Loading...
Site and Arch - 199804/10/2001 13:25 4889779111 ~D LANDSCAPE andsfape .? .Serw'ces, PAGE April 10, 2001 G & C HOMBS. 389 E Campbell Ave campbeil, CA Site location: 54 N. Campbell Ave. Phone #: ' (408)378.2306. Fax ,,¢: 1-408-378-2307 Note:' Estimate ls for e~terifr I~lantlng Oeds.o'nl¥: dOeS rlot inClUde container Dlarlts. .Haruscape wor~ not'included. ~ough grading ~o be done by contra~or. Plant sizes and ~'uantltles ~ken from faxed handwri~en ~heet mad<ed.~Ou~lde oroands.' 'price does not lncl'ude' anV~ee and/or ~hrub removals or pruning. 'Please ask for separate es=Ima~e on these items. A~rox landscape area = ~215 Sq. J¢~ Be~cri~tion: In~tall fl0) twen~-feur lnc~ ~ treeS; 11o2~ five-gallon (105) one-gallOn plants, (5I cubic yards compost, c5) cubic yards'mulch, (136 feet sleeving, (1) bat[flow, (180) bubblers, [I] ~l~ht ~tion c~ntroller, ~6) quick c~uplers with locking cover, (7) valve boxes~ (?t v~lves~ (324) feet m~inline, . feet lateral line, (1300) feet' wire, (1) bestpack ~erClilzer, {1) Bioweed pr~ emerge~ (bags), toot'barrier, (9) tree stakes aha ties. InCluees rocOCilling and trenching, Planting:. .Irrigation: $7,~31.00 JOB ~STIMATE: TOTAk $1~,457.00~ ~ ~c~ ~nciudes tabor, materl~ls, 5upervisio~~~ll~ ~,-- ,_ i aumorize,tne ~ove jo~ ~o 'be comnt~d ~ · ' · ' Bate ~,, .' , , ../~ / . P!ease sifn,.~retUrn~~ n~'mEe~, 408.g77.91~I, so that ~is jo~ can 0e included in our schedule] This 0id Is good for t~l~ G0) days. $ince~'e!y, '~?-' . Ste~nsnie Cu~is Project E-stimator SC:II THIS E£TiMA T~ ¢S ~C,R COMPI..=~?'INC TH£ dO~ A£ DE£CRIBED ABOVE-. IT IS BASED ON OUR EVALUATION AND DOES NOT INCLUDE MA TERIAL PRICE iNCREASES OR ADDITIONAL LABOR AND - MA TERIAL3 WHICH MA Y BE :eSQUlEED SHOULD UNFORSEEN PROBLEM5 OR ADVE, e5E WEATHER CONDITION5 ARISE AFTER THIS WORK HAS STARTED. 707 Lincoln Avenue - Corer. ~c. ~63672 · h~://~.m~.com TCAA Recording Requested By: Citv of Campbell When Recorded Mail To' City Clerk City of Campbell 70 N. First Street Campbell, CA 95008 For the Benefit of City of Campbell Recorded Free Gov. Code Sec. 27383 15959077 T/ties: 1 / Pages ~0015959077~ Fees ' No Fees Taxes Copies - 12 AMT PAID i2 BRENDA DAVIS RDE ~ 882 SANTA CLARA COUNTY RECORDER Recorded at the request of County Agency 11/~3/2901 5 (Space Above This Line t'or Recorder's Use) DECLARATION OF COVENANTS, CONDITIONS AND RESTRICTIONS This Declaration is executed and delivered as of the .~'Z.,aa'x day of 2001. by BRUCE BOWEN , having an address at 511 E. Campbell Avenue. Campbell. Calitbrnia , who is hereinafter referred to as "Owner", in favor of and for the benefit of the City of Campbell. having a business address of 70 North First Street, Campbell. California 95008. hereinafter referred to as "City". WITNESSETH: WHEREAS. Owner is the sole owner in tee of certain real propertv commonh-known as 54 North Central Avenue, Campbell, California, Santa Clara Countv (Assessor's ParCel Number 279-41-061), and more particularly described in Exhibit A attacl~ed hereto and made a part hereof by reference and hereinafter referred to as the "Subject Property"; WHEREAS, on November 24, 1998, the Planning Commission of the City adopted Resolution No. 3205 granting a Site and Architectural approval, which approved application S98-09 to allow' construction of a 12.711 square foot two-storv office building, hereinafter referred to as the "Project", subject to various conditions of approv~tl: WHEREAS. the Community Development Department's Condition No. 8 of the Site and Architectural Approval per Resolution No. 3205, provides that: Prior to building occupancy, the Owner shall record a public access/reciprocal access Covenant which shall make provisions for a pedestrian sidewalL/accesswav within the eastern six (6) feet of the property' (Subject Property). in order to provide a wide. shared. landscaped and lighted pedestrian walkway along the boundary of the Subject Property and the property contiguous to the east (Assessor's Parcel Number 279-41-062). If a security or loitering problem, or other such problem which threatens the public welfare develops, the City shall work with the property owners to eliminate said problem. If measures cannot be found to adequately address the problem, the City Council may allow access to this area to be restricted in a manner agreeable to both the property owner and the City; WHEREAS, the property (Assessor's Parcel Number 279-41-062) contiguous to the east of the Subject Property (hereinafter sometimes referred to as the "East Adjacent Property") is not yet developed to the point where the City is able to require its owner to construct the portion of the Shared Pedestrian Access Walkway that is to be located on the East Adjacent Property. NOW, THEREFORE, in consideration of the benefits bestowed on the Subject Property by the Site and Architectural Approval and in furtherance of the conditions thereof. Owner hereby declares, covenants, and agrees as follows: This is a Covenant to provide a Shared Pedestrian Access Walkway ("Walkway") located partly on the Subject Property and partly on the East Adjacent Property, commencing at the public sidewalk along the southerly side of Civic Center Drive to the alley contiguous to the southerly boundary of the Subject Property. The Walkway shall be paved and include landscape, lighting and irrigation, and shall comply with the regulations enacted under the Americans with Disabilities Act ("ADA"). The Owner shall construct and maintain that portion of the Walkway to be located on the eastern edge of the Subject Property as follows: construct a sidewalk 48" in width that runs from the existing landing to the alley contiguous to the southern boundary of the Subject Property; the 48" wide existing sidewalk that runs from the public sidewalk along the southerly side of Civic Center Drive to the existing landing, and the existing landing shall both stay in place. The Owner agrees to keep that portion of the Walkway located on the Subject Property in good repair and free and clear of obstacles. If a security or loitering problem, or other similar problem which threatens the public welfare develops in connection with the Walkway, the City shall cooperate with the owners of both parcels to eliminate such problems. If reasonable measures cannot be found to adequately address the problems, Owner mav apply to the City' Council to restrict access .to'that portion of the Walkway locatec~ on th~ Subject Property in a manner mutually and reasonably agreeable to Owner a.qd the City. The Covenants, Conditions and Restrictions set forth herein are for the mutual benefit of the Subject Property and the public right-of-way commonly known as Civic Center Drive. The covenants contained in this declaration shall be binding 2 o upon Owner and inure to the benefit of the City, and their respective successors and assigns. The Covenants set forth herein shall be appurtenant to and run with the land, and shall in all respects constitute covenants running with the land pursuant to applicable California law, enforceable by the City at law and in equity. The Walkway plans shall be submitted to the City for approval prior to construction. This Declaration may not be amended, modified, altered or changed unless in writing, in recordable form. approved by City'. This Declaration shall be recorded in the Santa Clara County Office of the Recorder prior to issuance of any occupancy permits for work authorized by the Site and Architectural approval. 1N WITNESS THEREOF, Owner has executed this Declaration as of the first date set forth above. BRUCE BOWEN, a married man as his sole BRUCE BOWEN Iq landdex'54ncentral cc&rslmp) EXHIBIT "A" All of Parcel 1, as shown upon that certain Map entitled, "Parcel Map Lands of Campbell Building & Investment Company being a portion of Lot 3 of the Swope Tract Recorded in Book E of Maps at pages 106 & 107 Santa Clara County Records," which Map was filed for Record in the office of the Recorder of the County of Santa Clara, State of California, on October 16, 1980 in Book 473 of Maps, at pages 27 and 28. CALIFORNIA ALL-PURPOS,. ACKNOWLEDGMENT · , State of (,.7.../~ I F O~-'~. ~ ', County of ~-f-i-r~) ,"?"l~ C ,~.; On It / Z,.-.~ before me, ,. ~,~ N .....d <~ personally appeared _ k~ '~ ~1~,/I O · ~roue Name(s) of Signerls, " _ personally known to me - OR - d to me on the basis of satisfactory evidence to be the person(s) ' · whose name(s) is/are subscribed to the within instrument ~ and acknowledged to me that he/she/they executed the · _ same in his/her/their authorized capacity(les), and that by ~- ;DX ~IO~RL~O; i his/her/their signature(s)on the instrument the person(st "' ~ .... U or the entity upon behalf of which the person(s) acted, ? ~ O:~.~mL~ion ~ 1258850 z ; ~ ~ Notcxy Public- Cclifomi'a ~_ executed the instrument. '~ ~ ~ Santa Clara County 1 ~ i~/Ccrrm, r::xpires AP'.'~,3:04 ~ WITNESS my hand and official seal. ~ gnature of Notary, OPTIONAL Though the information below is not required by taw. /t may prove valuable to persons retying on the document and could prevenr fraudulent removal and reattachment of this form to another document· Description of Attached Document Title or Type of Document: '~ C O~ C.... C Document Date: i Z,. O t Number of Pages: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: er's Name: ividual _ Individual "~X,Corporate Officer - Corporate Officer Title(s): Title(s): Partner-- Limited General Partner-- Limited _ General . Attorney-in-Fact Attorney-in-Fact _ Trustee Trustee Guardian or Conservator Guardian or Conservator Other: ~oc :~:%,~: -e,e ' Other: ' -:=: .,--~ ~e-: Signer Is Representing: Signer Is Representing: :/% "-'-. -'. ~'x ,'< ~'¢' ,' ,' ,- ,- ..-. ,-. ¢- '- 't'/~-'·'7' "'." ."~'·".','%.."· · ' ' ' ' '' "- ' "-" ' "' '"' '' September 27, 2001 CITY OF CAMPBELL Community Development Department - Current Planning Bruce Bowen 511 E. Campbell Avenue Campbell, CA 95008 SUBJECT: FINAL PLANNING CLEARANCE FOR 54 N. CENTRAL AVENUE Dear Mr. Bowen: Thank you for meeting with me at the project site on September 26, 2001. After reviewing our files, we have determined that although the Plat and Legal Description was prepared for the public pedestrian easement, the Grant of Easement was never formally recorded. The Condition of Approval states that this easement should provide a wide, shared, landscaped and lighted pedestrian walkway. City staff has not reviewed a description of the easement addressing the maintenance of the easement and standards for paving, irrigation, planting and lighting. Below is a list of additional items that need completing before the Planning Division can approve final clearance for the Certificate of Occupancy. 1. Add one-way directional arrows in parking garage; 2. Add a single sign near alley parking spaces that states that these spaces are available to the public after 6p.m. on weekdays and during the day and night on weekends and holidays, until 2:30 a.m.; 3. Paint out bollards around transformer in a neutral tone; 4. Paint as much of the fire service check valve black as allowed by the San Jose Water Company and the Santa Clara Valley County Fire District and provide landscape screening around the check valve; 5. Add landscaping on eastern side of building where there is no walkway. Add shrubs, bark cover, and a single tree in the middle between the windows; 6. Add landscaping to the planters on the second floor interior court; 7. Remove equipment/soils/etc, from City property and restore it to its previous state; 8. Add disabled parking restriction sign; and, 9. Stucco and cap the trash enclosure and add solid metal doors painted to match. Sincerely, kc, ' Darc~ Planner II C¢~ Geoff Bradley, Senior Planner Harold Housley, Land Development Engineer Bill Bruckart, Building Official 70 North First Street · Campbell, California 95008-1436 · TEL 408.866.2140 . FAX 408.866.8381 . TDD 408.866.2790 CITY OF CAMPBELL Community Development Department · Current Planning June 15, 2001 Mr. Bruce Bowen B & C Homes 389 E. Campbell Avenue Campbell, CA 95008 Re~ Revised Roll Up Gate 54 N. Central Avenue Dear Mr. Bowen: The Planning Division has reviewed and approved the proposed concept for a revised security gate system to the garage area of the above referenced office project. The proposed change is from a 20 foot rollup gate to a 16 foot gate with a fixed pedestrian gate at its side. This approval is based upon a description of the gate system as a decorative wrought iron style. Please provide 3 copies of the shop drawings to the Building Division for review and approval, prior to installation. If you should have any questions regarding this approval, I may be reached at (408) 866- 2144. Associate Planner cc: Frank Mills, Building Division J:\Plan Check Letters\BLD Garage Gate 54 N Central.doc 70 North First Street - Campbell, California 95008. 1423 · TEL 408.866.2140 . F^X 408.866.8381 . TDD 408.866.2790 CARROLL I NG. INEERING, 'NO. I ng/neers and surveyors Tel: 408-261-98e,() Fax: 408-261-0595 E-mail: carengl @aol.com 1101 So. Winchester Blvd., Suite H-184, San Jose, CA 95128-390.', January 28, 2000 Mr. Chuck Gomez City of Campbell Public Works Department 70 No. First Street Campbell, CA 95008 RECEIVED RE: Bowen Office Building Dear Chuck, Enclosed you will find the revised Central Avenue Street Dedication as revised per your instructions. We have also enclosed the Pedestrian Walkway Easement Plat and description which was previously submitted to you on November 2, 1999. If you have any further questions, please feel fi'ee to contact our office. Very truly yours, CARROLL ENGINEERING, INC. President BEC/lm Enclosures cc: Brace Bowen, B&C Homes DESCRIPTION OF A PEDESTRIAN WALKWAY EASEMENT An easement for a Pedestrian Walkway and Landscaping over a strip of land 6.0' feet in width described as follows: The easterly 6.0 feet of Parcel 1 as said Parcel 1 is shown on that certain Parcel Map recorded October 15, 1980, File No. 6871399, in Book 473 of Maps at Pages 27 and 28, Santa Clara County Records, the westerly I/ne of said easement being foreshortened or lengthened to meet the northerly line and southerly line of said Parcel 1 as said lines are shown on said map. ._.o! I 25.00' CIVIC CENTER DRIVE PARCEL 1 BOOK 4 73 OF MAPS, PA GE 28 AREA TO BE DEDICATED 777.74 SQ. FT.:I: N89'42'49'W ~140.03' PLAT TO ACCO ANY PEDESTRIAN ALKWAY EASEMENT THE CITY OF CAMPBELL, CENTRAL AVENUE &: CIVIC CENTER DRIVE BOWEN OFFICE BUILDING CAMPBELL, CALIFORNIA Design B,v: BEC Drawn By:. RM Check By;. BEC ltOl S. WI~ BLVD. SUITE ][-184 s~ ~osr, c~ ~sz~s Scale: 1 "=30' 't~L: ~08-25t-g800 FAZ: 408-361-0595 r-m~: cu~c~e,oLco]~ Date: 11/2/99 Job No. 1276 January 13, 2000 CITY OF CAMPBELL City Manager's Office Brace Bowen BWI Downtown Panners 393 E. Campbell Avenue Campbell, CA 95008 RE: Shared Parking Condition of Approval for 54 N. Cent~:al Avenue (S 98-09) Dear Brace: Per your request I have reviewed the above referenced project. Tl~e Planning Commission approved the Project on Novemb6r 28, 1998. The City Council heard your appeal of Condition of Approval No. 3 on January 5, 1999. Through approval of Resolution 9481, the City Council adopted the following amended Condition of Approval No. 3: In summary, the Council eliminated the requirement for the recordation of a covenant and substituted the 10 shared parking space requirement in lieu of all the parking spaces. Please do not hesitate to contact Geoff Bradlev, Redevelopment Coordinator (408~.R66-2 !')4 if you have any questions or need additional information. Sincerely, City Manager CC.' Community Development Director Redevelopment Manager City Attorney City Clerk H:'xDO'v~qTO'&34xBu w,. F~uw~ ~y\L~tt~s 1 .doc 70 North First Street - Campbell, Cali[ornia 95008. 