. b. All trees planted on the westerly side of the building shall half 24 inch and half 36 inch boxed tree sizes. c. Installation of riparian species of plant materials along the Los Gatos Creek frontage shall be required. d. Removal of any trees shall require replacement of trees on site in accordance with replacement standards of the City's Water Efficient Landscape Standards (WELS) and the Tree Protection Ordinance. e. All landscaping installed as required per the approved landscape plan shall be maintained in good health. f. Applicant shall obtain encroachment permits from the City of Campbell for all work performed within the right-of-way. g. The landscape plan shall illustrate appropriate quantities and sizes of plant materials to ensure buffering of buildings and parking areas. h. All on-site landscaping shall be installed prior to building occupancy. Landscaping in the Santa Clara Valley Water District property shall be installed prior to building occupancy unless otherwise approved by the Community Development Director. 1. The applicant shall protect existing trees during construction to ensure their continued health. Protective fencing shall be installed around the drip line of the trees and the recommendations of a certified arborist shall be followed to ensure the safety of the trees. Plans for the protective fencing and the recommendations of a certified arborist shall be reviewed and approved prior to the issuance of building permits. Damaged trees shall be replaced according to the provisions of the Tree Protection Ordinance. J. Landscape Plan to include landscape and irrigation installation between the project site and the creek trail (enhancement planting) along the project frontage. Landscaping to be consistent with Santa Clara Valley Water District requirements. 4. Permit Expiration: The Planned Development Permit is valid for a period of two years from the date of final City Council approval. A building permit must be obtained within this two- year period or the Planned Development Permit shall be void. Construction shall be completed within 18 months of building permit issuance. 5. Fences and Retaining Walls: Prior to the issuance of building permits, a fencing and wall plan shall be submitted for review and approval of the Community Development Director. a. Fencing along the property lines shall be installed and maintained at the expense of the applicant. b. Fencing shall be limited to six (6) feet in height and be a tubular steel style painted a dark color. c. Retaining walls adjacent to the spa area shall be faced with decorative rock similar to the building entrance and lobby. Exhibit A - Conditions of AT wal PLN2002-96 - 690-700 E. Campbell A venue - Planned Development .permit -- Hotel Page 1 NOW, THEREFORE, BE IT ORDAINED that the City Council approves a Planned Development Permit (PLN2002-96) to allow the construction of a new 95 room extended stay hotel on property located at 690-700 E. Campbell Avenue in a P-D (Planned Development) Zoning District, subject to the following conditions: Where approval by the Director of Community Development, City Engineer, Public Works Director, City Attorney or Fire Department is required, that review shall be for compliance with all applicable conditions of approval, adopted policies and guidelines, ordinances, laws and regulations and accepted engineering practices for the item under review. Additionally, the applicant is hereby notified that he/she is required to comply with all applicable Codes or Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified. COMMUNITY DEVELOPMENT DEPARTMENT Planning Division 1. Approved Proiect: Approval is granted for a Planned Development Permit to allow the construction of a four-story, 95 room hotel located at 690/700 East Campbell Avenue. The building designs and site design shall substantially conform to the project exhibits listed below, except as may be modified by the Conditions of Approval herein: a. Project plans prepared by Barry Swenson Builder dated revision November 5, 2002, including a site plan, building elevations, floor plans, roof plans, fencing plan and a conceptual landscaping plan. b. Colored elevation and material board submitted by Barry Swenson Builders and received by the Planning Division on November 18, 2002. c. Conceptual Grading and Drainage Plan prepared by Creegan + D'Angelo, dated November 5,2002. 2. Limitation on Hotel Stav: The use of the property is for transient occupancy as a hotel. No one shall occupy the hotel for a continuous period of more than nine (9) months. 3. Landscaping: The applicant shall submit four sets of landscape and irrigation plans to the Planning Division, prior to the issuance of building permits, for review by the Parks and Recreation Commission, the Site and Architectural Review Committee and approval by the Community Development Director. Landscape and irrigation plans shall be consistent with the Conceptual Landscape Plan already submitted and the City's Water Efficient Landscaping Standards (WELS). Landscaping plans shall include the following: City Council Ordinance PLN2002-96 - 690-700 E. Campbell A venue - Planned Development Permit -- Hotel Page 3 SECTION TWO: This Ordinance shall become effective thirty (30) days following its passage and adoption and shall be published, one time within fifteen (15) days upon passage and adoption in the Campbell Express, a newspaper of general circulation in the City of Campbell, County of Santa Clara. PASSED AND ADOPTED this 17th day of role call vote: June , 2003, by the following AYES: NOES: ABSENT: ABSTAIN: COUNCILMEMBERS: COUNCILMEMBERS: COUNCILMEMBERS: COUNCILMEMBERS: Watson, Kennedy, Burr, Furtado None None Dean APPROVED ATTEST: ~(aJ~ Exhibit A - Conditions of AI )Val PLN2002-96 - 690-700 E. Campbell A venue - Planned Development Permit -- Hotel Page 3 d. Landscape treatment along East Campbell A venue to include the installation of a decorative treatment that creates architectural interest through use of the decorative stone proposed on the building in the landscape treatment along the street edge. Final design to be reviewed and approved by the Site and Architectural Review Committee. 6. Propertv Maintenance and Graffiti Removal: The property is to be maintained free of any combustible trash, debris, and weeds until the time that actual construction commences. Any vacant existing structures shall be secured, by having windows boarded up and doors sealed shut, or be demolished or removed from the property (Section 11.201 and 11.414, 1985 Ed. Uniform Fire Code). The property owner shall be responsible for the removal of any graffiti from walls, fences or structures on the project site within one week of notification by the Community Development Director or their designate. 7. Utility Boxes and Back-Flow Preventers: The applicant shall submit a plan prior to installation of PG&E utility (transformer) boxes and San Jose Water Company back-flow preventers, indicating the location of the boxes and screening (if the boxes are above ground) for approval by the Community Development Director. 8. On-Site Li~hting: On-site lighting shall be shielded away from adjacent properties and the creek trail and directed on site. The design and type of lighting fixtures and lighting intensity of any proposed exterior lighting for the project shall be reviewed and approved by the Community Development Director, prior to installation of the lighting for compliance with all applicable Conditions of Approval, ordinances, laws and regulations. Lighting fixtures shall be of a decorative design to be compatible with the hotel development and shall incorporate energy saving features. a. Lighting near the Los Gatos Creek Trail shall be low level lighting near the spa area only. 9. Construction Mitigation Measures: The applicant shall implement the following construction mitigation measures: a. Construction activities will be limited to daytime hours of 8:00 am to 5:00 p.m. weekdays and 9:00 a.m. to 4:00 p.m. Saturdays. Construction is prohibited on Sundays and Holidays unless an exception is granted by the Building Official. b. No pile driving is allowed for construction of the project. c. All internal combustion engines for construction equipment used on the site will be properly muffled and maintained. d. All stationary noise generating construction equipment, such as air compressors and portable power generator, will be located as far as practical from the existing residences and businesses. Exhibit A - Conditions of Al )Val PLN2002-96 - 690-700 E. Campbell A venue - Planned Development Permit -- Hotel Page 4 e. All active construction areas shall be watered at least twice daily. f. Cover all trucks hauling soil and other loose materials stationed or prior to leaving the site. g. Pave, apply water, or apply non-toxic soil stabilizers on all unpaved surfaces, and staging areas at the construction site. 10. Parking and Driveways: All parking and driveway areas shall be developed in compliance with Chapter 21.50 of the Campbell Municipal Code except that unistall parking spaces will be permitted. a. The applicant shall provide a decorative pavement treatment for the entry driveway no less than fifteen (15) in depth. The design and material to be used for the decorative pavement shall be reviewed and approved by the Community Development Director, prior to issuance of building permits for the project. 11. Contractor Contact Information Posting: The project site shall be posted with the name and contact number of the lead contractor in a location visible from the public street prior to the issuance of building permits. 12. Architectural Details: Prior to the issuance of building permits the applicant shall submit the follow for review and approval by the Community Development Director: a. Color samples of paint for walls and building trim. Pinal color approval subject to field approval of color swatch on building for conformance with approved color scheme. b. Details of decorative railings at the windows. c. In addition to the smooth stucco base treatment, provide additional cultured stone base treatment, no less than 30 inches in height, at the base of the entire building, per details approved by the Community Development Director prior to issuance of building permits. 13. Trash and Recyclin~ Enclosure: The applicant shall submit details regarding the design and location of a trash and recycling enclosure(s) to the Planning Division for review and approval by the Community Development Director prior to the issuance of building permits for the project. Unless otherwise noted, enclosures shall consist of a concrete floor surrounded by a six-foot high solid wall and have decorative doors and designed to be architectural compatible to the hotel. The enclosure shall be constructed at grade level and have a level area adjacent to the trash enclosure area to service the containers. 14. On-Site Management: An on-site manager shall be present at all times the hotel IS III operation to provide effective control of the premises. Exhibit A - Conditions of Al )val PLN2002-96 - 690-700 E. Campbell A venue - Planned Development Permit -- Hotel Page 5 Building Division 15. Permit Required: A building permit application shall be required for the proposed structure. The building permit shall include Electrical!Plumbing/Mechanical fees when such work is part of the permit. 16. Construction Plans: The Conditions of Approval shall be stated in full on the cover sheet of construction plans submitted for building permit. 17. Size of Plans: The minimum size of construction plans submitted for building permits shall be 24 inches by 36 inches. 18. Plan Preparation: This project requires plans prepared under the direction and oversight of a California licensed Engineer or Architect. Plans submitted for building permits shall be "wet stamped" and signed by the qualifying professional person. 19. Soils Report: Two copies of a current soils report, prepared to the satisfaction of the Building Official, containing foundation and retaining wall design recommendations shall be submitted with the building permit application. This report shall be prepared by a licensed engineer specializing in soils mechanics. 