1423 - TEL 408.866.2125 · FAX 408.374.6889 ' TDD 408.866.2790 BIO TECH SERVICES 2301 Peachtree Lane San Jose, CA 95128 Phone: (408) 248-3266 · Fax: (408) 248-7713 NATBONAL ARBORIST ABSOCIATION 3/16/99 MEMO B&C Homes ATTN: Bruce Bowen (Builder) 54 N. Central Avenue, Campbell, CA SUBJECT: Addendum to Redwood tree preservation .quidelines RE: Answers to questions asked by Barbara Ryan, City of Campbell Q: How close can the foundation come to each tree? A: As close as can be accomplished without having to move or adjust any temporary fencing. Please refer to page 6 (#1) and pa~e7 (#3) in the original report. Q: How close can the building (including the wide trim and roof) come to the trees without requiring a trim job which would unbalance, damage or cause unsightliness? A: As close as can be accomplished without having to raise the canopy of the trees more than 20 feet or cause injury to the trunks during achievement. Q: What type of foundation should be used if the building is to be within the drip-line of the trees? A: Rather than a peripheral footing incorporate interrupted / modified foundations, or piers to minimize impact in the root zone. Q: Provide an evaluation of each tree, including the health, conformity and value. A: Regarding health and conformity please refer to Dane 3 (OBSERVATION DATA) and Da_cie 6 (DISCUSSION) in the original report. Contractors License No. 636510 · Certified Personnel ~,~*~e~ BIO TECH SERVICES ,~°~~ 2301 Peachtree Lane ~o~"'-~-~.~ San Jose, CA 95128 ' ~e88,o-- Phone: (408) 248-3266 · Fax: (408) 248-7713 ARBORIST A$80¢IATION Regarding value Monetary values were obtained using The International Society Of Arboriculture Guide For Plant Appraisals 8th Edition. In conjunction with the Western Chapter Species Classification and Group Assignment Guide. Appraisals are based on several factors: · Size - A measurement of the diameter of the tree at breast height, 4.5' above grade (DBH). · Species rating- This factor considers the tree's adaptability, suitability, and performance within our interior valley. It is predetermined in the Species Classification and Group Assignment Guide · Condition - This reflects the overall health and structural integrity of the individual plant. · Location - This factor evaluates the site in which the tree is growing, . contribution of the tree to the site, and it's placement with regards to it's surrounding environment. REDWOOD #! Size- 30.5 DBH Rating- 75% Condition- 64% Location- 80% REDWOOD #1 VALUE $8,300.00 REDWOOD #2 Size- 33.5 DBH Rating- 75% Condition- 76% Location- 80% REDWOOD #2 VALUE $11,600.00 Q: Care of the trees before, during and after construction? A: Please refer to pa.qe 6 & 7 (TREE PRESERVATION GUIDELINES) and oaee 8 in the original report. Q: Standards for the location and design of the sidewalk, and the landscaping and irrigation in the area of the trees. A: For landscape and irrigation design please refer to pane 7 (~) in the original report. Regarding sidewalk design. Within the footprint of the original walkway between the two Redwoods (removed by hand, pane 6 Note) a paver walkway can be achieved without grade change or soil compaction. Please refer to attached diagram. Placement would occur during the final stages of the project around the time of landscape installation. Any activity required near the Tree Protection Zone for construction purposes shall be supervised by the Consulting Arborist. Any questions, please give me a call. Brendan Nelson Contractors License No. 636510 · Certified Personnel ~ss~O~ BIO TECH SERVICES 2301 Peachtree Lane San Jose, CA 95128 Phone: (408) 248-3266 · Fax: (408) 248-7713 ARBORIST Qarmel Cobblestone Placed Ove~ 1" Of Medium ..qand [-'] _quffielentl9 P~al)Ped To AIIow-Wat~ Percolation PAVE Paver Edge Restraint System I~',r Interlocking ~.~nctete paver end br~k pav~eflt~ [ i .~. 1':':'T'a* .......~ '?~:}:"~ .... ~ ........ ~ _qldl~-Ctado Pe~viou~ _qttuetu~al ._qoil Mix (~on~ietin~[ of ~" Wat~ Washed Crav~ (No ~ine particle) Mixed With ~oar~e ~and Laid Ov~ Exl~tin~ CPade NOTE: U~o Onlg ~nou[h ~oar~e ~and To Jill ~ The Void ~paee P~odueed E~ The Crav~ Pave~ Eoa~d~= To Ee In,tailed Wifhout T~ehehlng U~ln~ ~[ Tho Pave~ An~t Eoa~de~=~ R'equifed I~o~ I~a=e Material Will Ee On CP~de Eaam D~lgn In,tailed On Int~rul)ted Pi~ T~po I~oundation~ Awa~ From Pe~vlou~ ~/'~¢wag Installation Within The ~Htl~l Root Zone Of T~e~ #1 - #~, Achieved Without ~adln~, BIO TECH SERVICES 2301 Peachtree Lane San Jose, CA 95128 Phone: (408) 248-3266 · Fax: (408) 248-7713 ARBORIST Tree Report 54 North Central Avenue Campbell, CA Prepared For: Bruce Bowen B & C Homes 54 North Central Avenue Suite 2 Campbell, CA 95008 Prepared By: Bio Tech Services 2301 :Peachtree Lane San Jose, CA 95128 Job #2266 November 1998 Contractors License No. 636510 · Certified Personnel BIO TECH SERVICES 2301 Peachtree Lane San Jose, CA 95128 Phone: (408) 248-3266 · Fax: (408) 248-7713 ARBORIST ASIOClATION TABLE OF CONTENTS: Arborist Report INTRODUCTION · Assignment · Purpose · Background SUMMARY PHOTOGRAPH OBSERVATION DATA · Tree Description · Site Description SUPPLEMENTAL DOCUMENTATION · Preliminary Grading & Trenching Plan · Arcl~itectural Rendering DISCUSSION TREE PRESERVATION GUIDELINES IMMEDIATE PRUNING RECOMMENDATIONS MAINTENANCE AFTER DEVELOPMENT 2 2 3 4 5 6 6&7 7 Contractors License No. 636510 · Certified Personnel B & C HOMES JOB//2266 11/98 TREE REPORT FOR 54 iq. CENTRAL AVENUE CAMPBELL. CAI,IFORNIA San Jose, CA 95128 Phone: (408) 248-3266 · Fax: (408) 248-7713 IGRID ;USTOMER'S ORD?REE REPORT FOR 54 N. CENTRAL AVENUE NAT~AL ARBORIST AISOCIATION DATE 853-E6 2/5/99 / NAME C/O: B & C HOMES ATTN: BRUCE BOWEN (DEVELOPER) (408) 378-2306 ADDRESS 54 N. CENTRAL AVENUE, STE #2, CAMPBELL, CA 95008. (408) 378-2307 Fax INTRODUCTION ASSIGNMENT: On 11/30/98 1 visited the site of the above listed address at the phone request of Brace Bowen. My assignment was to advise on preservation during redevelopment, of two large Coast Redwoods Sequoia sempervirens located on the northwest quadrant of the properly. PURPOSE OF REPORT: · Provide recommendations to the developer (Brace Bowen) to present to the city for the preservation of subject trees. · Provide advice on cultural adjustments to enhance health and longevity. BACKGROUND: The construction of a modem commercial complex currently in planning stages will replace an older commercial property. The improvements will take place on a lot on the corner of Central Avenue and Civic Center Drive in Campbell CA. This project will involve demolition of all existing buildings and surrounding hardscapes within the lot. Two large Redwoods are the only significant trees on site and their preservation during construction is a requirement by The City of Campbell. 1 Contractors License No. 636510 · Certified Personnel B & C HOMES TREE REPORT FOR 54 N. CENTRAL. AVENUE ~88t0~ BIO TECH SERVICES 2301 Peachtree Lane San Jose, CA 95128 Phone: (408) 248-3266 · Fax: (408) 248-7713 Summar~ Two large, sturdy, ailing Redwoods are growing alarmingly close to a single story building soon to be demolished. In place of the old structure a new office development must be constructed without injury to the trees. If several precautions are taken not only can the redwoods be successfully preserved, but there present state of decline, the result of drought and general lack of maintenance, would be arrested. Furthermore, attention to the tree preservation guidelines will provide basic but necessary remedial care essential to improving the health of the trees. Contractors License No. 636510 · Certified Personnel B & C HOMES JOB//2266 11/98 TREE REPORT FOR 54 N. CENTRAL AVENUE C AMPBEI ,L. CAI,WORN-IA BIO TECH SERVICES 2301 Peachtree Lane San Jose, CA 95128 Phone: (408} 248-3266 · Fax: (408) 248-7713 NATIONAL ARBORIST OBSERVATION DATA Tree description 'Species: Tree #1 Coast Redwood Tree #2 Coast Redwood Size: Tree #1 30.5 inch diameter (measured at 4.5 feet above grade) Tree #2 33.5 inch diameter Height: Tree #1 95 feet Tree #2 80 feet Canopy Spread: Tree #1 30 feet Tree #2 30 feet Health: Stressed (appealing to opportunistic pests and diseases) Pruning: Un-pruned (minimal crown raising) Trunks: Single trunks with good taper, no visual defects. Branches: Tree # 1 Foliage is sparse and indicates a lack of vitality Tree #2 Foliage exhibits appropriate vigor Site description Location: North-West quadrant of lot Irrigation: Seriously inadequate Root zone: Confined,, limited by hardscape (sidewalk, building foundation, etc.) Soil: Bare, Compacted Climate: Arid for this species Supplemental Documentation Preliminary grading & drainage plan (Page 4) Provided by Carroll Engineering Architectural renderings (Page 5) Provided bY Bruce Bowen (Artist unknown) Contractors License No. 636510 · Certified Personnel B & C HOMES JOB #2266 11/98 TREE REPORT FOR 54 N. CENrYRAL AVENUE CAMPREI,I.. CAI,IFORNIA BIO TECH SERVICES 2301 Peachtree Lane San Jose, CA 95128 Phone: (408) 248-3266 · Fax: (408) 248-7713 ARBORIST ABSOClAT~ON DISCUSSION: Stately specimens appear to be enduring difficult growing conditions reasonably well. The stem caliper and taper are at appropriate ratios for supporting the large upper canopies. Limbs throughout appear sound and well placed. Canopies are full (branching to near ground) but ailing (sparse*and chlorotic), even though, there are no obvious visual'signs of decay or defects. If reasonable amounts of care are taken during develop~ent,'minimal impact to these trees will occur. In fact, installation of new irrigation and lush landscaping beneath the Redwoods may significantly enhance their health. The following recommendations will help protect and improve vitality for the two large Redwoods at 54 North Central A~enue. Tree Preservation Guidelines Tree protection during construction The most important recommendation will be the preservation and protection of the area of exposed soil beneath the trees. Therefore; Completely enclose the soil area just under the canopy of both trees, 5 feet fro.m their trunks (no closer) ,with a single span of 6' high chain link temporary i~nCing in an oval pattern. The purpose of protective fencing is to prevent any activity within the fenced area of the protected tree. This ifidi~des preventing the cleaning and storage of materials, construction equipment., excess soil, chemicals, and debris. · Fencing must be installed before any building demolition, grading, or development OCCurS · Fencing is to remain in place until fine grading and final landscape installation. · This shall be defined as the Tree Protection Zone NOTE: Before fence installation, a portion of concrete walkway between the two Redwoods will have to be removed by hand rather then backhoe. This will minimize negative impacts, soil compaction, trunk wounding etc. that occu/: regularly when operating heavy machinery near trees. Contractors License No. 636510 · Certified Personnel B & C HOMES JOB #2266 11/98 · TREE REPORT FOR 54 N. C~ AVENUE CAMPBELL, CALIFORNIA BIO TECH SERVICES ~'~, 2301 Peachtree Lane San Jose CA ,95128 Phone: (408) 248-3266 · Fax: (408) 248;~77~3' NATIONAL 2. During demolition operators should be held accountable to work cautiously and sensitively near the tree canopies and root zones. Taking care not to damage trunks, limbs, or branches and minimize soil compaction throughout the demolition process. A delineation zone should be created so that no stock piling, storage, wash-outs, soil., contamina~.ts,, etc. are allowed within 25 feet of the trunk of each tree. This is where compaction and contamination of the soil during construction development is mOst destructive to trees. 3. No trenching for underground services including utilities, drainage, waterlines,: sewer, or i,rrigati, on.. i,s recommended within the Tree Protection Zone. Because of the minimal amount of rooting soil being protected (5' from trunks) any. undergroundx;ncroachment within this area could have devastating effects on future tree vitality and stability. Any trenching required just out side the Tree Protection Zone for construction purposes shall be' supervised by the Consulting Arborist. 4. Sub-surface fertilize within al5 foot radius of each t~ee with 600}allons ~f Greenbelt 22-14-14 fertilizer at 4 lbs of fertilizer per 100 gallons of water. Apply the fertilizer at the rate of 10 'gallons for every inch 0ftmnk diameter (DBH).Sub-surface fertilization is achieved by injecting high pressure liquid fertilizer through a needle at a minimum rate of 180 PSI (Pounds Per Sq. Inch). The needle when inserted into the soil around the root zone also ruptures the ground which helps aerate the soil and aids in a proper exchange of gases that occur naturally during root respiration. 5. Mulch the area within the Tree Protection Zone fence with chips, untreated fir bark, redwood bark, etc. While protecting nicely against soil compaction, mulching insulates, conditions and improves soil structure enhancing activity of beneficial organisms and is a natural provider or.nutrients for the tree. 6. ~ Proposed landscaping around the redwoods shall be compatible with this species. Landscape plants with high water and fertility requirements .such as azaloas or rhododendrons should be an integral part of the design. If irrigation is to be installed near the Tree Protection Zone trenching by hand must be performed. If roots are encountered tunneling under the roots.rather than root cutting shall be achieved. Immediate Pruning Recommendations; Any tree,pruning needed during construction must be performed by a Certified Arborist and not by construction personnel. ' Crown Raise both Redwoods to a height of 12 feet on the north and south over the city sidewalks and 20 feet on the east and west portion of the combined canopies for adequate constructionclearance. Crown raising shall consist of the removal of the lower branches to provide recommended clearances. No other pruning is required at this time. Contractors License NO. 636510 · Certified Personnel B & C HOMES JOB #2266 11/98 TREE REPORT FOR 54 N. CENTRAL AVENUE CAMPBELL, CALIFORNIA ~';~ "BIO TECH SERVICES ~o~'"-~ San Jose, CA 95128 ~eesto" Phone: (408) 248-3266 · Fax: (408) 248-7713 Maintenance after development A comprehensive management plan for the trees should include the following: 1. Evaluate fertilization needs of the trees after constru6tion. - 2, Organic mulch should be replenished ,and maintained under the trees. 3. Monitor the trees to determine pruning requirements. 4. Establish a landscape and irrigation management program. Respectfully Submitted, R. Brendan Nelson Certified Arborist #WC 961 BIO TECH SERVICES Contractors License No. 636510 · Certified Personnel B & C HOMES JOB #2266 11/98 TREE REPORT FOR 54 N. CENTRAL AVENUE CAMPBELL, CALIFORNIA CITY OF CAMPBELL City Clerk's Office January 11, 1999 Bruce Bowen BWI Downtown Partners 54 N. Central Avenue, Ste. 2 Campbell, CA 95008 Dear Mr. Bowen: At the regular meeting of January 5, 1999, the City Council held a public hearing to consider your appeal of a Planning Commission condition for a shared parking covenant in the approval of a Site and Architectural Review Permit for property located at 54 N. Central Avenue. Following due consideration and discussion, the City Council adopted Resolution No. 9481 modifying Planning Commission Resolution No. 3205, subject to conditions of approval. Flease find a certified copy of City Council Resolution attached for your records. Should you have any questions in regard to the City Council action, please do not hesitate to contact this office (866-2117) or Barbara Ryan, Planner I, Community Development Department. Sincerely, Anne Bybee . ~¢Y Clerk L/cc. Barbara Ryan, Comm. Develop. Department 70 North First Street · Campbell, California 95008.1423 · TEL 408.866.2117 · FAX 408.374.6889 - TDD 408.866.2790 RESOLUTION NO. 9481 BEING A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CAMPBELL MODIFYING THE PLANNING COMMISSION DECISION APPROVING A SITE & ARCHITECTURAL REVIEW PERMIT FOR A TWO- STORY OFFICE BUILDING ON PROPERTY LOCATED AT 54 N. CENTRAL AVENUE IN THE C-3-S (CENTRAL BUSINESS DISTRICT) ZONING DISTRICT. APPLICATION OF BWI DOWNTOWN PARTNERS, INC. FILE NO. S 98-09. After notification and public hearing, as specified by law, and after presentation by the Community Development Director, proponents and opponents, the hearing was closed. After due consideration of all evidence presented, the City Council did find as follows with respect to application S 98-09: An initial study was prepared for this project which concludes there are no significant environmental impacts and a Negative Declaration has been prepared for this project. The proposed use is consistent with the commercial land use of the General Plan and the C-3-S (Central Business District) Zoning designation for the site. The proposed project furthers the following objectives. A. Restores the downtown as the civic and cultural center by creating an attractive project in this portion of the downtown. B. Facilitates economic viability through the introduction of new office spaces. C. Encourages a pedestrian oriented environment through the construction of pedestrian sidewalks and pedestrian level uses and doorways. D. Creates an architecturally pleasing project reflective of the traditional building styles that exist in the downtown area. 3. The project will generate a demand for 30 parking spaces. The project can accommodate 30 parking spaces on-site without adverse circulation impacts. o The provision of 30 on-site parking spaces will adequately mitigate the parking demand generated by the project. The proposed building, parking facilities of 20 garage parking spaces, 10 off-driveway parking spaces, new loop street parking spaces and sidewalk and landscape improvements will result in a project which integrates the proposed project with the surrounding neighborhood. Adequate circulation has been provided on site and the site is so located on public streets to accommodate the estimated traffic associated with the project. City Council Resolution S 98-09 - 54 N. Central - Granting of Appeal/Modifying Planning Commission Approval 'Page 2 The proposed project is well designed, integrates the use of traditional downtown siting and architectural features and is architecturally compatible with the neighborhood and USES. 10. The proposed project, subject to the recommended conditions of approval, meets the development standards for the C-3-S (Central Business District) Zoning District. The project will not create a nuisance due to noise, litter, vandalism, traffic or other factors. 11. The project will not significantly increase the demand on City services. 12. The recommended conditions of approval and the related improvements are proportional to the scale and size of the project. Based on the foregoing findings of fact, the City Council further finds and concludes that: The proposed project will aid in the enhancement and the harmonious development of the immediate area. The establishment, maintenance or operation of the uses will not be detrimental to the public health, safety, peace, morals, comfort or general welfare of persons residing or working in the neighborhood of such proposed use. The proposed site is adequate in size and shape to accommodate the proposed uses and the surrounding uses in the area. The proposed project is adequately served by streets of sufficient capacity to carry the kind and quality of traffic such uses would generate. Based upon the above findings, the City Council modifies the Site and Architectural Review Permit by amending Condition No. 3 of the Planning Commission Resolution 3205 to read: "The ten (10) outside parking spaces located immediately off the alley shall be available to the public." PASSED AND ADOPTED this 5th day of January ,1999 by the following roll call vote: AYES: COUNCILMEMBERS: Watson, Dougherty, Dean, Furtado NOES: COUNCILMEMBERS: None ABSENT: ABSTAIN: ATTEST' COUNCILMEMBERS: Kennedy ~ /"~ Daniel E. Furtado, Mayor Anne Bybee, City Clerk AYES: Councilmembers: Watson, Dougherty, Dean, Kennedy, Furtado 11. NOES: Councilmembers: None Appeal of a Planning Commission Condition for a Shared Parking Covenant in the Approval of a Site and Architectural Review Permit for Office Building Project at 54 N. Central Avenue 0lesolution/RoH Call Vote) Vice Mayor Kennedy stated that she would not be participating on this item and left the meeting. This is the time and place for a public hearing to consider an Appeal of Brace Bowen of a Planning Commission Condition for a Shared Parking Covenant in the Approval of a Site and Architectural Review Permit for Office Building Project at 54 N. Central Avenue. Planner I Ryan - Staff Report dated January 5, 1999. Mayor Furtado declared the public hearing open and asked if anyone in the audience wished to be heard. Brace Bowen, Applicant, appeared before the City Council and stated that he objected to the recordation of a covenant and expressed concerns regarding liability issues. There being no one else wishing to speak, Mayor Furtado closed the public hearing. Following discussion, M/S: Watson/Dougherty - that the City Council adopt Resolution 9481 modifying the title as follows: Being a Resolution of the City of Campbell Modifying the Planning Commission decision approving a Site and Architectural Permit for a two-story office building on property located at 54 N. Central Avenue in a C-3-S (Central Business District) Zoning District. Application of BWI Downtown Business Partners, Inc., File No. S 98-09; and revise the last paragraph of Resolution 9481 to read: Based upon the above f'mdings, the City Council modifies the Site and Architectural Review Permit by amending Condition # 3 of Planning Commission Resolution 3205 to read: other terms and conditions to remain the same. Motion adopted by the following roll call vote: AYES : Councilmembers: Watson, Dougherty, Dean, Furtado NOES : Conncilmembers: None ABSTAIN: Councilmembers: Kennedy Minutes of 1/5/99 City Council Meeting 4 12. Vice Mayor Kennedy returned to the meeting. Application of Dr. Ken Savage for Approval of a Modification to a Previously- approved Planned Development Permit to allow a professional office/medical office use in addition to a retail use - 535 W. Hamilton Avenue (Resolution/Roll Call Vote) This is the time and place for a public hearing to consider the Application of Dr. Ken Savage for Approval of a Modification to a Previously-approved Planned Development Permit to allow a professional office/medical office use in addition to a retail use for property located at 535 W. Hamilton Avenue. Senior Planner Fierro - Staff Report dated January 5, 1999. Mayor Furtado declared the public hearing open and asked if anyone in the audience wished to be heard. There being no one wishing to be speak, Mayor Furtado closed the public hearing. M/S: Dean/Dougherty - that the City Council adopt Resolution 9482 approving a Modification to a previously approved Planned Development Permit (PD 94-02) to allow a professional office/medical office use in addition to a retail use for the front portion of the building on property located at 535 West Hamilton Avenue in a PD (Planned Development) Zoning District, application of Dr. Kenneth Savage. Motion adopted by the following roll call vote: AYES: Councilmembers: Watson, Dougherty, Dean, Kennedy, Furtado NOES: Councilmembers: None UNFINISHED BUSINESS There were no agendized items. Convene Joint Meeting of the City Council and Redevelopment Agency Board Mayor Furtado convened the Joint Meeting of the City Council and Redevelopment Agency Board. Roll Call: Present: Agency Members: Watson, Dougherty, Dean, Kennedy, Fm-~do Absent' Agency Members: None Minutes of 1/5/99 City Council Meeting 5 Council Report ITEM NO: CATEGORY: MEETING DATE: Public Hearing January 5, 1998 TITLE Appeal of a Planning Commission condition for a shared parking covenant in the Approval of a Site and Architectural Review Permit for 54 N. Central Avenue. RECOMMENDATION The City Council take one of the following actions in regard to the Appeal filed by the applicant: Adopt a Resolution denying the applicant's appeal of a condition of approval requiring the recordation of a shared parking covenant and upholding the Planning Commission condition of approval of S 98-09 for a two-story office building. 2. Adopt a Resolution upholding the applicant's appeal and removing the condition requiring the recordation of a shared parking covenant. 3. Adopt a Resolution containing one of the Alternatives listed on page 3. BACKGROUND On November 24, 1998, the Planning Commission adopted Resolution 3205 granting Site and Architectural approval for a two-story office building at 54 N. Central Avenue. The proposal approved by the Planning Commission consists of a 12,711 square foot, two-story office building on a 17,500 square foot parcel (net size after dedication). Thirty parking spaces are provided, with 20 being located under the building on the first floor, and 10 outside the building off the alley. The Planning Commission considered the shared parking goals and requirements of the Campbell Downtown Development Plan and the C-3-S Central Business District zone, and conditioned the approval to include the recordation of a covenant, running with the land, which requires the on-site parking to be made available after the buildings' office hours (6 p.m.) until 2:30 a.m. to tenants, employees and customers of other downtown businesses. The Commission did not want parking spaces sitting empty at a time when there is a high demand for parking in the downtown. The Campbell Downtown Development Plan states the following Goals and Policies: Parking Goals · Goal 1. To provide adequate parking in the downtown. · Goal 2. To maximize the use of existing and future parking resources. · Goal 3. To encourage the joint utilization of parking. City Council Report - January 5, 1998 54 N. Central Avenue--Appeal of S 98-09 Page 2 Parking and Development Policies relevant to this project · The City shall continue to work with property owners to promote and facilitate the provision of shared parking. · Building placement shall allow for the retention of existing mid-block parking. It iS recognized that in order to maintain mid-block parking and access, it may not be possible to achieve the maximum allowable FAR (2.0) and coverage (1.0). · The City shall work with property/business owners to develop a parking management plan to maximize the use of existing parking. The C-3-S Zoning District goals and requirements included: · Goal 3: To ensure the availability of adequate parking for the retail and service commercial customers and to encourage the joint utilization of parking. Section 21.26.080(2)(A) All new parking shall be provided in the shared parking facilities, unless the city council, upon recommendation of the planning commission, finds that another arrangement would better serve the public safety or welfare, and would not be detrimental to the overall parking and circulation in the area. The staff report included a recommended condition requiring that shared parking be ensured by a covenant allowing the parking spaces to be available to employees, tenants and customers of other downtown businesses during evening hours when the offices are not in use. The applicant indicated to staff before the Planning Commission meeting that he was opposed to this condition. Staff therefore offered an alternative at the Planning Commission meeting: that the 20 spaces under the building be made available for use by businesses in other buildings owned by the applicant, with the 10 spaces outside the building off the alley open to the general public. The applicant stated to the Planning Commission that he is willing to have the parking available after hours, but does not want to encumber the property with any shared parking covenant. While this property owner has stated he is willing to informally open the spaces to use during the evening hours, without a covenant this arrangement could not be assured to continue with subsequent owners. ANALYSIS On December 4, 1998, an appeal of the Planning Commission's decision was filed citing that "the recordation of a covenant eliminates the ability to control whom enters the property, thus creating an enormous liability to the property owner." (See Attachment 6). The Planning Commission discussed security concerns, and noted that the site is across the street from the police station, and that if problems developed, the applicant could request the City Council to increase City police patrols, and to take other measures. They also noted that the City Council Report - January 5, 1998 54 N. Central Avenue-~Appeal of S 98-09 Page 3 owner has the ability to petition the City in the future to allow the