20. Site Plan: Application for building permit shall include a competent site plan that identifies property and proposed structures with dimensions and elevations as appropriate. Site plan shall also include site drainage details. Site address and parcel numbers shall also be clearly called out. Site parking and path of travel to public sidewalks shall be detailed. 21. Foundation Inspections: A pad certificate prepared by a licensed civil engineer or land surveyor shall be submitted to the project's building inspector upon foundation inspection. This certificate shall certify compliance with the recommendations as specified in the soils report and the building pad elevation and on-site retaining wall locations and elevations are prepared according to approved plans. Horizontal and vertical controls shall be set and certified by a licensed surveyor or registered civil engineer for the following items: a. pad elevation b. finish floor elevation (first floor) c. foundation comer locations 22. TITLE 24 Energv Compliance: California Title 24 Energy Standards Compliance forms shall be blue-lined on the construction plans. Compliance with the Standards shall be demonstrated for conditioning of the building envelope and lighting of the building. Applicant shall prepare an acoustical analysis prepared by a licensed acoustical engineer detailing building and architectural treatments to mitigate potential sound impacts from Exhibit A - Conditions of Ai )Val PLN2002-96 - 690-700 E. Campbell A venue - Planned Development Permit -- Hotel Page 6 Highway 17. Sound attenuation measures shall comply with California State Building Code, Volume 1, Appendix Chapter 12, Division ITA. 23. Special Inspections: When a special inspection is required by u.B.c. Section 1701, the architect or engineer of record shall prepare an inspection program that shall be submitted to the Building Official for approval prior to issuance of the building penmts, in accordance with u.B.C Section 106.3.5. Please obtain City of Campbell, Special Inspection forms from the Building Inspection Division Counter. 24. Non- Point Source Pollution: The City of Campbell, standard Santa Clara Valley Non-point Source Pollution Control Program specification sheet shall be part of plan submittal. The specification sheet (size 24" X 36") is available at the Building Division service counter. 25. TITLE 24 Accessibilitv- Commercial: On site general path of travel shall comply with the latest California Title 24 Accessibility Standards. Work shall include but not be limited to accessibility to building entrances from parking facilities and sidewalks. 26. TITLE 24 Accessibility -Commercial: Projects seeking to use the Title 24 Hardship exemption clause shall blue-line completed, City of Campbell "20%" exemption form on submitted construction plans. Form is available at Building Division service counter. 27. Approval required: The project requires the following agency approval prior to issuance of the building permit: a. West Valley Sanitation District b. Santa Clara County Fire Department c. School District: i) Campbell Union School District (378-3405) ii) Campbell Union High School District (371-0960) iii) Moreland School District (874-2900) iv) Cambrian School District (377-2103) d. Bay Area Air Quality Management District (Demolitions Only) e. Santa Clara County Department of Environmental Health 28. P. G. & E. Applicant shall contact Pacific Gas and Electric Company (P.G.& E.) on issues related to the relationship of this proposed project to overhead high voltage power lines in the area. Applicant shall also be responsible to contact P.G. & E. concerning scheduling of improvements to supply gas and electric power to the proposed project. COUNTY FIRE DEPARTMENT 29. Application: Prior to building permit review, the applicant shall submit an application for use of alternate materials, methods of construction, or Modification of code to this department for review and approval. Exhibit A - Conditions of Ai )val PLN2002-96 - 690-700 E. Campbell A venue - Planned Development Permit -- Hotel Page 7 30. Fire Sprinkler: In addition to a full NFP A 13 fire sprinkler system installed throughout the building, attic sprinklers protection shall be installed within the scope of the project. In addition to above, fire sprinkler protection of all usable spaces including guest room closets and bathrooms shall be provided. 31. Wet Standpipes: Wet standpipe systems shall be installed within the stair enclosures. Note: 2 1/2 inch outlets only, no hoses. 32. Fire Alarm System: A monitored manual and automatic fire alarm system including smoke detection within all exit corridors and common areas shall be installed. The fire alarm system would annunciate all initiating devices by floor and device type at the main alarm panel. 33. Hvdrant: One additional public hydrant shall be installed in addition to the currently required l/public/1 private hydrant. CA total of three fire hydrants are now required). 34. Public Address System: A public address system shall be installed throughout the building. 35. Fire Apparatus Access: There shall be provisions for emergency fire apparatus to make a left turn from Campbell Avenue heading westbound directly into the project driveway. 36. Timin~ of Required Roadwav Installations: Required access roads, up through first lift of asphalt, shall be installed and accepted by the Fire Department prior to the start of construction. Bulk combustible materials shall not be delivered to the site until installation is complete. During construction, emergency access roads shall be maintained clear and unimpeded. Note that building permit issuance will be withheld until installations are complete. 37. Premises Identification: Approved numbers or addresses shall be placed on all new and existing buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Numbers shall contrast with their background. 38. Fire Lane Marking Required: Roadways deemed necessary to facilitate emergency vehicle access, shall be identified in accordance with Fire Department Standards Details and Specification A-6 and Local Government Standards. PUBLIC WORKS DEPARTMENT 39. Preliminary Title Report: Prior to issuance of any grading or building permits for the site, the applicant shall provide a current Preliminary Title Report. 40. Right-of-Wav for Public Street Purposes: Prior to issuance of any grading or building permits for the site, the applicant shall cause right-of-way to be granted for public street purposes along the Campbell Avenue frontage to accommodate a half-street of 38 feet Exhibit A - Conditions of Aj, oval PLN2002-96 - 690-700 E. Campbell A venue - Planned Development Permit -- Hotel Page 8 southerly of the centerline of the existing median island. The applicant shall cause all documents to be prepared by a registered civil engineer/land surveyor, as necessary, for the City's review and recordation. 41. Street Improvements: Prior to issuance of any grading or building permits for the site, the applicant shall execute a street improvement agreement and shall cause plans for public street improvements to be prepared by a registered civil engineer, pay various fees and deposits, post security and provide insurance necessary to obtain an encroachment permit for construction of the standard public street improvements, as required by the City Engineer. The fee for a non-utility encroachment permit application is currently $260.00. The plans shall include the following: a. Removal of existing street improvements and related improvements along the property frontage; b. Installation of new curb and gutter at 28 feet from the centerline of the existing median island; c. Installation of new sidewalk; d. Installation of decorative and conventional street lights, conduits, conductors, and related improvements in accordance with Campbell Street Lighting Policy; e. Installation of street trees, tree wells, and irrigation system along the street frontage and median; f. Modification of the existing median to accommodate emergency vehicles; g. Installation of signal interconnect conduit along the frontage; h. Installation of traffic control signage and stripes as necessary; 1. Construction of conforms to existing public and private improvements, as necessary. J. Provide for installation and maintenance of public drinking fountain at pedestrian plaza. 42. Water Meter(s) and Sewer Cleanout(s): Existing and proposed Water Meter(s) and Sewer Cleanout(s) shall be installed on private property behind the public right-of-way line. 43. Soils Report: Prior to issuance of any grading or building permits for the site, applicant shall provide a Soils Report prepared by a registered geotechnical or civil engineer. 44. Utilities: All new on-site Utilities and existing boundary line along Campbell A venue shall be installed underground per Section 20.36.150 of the Campbell Municipal Code for any new or remodeled buildings or additions. Applicant shall comply with all plan submittals, permitting, and fee requirements of the serving utility companies. 45. Utilitv Coordination Plan: Prior to issuance of building permits for the site, the applicant shall submit a utility coordination plan and schedule for approval by the City Engineer for installation and/or abandonment of all utilities. Streets, which have been resurfaced within the previous five years, will require boring and jacking for all new utility installations. Applicant shall also prepare pavement restoration plans for approval by the City Engineer prior to any utility installation or abandonment. Exhibit A - Conditions of Al IvaI PLN2002-96 - 690-700 E. Campbell A venue - Planned Development Permit -- Hotel Page 9 46. Grading and Drainage Plan: Prior to issuance of any grading or building permits for the site, the applicant shall conduct hydrology studies based on a ten-year storm frequency, prepare an engineered Grading and Drainage Plan, and pay fees required to obtain necessary grading permits. The plans shall comply with the 1998 edition of the California Building Code including Chapters 10, 11, 18,33, and Appendix Chapter 33. 47. Storm Drain Area Fee: Prior to issuance of any grading or building permits for the site, the applicant shall pay the required Storm Drain Area fee which is $2,500.00 per acre. 48. Santa Clara Vallev Water District (SCVWD): Prior to issuance of any permits for grading or building, the applicant shall obtain a clearance and permit from the SCVWD. 49. Storm Water Pollution Prevention Measures: Prior to issuance of any grading or building permits, the applicant shall comply with the National Pollution Discharge Elimination System (NPDES) permitting requirements, the California Storm Water Best Management Practices Handbook prepared by the Storm Water Quality Task Force, Santa Clara Valley Water District requirements, and the City of Campbell Municipal Code regarding Stonn Water Pollution Prevention. The City will provide the applicant with information to assist in complying with this condition of approval. The primary objective is to improve the quality and reduce the quantity of storm water runoff to the Bay. 50. Parking Encumbrance: Prior to issuance of any grading or building permits, the applicant shall cause appropriate encumbrances to be made to ensure the provision of the legal right to use the proposed parking lot improvements on adjacent lots. 51. Short-Term Air Quality Mitigation Measures: The following practices should be followed during all phases of site preparation and construction activities: a. Use dust-proof chutes for loading construction debris onto trucks. b. Water or cover stockpiles of debris, soil, and other materials that can be blown by the wind. c. Cover all trucks hauling soil, sand, and other loose materials or require all trucks to maintain at least two feet of freeboard. d. Sweep daily (with water sweepers) all paved access roads, parking areas, and staging areas at the construction site. e. Sweep streets daily (with water sweepers) if visible soil material is carried onto adjacent public streets, as directed by the City Engineer. f. Enclose, cover, water twice daily or, or apply (non-toxic) soil stabilizers to exposed stockpiles (dirt, sand, etc.). g. Install sandbags or other erosion control measures to prevent silt runoff to public roadways.