area to be closed should other measures not solve security issues. Lastly, the Planning Commission limited the scope of the requirement for shared parking to after normal office hours, and only until the other businesses close. FISCAL IMPACTS The approval of this application presented herein will not result in fiscal impacts to the City. ALTERNATIVES 1. Adopt a Resolution rewording the condition of approval to stipulate that the covenant be limited to the provision of evening parking for the adjacent parcel (now under the same ownership) at 369 E. Campbell Avenue (now Katie Bloom's restaurant and pub). Adopt a Resolution rewording the condition of approval to stipulate that the covenant limit shared evening parking to the 10 outside parking spaces located immediately off the alley. o Adopt a Resolution rewording the condition of approval to stipulate that parking spaces not in use by the offices in the building during the evening be available to other business during those hours until such time as a public parking structure is constructed in the downtown. Attachments: 1. Draft City Council Resolution Denying the Appeal 2. Draft City Council Resolution Upholding the Appeal 3. Planning Commission Resolution No. 3205 4. Planning Commission Minutes of November 24, 1998 5. Planning Commission Staff Report dated November 24, 1998 6. Letter of Appeal 7. Location Map PREPARED BY: ~',rb~ho~t{, l~lar~nel~ Steve haseck;, Community Development Director APPROVED BY: Bernard M. Strojny, City Manager Office of the County Clerk 191 North First Street .San Jose. California 95113 (408) 299-2968 *ENVIRONMENTAL DECLARATION NAME OF LEAD AGENCY: NA~E OF A?PLICANT: CLASSIFICATION OF ENVIRONMENTAL DOCUMENT: FOR COURT USE ONLY FILING NO. E 07793 ( ) NOTICE OF PREPARATION --NO FEE-- ) NOTICE OF EXEMPTION/STATEMENT OF EXEMPTION --NO FEE-- NOTICE OF DETERMINATION ( ) A--NEGATIVE DECLARATION PURSUANT TO SECTION 21080(C) OF THE PUBLIC RESOURCES CODE $1,250.00 (Twelve Hundred Fifty Dollars)--STATE FILING FEE $25.00 (Twenty-five Dollars)wCLERK FEE ( ~//B--CERTIFICATE OF EXEMPTION DE MINIMIS IMPACT FINDING --NO FEE-- NOTICE OF DETERMINATION ( ) A--ENVIRONMENTAL IMPACT REPORT PURSUANT TO SECTION 21152 OF THE PUBLIC RESOURCES CODE $850.00 (Eight Hundred Fifty DolIars)--STATE FILING FEE $25.00 (Twenty-Five Dollars)--CLERK FEE ) B--CERTIFICATE OF EXEMPTION DE MINIMIS IMPACT FINDING --NO FEE-- *THIS FORM MUST BE COMPLETED AND FILED WITH ALL ENVIRONMENTAL DOCUMENTS FILED WITH THE SANTA CLARA COUNTY CLERK'S OFFICE. MAKE CHECKS PAYABLE TO: COUNTY CLERK 3882REV 6/91 CALIFORNIA DEPARTMENT OF FISH AND GAME CERTIFICATE OF FEE EXEMPTION De Minimis Impact Finding Project Title/Location (include county): S 98-09 54 N. Central Avenue Campbell, CA 95008 Santa Clara County APN 279-41-061 Project Description: Removal of an existing 2,332 square foot, one-story office building and 37 space asphalt parking lot. Construction of a 12,711 square foot, two-story office building with 20 parking spaces under the building and 10 outside the building. The two redwood trees on the site are to remain. Findings of Exemption (attach as necessary): The Planning Commission granted a Negative Declaration based upon the findings in the initial study prepared for this report which determined that no negative effects on wildlife or the environment will result from the development of this project. Certification: I hereby certify that the public agency has made the above finding and that the project will not individually or cumulatively have an adverse effect on wildlife resources, as defined in Section 711.2 of the Fish and Game Code. Signature: / Title: 2~(4 ~ ~4 e4.- City of Campbell Date: /~ o2 5- ~/5' City of Campbell 70 N. First Street Campbell, CA 95008 (408) 866-2140 NOTICE OF DETERMINATION Office of Planning & Research 1400 Tenth Street, Room 121 Sacramento, CA 95814 /County Clerk's Office Santa Clara County 191 N. First Street San Jose, CA 95113 (3 copies & cover sheet filled out by planner) Subject: Filing of Notice of Determination in compliance with Section 21108 or 21152 of the Public Resources Code. Project Title: State Clearinghouse Number (If submitted to Clearinghouse) Lead Agency Contact Person ,~t?-~Arg>t Phone (408) 866-2140 Project Location (include County) ,5'-4, This is to advise that the r- ........... J ...... v .... u, ~qa,u u,,~t has approved the above-described project on ~ Lead Agency O Responsible Agency tl -&c/. ~'~ and has made the following determinations regarding the above described project: Date ~-~-C / 't '4 ~- ~ ...... 7', ' -' '. ,, - (O win 2. O ~ Env~o~en~l ~pact Repoff w~ prepped for ~s project p~s~nt to ~e provisions of CEQA. ~A Negative Decl~aaon was prepped for ~s project pursuit to ~e provisions of CEQA. 3. Mitigation measles (O were ~ were not ) made a con,rio= of approval of ~e project. 4. A S~t~m~t of Ov~m~g Co~iderafio~ ( O w~ was ~ot ) adopted for ~s project. . ., . . ~s ,s ~ ~at ~al '~ener~b~t ~Comm~_pe~ropme~~t ~ of Cmpbell, 70 N:-F~t S=eet, C~el~ CA ~408) 86~40. Signa~e (Public Agency) Date received for filing and posting at OPR: ' T!ffiOUGH BW Downtown Partners, Inc. 54 N. Central Avenue Suite 2 Campbell CA 95008 Phone: 408-378-2306 Fax: 408-378-2307 December 4, 1998 Mayor Jeannette Watson City of Campbell 70 North First Street Campbell, CA 95008 RECEIVED DEC 0 CiTY OF CAMP/3ELL PLANNING DF. PT, Dear Mayor Watson: This letter is regarding the Site and Architectural approval of our office building project at 54 N. Central Avenue. Specifically, BWI Downtown Partners is appealing the decision made by the Planning Commission on November 24% 1998. Our appeal is based on our belief that the Planning Commission made an error in at least one condition of the approval. The condition centers on the recordation of a covenant that elimm' ates the ability to control whom enters the property, thus creating an enormous liability to the property owner. We look forward to addressing this issue with the City Council at its first available meeting. We thank you for your time and attention to this matter. Partner BWI Downtown Partners .0¥' C A,~La CITY OF CAMPBELL Public Works Department December 2, 1998 BWI Downtown Partners 54 N. Central Avenue Campbell, CA 95008 Re: Application S 98-09 - 54 N. Central Avenue Gentlemen: The Planning Commission, at its meeting of November 24, 1998, adopted Resolution 3205 granting a Site and Architectural Approval to allow the construction of a 12,711 square foot, two-story office building on the above-referenced property. At your earliest convenience, I would like to arrange a meeting with you, your consultants, and the City's Public Works land development representative(s). The purpose of the meeting would be to review the conditions of approval imposed by the Public Works Department and the Department's procedures and requirements for satisfaction of those conditions. The land development representative(s) may also include staff members from the Planning and Building Divisions, if necessary. We hope this meeting will facilitate your project and assist in making your project a success. Please contact me at (408)866-2158 to arrange a meeting time and to answer any questions. ..... ,S,incg'ely~//[ /// .,//~-, . /~ Harold H_..H,.~/, gley, ~ L~O6pmeht ~ngineer CC: Michelle Quinney, City Engineer Frank Cauthorn, Building Official Barbara Ryan, Planner I ~ h:\word/landdev/54centrl(mp) 70 North First Street · Campbell, California 95008. 1423 · TEL 408.866.2150 ' F^X 408.376.0958 ' TDO 408.866.2790 CITY OF CAMPBELL Community Development Department · Current Planning November 24, 1998 BWI Downtown Partners 54 N. Central Avenue Campbell, CA 95008 Re: S 98-09 - 54 N. Central Avenue Dear Applicant: Please be advised that the Planning Commission, at its meeting of November 24, 1998, adopted Resolution No. 3205 granting a Site and Architectural Approval to allow the construction of a 12,711 square foot, two-story office building on the above-referenced site. This approval is effective in ten days, unless appealed in writing to the City Clerk. The time within which judicial review of this decision must be sought is governed by California Code of Civil Procedure, Section 1094.6. If you have any questions, please do not hesitate to contact me at (408) 866-2140. Sincerely, B rb~~a Schoetz Ryan Planner I cc: Harold Housley, Public Works Frank Cauthorn, Building Wayne Hokanson, Central Fire Geoff Bradley, Redevelopment 70 North First Street · Campbell, California 95008.1423 . TEL 408.866.2140 · FaX 408.866.8381 · TDD 408.866.2790 RESOLUTION NO. 3205 BEING A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CAMPBELL GRANTING A SITE AND ARCHITECTURAL APPROVAL TO ALLOW THE CONSTRUCTION OF A 12,711 SQUARE FOOT, TWO-STORY OFFICE ON PROPERTY LOCATED AT 54 N. CENTRAL AVENUE IN THE C-3-S (CENTRAL BUSINESS DISTRICT) ZONING DISTRICT. APPLICATION OF BWI DOWNTOWN PARTNERS. FILE NO. S 98-09. After notification and public hearing, as specified by law, and after presentation by the Community Development Director, proponents and opponents, the hearing was closed. After due consideration of all evidence presented, the Planning Commission did find as follows with respect to application S 98-09: An initial study was prepared for this project which concludes there are no significant environmental impacts and a Negative Declaration has been prepared for this project. The proposed use is consistent with the commercial land use of the General Plan and the (C-3-S) Central Business District Zoning designation for the site. The proposed project achieves the following objectives: a) Restores the downtown as the civic and cultural center by creating an attractive project in this portion of the downtown. b) Facilitates economic viability through the introduction of new office spaces. c) Encourages a pedestrian oriented environment though the construction of pedestrian sidewalks and pedestrian level uses and doorways. d) Creates an architecturally pleasing project reflective of the traditional building styles that exist in the downtown area. The proposed building, parking facilities of 20 garage parking spaces, 10 off-driveway parking spaces, new loop street parking spaces, and sidewalk and landscape improvements will result in a project which integrates the proposed project with the sun'ounding neighborhood. Adequate circulation has been provided on site and the site is so located on public streets to accommodate the estimated traffic associated with the project. o The proposed project is well designed, integrates the use of traditional downtown siting and architectural features and is architecturally compatible with the neighborhood and uses. o The proposed project, subject to the recommended conditions of approval, meets the development standards for the C-3-S (General Commercial) Zoning District. 7. The project will not create a nuisance due to noise, litter, vandalism, traffic or other factors. 8. The project will not significantly increase the demand on city services. Planning Commission Resolution No. 3205 S 98-09 - 54 N. Central Avenue - BWI Downtown Partners Page 2 The recommended conditions of approval and the related improvements are proportional to the scale and size of the project. Based on the foregoing findings of fact, the Planning Commission further finds and concludes that: The proposed project will aid in the enhancement and the harmonious development of the immediate area. The establishment, maintenance, or operation of the uses will not be detrimental to the public health, safety, peace, morals, comfort or general welfare of persons residing or working in the neighborhood of such proposed use. 2. The proposed site is adequate in size and shape to accommodate the proposed uses and the surrounding uses in the area. 3. The proposed project is adequately served by streets of sufficient capacity to carry the kind and quality of traffic such uses would generate. The applicant is hereby notified, as part of this application, that he/she is required to meet the following conditions in accordance with the ordinance of the City of Campbell and the State of California. Additionally, the applicant is hereby notified that he/she is required to comply with all applicable Codes or Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified: COMMUNITY DEVELOPMENT DEPARTMENT Proiect Approval. Approval is granted for a Site and Architectural Review Permit (S 98-09) allowing redevelopment on property located at 54 N. Central Avenue consisting of the following: A. Removal of the existing 2,332 square foot office and 37 space parking lot. B. Construction of a two-story office building with ground floor of 4427 gross square feet, plus a 20 car parking garage and 10 exterior parking spaces, and second floor of 8284 square feet. Project approval shall substantially comply with project plans prepared by Chris Spaulding, Architect, dated 5-18-98, except as modified by the Conditions of Approval contained herein. Access Improvement. The 20 foot wide accessway adjacent to the south property line shall be improved and repaved to standards which will accommodate all vehicles expected to access this and the adjacent parcels using this accessway, including trash trucks, moving vans, firetrucks, and the like. Applicant shall also repair any potholes in the 20 foot wide accessway between the westerly edge of this property and the City property known as Ainsley Park Plaza at the west end of the accessway. Planning Commission Resolution No. 3205 S 98-09 - 54 N. Central Avenue - BWI Downtown Parmers Page 3 o o Parking. Prior to building occupancy, applicant shall record a covenant, running with the land, which shall provide shared parking, consistent with the Downtown Development Plan and C-3-S Zoning District, which incorporates the provision to make all parking spaces available to tenants, employees and customers of other downtown uses after 6 p.m. weekdays, and during the day and night on weekends and holidays, until 2:30 a.m. Revised Plot Plan and Elevations to Save Redwood Trees. Applicant shall continue to work with staff on revising the plan to ensure that the two large redwood trees on the site will be saved and flourish. Prior to issuance of a demolition permit for the existing building, and the submittal for a building permit for the proposed building, a written plan shall be submitted by a licensed arborist which shall provide details to guide the construction and care of the trees, and which shall include, but not be limited to: A. Minimum distance between tree trunks and building foundations. B. Type of foundation to be used. C. Construction methods to be employed. D. Care of trees roots, branches, and the ground area around the trees, including and aeration. sidewalk Construction Plans and Trees. All construction plans shall contain clear instructions based upon the