(Building Division) Exhibit A - Conditions of At val PLN2002-96 - 690-700 E. Campbell A venue - Planned Development Permit -- Hotel Page 10 52. Design-Specific Geotechnical Analvsis: Prior to issuance of building permits for the project, a design-specific geotechnical analysis shall be prepared by a registered geotechnical engineer, and all recommendations of the analysis shall be incorporated into the project's final engineering design to minimize the damage from seismic shaking. The project sponsor shall use standard engineering techniques and conform to the requirements of the Uniform Building Code to reduce the potential for seismic damage and risk to future occupants.(Building Division) 53. Archaeological or Paleontological Resource Discoverv: If archaeological or paleontological resources are encountered during excavation or construction, construction personnel shall be instructed to immediately suspend all activity in the immediate vicinity of the suspected resources and the City and a licensed archeologist or paleontologist shall be contacted to evaluate the situation. A licensed archeologist or paleontologist shall be retained to inspect the discovery and make any necessary recommendations to evaluate the find under current CEQA guidelines prior to the submittal of a resource mitigation plan and monitoring program to the City for review and approval prior to the continuation of anyon-site construction activity.(Building Division) 54. Human Burial or Skeletal Element Discoverv: In the event a human burial or skeletal element is identified during monitoring, work in that location shall stop immediately until the find can be properly treated. The City and the Santa Clara County Coroner's office shall be notified. If deemed prehistoric, the Coroner's office would notify the Native American Heritage Commission who would identify a "Most Likely Descendant." The archeological consultant and MLD in conjunction with the project sponsor shall formulate an appropriate treatment plan for the find, which might include, but not be limited to, respectful scientific recording and removal, being left in place, removal and reburial on site, or elsewhere. Associated grave goods are to be treated in the same manner (Building Division) CALIFORNIA DEPARTMENT OF FISH AND GAME CERTIFICATE OF FEE EXEMPTION De Minimis Impact Finding Project TitleILocation (include county): Campbell Gateway Townplace Suites Campbell Suites, L.L.C.(PLN 2002-96,PLN 2002-116, and PLN 2002-129) 690 & 700 East Campbell A venue Campbell, Santa Clara County, CA 95008 Project Description: Four-story 95 unit extended stay hotel Findings of Exemption (attach as necessary): The City Council granted a Negative Declaration based upon the findings in the initial study prepared for this project which determined that no effects to wildlife or the environment will result from the development of this project. Certification: I hereby certify that the public agency has made the above finding and that the project will not individually or cumulatively have an adverse effect on wildlife resources, as defined in Section 711.2 of the Fish and Game Code. ~ \.:~~ Planning lcial Title: A~t.\Arc:: P~""''€tZ- City of Campbell Date: ~I 07 Page 1 of 2 Corinne Shinn From: Sharon Fierro Sent: Monday, June 16, 2003 4:37 PM To: Geoff Bradley; Corinne Shinn Subject: FW: Marriott Hotel - Not A Good Idea!! fat the file -----Original Message----- From: Marlene Pomeroy Sent: Monday, June 16, 2003 3:55 PM To: Bob Kass; Bernie Strojny; Sharon Fierro; Geoff Bradley; Matthew Jue Subject: FW: Marriott Hotel - Not A Good Idea!! This e-mail was sent to the Council and the generic Public Works e-mail address. Just forwarding to all parties involved. marlene -----Original Message----- From: City of Campbell Public Works Sent: Monday, June 16, 2003 3:52 PM To: Joanne 0' Ambrosia; Marlene Pomeroy Subject: FW: Marriott Hotel - Not A Good Idea!! From: Melissa Wilhite[SMTP:MELOUB78@YAHOO.COM] Sent: Monday, June 16, 2003 3:51:44 PM To: campbellreporter@svcn.com Cc: danf@cLcampbell.ca.us; donb@cLcampbell.ca.us; matthewd@cLcampbell.ca.us; janek@cLcampbell.ca.us; jeanette@cLcampbell.ca.us; publicworks@cLcampbell.ca.us Subject: Marriott Hotel - Not A Good Idea!! Auto forwarded by a Rule To Whom it May Concern: I just recently moved to Campbell to get away from the hustle and bustle of downtown San Jose. To my dismay, I recently learned of the approval of the Marriott Hotel, which will soon be found right around the comer from my new home. I was very diappointed to learn that the city council reversed the planning commission's decision to allow Marriott to build a hotel in my neighborhood. I find it hard to believe that the Campbell City Traffic Engineer does not think that the traffic in and around the proposed hotel site will be impacted. Have you driven in this area during the morning and afternoon rush hours? Of course, it is not comparable to downtown San Jose, but add to it a few more cars from the hotel, and it could get a little out of control. As for the city council members supporting the idea of "having a hotel within walking distance of the Pruneyard Shopping Center" (Campbell Reporter, June 11,2003), are there not already the Pruneyard 6/16/03 Page 2 of 2 Inn and the Campbell Inn? I am very upset about the Marriott Hotel being built in Campbell, and I hope that everyone else who feels this way will take the time and effort to voice their oppinion. Melissa Wilhite Union A venue Campbell, CA Do you Yahoo!? SBC Yahoo! DSL - Now only $29.95 per month! 6/16/03 '" 0$0... -------- \ I { \ ", ~::J ot 'C"'1It . A !..4. ^. ~~ ... .r" U '. r' OIlCHAtl"Q CITY OF CAMPBELL City Clerk's Office June 6, 2003 Ms. Libby Glass Campbell Suites Group, LLC 777 N. First Street, 5th Floor San Jose, CA 95112 Dear Ms. Glass: At the regular meeting of June 3, 2003, the City Council held a public hearing to consider your application, on behalf of Campbell Suites Group, LLC for approval of the following: 1. A Planned Development Permit (PLN 2002-96) to allow the construction of a 95 unit extended stay hotel; 2. A Tree Removal Permit (PLN 2002-116) to allow the removal of two protected trees; and 3. A Sign Application (pLN 2002-169) for a freeway oriented sign on property owned by John Davis Family Trust and located at 690-700 E. Campbell A venue. After hearing public testimony, and City Council discussion and consideration, the Campbell City Council took the following action: 1. Adopted Resolution No. 10191 granting a Mitigated Negative Declaration for the Campbell Gateway Townplace Suites Project; 2. Gave first reading to Ordinance No. 2032 approving a Planned Development Permit (PLN 2002-96) to allow the construction of a 95-unit Extended Stay Hotel on property located at 690-700 E. Campbell Avenue, incorporating findings and subject to the Conditions of Approval. Please note that additional Condition #41.j., on Page 8 of the Conditions of Approval, has been added per direction of the City Council. Second reading will be given to this Ordinance at the regularly scheduled meeting of June 17, 2003. Please be aware that a certified copy of the Ordinance will be forwarded to you at that time. 70 North First Street. Campbell, California 95008.1423 . TEL 408.866.2117 . FAX 408.374.6889 . TOD 408.866.2790 ( Continued Page 2 3. Adopted Resolution No. 10192 approving a Tree Removal Permit (PLN 2002-116) to allow the removal of two trees on property located at 690-700 E. Campbell Avenue; and 4. Adopted Resolution No. 10193 approving a Sign Application (pLN 2002-124) for a Freeway Oriented Sign on property located at 690-700 E. Campbell A venue, incorporating findings and subject to the Conditions of Approval. A certified copy of Resolution No. 10191, 10192, and 10193 is enclosed for your records. Please do not hesitate to contact this office (866-2117) or Tim Haley, Associate Planner, Community Development Department, should you have any questions in regard to the City Council's action. Enc. cc. Tim Haley, Associate Planner, Community Development Dept. John Davis Family Trust, 381 A Stockton Street, San Jose, CA 95126 RESOLUTION NO. ---1.0191 BEING A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CAMPBELL ADOPTING A MITIGATED NEGATIVE DECLARATION FOR THE CAMPBELL GATEWAY TOWNPLACE SUITES PROJECT ON PROPERTY OWNED BY THE JOHN DA VIS FAMILY TRUST LOCATED AT 690-700 EAST CAMPBELL AVENUE IN A P-D (PLANNED DEVELOPMENT) ZONING DISTRICT. APPUCA TION OF MS. LIBBY GLASS, ON BEHALF OF CAMPBELL SUITES GROUP, LLC. After notification and public hearing, as specified by law, and after presentation by the Community Development Director, proponents and opponents, the hearing was closed. After due consideration of all evidence presented, the City Council did find as follows: 1. An Initial Study has been prepared for the Campbell Gateway Townplace Suites Project, which provides documentation for the factual basis for concluding that a Mitigated Negative Declaration may be adopted since no substantial evidence exists, in light of the whole record, that the project may have a significant effect on the environment. The project consists of the development of a four-story hotel with 95 units. 2. Higgins Associates, Civil and Traffic Engineers of Gilroy, California prepared an Analysis of Transportation Impacts to evaluate the potential traffic impacts of the project and found that the proposed project would not cause significant traffic impacts on the local transportation facilities. 3. The Mitigated Negative Declaration describes the reasons that the Campbell Gateway Townplace Suites Project will not have a significant effect on the environment and therefore does not require the preparation of an Environmental Impact Report pursuant to Section 15071 of the California Environmental Quality Act Guidelines. 4. Santa Clara Valley Water District (SCVWD) is the only agency responsible for resources affected by the Campbell Gateway Townplace Suites in that the project is within 50 feet of their facilities. The project conditions of approval require the applicant to obtain a permit from the SCVWD prior to the issuance of any building or grading permits for the project. 5. The City of Campbell provided a Notice of Intent to adopt a Mitigated Negative Declaration to the public via the Campbell Express and the County Clerk. 6. The City of Campbell provided a 20-day public review period of the Mitigated Negative Declaration pursuant to Section 15073 of the California Environmental Quality Act Guidelines. The 20-day public review period for the draft Mitigated Negative Declaration was between October 16, 2002 and November 4,2002. Comments from Santa Clara Valley water District are attached to the initial study. City Council Resolution PLN2002-96 - 690-700 E. Campbell A venue - Mitigated Negative Declaration -- Hotel Page 2 7. The mitigation measures address potential short-term air quality impacts associated with construction, paleontological or archaeological resources that might be encountered during project construction, strong seismic ground shaking associated with potential geologic impacts, and potential noise impacts during project construction. The mitigation measures are included as Conditions of Approval of the Planned Development Permit. 8. The City Council hereby finds and determines that the Mitigated Negative Declaration reflects the independent judgment of the City Council. Based upon the foregoing findings of fact, the City Council further finds and concludes that: 1. No substantial evidence has been presented from which a reasonable argument could be made that shows that the project, as currently presented and subject to the required Conditions of Approval, will have a significant adverse impact on the environment. 2. The Custodian of the Record for this Mitigated Negative Declaration and Initial Study is the City Clerk of the City of Campbell, located at 70 North First Street, Campbell, California. NOW, THEREFORE, BE IT RESOLVED that the City Council adopts a Mitigated Negative Declaration for the Campbell Gateway Townplace Suites Project on property owned by the John Davis Family Trust located at 690-700 E. Campbell Avenue in a P-D (planned Development) Zoning District. PASSED AND ADOPTED this ---1J:iL day of vote: .Tune , 2003, by the following roll call AYES: NOES: ABSENT: ABSTAIN: COUNCILMEMBERS: Watson, Kennedy, Burr, Furtado COUNCILMEMBERS: None COUNCILMEMBERS: Dean COUNCILMEMBERS: None APPROVED: G)~ ~ ~~~ Daniel E. Furtado, Mayor ATTEST: ~J.u. - Anne Bybee, Cit;t~;-- '''''''\~'~~ -~~ j\ft .; i/-l,,~r_:':;.U.:.l.rJ:.. l,iJ.,;'(V ~~'.; ,-' '~t\v~ tJ ~k J\ -- ~^.lfu: ~ / <?