arborist report, which will ensure the contractor is informed about the conditions necessary to save the trees. Architectural Details. Applicant shall submit plans and illustrated brochures indicating the location and design of architectural features such as gates, window muntins, light fixtures and facilities, and planters that will be utilized in the new building areas for approval by the Community Development Director. Landscaping and Sidewalks. Prior to submittal of plans for building permits, the applicant shall provide planting, hardscape and irrigation plans prepared by a Landscape Architect for City review and approval, which include, but are not limited to the following: A. The provision of landscaping and pedestrian access along the east boundary of the property. B. The provision of pedestrian access which is well-lighted, both day and night and wheel- chair accessible. C. Screening of any above ground utility and services accouterments, including, but not limited to trash enclosures, meters, transformers, and anti-siphon devices (see #10). D. The landscaping of all areas indicated on the approved site plans, to include street trees. E. Landscape measures, as recommended in the arborist report to enhance the health of the redwood trees. Planning Commission Resolution No. 3205 S 98-09 - 54 N. Central Avenue - BWI Downtown Partners Page 4 o 10. A landscape screen/hedge/planter box on the second floor of the building to provide a visual and safety buffer between the exterior corridor and the opening to the parking garage below. Public/Shared Pedestrian Access. Prior to building occupancy, the applicant shall record a public access/ reciprocal access covenant which shall make provisions for a pedestrian sidewalk/accessway within the eastern 6 feet of the property, on order to provide a wide, shared, landscaped and lighted pedestrian walkway along the boundary of this property and the property adjacent to the east. If a security or loitering problem, or other such problem which threatens the public welfare develops, the City shall work with the property owners to eliminate said problem.. If measures cannot be found to adequately address the problem, the City Council may allow access to this area to be restricted in a manner agreeable to both the property owner and the City. Signage. No signage is approved as part of the development application approved herein. The applicant shall submit a master sign plan for the development. No sign shall be installed until such application is approved and a permit issued by the Community Development Director as specified in Chapter 21.53. of the Zoning Ordinance, and consistent with the standards for signing in the C-3-S Zoning District. Construction Measures for Compatibility. The applicant shall implement the following measures to ensure that construction practices do not disturb surrounding streets and uses: A. The applicant shall submit a construction management plan to the City for review and approval. Such plan shall address the provision of adequate access to the surrounding parcels and for the public on the adjacent streets and sidewalks. B. Construction activities will be limited to daytime hours of 8:00 a.m. to 5:00 p.m. weekdays and 9:00 a.m. to 4:00 p.m. Saturdays. Construction is prohibited on Sundays and Holidays. Any exception to these times shall require an exception by the City Building Official. C. No pile driving is allowed for construction of the project. D. All internal combustion engines for construction shall be properly muffled and maintained. E. All stationary noise generating construction equipment, such as air compressors and portable power generators, will be located as far as practical from the existing residences located to the northeast, and the existing businesses and County Library. F. Soil management: All active construction areas shall be watered at least twice daily. All trucks hauling soil and other small materials shall be covered. All sidewalks, parking areas, driveways, adjacent streets and sidewalks shall be swept daily, as directed by the City Engineer. Any stockpiles of materials shall be treated so as to prevent their being blown, dragged, or otherwise carried off site. Erosion control measures shall be undertaken as directed by the City Engineer. Planning Commission Resolution No. 3205 S 98-09 - 54 N. Central Avenue - BWI Downtown Partners Page 5 10. 11. 12. 13. 14. 15. 16. Garbage Collection: Trash containers of a size and quantity necessary to serve the trash and recycling needs of the building occupants shall be located in side a masonry screening wall. The wall shall have an appearance which matches or is architecturally compatible with that of the building. The area shall consist of a concrete floor, and have self-closing, solid doors. The area shall be at grade level and have a level area adjacent to the trash enclosure area to service the containers. The design of the enclosure shall be approved by the Community Development Department and the Fire District. UBC, Building Permit: A. The proposed uses require a one hour fire separation between the parking area and the office areas. Provide listed assemblies for the horizontal separation. B. The exterior exit balcony is the equivalent of a corridor. Provide equivalent construction, including doors and windows, was well as minimum width. No dead ends greater than 20 feet permitted. C. Structural design and calculations shall include the weight of a minimum 18 inch wide, 3 foot deep, irrigated, dirt-filled planter box bordering the second floor corridor opening to the parking garage below. Mechanical Equipment: No roof-mounted equipment is approved, except as submitted to and approved by the Community Development Director. Any such equipment must be shown to not be able to be otherwise accommodated, and shall be screened from view in a manner which complements the building architecture. Any ground-mounted equipment visible to the public shall be screened with building mater/als similar to the building, subject to the approval of the Community Development Director. All roof vents shall be painted to match the roof. DisabiliW Access: The building shall be designed to provide access to disabled persons in accordance with the Uniform Building Code (UBC), the Uniform Federal Accessibility Standards (UFSA) and the federal Americans with Disabilities Act (ADA). Include a dedicated walkway from the disabled parking lot space to an elevator or route to the exterior of the building without traveling behind parked vehicles or within vehicle paths of travel. Fireflow: A minimum fireflow of 3,500 gallons per minute at 20 pounds per square inch residual pressure is required. Sprinkler If the building is over 2 stories in height, 35 feet, or requires a fireflow in excess of 2,000 gallons per minute, an automatic fire sprinkler system shall be supplied, hydraulically designed per National Fire Protection Association Standard #13, 1994 Edition. Final Fire Flow: Required fireflow may be reduced up to 50% in buildings equipped with automatic fire sprinkler systems, but can be no less than 1500 gallons per minute. Therefore, the final required fireflow is 1750 gallons per minute at 20 pounds per square inch residual pressure. This flow shall be taken from any two fire hydrants, on or near the site, so long as they are spaced at a maximum spacing of 250 feet. Planning Commission Resolution No. 3205 S 98-09 - 54 N. Central Avenue - BWI Downtown Partners Page 6 17. 18. 19. 20. Fire Department Keybox: The applicant shall provide an approved fire department key box and appropriate building keys. Installations shall conform with Fire Department Standard Detail and Specification K-1. Preliminary_ Title Report: Prior to issuance of any grading or building permits for the site, the applicant shall provide a current Preliminary Title Report. Right-of-Way for Public Street Purposes: Prior to issuance of any grading or building permits for the site, the applicant shall grant approximately 2 feet of Right-of-Way for Public Street Purposes along the Central Avenue frontage to set the property line at 10 feet from the existing curb face. The applicant shall grant additional Right-of-Way for Public Street Purposes along the Civic Center Drive frontage as necessary to accommodate a minimum of 10 feet from the new curb face. Applicant shall cause to be prepared all documents necessary to record dedication and submit to the City for review. Street Improvements: Prior to issuance of any grading or building permits for the site, the applicant shall execute a street improvement agreement and shall cause plans for public Street Improvements to be prepared by a registered civil engineer, pay fees, post security and provide insurance necessary to obtain an encroachment permit for construction of the public improvements, as required by the City Engineer. The plans shall include the following: Central Avenue - A. Removal of the existing curb, gutter, sidewalk, two existing driveway approaches, decorative street light, street tree, traffic control signs and related improvements. B. Construction of new 10' sidewalk and two standard commercial driveway approaches in compliance with ADA requirements. Sidewalk width and construction in the area of the shall be in conformance with the recommendation of the arborist report (see Condition #2) C. Installation of decorative street light including pull boxes, conduits, and conductors. Civic Center Drive - A. Removal and construction of street improvements as shown on the attached Conceptual Street Improvement Plan including: i. Removal of the existing curb and gutter from the easterly end of the curb "pop out" to approximately 15' easterly of the easterly property line. ii. Construction of new curb and gutter from the easterly end of the curb "pop out" easterly along the general alignment of the northerly stripe of the "herringbone" striping to the easterly property line projected plus a 15 foot conform to the existing curb. Removal of existing pavement as needed to construct the new curb, gutter, and sidewalk. B. Construction of a new, 10 foot minimum, sidewalk from the back of new curb to the easterly property line. Sidewalk width and construction in the area of the shall be in conformance with the recommendation of the arborist report (see Condition//2) Planning Commission Resolution No. 3205 S 98-09 - 54 N. Central Avenue - BWI Downtown Partners Page 7 21. 22. 23. 24. 25. 26. Central Avenue and Civic Center Drive A. Protection of underground and surface utilities, street light conduits, traffic control facilities, and similar improvements. B. Adjustment and relocation of existing utility boxes and related facilities. C. Installation of traffic control signs, striping, as determined by the City Engineer. D. Construction of all conforms as needed to join existing improvements. E. Construction of street and traffic control improvements as needed to conform to the City of Campbell's Downtown Street Loop Parking Project 98-05. F. Installation of street trees in tree wells and irrigation at approximately 40 feet on center. Water Meter(s) and Sewer Cleanout(s): Existing and proposed Water Meter(s) and Sewer Cleanout(s) shall be installed on private property behind the public right-of-way line. Utility Installation Plan: Prior to issuance of building permits for the site, the applicant shall submit a Utility Installation Coordination Plan and Schedule for approval by the City Engineer for installation and/or abandonment of all utilities. Streets which have been resurfaced within the previous 5 years will require boring and jacking for all new utility installations. Applicant shall also prepare pavement restoration plans for approval by the City Engineer prior to any utility installation or abandonment. Maintenance Security: Prior to issuance of occupancy approval for the site, all public street improvements required by the street improvement agreement and the encroachment permit must be completed and accepted by the City and the applicant must provide a one-year Maintenance Security in an amount of 25% of the Faithful Performance Bond. Grading and Drainage Plan: Prior to issuance of any grading or building permits for the site, the applicant shall conduct hydrology studies based on a 10 year storm frequency, prepare an engineered Grading and Drainage Plan, and pay fees required to obtain necessary grading permits. The plans shall comply with the 1994 edition of the UBC including Chapters 18, 33, and Appendix Chapter 33. Should the development require hauling of soil or other demolition materials on or off site, the applicant shall request and obtain approval of a haul route from the City Engineer. No underground drainage lines are to be placed within 8-10 feet of the existing redwood trees. Storm Drain Area Fee: Prior to issuance of any grading or building permits for the site, the applicant shall pay the required Storm Drain Area fee. The current fee is $2,500. Storm Water Pollution Prevention Measures: Prior to issuance of any grading or building permits, the applicant shall comply with the National Pollution Discharge Elimination System (NPDES) permitting requirements and the California Storm Water Best Management Practices handbook prepared by the Storm Water Quality Task Force, Santa Clara Valley Water District and the City of Campbell Municipal Code regarding Storm Water Pollution Prevention. Planning Commission Resolution No. 3205 S 98-09 - 54 N. Central Avenue - BWI Downtown Partners Page 8 27. 28 Demolition: Prior to issuance of a Demolition permit to remove the existing building, the applicant shall obtain clearance from the Public Works Department. Covenant: The applicant shall record a covenant recognizing that occasionally access to the site may be limited due to downtown special events. PASSED AND ADOPTED this 24~ day of November, 1998, by the following roll call vote: AYES: NOES: ABSENT: ABSTAIN: Commissioners: Commissioners: Commissioners: Commissioners: Francois, Jones, Keams, Lindstrom, Lowe, Meyer-Kennedy Gibbons None None APPROVED: Dennis Lowe, Chair ATTEST: Steve Piasecki, Secretary Planning Commission Minutes of November 24, 1998 Page 4 Chairman Lowe advised that this approval is final in 10 days unless appealed in writing to the City Clerk. Commissioner Meyer-Kennedy announced that she would be abstaining from Items No. 2 and 3 as her office is located in Downtown Campbell. Chairman Lowe read Agenda Item No. 2 into the record. 