~LJ ~ -- ~ \0 \~'\~ - (/ \ RESOLUTION NO. BEING A RESOLUTION OF THE CITY COUNCn... OF THE CITY OF CAMPBELL APPROVING A TREE REMOV AL PERMIT (PLN2002- 116) TO ALLOW THE REMOVAL OF TWO TREES ON PROPERTY OWNED BY THE JOHN DAVIS FAMILY TRUST LOCATED AT 690- 700 EAST CAMPBELL A VENUE IN A P-D (PLANNED DEVELOPMENT) ZONING DISTRICT. APPLICATION OF MS. LIBBY GLASS, ON BEHALF OF CAMPBELL SUITES GROUP, LLC. FILE NO. PLN2002-116 10192 After notification and public hearing, as specified by law, and after presentation by the Community Development Director, proponents and opponents, the hearing was closed. After due consideration of all evidence presented, the City Council did find as follows with respect to application PLN2002-116: 1. The proposed Tree Removal Permit is consistent with the proposed P-D (Planned Development) zoning designation and the Central Commercial designation. 2. The proposed tree replacement requirement of one 24-inch box size tree and one 36-inch box size tree is consistent with the requirements of the Tree Protection Ordinance. A total of 50 trees will be planted on the project site with 50 percent being 24-inch box size trees and 25 percent 36-inch box trees and the remainder 15-gallon sizes. 3. The proposed replacement trees will be a sufficient replacement for the trees to be removed and will continue the diversity of tree species found in the community. 4. The project will include the removal of two protected trees (one Carob and one Monterey Pine) due to parking improvements and driveway locations. Based upon the foregoing findings of fact, the City Council further finds and concludes that: 1. The trees would prohibit the configuration of the driveways and parking facilities for the proposed hotel use. 2. The retention of the trees restricts the economic enjoyment of the property and creates an unusual hardship for the property owner by severely limiting the use of the property in a manner not typically experienced by owners of similarly zoned and situated properties, and the applicant has demonstrated to the satisfaction of the Planning Commission that there are no reasonable alternatives to preserve the trees. 3. There is a reasonable relationship and a rough proportionality between the Conditions of Approval and the impacts of the project. City Council Resolution PLN2002-116 - 690-700 E. Campbell Avenue - Tree Removal Permit Page 2 NOW, THEREFORE, BE IT RESOLVED that the City Council approves a Tree Removal Permit (PLN2002-116) to allow the removal of two trees on property owned by the John Davis Family Trust located at 690-700 E. Campbell A venue in a P-D (Planned Development) Zoning District. PASSED AND ADOPTED this 3rd day of vote: June , 2003, by the following roll call AYES: NOES: ABSENT: ABSTAIN : ATTEST: COUNCILMEMBERS: Watson, Kennedy, Burr, Furtado COUNCILMEMBERS: None COUNCILMEMBERS: Dean COUNCILMEMBERS: None .2J- APPROVED: \~.-~ ~ ~ Daniel E. Furtado, Mayor Anne Bybee, City Clerk Ql'" ,,'''1.... \$ A TFll.l6 __ FOflEootl'lG INST. ,:~"'Ii QlUGUllAL n- (;T or!,,'" '. '. .Ii AND OORRE., ' '7 ON fILE IN HilS C,.,.ICL'. Rl<. am ST' A"lNE BYL,EE, CITY Ct.1i ~PBELL, CAUf-oAA1A. .A~.. lS lliJ-t- , ~. - ~-) j BY L ~~\0~"__ fDATE - \ \ '" RESOLUTION NO. BEING A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CAMPBELL APPROVING A SIGN APPUCATION (pLN2002-124) FOR A FREEWAY ORIENTED SIGN ON PROPERTY OWNED BY THE JOHN DAVIS FAMILY TRUST LOCATED AT 690-700 EAST CAMPBELL A VENUE IN A P-D (pLANNED DEVELOPMENT) ZONING DISTRICT. APPUCATION OF MS. LIBBY GLASS, ON BEHALF OF CAMPBELL SUITES GROUP, LLC. FILE NO. PLN2002- 129 10193 After notification and public hearing, as specified by law, and after presentation by the Community Development Director, proponents and opponents, the hearing was closed. After due consideration of all evidence presented, the City Council did find as follows with respect to application PLN2002-129: 1. The proposed freeway-oriented sign is limited to identification of an on-site business located on the project site. 2. The applicant has demonstrated that the business operation is dependent upon freeway identification and that denial of said identification would cause an undue hardship. 3. The hotel project is unusually difficult to locate due to its limited access from East Campbell A venue and lack of direct freeway access. 4. The applicant has demonstrated that the signage is similar to other similarly situated hotel businesses in the area. 5. The proposed freeway-oriented sign would best serve the public welfare and is necessary to provide adequate visibility from Highway 17. 6. The height and sign area are the minimums necessary to provide adequate freeway identification for the hotel use. 7. The proposed sign, as conditioned, is architecturally compatible in design and consistent with the proposed hotel. Based on the foregoing findings of fact, the City Council further finds and concludes that: 1. The proposed sign will promote the economic viability of the City by providing adequate identification and visibility of the new business, and will also best serve the traveling public in keeping with the principles and purposes of the City's Sign Ordinance. 2. The proposed freeway-oriented sign will aid in the harmonious development of the area. City Council Resolution PLN2002-129 - 690-700 E. Campbell A venue - Freeway Oriented Sign -- Hotel Page 2 3. The proposed freeway-oriented sign is consistent with the City's Zoning Ordinance and General Plan. NOW, THEREFORE, BE IT RESOLVED that the City Council approves a Sign Application (PLN2002-129) for a freeway-oriented sign on property located at 690-700 E. Campbell Avenue in a P- D (Planned Development) Zoning District, subject to the following conditions: Where approval by the Director of Community Development, City Engineer, Public Works Director, City Attorney or Fire Department is required, that review shall be for compliance with all applicable conditions of approval, adopted policies and guidelines, ordinances, laws and regulations and accepted engineering practices for the item under review. Additionally, the applicant is hereby notified that helshe is required to comply with all applicable Codes or Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified. CO~TYDEVELOPMENTDEPARTMENT Planning Division 1. Approved Proiect: Approval is granted for two freestanding signs at 690/700 East Campbell Avenue. The signs shall substantially conform to the Sign Plan prepared by Barry Swenson Builders, dated October 9, 2002 and revised November 5, 2002 except as may be modified by the Conditions of Approval herein. This sign approval is valid only in conjunction with a valid Planned Development approval. The sign area and letter design shall substantial comply with the style and lettering reading 'Marriott Townplace Suites'. 2. Revised Plan: Applicant shall submit a revised sign elevation of the freeway-oriented sign for review and approval of the Community Development Director, prior to submittal to the Building Division for permits. Revisions to incorporate decorative details complementary to the hotel building through building materials, colors and design elements. 3. Approval Expiration: The sign approval is valid for a period of two years from the date of final City Council approval unless an extension is granted prior to the expiration date. 4. Landscaping: The applicant shall submit a landscape plan for review and approval of the Community Development Director prior to submittal to the Building Division providing for the installation of foundation plantings at the base of the sign to introduce planting materials to screen the base and support structures of the sign. 5. Sign Maintenance: The property owner 1 applicant shall maintain the sign in a state of good condition. Deterioration of illumination and/or sign materials shall be removed or replaced within 30 days of notification by the Community Development Director. City Council Resolution PLN2002-129 - 690-700 E. Campbell A venue - Freeway Oriented Sign -- Hotel Page 3 PASSED AND ADOPTED this 3rd vote: day of June , 2003, by the following roll call AYES: NOES: ABSENT: ABSTAIN: COUNCILMEMBERS: WatlOn, Kennedy, Burr, Furtado COUNCll..MEMBERS: None COUNCILMEMBERS: Dean COUNCILMEMBERS: None ^- .-L APPROVED:~~ -=>~,,~ , ATTEST: ~ Anne Bybee, City Clerk Daniel E. Furtado, Mayor f1'It! FOREGOING tNSTP!J'fEMT IS A TRUI AND CORR"CT COPI (;or THE ORlGtNAl ON FiLE iN Td:;3 C; i~C::, ( L:kiL 6. Amendment to the Classification and Salary Plan - Park Maintenance Worker I, Park Maintenance Worker II, Park Maintenance Lead Worker, Street Maintenance Worker I, Street Maintenance Worker II, Street Maintenance Lead Worker, Mechanic I, Mechanic II (Resolution/Roll Call Vote) Resolution 10189 amends the Classification and Salary Plan for the positions of Park Maintenance Worker I, Park Maintenance Worker II, Park Maintenance Lead Worker, Street Maintenance Worker I, Street Maintenance Worker II, Street Maintenance Lead Worker, Mechanic I and Mechanic II. 7. Proposition 4 - Gann Spending Limitation FY 2003/04 (ResolutionlRoll Call Vote) This action adopts the increase in California per capita income and County population growth as the calculation factors to be used in determining the City's spending limitation for FY 2003/04 and approves Resolution 10190 establishing the City of Campbell's FY 2003/04 appropriations limit as $35,562,467. M/S: Burr/Kennedy - that the City Council approve the Consent Calendar. Motion adopted by the following roll call vote: AYES: Councilmembers: Watson, Kennedy, Burr, Furtado NOES: Councilmembers: Dean ORAL REQUESTS a. Clare Lee, 4713 Cherrywood Drive, San Jose, appeared before the City Council and spoke regarding the persecution of the Falun Gong in China. b. Alan Aerts, 498 Salmar Avenue, Campbell, appeared before the City Council and invited the City Council to a charity event scheduled for Saturday, September 13 to benefit the American Cancer Society, American Diabetes Association, Guide Dogs for the Blind and Special Olympics. PUBLIC HEARINGS AND INTRODUCTION OF ORDINANCES 8. Application of Ms. Libby Glass, on behalf of Campbell Suites Group, LLC, for a Planned Development Permit (PLN2002-96) to allow the construction of a new 95 room extended stay hotel and a Tree Removal Permit (pLN2002-116) to allow the removal of two trees and a Sign Application (pLN2002-124) for a freeway-oriented sign on property owned by the John Davis Family Trust located at 690-700 E. Campbell A venue in a PD (planned Development) Zoning District (Resolution/Roll Call Vote) Minutes of 6/3/2003 City Council Meeting 3 This is the time and place for a public hearing to consider the application of Ms. Libby Glass, on behalf of Campbell Suites Group, LLC, for a Planned Development Permit (PLN2002-96) to allow the construction of a new 95 room extended stay hotel and a Tree Removal Permit (PLN2002-116) to allow the removal of two trees and a Sign Application (PLN2002-124) for a freeway-oriented sign on property owned by the John Davis Family Trust located at 690-700 E. Campbell A venue in a PD (Planned Development) Zoning District. City Attorney Seligmann stated that he would need to recuse himself from this item due to a professional conflict and left the Council Chamber. Consulting City Attorney, Kirsten Powell, Logan & Powell, was present to provide legal counsel on this item. Community Development Director Fierro - Staff Report dated June 3, 2003. Mayor Furtado declared the public hearing open and asked if anyone in the audience wished to. be heard. Libby Glass, Applicant, appeared before the City Council and spoke in support of the project. Ms. Glass identified the various consultants involved with the project and was available to answer any questions. Bill Hemrick, President of TMH Hotels, appeared before the City Council and spoke in support of the project. Jeff Current, Project Architect for Barry Swenson Builder, appeared before the City Council and spoke in support of the project. Mr. Current requested that Condition of Approval12c be removed. Adam Moutafian, 416 San Benito Avenue, Los Gatos, appeared before the City Council and spoke in support of the project. Ola Marra Cook, 927 Sheila Court, Campbell, appeared before the City Council and spoke against the project. Eileen Tanaka, 360 E. Campbell A venue, Campbell, appeared before the City Council and spoke in support 'Of the project. Jeff Hofstrand, 577 Hawthorne A venue, Campbell, appeared before the City Council and spoke against the project citing concerns about size of the project and traffic. Max Aghazadeh, 1429 Theresa A venue, Campbell, appeared before the City Council and spoke in support of the project. Minutes of 6/3/2003 City Council Meeting 4 Cynthia Aghazadeh, 1429 Theresa Avenue, Campbell, appeared before the City Council and spoke in support of the project. Lloyd Taylor, 5011 Moorpark A venue, San Jose, appeared before the City Council and spoke against the project citing concerns about the size of the building. Meg Stein, 1203 Hazel A venue, Campbell, appeared before the City Council and spoke against the project citing concerns about the size of the building. Marilyn Gadway, 2155 Lilac Lane, Morgan Hill, appeared before the City Council and spoke in support of the project. Frank Leamy, owner of Mama Mia's Restaurant, Campbell, appeared before the City Council and spoke in support of the project. Peter and Audrey Kiehtreiber, 1509 Walnut Drive, Campbell, appeared before the City Council and spoke against the project citing concerns about size of the building and traffic. Paul Hoyle, 1995 S. Bascom Avenue, Campbell, appeared before the City Council and spoke against the project stating that he believes a new hotel will dilute the market affecting the occupancy rates of existing hotels. James Zurer, 1875 Blossom Hill Road #100, San Jose, appeared before the City Council and spoke in support of the project. Carrie Williams, 600 Maple A venue, Campbell, appeared before the City Council and spoke in support of the project. Grail Nitsch, 546 H4rrison Avenue, Campbell, appeared before the City Council and spoke in support of the project. Jose Costa, 1032 N. Central A venue, Campbell, appeared before the City Council and spoke in support of the project. There being no one else wishing to speak, Mayor Furtado closed the public hearing. City Council discussion followed during which individual Councilmembers spoke in support of the project. MIS: Burr/Kennedy - that the City Council adopt Resolution 10191 granting a Mitigated Negative Declaration for the Campbell Gateway Towneplace Suites Project on property owned by the John Davis Family Trust located at 690-700 E. Campbell A venue in a PD (Planned Development) Zoning District; introduce Ordinance 2032 approving a Planned Development Permit (pLN2002-96) to allow the construction of a 95-unit extended stay hotel on property owned by the John Minutes of 6/3/2003 City Council Meeting 5 Davis Family Trust located at 690-700 E. Campbell A venue in a PD (Planned Development) Zoning District, subject to Conditions of Approval including the requirement that a drinking fountain be located in the public area as an added Condition of Approval, for first reading; adopt Resolution 10192 approving a Tree Removal Permit (pLN2002-116) to allow the removal of two trees on property owned by the John Davis Family Trust located at 690-700 E. Campbell Avenue in a PD (planned Development) Zoning District and incorporating Findings; and adopt Resolution 10193 approving a Sign Application (PLN2002-124) for a freeway oriented sign on property owned by the John Davis Family Trust located at 690-700 E. Campbell A venue in a PD (Planned Development) Zoning District, incorporating Findings and subject to Conditions of Approval. Motion adopted by the following roll call vote: AYES: Councilmembers: Watson, Kennedy, Burr, Furtado NOES: Councilmembers: Dean The City Clerk read the title of Ordinance 2032. M/S: Burr/Watson - that further reading of Ordinance 2032 be waived. Motion adopted by a 4-0-1 vote, Councilmember Dean absent. Recess/Reconvene: Mayor Furtado declared a five minute recess. The City Council reconvened at 9:00 p.m. City Attorney Seligmann returned to the Council Chamber. 9. * Adoption of Fiscal Year 2003/04 Operating and Capital Budget (Resolution/Roll Call Vote) This is the time and place for a public hearing to consider adoption of the Fiscal Year 2003/04 Operating and Capital Budget. Finance Director Conner - Staff Report dated June 3, 2003. Mayor Furtado declared the public hearing open and asked if anyone in the audience wished to be heard. . There being no one wishing to speak, Mayor Furtado closed the public hearing. MIS: KennedylBurr - that the City Council adopt Resolution 10194 and Redevelopment Agency adopt Resolution 2003-6 adopting the fiscal year 2003-04 City and Operating Budgets in the amounts of $39,029,918 and $8.908,920 respectively, for a combined Operating Budget of $47,938,838; and adopt the fiscal year 2003-04 City and RDA Capital Budgets in the amounts of $4,343,466 and Minutes of 6/3/2003 City Council Meeting 6 ( 'II (If Cilill/JiJel/ City Council. Report ITEM NO: CATEGORY: MEETING DATE: 8. Public Hearing June 3, 2003 TITLE Public Hearing to consider the application of Ms. Libby Glass on behalf of Campbell Suites Group, L.L.C., for a Planned Development Permit (PLN 2002-96) to allow the construction of a 95 unit extended stay hotel, a Tree Removal Permit (pLN 2002-116) to allow the removal of two protected trees and a Sign Applic,ation (pLN 2002-129) for a freeway oriented sign on property owned by John Davis Family Trust located at 690-700 East Campbell Avenue in the P-D (planned Development) Zoning District. Adoption of a Mitigated Negative Declaration. CITY COUNCIL ACTION The City Council may take one of the following a.ctions: 1. Deny: Accept the Planning Commission recommendation and: a) Take first reading of an Ordinance denying a Planned Development Permit to allow the construction of a four-story 95-unit hotel on the project site. (No action on the Mitigated Negative Declaration is required if the project is denied.) 2. Approve: Adopt a Resolution granting a Mitigated Negative Declaration for the proposed project; and; a) Take first reading of an Ordinance approving a Planned Development Permit to allow the construction of a four story, 95 unit hotel, subject to the attached conditions of approval; and b) Adopt a Resolution, incorporating the attached findings approving a Tree Removal Permit; and c) Adopt a Resolution, incorporating the attached findings approving a freeway- oriented sign. 3. Continue this application for further review and/or modifications and/or referral back to the Planning Commission. ENVIRONMENTAL DETERMINATION In accordance with the California Environmental Quality Act (CEQA), the City conducted an Initial Study for this project. The results of the study determined that no significant unmitigated impacts would be created as a result of this project. Based upon the information provided in the Initial Study, staff recommends that the City Council adopt the Mitigated Negative Declaration prepared for this proJect. The Initial Study and the Mitigated Negative Declaration are included as an attachment to this report. The mitigation measures address potential short-term air quality impacts associated with construction, paleontological or archaeological resources that might be encountered during project construction, strong seismic ground shaking associated with potential geologic impacts and potential noise impacts during project construction. City Council Report PLN2001-129/130 & 2002-05 - 690-700 East Campbell Avenue Planned Development Permit, Tree Removal Permit & Freeway-oriented Sign Page 2 The mitigation measures are included as Conditions of Approval of the Planned Development Permit. The 20-day public review period for the draft Mitigated Negative Declaration was between October 16, 2002, and November 4, 2002. Comments received from the Santa Clara Valley Water District are attached to the Planning Commission report dated May 13, 2003. The Planning Commission took no action in regards to an environmental determination for the project. No action is required under CEQA on the Mitigated Negative Declaration if the project is denied by the City Council. BACKGROUND Applicant's Proposal: The applicant is requesting approval of a Planned Development Permit (pLN2002-93) to allow the construction of a four-story, 95 unit extended-stay hotel, a Tree Removal Permit (pLN 2002-116) to remove two protected trees and a Sign Application (pLN 2002-129) to permit a freeway-oriented sign. An extended-stay hotel is a business hotel typically with weekly stays and kitchen facilities in each room. The proposed owner and operator of the hotel is TMH Hotels, Inc. TMH Hotels would operate the Towneplace Suites by Marriott hotel under a franchise agreement with Marriott Hotels. This owner currently has similar hotels in operation in Redwood City, San Jose (Saratoga Avenue) and one under construction in Sunnyvale. The project site is located on the south side of East Campbell A venue between Los Gatos Creek and Highway 17. The subject property is currently developed with Andy's BBQ Restaurant and two single-family residences. The 1.4-acre site (two parcels owned by the applicant and one parcel owned by Santa Clara Valley Water District that the property owner has surface development rights) is bisected by both the 30-foot wide Santa Clara Valley Water District owned land and an 80-foot wide PG&E easement. The property is adjacent to the Los Gatos Creek Trail and directly across Los Gatos Creek from Campbell Park. Staff and the applicant have explored a number of development scenarios on the property, all of which included significant new multi-story buildings. The attached Planning Commission Report discusses the project background and various land use alternatives for the project site. The report also describes the related General Plan Policies, the Zoning Designation, and a description of the proposed project. Planning Commission Public Hearing: The Planning Commission held a Public Hearing on the proposed project on May 13, 2003. Eleven members of the public addressed the Commission. The issues and concerns raised by the public included the following: · Proposed hotel is too tall and/or too large for the site; · The site should be used for affordable housing; · Did not believe photo-simulations were accurate depictions of the proposal; · Desire for a heritage orchard on the property; · Make the site part of Campbell Park; J:\Reports\COUNCIL REPORTS\CC Report -- 690-700 E. Campbell Avenue-2.doc City Council Report PLN2001-129/130 & 2002-05 - 690-700 East Campbell Avenue Planned Development Permit, Tree Removal Permit & Freeway-oriented Sign Page 3 . Affect on other hotels in Campbell; Concerns over the traffic to be generated by the proposed hotel; and Proposed hotel would be good for business in the Historic Downtown. . . The minutes of the meeting are included as Attachment No.6 of this report. The Planning Commission, after receiving the testimony at the public hearing and deliberating at its meeting of May 13, 2003, forwarded a recommendation to the City Council by a 6-1 vote to deny the proposed project. A copy of the Planning Commission's draft resolution is included as Attachment No.6. The Planning Commission's discussion focused on the following issues: 1. Scale/Compatibility: The scale and massing of a four-story hotel and whether it would be compatible with the Los Gatos Creek Trail and Campbell Park; 2. Image: The perceived image of a four-story hotel as viewed from Highway 17 and adjacent to the Historic Downtown area; and 3. Feasibility: Whether or not the local economy can support another hotel. These issues will be discussed throughout the remainder of this report in the appropriate subject areas. ANALYSIS Strategic Plan: The strategic plan contains a number of major community goals that relate to the proposal: · A safe, clean, comfortable and healthy environment. · A physically connected and involved community with a strong sense of identity. · Attractive residential neighborhoods and business districts. · Friendly, small town atmosphere. · Fiscally self-reliant City government with effective basic municipal services. The plan contains Objectives in support of the goals. Specific Land Use Objectives include: · A balanced small town. · An attractive community with an enhanced image. · An economically diverse and viable community. · A vibrant downtown that serves as the focal point of the community. The proposed hotel addresses many of these goals and objectives through the redevelopment of a underutilized, blighted property. The hotel would also generate spin-off benefits to businesses in the Downtown and Pruneyard. The use of the property for a