2. S 98-09 Public Hearing to consider the application of BWI Downtown BWI Downtown Partners for a Site and Architectural Approval (S 98-09) to Partners allow the construction of a 12,711 square foot, two-story office building with an interior first floor parking garage on property located at 54 N. Central Avenue in the C-3-S (Central Business District) Zoning District. A Negative Declaration has been prepared for this project. Planning Commission decision final unless appealed in writing to the City Clerk within 10 days. Ms. Barbara Schoetz Ryan, Planner I, presented the staff report as follows: · The applicant is seeking approvals to construct a two-story office building on property located at 54 N. Central Avenue, an 18,000 square foot parcel on the southeast comer of Civic Center Drive and Central Avenue. The applicant will demolish the existing building and 37 parking spaces and construct a new two-story office building, with garage space for 20 vehicles and 10 additional uncovered parking spaces. · This construction will result in an expansion of 10,000 square feet of space and a decrease of seven parking spaces. · The Land Use is Commercial and the Zoning is Co3. · An office building is permitted. · The Downtown Development Plan encourages shared parking. The applicant proposes to share 10 spaces that are uncovered. The 20 covered spaces are proposed for use only by the offices. · The building materials include mission tile roofing and stucco walls. · Two large redwood trees (34 and 36-inches in diameter) will be retained. · SARC reviewed the project and was supportive of saving the redwood trees and in allowing the garage to be used by downtown patrons in the evenings after the office building is closed. · Staff recommends a Negative Declaration and that the Commission approve this project. Commissioner Gibbons asked staff if Condition No. 3 means that if a different owner owns some of the BWI owned buildings would the parking still be available to those buildings. Ms. Barbara Schoetz Ryan replied no. Planning Commission Minutes of November 24, 1998 Page 5 Commissioner Gibbons asked the schedule for this project. Chairman Lowe asked about the reduction in parking spaces fi.om 37 to 30. Ms. Barbara Schoetz Ryan advised that even with the reduction in the number of spaces, the applicant is meeting the parking requirements for their proposal. The C-3 Zoning requires that 40% of parking spaces be compact (8x16) and 60% be standard size (9x20). Commissioner Jones presented the Site and Architectural Review Committee report as follows: · SARC meet on November 10th and was supportive. · SARC's main concern was the saving of the redwood trees and the parking spaces' size and accessibility. · SARC wants to see all 30 spaces available for outside use after the offices are closed. Chairman Lowe opened the Public Heating for Agenda Item No. 2. Mr. Bruce Bowen, Applicant, 54 N. Central Avenue, Campbell: · Advised that the big issue for this project is parking, particularly shared use. · Expressed concern for the requirement to record a covenant. Stating that he is not comfortable encumbering the property in this way. · Advised that over the years they have allowed outside users to park on their lot. · Informed that they have pulled the building back on the site in order to save one of the redwood trees. Commissioner Lindstrom said that the covenant can be changed in the future if ownership and/or circumstances change. Commissioner Francois advised that the applicant can appeal. City Attorney William Seligrnann advised that if the covenant does not make sense in the future, the applicant can come back for a modification to release the covenant. Chairman Lowe stated that he supports shared parking after hours. Commissioner Jones stated that during the day the spaces would be reserved for the offices. Said that he is against restricting the parking to only the other buildings owned by the applicant. Commissioner Gibbons asked if the arborist's report was ready. Mr. Bruce Bowen answered that it has not yet been received in writing. Planning Commission Minutes of November 24, 1998 Page 6 Commissioner Gibbons mentioned the fact that on several occasions during the year, the site will be less accessible as a result of community events in the downtown where the roadways are blocked off. Asked when the project was scheduled to be built. Mr. Bruce Bowen advised that they would break ground in six months and the construction should take about six months. Chairman Lowe closed the Public Hearing for Agenda Item No. 2. Commissioner Keams stated that she supports shared parking after hours. Commissioner Lindstrom stated that the building is a nice one. Agreed that the wording of the Condition on parking is proper. Commissioner Gibbons stated that it is reasonable to limit the parking to the tenants of the applicant's own buildings. Commissioner Jones asked if a parking plan is required. Mr. Steve Piasecki advised that a parking plan is only required when parking is deficient. That is not the case with the project. The applicant can provide the required number of spaces on site. Chairman Lowe stated that he hates to see a gate. Rather the parking area should be open. Commissioner Gibbons suggested a compromise whereby the 20 parking spaces be made available for public parking on weekends from 8 a.m. to 8 p.m. and leave the weekday evening conditions as proposed. Chairman Lowe reopened the Public Hearing for Agenda Item No. 2. Commissioner Gibbons asked how the 20 spaces would be controlled. Mr. Bruce Bowen, Applicant, replied that pass cards during the day and gates would be left up in the evenings. Added that during the day, the spaces must be controlled for those working in the office. Stated that he has a problem with being obligated to provide public parking. Mr. Steve Piasecki suggested that the applicant can allow the employees of his several buildings to park on site after 6 p.m. to leave public spaces elsewhere in the downtown available for the public as well as having the lot open on weekends. Mr. Bruce Bowen stated that he has no problem with the spaces being used after hours but does disagree that a covenant should be imposed. Planning Commission Minutes of November 24, 1998 Page 7 Chairman Lowe expressed his disappointment in the idea that a gate is even considered necessary in Campbell. Commissioner Keams added that she is not supportive of the gate. Commissioner Francois stated that the gate adds security for the building and that he is supportive of it. Added that the applicant has been generous with public parking on his property and he should have a say in how he does it. Commissioner Gibbons said that she is not happy about the gate. Added that as a compromise she would like the spaces made available during weekends. Commissioner Lindstrom stated that the applicant has worked with people downtown and he has been and will continue to share spaces. The gate and security will cost him. Added that the project is good and he will support it. Chairman Lowe closed the Public Hearing for Agenda Item No. 2. Motion: Upon motion of Commissioner Jones, seconded by Commissioner Kearns, the Planning Commissioner adopted a Negative Declaration and adopted Resolution No. 3205 granting a Site and Architectural Approval (S 98-08) to allow the construction of a 12,711 square foot, two-story office building with an interior first floor parking garage, with the added condition that the applicant record a covenant stating his understanding and support that on several occasions a year accessibility downtown will be cut off to host community events, on property located at 54 N. Central Avenue, by the following roll call vote: AYES: Francois, Jones, Kearns, Lindstrom, Lowe NOES: Gibbons ABSENT: None ABSTAIN: Meyer-Kennedy Chairman Lowe advised that this approval is final in 10 days unless appealed in writing to the City Clerk. Chairman Lowe read Agenda Item No. 3 into the record. S 98-17/UP 98-11 BWI Downtown Partners Public Hearing to consider the application of BWI Downtown Partners for a Site and Architectural Approval (S 98-17) to allow the construction of a new two-story building in the Downtown area and approval of a Conditional Use Permit (UP 98-11) to allow a billiard establishment on property located at ITEM NO. 2 STAFF REPORT - PLANNING COMMISSION MEETING NOVEMBER 24,1998 S 98-09 BWI Downtown Partners Public Hearing to consider the application of BWI Downtown Partners for a Site and Architectural Review Permit approval (S 98-09) to allow the construction of a 12,711 square foot, two-story office building on property located at 54 N. Central Avenue in the C-3-S (General Commercial) Zoning District. STAFF RECOMMENDATION That the Planning Commission take the following actions: 1. Grant a Negative Declaration for this project; and 2. Adopt a Resolution, incorporating the attached findings, approving a Site and Architectural Review Permit, subject to the attached Conditions of Approval. ENVIRONMENTAL DETERMINATION An initial study was prepared for this project which concludes that there are no significant environmental impacts associated with this project, consequently, a Negative Declaration is recommended in accordance with Section 15074 (b) of the California Environmental Quality Act (CEQA) Guidelines. The initial study is attached for review. PROJECT DATA Site Area: Existing: approx. 18,000 sq. ft. (.41 acres) Proposed: approx. 17,500 sq. ft. (.40 acres) Proposed Building (Existing office building of 2,332 square feet to be removed) First floor 4,427 sq. ft. Second floor 8.284 sq. ft. Total 12,711 sq. ft. Floor Area Ratio Permitted Maximum Floor Area Ratio, Downtown Development Plan = 2.0 Proposed FAR for exterior dimensions (visual bulk): 92 ft. x 120 ft. exterior dimensions each floor = 22,020 sq. ft. total building bulk/17,500 sq. ft. lot = 1.26 FAR Proposed FAR, not including interior parking area and second floor central open area: 12,711/17,500 = .73 FAR Provided Parking: Required (1/425 sq. ft): Proposed: = 30 spaces, shared, unless otherwise approved by Council = 30 spaces (20 inside building, 10 outside building) Staff Report - Planning Commission Meeting of November 24, 1998 S 98-09 - 54 N. Central Avenue Page 2 Surrounding Land Uses: North: County Library, City Hall South: Commercial East: Commercial (parking, offices) West: Offices, History Museum DISCUSSION Applicant's Proposal: The applicant is requesting approval of a Site and Architectural Review Permit for the construction of a two-story office building, with an interior first floor parking garage for 20 vehicles and an exterior parking area for 10 vehicles, at the southeast comer of Civic Center Drive and N. Central Avenue. The square shaped parcel is currently occupied by a one-story, 2,332 square foot office building and a parking lot striped for 37 vehicles. A Site and Architectural Review Permit is required in the C-3-S Zoning District for the proposed development. The applicant proposes a two story office building of 12,711 square feet with 4,427 square feet of offices and a parking garage for 20 vehicles on the first floor, and, on the second floor, 8,284 square feet of offices off an exterior corridor open to the parking garage below. The proposed building represents an expansion of approximately 10,000 square feet of office area over that existing on the site, and a decrease of 7 parking spaces. ANALYSIS General Plan Designation: The project site is designated as Commercial on the General Plan Land Use Element Map and is subject to the Downtown Redevelopment Plan. Downtown Redevelopment Plan: The subject site has been identified as within the retail, office and personal service area of the downtown in the Downtown Plan. Staff finds the proposed use and building to be consistent with the Downtown Redevelopment Plan (DRP) and the policies expressed therein. Zoning Designation: The project site is zoned C-3-S (Central Business District), and is subject to all the terms of that district. · Use: The proposed office building is permitted within this zoning district subject to the site and architectural approval process, section 21.26.020 C.M.C. Parking: The Downtown Development Plan encourages shared parking facilities, and section 21.26.080(2)(A) of the C-3-S zoning regulations states, "All new parking shall be provided in shared parking facilities, unless the city council, upon recommendation of the planning Staff Report - Planning Commission Meeting of November 24, 1998 S 98-09 - 54 N. Central Avenue Page 3 commission, finds that another arrangement would better serve the public safety or welfare, and would not be detrimental to the overall parking and circulation in the area." (See Attachment 5). The proposed plan indicates that 10 of the parking spaces will be off the 20 foot wide accessway which serves not only this parcel, but the ones to the south and to the east. Therefore, unless the parcel is otherwise signed, these spaces will be open for use by customers of the adjacent parcels. The applicant owns those parcels which are on the other side of the driveway. The 20 parking spaces inside the building will be gated for use by office personnel only. Staff is suggesting that the parking garage be open in the evening when not required for use by the offices, so that the spaces may be used by restaurant and other evening business' customers. The garage should be well lighted, and the stairways gated to prevent access to the building corridors. Building Design: The proposed two story office building presents a traditional building form which is accented by three comer towers, second-story cantilevered bays and balconies, and wide arches at street level on the north, south and west elevations. The pedestrian orientation of the building is demonstrated by pedestrian doorways to the individual offices on the first floor facing Civic Center Drive and Central Avenue. Roofing material will be mission tile, and the walls a stippled beige stucco. A continuous horizontal decorative molding on the exterior wall visually divides the first floor from the second floor. Doorways are French windows with transom windows above. Windows will be elongated rectangles with the glass appearing to have tree divided lights (panes). Decorative support brackets are located under both the roof of the comer towers and the second story bays (oriel windows). The proposed design is consistent with the requirements of the C-3-S zone. Redwood Tree Protection: On the street comer of the parcel are two large redwood trees (34 inch and 36 inch diameter trunks, measured 4 feet above ground.) The larger, southerly of the two trees, has a lean to its trunk toward the building. The plan, as presently proposed, would have a detrimental, and quite possibly terminal effect upon that tree. The plan indicates the new building's foundation to be located on two sides within a few feet of the tree trunk, requiring cutting of large tree roots. The existing office building will be taller than the present one, resulting in the need to trim closely a number of branches on one or two sides of the tree. The grading plan shows a proposed underground drainage line on a third side of the tree, between the two trees a few feet from their trunks, resulting in the roots being cut on that side. Additionally, the standard commercial sidewalk width conditions call for the widening of the sidewalk up to the trunk on the fourth side. Staff Report - Planning Commission Meeting of November 24, 1998 S 98-09 -- 54 N. Central Avenue Page 4 The applicant indicated his intent to save the trees, and to make whatever changes are necessary to accomplish this. Staff requested the Public Works Department examine the need for the drainage line and the sidewalk width, and asked the applicant to have an arborist examine the trees and make recommendations. Public Works has indicated that the drainage line is unnecessary, and that the sidewalk can be narrower near the trees. The applicant has indicated that the arborist advised that the building foundation be no closer than 8 to 10 feet from the tree trunk. Therefore, the floor plan and the elevations will need to be revised slightly to save the trees. Recommended conditions of approval address these changes. Street Improvements: The site plan indicates the repaving of the shared driveway together with the new parking lot. The sidewalk along Civic Center Drive is shown on the application to be narrowed a few feet to match its width across Central Avenue. The Public Works and Redevelopment Departments have prepared a plan to provide additional parking on the downtown loop streets, per the Downtown Development Plan. That plan would accommodate on-street parking spaces on Civic Center Drive in the area of this new building, and would not require a narrowing of the existing sidewalk. These circumstances are reflected in the conditions of approval. ~ The site plan denotes areas where landscaping can be located. Staff has concerns regarding the lack of landscaping along the east side of the building. Only a sidewalk is indicated between a long blank first floor wall and the property line. Room should be reserved for a minimum of a 3 foot deep planter next to the building, with either the sidewalk shared with the adjacent parcel, or additional room provided on this parcel for both an adequately sized planter and a sidewalk. Preliminary plans have been submitted for the development of the adjacent parcel, and staff would like to ensure that the walking experience between the multi-storied buildings is a pleasant and safe experience. This means that the space should be wide, well-lighted, with adequate public visibility, and pleasant, safe landscaping. If two buildings do not share a common wall, the space between them must provide for safety and aesthetics, especially in the Campbell downtown where the pedestrian experience is vital. This aspect of the plan was not examined at the Site and Architectural Review Committee. Conditions of approval include detailed landscaping, irrigation, lighting and building plans, as well as a recorded public/reciprocal access covenant which address this area. Site and Architectural Review Committee: This application was reviewed by the Site and Architectural Review Committee at its meeting of November 10, 1998. The Committee was supportive of the design, provided changes were made to save the redwoods. The Committee also recommended that the parking garage be open in the evening, and noted that it could be closed in the early morning hours when patrons of the nearby restaurants had left. Staff Report - Planning Commission Meeting of November 24, 1998 S 98-09 -- 54 N. Central Avenue Page 5 Attachments: 1. Findings for Site and Architectural Approval 2. Conditions of Approval Site and Architectural Approval 3. Initial Study 4. Reduced Plans 5. C-3-S(Central Business District) Zoning District 6. Location Map Prepared by: ~~~-~' ' B~bar~ i~. ant(er I Approved by: /~-fi~~~ -' '~teve P~aseck~' -"~ ' ', ~ot~munity Development Director Attachment #1 FINDINGS FOR APPROVAL OF FILE NO. S 98-09 SITE ADDRESS: 54 N. CENTRAL AVENUE APPLICANT: BWI Downtown Partners P.C. MEETING: November 24, 1998 Findings for Approval of a Site and Architectural Application to allow a two-story office building on property located at 54 N. Central Avenue. The Planning Commission finds as follows with regard to File No. S 98-09: An initial study was prepared for this project which concludes there are no significant environmental impacts and a Negative Declaration has been prepared for this project. The proposed use is consistent with the commercial land use of the General Plan and the (C-3-S) Central Business District Zoning designation for the site. The proposed project achieves the following objectives: a) Restores the downtown as the civic and cultural center by creating an attractive project in this portion of the downtown. b) Facilitates economic viability through the introduction of new office spaces. c) Encourages a pedestrian oriented environment though the construction of pedestrian sidewalks and pedestrian level uses and doorways. d) Creates an architecturally pleasing project reflective of the traditional building styles that exist in the downtown area. The proposed building, parking facilities of 20 garage parking spaces, 10 off-driveway parking spaces, new loop street parking spaces, and sidewalk and landscape improvements will result in a project which integrates the proposed project with the surrounding neighborhood. Adequate circulation has been provided on site and the site is so located on public streets to accommodate the estimated traffic associated with the project. o The proposed project is well designed, integrates the use of traditional downtown siting and architectural features and is architecturally compatible with the neighborhood and uses. o The proposed project, subject to the recommended conditions of approval, meets the development standards for the C-3-S (General Commercial) Zoning District. 7. The project will not create a nuisance due to noise, litter, vandalism, traffic or other factors. 8. The project will not significantly increase the demand on city services. The recommended conditions of approval and the related improvements are proportional to the scale and size of the project. FINDINGS FOR APPROVAL OF FILE NO. S 98-09 Page 2 Based on the foregoing findings of fact, the Planning Commission further finds and concludes that: The proposed project will aid in the enhancement and the harmonious development of the immediate area. The establishment, maintenance, or operation of the uses will not be detrimental to the public health, safety, peace, morals, comfort or general welfare of persons residing or working in the neighborhood of such proposed use. 2. The proposed site is adequate in size and shape to accommodate the proposed uses and the surrounding uses in the area. 3. The proposed project is adequately served by streets of sufficient capacity to carry the kind and quality of traffic such uses would generate. Attachment #2 CONDITIONS OF APPROVAL FOR FILE NO. S 98-09 SITE ADDRESS: 54 N. Central Avenue APPLICANT: BWI Downtown Partners P.C. MEETING: November 24, 1998 The applicant is hereby notified, as part of this application, that he/she is required to meet the following conditions in accordance with the Ordinances of the City of Campbell and the State of California. Where applicable, the lead department with which at the applicant will work is identified on each condition. Additionally, the applicant is hereby notified that he/she is required to comply with all applicable Codes or Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified. COMMUNITY DEVELOPMENT DEPARTMENT Project Approval. Approval is granted for a Site and Architectural Review Permit (S 98- 09) allowing redevelopment on property located at 54 N. Central Avenue consisting of the following: A. Removal of the existing 2,332 square foot office and 37 space parking lot. B. Construction of a two-story office building with ground floor of 4427 gross square feet, plus a 20 car parking garage and 10 exterior parking spaces, and second floor of 8284 square feet. Project approval shall substantially comply with project plans prepared by Chris Spaulding, Architect, dated 5-18-98, except as modified by the Conditions of Approval contained herein. Access Improvement. The 20 wide accessway adjacent to the south property line shall be improved to standards which will accommodate all vehicles expected to access this and the adjacent parcels using this accessway, including trash trucks, moving vans, firetrucks, and the like. o Parking. Prior to building occupancy, applicant shall record a covenant, running with the land, which shall provide shared parking, consistent with the Downtown Development Plan and C-3-S Zoning District, which incorporates the provision to make all parking spaces available to tenants, employees and customers of other downtown uses after 6 p.m. weekdays, and during the day and night on weekends and holidays, until 2:30 p.m. Revised Plot Plan and Elevations to Save Redwood Trees. Applicant shall continue to work with staff on revising the plan to ensure that the two large redwood trees on the site will be saved and flourish. Prior to issuance of a demolition permit for the existing building, and the submittal for a building permit for the proposed building, a written plan shall be submitted by a licensed arborist which shall provide details to guide the construction and care of the trees, and which shall include, but not be limited to: A. Minimum distance between tree trunks and building foundations. B. Type of foundation to be used. CONDITIONS OF APPROVAL OF FILE NO. S 98-09 Page 2 C. Construction methods to be employed. D. Care of trees roots, branches, and the ground sidewalk and aeration. area around the trees, including Construction Plans and Trees. All construction plans shall contain clear instructions based upon the arborist report, which will ensure the contractor is informed about the conditions necessary to save the trees. Architectural Details. Applicant shall submit plans and illustrated brochures indicating the location and design of architectural features such as gates, window muntins, light fixtures and facilities, and planters that will be utilized in the new building areas for approval by the Community Development Director. Landscaping and Sidewalks. Prior to submittal of plans for building permits, the applicant shall provide planting, hardscape and irrigation plans prepared by a Landscape Architect for City review and approval, which include, but are not limited to the following: A. The provision of landscaping and pedestrian access along the east boundary of the property. B. The provision of pedestrian access which is well-lighted, both day and night and wheel- chair accessible. C. Screening of any above ground utility and services accouterments, including, but not limited to trash enclosures, meters, transformers, and anti-siphon devices (see # 10). D. The landscaping of all areas indicated on the approved site plans, to include street trees. E. Landscape measures, as recommended in the arborist report to enhance the health of the redwood trees. F. A landscape screen/hedge/planter box on the second floor of the building to provide a visual and safety buffer between the exterior corridor and the opening to the parking garage below. Public/Shared Pedestrian Access. Prior to building occupancy, the applicant shall record a public access/reciprocal access covenant which shall make provisions for a pedestrian sidewalk/accessway within the eastern 6 feet of the property, in order to provide a wide, shared, landscaped and lighted pedestrian walkway along the boundary of this property and the property adjacent to the east. Signage. No signage is approved as part of the development application approved herein. The applicant shall submit a master sign plan for the development. No sign shall be installed until such application is approved and a permit issued by the Community Development Director as specified in Chapter 21.53. of the Zoning Ordinance, and consistent with the standards for signing in the C-3-S Zoning District. CONDITIONS OF APPROVAL OF FILE NO. S 98-09 Page 3 10. Construction Measures for Compatibility. The applicant shall implement the following measures to ensure that construction practices do not disturb surrounding streets and uses: A. The applicant shall submit a construction management plan to the City for review and approval. Such plan shall address the provision of adequate access to the surrounding parcels and for the public on the adjacent streets and sidewalks. B. Construction activities will be limited to daytime hours of 8:00 a.m. to 5:00 p.m. weekdays and 9:00 a.m. to 4:00 p.m. Saturdays. Construction is prohibited on Sundays and Holidays. Any exception to these times shall require an exception by the City Building Official. C. No pile driving is allowed for construction of the project. D. All internal combustion engines for construction shall be properly muffled and maintained. E. All stationary noise generating construction equipment, such as air compressors and portable power generators, will be located as far as practical from the existing residences located to the northeast, and the existing businesses and County Library. F. Soil management: All active construction areas shall be watered at least twice daily. All trucks hauling soil and other small materials shall be covered. All sidewalks, parking areas, driveways, adjacent streets and sidewalks shall be swept daily, as directed by the City Engineer. Any stockpiles of materials shall be treated so as to prevent their being blown, dragged, or otherwise carried off site. Erosion control measures shall be undertaken as directed by the City Engineer. 11. Garbage Collection: Trash containers of a size and quantity necessary to serve the trash and recycling needs of the building occupants shall be located in side a masom'y screening wall. The wall shall have an appearance which matches or is architecturally compatible with that of the building. The area shall consist of a concrete floor, and have self-closing, solid doors. The area shall be at grade level and have a level area adjacent to the trash enclosure area to service the containers. The design of the enclosure shall be approved by the Community Development Department and the Fire District. 