park or heritage orchard is not feasible due to the prohibitively high cost of property acquisition. Additionally, the area near the site is currently well served by Campbell Park and is not an underserved area for park space. J:\Reports\COUNCn. REPORTS\CC Report - 690-700 E. Campbell Avenue-2.doc City Council Report PLN2001-129/130 & 2002-05 - 690-700 East Campbell Avenue Planned Development Permit, Tree Removal Permit & Freeway-oriented Sign Page 4 General Plan Designation: The General Plan land use designation for the project site is Central Commercial. The Central Commercial designation calls for a mix of shopping, services and entertainment uses in the Downtown area. A hotel is a visitor serving land use that is consistent with the Central Commercial land use designation. The proposed hotel use is in a transition area between the Downtown and the Pruneyard. The General Plan vision calls for connecting the Community Center, the Downtown and the Pruneyard into an active, cohesive, pedestrian oriented heart of the community. The project site is located 500 feet from the Pruneyard and 1,000 feet from Historic Downtown, providing ample pedestrian opportunities. The Central Commercial designation does not support a residential-only project. The Planning Commission report details the different development scenarios considered and the issues related with them. The proposed project complies with the following General Plan Land Use Element Strategies and Policies: LUT-13.1a: Hotels: Attract major hotels to Campbell as a: convenience for local residents and businesses, as well as a tax generator for the community. The proposal for a major hotel at this location is appropriate given the proximity to both the Downtown and the Pruneyard as well as visibility from Highway 17. Currently, Campbell is home to four other hotels, as follows: HOTEL No. of Rooms Tvpe Motel 6 49 Economv Hotel Campbell Inn 95 Standard Hotel Larkspur Landing 117 Extended Stay Hotel Prune Y ard Inn 171 Standard Hotel TOTAL 432 Typically the City does not discourage competition among businesses and does not attempt to regulate new businesses based on market conditions. However, the applicant has provided ample evidence that the proposed hotel would be able to be constructed and successfully operated within the local economy. LUT-14.3c: Development along Los Gatos Creek: Ensure that new projects adjacent to the Los Gatos Creek participate in developing the creek as a landscaped parkway and extend the landscape theme into creekside development to enhance exposure to the creek, provide passive recreation (seating areas) and integrate the creek and new development. LUT-14.3d: Links to Los Gatos Creek: Ensure that new development provides visual and pedestrian linkages with Los Gatos Creek. This General Plan Land Use policy clearly anticipates that development will take place adjacent to J:\Reports\COUNClLREPORTS\CC Report - 690-700 E. Campbell Avenue-2.doc City Council Report PLN2001-129/130 & 2002-05 - 690-700 East Campbell Avenue Planned Development Permit, Tree Removal Permit & Freeway-oriented Sign Page 5 the Los Gatos Creek. The project provides landscaping that enhances the site and reduces the visual mass of the building as viewed from the Creek Trail. The proposal includes significant landscaping in the area between the building and the Creek Trail, including the installation of 20 new trees and the retention of five existing trees. All of the new trees along the Creek trail are required to be 24 and 36-inch box size. As the attached photo-simulations and landscape sections show, the existing and proposed landscaping would significantly screen the proposed building. The hotel would offer approximately one half of the rooms overlooking the creek and providing passive security and observation of this area. The project includes the construction of an enhanced trail entrance where the Creek Trail and Campbell A venue intersect. This circular area adjacent to the public sidewalk includes a pedestrian plaza, two benches, a specimen tree and a bike rack. An attached diagram provides an enlarged plan view of this area. Earlier discussions with the developer included the provision of a water fountain as an enhancement to this area. The applicant objected to this as a condition of approval due to concern over potential maintenance issues. If the City Council wishes the drinking fountain to be included in the proiect, Condition of Approval No. 40 - Street Improvements, could be modified to require the installation. LUT-9.3d: Building Design: Design buildings to revitalize streets and public spaces by orienting the building to the street, including human scale details and massing that engages the pedestrian. The building has been designed to provide an engaging street elevation. The half round projection at the front of the building is the gathering spot for the hotel, providing couches, television and a fireplace. The activity in this area will be visible from the street through large windows. LUT-9-3e: Building Materials: Encourage the use of long lasting, high quality building materials on all buildings to ensure the long-term quality of the built environment. The proposed building includes a concrete tile roof, vertical board siding, three layer stucco and cultured rock accent material. Staff finds that the materials will be long lasting and durable. LUT-9.3f: Development Orientation: Orient new development towards public and private amenities or open space, in particular: · Orient front entrances, living/office area and windows toward the amenity or open space. Zoning Designation: The zoning designation for the project site is P-D (planned Development). The applicant is requesting approval of a Planned Development Permit consistent with the Planned Development Permit ordinance and a use consistent with the General Plan land use. The P-D application allows for consideration of the following: J:\Reports\COUNClLREPORTS\CC Report - 690-700 E. Campbell Avenue-2.doc City Council Report PLN2001-1291130 & 2002-05 - 690-700 East Campbell Avenue Planned Development Permit, Tree Removal Permit & Freeway-oriented Sign Page 6 1. Consideration of the general silhouette and mass, including location on the site, elevations and relation to natural plant coverage, all in relationship to the neighborhood; 2. Consideration of exterior design in relation to adjoining structures in height, bulk and area openings, breaks in the fa~ade facing onto the street. 3. Consideration of the appropriateness and compatibility of the proposed uses in relation to the adjacent uses and the area as a whole. In regards to evaluating the above considerations, the most serious concern expressed by the Planning Commission is the appearance of the hotel as viewed from the creek trail. The hotel is 46 feet tall from the ground to the highest point of the roof. The distance from the ground to the eave of the roof is 36 feet. However, the site is roughly level whereas the Creek Trail slopes down from Campbell Avenue to the south. The grade differential between the Creek Trail and the site is six to seven feet at the southern end of the site. A number of the Planning Commissioners and members of the public stated that the hotel use appeared to be a good use of the property. Under the P-D zoning, the City Council has the ability to determine whether the proposal is appropriate. Site Plan: A number of comments concerned the appearance of the proposed hotel from Campbell Park. The building is located approximately 250 feet from Campbell Park at the southern end of the site and 200 feet at the northern end of the site. The proposed building would be 10 to 20 feet from the westerly property line and 18 to 23 feet from the edge of the existing Los Gatos Creek trail. The conceptual grading and drainage plan indicates the building as 32 to 40 feet from the easterly top of the Los Gatos Creek top of bank. The building is setback 10 to 20 feet from the top of bank as defined by SCVWD. The following table summarizes the setbacks: Minimum Maximum Setback Setback Western Property Linel SCCWD Top of Bank 10 ft. 20 ft. Edge of Creek Trail 18 ft. 23 ft. Creek Top of Bank 32 ft. 40 ft. The District has requested a 20-foot setback from the SCVWD defined top of bank:. This requested setback was to provide an additional buffer to the Creek Trail and Los Gatos Creek. Thi& request was not based on the need to provide creek bank: stability, erosion control or water quality impacts. This request has not been accommodated due to the extremely constrained site. This project will enhance the stability of the adjacent slope and will direct run-off into the storm drain system after being appropriately filtered. At the request of the Planning Commission and staff, the applicant has explored a number of building configurations on the site. Due to the constraints of the easements; however, the proposed building placement is the most viable. The building mass steps down from four to three and one- J:\Reports\cOUNCa REPORTS\CC Report -- 690-700 E. Campbell A venue-2,doc City Council Report PLN2001-129/130 & 2002-05 - 690-700 East Campbell Avenue Planned Development Permit, Tree Removal Permit & Freeway-oriented Sign Page 7 and-a-half stories as the building nears Campbell A venue. A letter from the applicant is attached discussing the infeasibility of alternative site layouts and building designs. The parking facilities for the project as well as the entrances to the hotel are proposed from the easterly side of the project site. A spa area is proposed at the northwestern comer of the building. Architecture: A majority of the discussion by both the public and the Planning Commission at the May 13, 2003 meeting concerned the relative merits of the height and massing of the proposed building. Many speakers indicated they thought it was a very attractive building but expressed concern that the building was too tall and massive, especially as viewed from the following vantage points: . Trail users headed north and south on the Creek trail; . People in Campbell Park looking towards the site; . Viewing the building traveling westbound on Campbell Avenue. The proposed hotel is a predominately four-story craftsman style building. The front portion of the building is one and three stories. The elevations introduce three wall treatments of smooth tooled stucco surface at the building base, a stucco wall material as the body and a board and batten material at the fourth floor. The building footprint has been articulated with three to five foot offsets to provide visual interest along both the Creek Trail and the Highway 17 elevations. The proposed exterior paint colors consist a beige, gray and taupe color scheme. Roofing is shown as gray concrete tile. Ledgestone, a material commonly used in Craftsman-styled buildings, is used at the base of the building. Included in the attachments is two different photo-simulations that indicate two different base treatments. Staff is recommending the cultured stone treatment while the applicant prefers the smooth stucco treatment. The attached photo-simulations were prepared by a company (Focus 360) that specializes in the accurate depiction of development proposals. Attachment No. 13 details the technical aspects' of how this is done. The proposed design is very detailed and would be one of the most attractive buildings near the Downtown area and would set a high standard for other new developments. The location also provides an attractive gateway for the Downtown and would compliment Campbell Park and the Creek Trail. Street Improvements and Circulation: The project includes the dedication of 10 feet of land and the installation of curb, gutter, sidewalk, street trees and lighting along Campbell A venue. The project also proposes an enhanced entry to the creek trail accommodating benches and a small plaza at the northwestern comer of the property thus providing a more visible entry to the creek trail. This portion of Campbell A venue is used by pedestrians accessing the Los Gatos Creek trail and Campbell Park. The proposed public improvements along Campbell Avenue will provide a major J:\Reports\COUNcIL REPORTS\Cc Report -- 690-700 E. Campbell Avenue-2.doc City Council Report PLN2001-129/130 & 2002-05 - 690-700 East Campbell Avenue Planned Development Permit, Tree Removal Permit & Freeway-oriented Sign Page 8 improvement in an area of very high visibility and high pedestrian activity. A traffic impact analysis has been prepared for the proposed project, which concludes that the proposed driveway and existing circulation system along East Campbell Avenue will be adequately improved to accommodate the anticipated traffic associated with the proposed hotel. The City's Traffic Engineer has reviewed the analysis and agrees with the conclusions. Because of the site location on Campbell A venue between the Los Gatos Creek bridge and the Highway 17 overpass, road widening to accommodate a center turn lane is not feasible. As a result, left turns are not permitted into or out of the site. This situation currently exists with the 95-room Campbell Inn on the north side of Campbell A venue and the existing restaurant located at the site. A concern expressed at the Planning Commission meeting was the possibility of increased traffic in the Page/Poplar neighborhood due to drivers seeking to reverse direction on Campbell Avenue to reach the site. The City's Traffic Engineer has evaluated this situation and believes that it is highly unlikely that a motorist wishing to make a V-turn would turn right onto a side-street (poplar to Maple to Page) in order to make a difficult left-turn across four lanes of heavy traffic on Campbell A venue from Page Street. More likely, motorists would make a left-turn at Gilman and make a U- turn on Gilman, or make a V-turn at Dillon A venue, where V-turns are allowed. The hotel operator as a normal business practice, would also provide detailed directions to guest traveling to the hotel from the San Jose Airport and other locations. The hotel will also maintain maps and directions to local restaurants and sites of interest within the area, using the most convenient and direct routes. The applicant has also provided actual driveway counts from the TownePlace Suites located on Saratoga A venue in San Jose. This analysis shows that the actual traffic counts for an extended stay hotel are lower than the Institute of Traffic Engineers (ITE) traffic data used for the traffic analysis. The traffic counts that were used in the original traffic analysis were based on a standard hotel rather an extended stay hotel. This letter is included as Attachment No.9. Of all the possible development scenarios explored for the site, the hotel use generates the least total traffic and peak hour traffic. The proposed hotel is also located within a 1,4 mile walk of the Downtown Campbell Station now under construction for the Vasona Light Rail Line. The construction of the hotel would support increased transit usage. Landscaoingffrees: The proposed landscaping represents nineteen percent of the total lot area. The conceptual landscape plan proposes the installation of approximately fifty trees. Staff is recommending that a detailed landscaping plan be prepared as a condition of approval wherein seventy-five percent of the trees shall be 24 and 36-inch boxed sizes. These larger trees would be planted to compensate for the removal of the existing trees and to provide a significant plant buffer between the building and the creek trail. J:\Reports\COUNCIL REPORTS\CC Report - 690-700 E. Campbell Avenue-2.doc City Council Report PLN2001-129/130 & 2002-05 - 690-700 East Campbell Avenue Planned Development Permit, Tree Removal Permit & Freeway-oriented Sign Page 9 The attached photo-simulations show the significant landscape treatment at both one year and five years after planting. The applicant has provided additional exhibits that illustrate the landscape concept between the creek trail and the building. Viewscape: While the building will be visible from certain vantage points along Highway 17, the view is softened by trees and significant shrubs planted on the shoulder of the road in the Caltrans right-of-way. New evergreen trees planted in the parking lot will eventually provide further screening. The current view from Highway 17 is the rooftop of Andy's BBQ Restaurant. New landscaping along the creek frontage and existing vegetation in the creek channel will further soften the views from Campbell Park and the Creek trail. Concerns were expressed that the four-story hotel is too tall and might be visible from areas as distant as the downtown. Attachment 8, "Building Heights in Campbell- A Comparative Analysis" provides the heights of well-known buildings in Campbell for comparison purposes. Buildings of similar height include the Heritage Theatre and Water Tower II Offices in the downtown area. The proposed building and landscaping would partially screen the current view of the high-voltage electrical towers as viewed from Campbell Park and would also shield Campbell Park and portions of the Creek trail from freeway noise. Due to the constraints of the site, any redevelopment of the property is going to result in a taller building than what currently exists. Freewav Oriented Sign: The applicant is requesting approval of two freestanding signs. A freeway oriented sign in the parking lot, with a sign height of 30 feet and a sign area of 112 square feet, and a monument sign of 36 square feet at the project entrance. The applicant investigated building mounted signs that are visible from the freeway versus the pylon freestanding sign; however, they concluded, and staff concurs, that a freestanding sign provided more effective identification for the project with less obtrusive signing. The proposed monument sign incorporates elements of the building materials and shape and is found to be architecturally compatible and consistent with the provisions of the Sign Ordinance. Freeway-oriented signs must be considered by the City Council upon recommendation from the Planning Commission. The Planning Commission referred this matter to the City Council without a recommendation. Applications for such signs shall be considered in accord with the guidelines as follow: 1. Permanent signs oriented to freeways or expressways shall be limited to identification of on-site businesses. 2. The applicant shall demonstrate that the business operation is dependent upon freeway or expressway identification and that denial of said identification would cause an undue hardship. J:\Reports\COUNCn.. REPORTS\cc Report - 690-700 E. Campbell Avenue-2.doc City Council Report PLN2001-129/130 & 2002-05 - 690-700 East Campbell Avenue Planned Development Permit, Tree Removal Permit & Freeway-oriented Sign Page 10 3. The applicant shall demonstrate that the signage is necessary due to limited visibility of the parcel due to its shape and location or other factors unique to the site. 4. The sign shall be the minimum height and size necessary to achieve visibility from the freeway, expressway or public facility. 5. The sign shall not move, nor be animated, nor have flashing or moving lights. 6. Additional landscaping or architectural modification may be an added condition of approval of said signing to screen the sign or its supporting structure or to soften and/or enhance the appearance of the sign or the site as viewed from off-site locations. A letter from the applicant supporting the sign request is attached to the Planning Commission report. Staff finds that a freeway-oriented sign is justified with the proposed use and location. Hotels are typically located near major thoroughfares and are dependent on identification from the freeway. The proposed freeway oriented sign is similar in area and height to the signs identifying the Campbell and Pruneyard Inns. ALTERNA TIVES The alternative actions the City Council may take are listed on page one under "City Council Actions". FISCAL IMPACTS No negative fiscal impacts to the City as a result of the project have been identified. A transient occupancy tax (TOT) of approximately $200,000 to $250,000 annually would be potentially generated by this project based upon review of similar hotels. This is based on an occupancy rate of 70% and a room rate of $100 per night, an estimate based on current economic conditions and the trend at the Townhouse Suites on Saratoga Avenue in San Jose. The Transient Occupancy Tax (10% of room rate) would be collected on the first thirty days of each stay as required by the Campbell Municipal Code. Revenue from Transit Occupancy Tax currently provides approximately $1.1 million (4.5%) of total General Fund revenues. Like sales tax, it is an important contributor to the overall fiscal well being of the community. The City has enjoyed a diversified sales tax base in the past that has provided a cushion against a fluctuating economy. A similar approach in regards to hotels could be equally successful. Hotels rooms in Campbell would increase from 432 to 527 rooms. The addition of a 95- unit hotel would increase of the number of rooms available in Campbell by 22 percent. Of all the potential land uses, the hotel use would provide the greatest amount of revenue to help support City services and will assist in further diversifying the City's revenue base. J :\Reports\COUNClL REPORTS\CC Report -- 690-700 E. Campbell A venue-2,doc City Council Report PLN2001-1Z9/130 & 2002-05 - 690-700 East Campbell Avenue Planned Development Permit, Tree Removal Permit & Freeway-oriented Sign Page 11 Attachments: 1. Draft City Council Resolution Granting a Mitigated Negative Declaration - Resolution 2. Draft City Council Ordinance Denying Planned Development Permit - Ordinance 3. Draft City Council Ordinance Approving Planned Development Permit - Ordinance 4. Draft City Council Resolution Approving Tree Removal Permit - Resolution 5. Draft City Council Resolution Approving Freeway Oriented Sign - Resolution 6. Planning Commission Resolution and Minutes 7. Planning Commission Report including Attachments 8. Building Heights in Campbell- A Comparative Analysis 9. Letters from Applicant a. Discussing alternative building designs - May 21,2003 b. Additional traffic analysis - May 28, 2003 10. Project Exhibits including photo-simulations 11. Exhibits depicting landscape design along Creek trail 12. Enlarged view of Pedestrian Plaza 13. Photo-simulation explanation from Focus 360 14. Correspondence: Letter from Peter and Audrey Kiehtreiber - May 15,2003 Letter from Bret Rust - Campbell Inn - January 13, 2003 Letter from Kenneth S. Manrao - January 29, 2003. ~ Prepared by: \ ~ ~ Timothy Haley, Associate Planner. Prepared by: Reviewed by: Geoff r. Bradley, Senior Planner ~f~ ~ Sharon Fierro, Community Development Director Reviewed by Approved by: J:\Reports\cOUNCIL REPORTS\cc Report -- 690-700 E. Campbell A venue-2.doc Attachment #8 Buildings Heights in Campbell A Comparative Analysis Common Name Address No. of Wall Total storie height height s Two StOry Buldings Heritaae Theatre 1 W. Campbell Avenue 2 30 ft. 47 ft. Campbell Medical Offices 476 E. Campbell Avenue 2 29 ft. 31 ft. Stoddard's Brewhouse 200 E. Campbell Avenue 2 32 ft. 37 ft. Camobell Technoloav Park Campbell Technology Parkway 2 34 ft. 50 ft. * Water Tower I 300 Orchard City Drive 2 28 ft. 34 ft. Three Story Buildings Avalon Apartment at Campbell 500 Railway Avenue 3 29 ft. 40 ft. Campbell Gateway (Stacks) 125 E. Campbell Avenue 3 31 ft. 40 ft. Lincoln Court Offices 2105 S. Bascom Avenue 3 46 ft. 52 ft. AI-Cal Title 901 Campisi Way 3 49 ft. 57 ft. Water Tower II Central Ave. 3 20 ft. 47 ft. Four Story Buildings Pruneyard Garage 1909 S. Bascom Avenue 4 31 ft. 40 ft. levels Larkspur LandinQ 550 W. Hamilton Avenue 4 38 ft. 53 ft. Marriott Towneplace Suites 690 E. Campbell Ave. 4 36 ft. 46 ft. Over Four Story Buildings Pruneyard Office BuildinQ 1919 S. Bascom Avenue 6 75 ft. 90 ft. 900 East Hamilton Avenue 900 E. Hamilton Avenue 6 75 ft. 89 ft. Water Tower (Hyde Park) 90 S. First Street n.a. n.a. 1 30 ft. * Indicates height of entry tower Campbell Community Development Department 5/22/03 MaY'L~' LUUJ lU:JUAM IMH HVltL~ Ii V . V V V V 11 (fffi) 01l frTI @~@ ~ @ Attachment #9A IMA Plaza /250 North Water, Suite 325 I Post Offfce Box 2176/ Wichita, Kansas 67201 Phone (316) 262. 2841 I Fax (316) 262. 1214 May 21,2003 Mr. GeoffBradley City of Campbell Planning Department 70 North First Street Campbell, CA 95008 Re: One Building vs. Two.Building Marriott Site Plan Dear Geoff, There are several reasons for our decision to proceed with a one-building site plan instead of a two-building plan. First, there are many operational advantages to a one-building design, such as guest preference: secqrity and operational costs. Second, Marriott has moved away from the two building nwdel. Their current design calls for a single building. Next, there is not enough on- graQ.e parking to accommodate a tWo-building hotel. Two buildings simply won't fit on the site. Finally, the construction costs for two buildings is significantly higher than the cost for one building. A two-building design is not financially feasible at this location. Security is much easier lo control with one building as there are fewer entrances, guests don't have to leave their building for services, there is ne'9'er a building without a staff member in it. and generally things ate easier for the staff to watch and control. There are a number of operational cost issues related to a second building. For instance. the two- building hotel costs far more to heat and cool because of the additional common space. Employees' waste a considerable amount oftime and energy moving from building to building. On-going maintenance of two buildings is significantly costlier than one. Marriott introduced the TownePlace Suites concept as a two-building prototype and subsequently lcamed through experience that one building was preferable and has changed the prototype to one building. Please see-the attached letter from the Marriott Brand Vice President which outlines some ofManiott's reasons for changing its prototype to a one-building site plan. Nearly ~o years ago, we explored a two-bl.\ilding design in an attempt to build a three-story project. We found that a design of two or three stories of rooms over on-grade parking niakes it impossible to provide enough parking (or the hotel. We lost a significant number of parking spaces because the structural elements for the podium take away from the surface area needed for parking. leaving far less than one parking space per room. The hotel requires a minimum of one space per guest room. We tried a number of different layouts, however, each design yielded too few parking spaces to be feasible. MaY.ZH. ZUU~ lU:~lAM IMH HOltL~ NO.OU~~ ~. J Finally, the cost to construct a second building is significantly higher than the cost of ~>ne building. One of the largest additional costs is the cost of the podium. Other additional costs include structural elements, roof area, and common area. We investigated the cost of a second building with our subcontractors during the initial design phase, and found that the cost ot a second buil~g would make the project totally infeasible. We.looked at numerous site layouts in-house and with Staff. We even had two other architects submit design ideas and we investigated the possibility oflUlderground and structured parking. Frankly, a threec.story building is significantly more cost effective than a four-story building. We would be much better off financially with a three-story building. However. despite months of design attempts and working closely with Staff, we found it impossible to physically locate a three-story project on this challenging site with anything close to the required 95 rooms. Having said that, we also found it impossible for the hotel to support the construction costs for a two- building project. In conclusion, a two.building plan provides significant operational challenges, and is not physically or fmancially viable in this location. ~lease feel free to call me with any questions. Best regards, =tmnriek enclosure DS'MAY. 28. 20031110: 20AM BARRY SWENSON BLDR r-3!NO. 505? P. 2/8 MHIGGINS ASSOCIATES CIVIL & TRAffIC ENGINEERS Attachment #9B May 28, 2003 MEMORAND~ TO: Libby Glass FROM: Dan Takacs SUBJECT: TowneP1ace Suites, CampbeD Trip Generation Analysis This memorandum summarizes a trip generation analysis fur the proposed Marriott TownePlace SuileS project located in Campbell. California. To veritY the trip generation associated with the proposed project, a trip generation survey was conducted of an existing TownePJace Suites located on Saratoga Avenue in. San Jose, California. The location of the existing hotel is shown on Exhibit 1. The existing hotel consists of 101l'OOms. A manual count of vehicles entering and exiting the driveway serving the existing hotel was ronducted on Thursday May 22, 2003 between 7:00 AM aud 9:00 AM and between 4:00 PM and 6:00 PM. The results of the manual coUllls are shown on Exhibit 2. A total of 73 vehicles were coUDted entering aud exiting via the driveway during the AM survey period and 36 vehicles were obse1ved during the PM survey period. The highest ODea hour volume of driveway traffic was observed between 7:30 AM and 8:30 AM when 41 vehicles entered and exiled the property and between 5:00 PM and 6:00 PM when 22 vehicles entered and exited the property. The hotel occ~y on Wedoesday' evening was used to calculate the trip genemion rate for the Thursday AM peak hour. For hotel projects, the occupancy during the night befure the surveyed AM peat period is a more importaDl determinant of AM peak hour trip generation tllan the occupancy during the night of the .surveyed AM peak period. On Wednesday evening~ 88 rooms were occupied.. Therefore, the AM peak hour trip generation rate for the Thursday AM peak bour is 0.41 trips per occupied room The hotel occupancy on lbursday evening was used to ca.1culate the trip geDmltion late for the PM peak hour. On Thursday evening. 73 rooms were occupied. Therefore. the PM peak hour trip gCDCn1tion rate for the Thursday PM peak hour is 0.30 trips per occupied room. 1309-8 First Street. Gilroy, Q)Jifornia. 95020-4-738. vob!408 848-3122. JlAJ/408 -848-2202 . www.kbhiggins.com U~MAY, 28. 2003~"1 0: 20AM BARRY SWENSON BLDR T-;NO, 50513 p, 3/8 Exhibit 3 compares the trip generation rates tOr the surveyed T ownePlace Suites with the Business Hotel trip generation rates published by the Institute of Transportation Engineers (ITE). The ITE trip generation rates fur the Business HotellaDd use category were used to evaluate potential traffic related impacts associated with the proposed TownePlace Suites, Campbell. For comparison purposes. ITE trip generation rates for the A1l Suites Hotel land use category are also presented on Exhibit 3. The trip generation rate during the AM peak hour for the surveyed hotel is about 19% less than the ITE trip generation rate for the Business Hotel land use c:ateg01Y. The trip generation rate during the PM peak hour for the smveyed hotel is about one.balf of the ITE trip generation rate fur the Business Hotel land use category. Also, the directional distribution for the smveyed hotel shows a higher percentage of outbound trips during the AM peak hour than the ITE data for tbe Business Hotel categOJy. Based OD. the nip generation rates det.ermiDed from the survey of the existing T ownePJace Suites Hotel, the proposed project will result in the generation of 45 new trips during the AM peak hour and 10 new trips during the PM peak hour. These totals are presented. at the bott0111 of the table shown on Exhibit 3. The net new trips generated by the project accoUlrt for 1rips currently being geoerated by the existing restaurant on the project site. The net new 45 AM peak hour trips calculated using the survey data compares with an estimate of 55 net JJI:JW AM peak hour trips cakulated using the lTE Business Hotel trip rates. The net new to PM peak hour trips calculated using the survey data compares with an estimate of 40 net new PM peak hour trips calculated using the ITE Business Hotel trip rates. Exhibit 4 shows the estiInated number of new u-turn movements calculated using the ITE trip generation rates aod the number of u-turn movements calculated using the results of the trip generation survey of the existing hotel In the August 20, 2002 letter report prepared to analyze potential traffic related impacts associated with the project, it was estimated that the project would generate 18 new u-turn movements west of the project site and 10 new u-turn movements east of the project site during the AM peak hour. DuriDg the PM peak hour, it was estimated that the project would generate 14 new u~tum movements west ofthe project site and 7 new u~tum movements east of the project site. Based on the revised trip generation estimate for the project using the TownePJace Suites. San Jose trip generation survey, the project will generate an estimated 6 new u-turn movements west of the project site and 15 new u-tums east of the project site during the AM peak. hour. DuriD& the PM peak hour; me project will gea:l31e 3 new u-turn movements west of the project site and 2 new u-turn movements east of tile project site during the PM peak bour using the revised trip generation estimate. The ~ted number of new u-turn movements east of the project site is bjgher during the AM peak hour using the trip generation rates based on the survey data versus the ITE trip rates because the data. from the surveyed hotel show a higber percentage of outboUDd. trips duriDg the AM peak. hour than the ITE data. The lTE directiooal split is S9% iD/41 % out while the directional split fur the surveyed hotel is 24% inf76% out. 2 U;MAY. 28. 2003a'1 0 20AM' BARRY SWENSON BLDR r-NO. 50504/D8 P. 4/8 As shown on Exhibit 4, based on the ITE trip generation estimate for the project, the project will generate an estimated 28 total new u-tum moven.lellts during the AM peak hour (or an average of 1 OI:W u..turn movement per 2.1 IUinutes) and 21 total new u-turn mov~1:$ during the PM peale. hour (or an average of 1 new u-turn movemmt per 2.9 miDutes). Based. on the project trip generation estimate using the results of the trip geneTation survey study, the project will generate an estimated 21 total new u-tmn movements during the AM peak hour (or an average of J new u-turn movemcot per 2.9 minutes) and 5 total new u-turn movements during the PM peak hour (or an average of 1 DeW u-turn movement per 12.0 minutes). Please can me if you have any questions regarding this information. 3 -\~. 0'- . CA-11A<9 t:: ~ U r- o 0 ~ -'- 1- "- ~ ,-' .Of?CHA\\Q. F I l.lED OCT :J 0 2002 BRENU/\ i)t\iJ!~. Sant2 eN:, ;: Bv~~__~ ""'-~ '~".. ~, -.-__~.___.__.__ C,puty B. HonlUCHI NOTICE OF INTENT INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION CITY OF CAMPBELL, CALIFORNIA Notice is hereby given of the intent of the City of Campbell City Council to adopt a Mitigated Negative Declaration for the development of a 95 room extended stay hotel at 690-700 East Campbell A venue. The proposed project is a Planned Development Permit for the construction of a hotel which consists of a four story. 50,000 square foot building and related parking and landscaping; and a Tree Removal Permit for the removal of two trees, a 22 inch diameter Carob tree and a 35 inch diameter Monterey Pine tree. The site currently contains Andy's BBQ Restaurant and two single family homes. Based on the Initial Study, it has been concluded that the project described above will not have a significant effect on the environment and a draft Mitigated Negative Declaration has been prepared. The public review period for the draft Mitigated Negative Declaration begins on October 9, 2002 and ends on October 29, 2002. Any comments must be submitted to the Community Development Department by 5:00 p.m. on October 29, 2002. Copies of the Initial Study and draft Mitigated Negative Declaration are available for review from 8:00 a.m. to 5:00 p.m. at the Community Development Department, City Hall, 70 North First Street, Campbell, California. Notice is also hereby given that this project has been scheduled for a Planning Commission public hearing at 7:30 p.m., or shortly thereafter, on November 12, 2002, in the City Hall Council Chambers, 70 North First Street, Campbell, California. Interested persons may attend this public hearing and comment upon the project or provide written comments submitted before the public hearing date. Please be advised that if you challenge the nature of this project in court, you may be limited to raising only those issues you or someone else raised at the public hearing described in this notice or written correspondence delivered to the City of Campbell Community Development at, or prior to the public hearing. Questions may be addressed to Geoff I. Bradley, Senior Planner, at (408) 866-2124. CITY OF CAMPBELL ANNE BYBEE CITY CLERK Del 3 0 ZCC~ NOV 1 9 zoaz peSTED ON _.____ THROl'U! IN THF. UFFICi:' 01 TilE COL'>,TY CL1::RK-l\.ECGHDER UHLi\lDA D/.\':JS, ('OUl'<rY Cl'[I~I( BY._~ __ DEPUTY B. HORIUCHli Pub. October 9,2002