12. [IBC. Building Permit: A. The proposed uses require a one hour fire separation between the parking area and the office areas. Provide listed assemblies for the horizontal separation. B. The exterior exit balcony is the equivalent of a corridor. Provide equivalent construction, including doors and windows, was well as minimum width. No dead ends greater than 20 feet permitted. C. Structural design and calculations shall include the weight of a minimum 18 inch wide, 3 foot deep, irrigated, dirt-filled planter box bordering the second floor corridor opening to the parking garage below. CONDITIONS OF APPROVAL OF FILE NO. S 98-09 Page 4 13. Mechanical Equipment: No roof-mounted equipment is approved, except as submitted to and approved by the Community Development Director. Any such equipment must be shown to not be able to be otherwise accommodated, and shall be screened from view in a manner which complements the building architecture. Any ground-mounted equipment visible to the public shall be screened with building materials similar to the building, subject to the approval of the Community Development Director. All roof vents shall be painted to match the roof. 14. Disability Access: The building shall be designed to provide access to disabled persons in accordance with the Uniform Building Code CLIBC), the Uniform Federal Accessibility Standards (UFSA) and the federal Americans with Disabilities Act (ADA). Include a dedicated walkway from the disabled parking lot space to an elevator or route to the exterior of the building without traveling behind parked vehicles or within vehicle paths of travel. 15. Fireflow: A minimum fireflow of 3,500 gallons per minute at 20 pounds per square inch residual pressure is required. 16. Sprinkler If the building is over 2 stories in height, 35 feet, or requires a fireflow in excess of 2,000 gallons per minute, an automatic fire sprinkler system shall be supplied, hydraulically designed per National Fire Protection Association Standard #13, 1994 Edition. 17. Final Fire Flow: Required fireflow may be reduced up to 50% in buildings equipped with automatic fire sprinkler systems, but can be no less than 1500 gallons per minute. Therefore, the final required fireflow is 1750 gallons per minute at 20 pounds per square inch residual pressure. This flow shall be taken from any two fire hydrants, on or near the site, so long as they are spaced at a maximum spacing of 250 feet. 18. Fire Department Keybox: The applicant shall provide an approved fire department key box and appropriate building keys. Installations shall conform with Fire Department Standard Detail and Specification K-1. 19. Preliminary_ Title Report: Prior to issuance of any grading or building permits for the site, the applicant shall provide a current Preliminary Title Report. CONDITIONS OF APPROVAL OF FILE NO. S 98-09 Page 5 20. Right-of-Way for Public Street Purposes: Prior to issuance of any grading or building permits for the site, the applicant shall grant approximately 2 feet of Right-of-Way for Public Street Purposes along the Central Avenue frontage to set the property line at 10 feet from the existing curb face. The applicant shall grant additional Right-of-Way for Public Street Purposes along the Civic Center Drive frontage as necessary to accommodate a minimum of 10 feet from the new curb face. Applicant shall cause to be prepared all documents necessary to record dedication and submit to the City for review. 21. Street Improvements: Prior to issuance of any grading or building permits for the site, the applicant shall execute a street improvement agreement and shall cause plans for public Street Improvements to be prepared by a registered civil engineer, pay fees, post security and provide insurance necessary to obtain an encroachment permit for construction of the public improvements, as required by the City Engineer. The plans shall include the following: Central Avenue - A. Removal of the existing curb, gutter, sidewalk, two existing driveway approaches, decorative street light, street tree, traffic control signs and related improvements. B. Construction of new 10' sidewalk and two standard commercial driveway approaches in compliance with ADA requirements. Sidewalk width and construction in the area of the shall be in conformance with the recommendation of the arborist report (see Condition #2) C. Installation of decorative street light including pull boxes, conduits, and conductors. Civic Center Drive - A. Removal and construction of street improvements as shown on the attached Conceptual Street Improvement Plan including: i. Removal of the existing curb and gutter from the easterly end of the curb "pop out" to approximately 15' easterly of the easterly property line. ii. Construction of new curb and gutter from the easterly end of the curb "pop out" easterly along the general alignment of the northerly stripe of the "herringbone" striping to the easterly property line projected plus a 15 foot conform to the existing curb. iii. Removal of existing pavement as needed to construct the new curb, gutter, and sidewalk. B. Construction of a new, 10 foot minimum, sidewalk from the back of new curb to the easterly property line. Sidewalk width and construction in the area of the shall be in conformance with the recommendation of the arborist report (see Condition #2) Central Avenue and Civic Center Drive A. Protection of underground and surface utilities, facilities, and similar improvements. street light conduits, traffic control CONDITIONS OF APPROVAL OF FILE NO. S 98-09 Page 6 B. Adjustment and relocation of existing utility boxes and related facilities. C. Installation of traffic control signs, striping, as determined by the City Engineer. D. Construction of all conforms as needed to join existing improvements. E. Construction of street and traffic control improvements as needed to conform to the City of Campbell's Downtown Street Loop Parking Project 98-05. F. Installation of street trees in tree wells and irrigation at approximately 40 feet on center. 22. Water Meter(s) and Sewer Cleanout(s): Existing and proposed Water Meter(s) and Sewer Cleanout(s) shall be installed on private property behind the public right-of-way line. 23. Utility Installation Plan: Prior to issuance of building permits for the site, the applicant shall submit a Utility Installation Coordination Plan and Schedule for approval by the City Engineer for installation and/or abandonment of all utilities. Streets which have been resurfaced within the previous 5 years will require boring and jacking ~or all new utility installations. Applicant shall also prepare pavement restoration plans for approval by the City Engineer prior to any utility installation or abandonment. 24. Maintenance Security: Prior to issuance of occupancy approval for the site, all public street improvements required by the street improvement agreement and the encroachment permit must be completed and accepted by the City and the applicant must provide a one-year Maintenance Security in an amount of 25% of the Faithful Performance Bond. 25. Grading and Drainage Plan: Prior to issuance of any grading or building permits for the site, the applicant shall conduct hydrology studies based on a 10 year storm frequency, prepare an engineered Grading and Drainage Plan, and pay fees required to obtain necessary grading permits. The plans shall comply with the 1994 edition of the UBC including Chapters 18, 33, and Appendix Chapter 33. Should the development require hauling of soil or other demolition materials on or off site, the applicant shall request and obtain approval of a haul route from the City Engineer. No underground drainage lines are to be placed within 8-10 feet of the existing redwood trees. 26. Storm Drain Area Fee: Prior to issuance of any grading or building permits for the site, the applicant shall pay the required Storm Drain Area fee. The current fee is $2,500. 27. Storm Water Pollution Prevention Measures: Prior to issuance of any grading or building permits, the applicant shall comply with the National Pollution Discharge Elimination System (NPDES) permitting requirements and the California Storm Water Best Management Practices handbook prepared by the Storm Water Quality Task Force, Santa Clara Valley Water District and the City of Campbell Municipal Code regarding Storm Water Pollution Prevention. 28. Demolition: Prior to issuance of a Demolition permit to remove the existing building, the applicant shall obtain clearance from the Public Works Department. CITY OF CAMPBELL CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) INITIAL STUDY This initial study shall document the evaluation required by CEQA. It will include findings as to whether or not the proposed project would have a significant impact upon the environment. DESCRIPTION OF THE PROJECT The proposed project is for a two-story, 12,711 square foot office building to be located on the southeast comer of Central Avenue and Civic Center Drive, across from the Campbell branch of the Santa Clara Library, and the City Hall complex in Campbell's historic downtown. The building will have offices and an interior, gated, parking garage on the first floor, and offices on the second floor surrounding a corridor open to the garage below. Access to the parking garage will be via Central Avenue as well as from a private access easement along the north property line. The project will replace a 2,872 square foot, one story office building and parking lot. Two large redwood trees on the corner (34" dbh and 3 l"dbh) are to be integrated into the design. The parcel is designated on the City's General Plan for commercial use and on the Zoning Map as C-3-S (Central Business District). A. Project Address 54 N. Central Avenue (aka 44 N. Central Avenue) Campbell, CA 95008 Assessor Parcel Number 279-41 06 ! B. Application Number S 98-09 Ce Lead Agency Name and Address City of Campbell Community Development Department 70 N. First Street Campbell, CA 95008 Contact Person Barbara Ryan (408) 866-2193 Ee Project Sponsor's Name and Address BWI Downtown Partners Bruce Bowen, Jeff Wyatt 54 N. Central Avenue, Suite #2 Campbell, CA 95008 Fe General Plan Designation and Zoning General Plan: Commercial; Downtown Development Plan Area; Redevelopment Area Zoning: C-3 (Central Business District) G. Location of Project Southeast coruer of Civic Center Drive and Central Avenue. II. RESPONSES ~1 o ENVIRONMENTAL CHECKLIST The following explanations are keyed to the letter of the item contained in the Environmental Checklist. Fe Transportation At the traffic generation rate for an office of 11 trips per 1,000 square feet, the new office building, which is approximately 10,000 square feet larger than the existing one, will generate 110 more trips per day, or 52 visits per day. Civic Center Drive and Salmar Avenue, the major arterials in the area, have adequate capacity to accommodate this additional traffic. Presently the site provides parking for 37 vehicles. The size of the existing office would require the provision of 6 parking spaces under the requirements of the C-3-S Zoning District. Some of the present parking is by employees or customers of businesses on other, adjacent parcels. The proposed new parking arrangement will provide parking for 30 vehicles, 2 of which will be reserved as handicap parking and 20 of which will be inside the gated portion. This is the exact number of spaces required for the size of the proposed office. Thus, any persons from adjacent properties who have been using the present parking spaces will need to find parking elsewhere. P. MANDATORY FINDINGS OF SIGNIFICANCE 1. As discussed above, this project does not have the potential to significantly degrade the quality of the environment, including effects on animals or plants, or to eliminate historic or prehistoric sites. 2. As discussed above, both short and long-term environmental effects associated with this project will be less than significant. 3. When impacts associated with this project are considered alone or in combination with impacts of other projects, they are not significant. 4. The above discussions do not identify any substantial adverse impacts to people as a result of this project. V. DETERMINATION X__ The proposed project COULD NOT have any significant effect on the environment, and a NEGATIVE DECLARATION is hereby adopted. Although the project as proposed could have had a significant effect on the environment, there will not be any in this case because measures to mitigate those effects have been added to the project, and therefore, a MITIGATED NEGATIVE DECLARATION is hereby adopted. The proposed project MAY have a significant effect on the environment, and therefore an ENVIRONMENTAL IMPACT REPORT is required. For Steve Piasecki, ~ Date Community Development Director II. ENVIRONMENTAL CHECKLIST Yes Significant WILL THE PROPOSED PROJECT Unless No Infor- RESULT IN THE FOLLOWING No Not It Is Apparent Cum- marion ENVIRONMENTAL EFFECTS: Impact Significant Mitigated Mitigation' ulative Sources A. LAND USE AND PLANNING: 1. Result in conflicts with existing General x o o o o 2,3, Plan designation or zoning. 2. Result in conflicts with environmental plans or x o o o o 1,2 policies adopted by agencies with jurisdiction over the project. 3. Affect agricultural resources or operations x o o o o 3 (e.g., impacts to soils or farm lands). 4. Disrupt or divide the physical x o o o o 2,3 arrangement of an established community. B. POPULATION AND HOUSING: 1. Cummulatively exceed official regional or local x o o o o 2,3 population projections. 2. Induce substantial growth in an area either x o o o o 2,3 directly or indirectly (e.g., through projects in undeveloped areas or infrastructure expansion). 3. Displace existing housing, especially x o o o o 2,3 affordable housing. C. GEOPHYSICAL: 1. Result in, or expose people to, fault rupture, x o o o o 2,3 2. Result in, or expose people to ground x o o o o 2,3 shaking or liquifacfion. 3. Result in, or expose people to seismic x o o o o 2,3 seiche or tsunami. 4. Result in, or expose people to, landslides or x o o o o 2,3 or mudslides 5. Result in erosion, changes to topography, or x o o o o 2 unstable conditions from excavation or grading. 6. Result in, or expose people to subsidence x o o o o 3 of the land. Page 1 II. ENVIRONMENTAL CHECKLIST Yes Significant Significant WILL THE PROPOSED PROJECT Unless No Infor- RESULT IN THE FOLLOWING No Not It Is Apparent Cum- marion ENVIRONMENTAL EFFECTS: Impact Significant Mitigated Mitigation ulative Sources 7. Result in, or expose people to, expansive soils, x o o o o 3 8. Affect unique geologic or physical features, x o o o o 3 D. WATER: 1. Change absorption rates, drainage patterns, x o o o o 2,3 or the rate and amount of surface runoff. 2. Expose people or property to water related x o o o o 3 hazards such as flooding. 3. Discharge into surface waters or other alter- x o o o o 2,3 ation of surface water quality. 4. Change the amount of surface water in any x o o o o ,3 water body. 5. Change currents or the course or direction of x o o o o 2,3 water movements. 6. Change the quantity of ground water, either x o o o o 2,3 through direct additions or withdrawals, or through interception of an aquifer by cuts. 7. Alter direction or rate of flow of ground water, x o o o o 2,3 8. Adversely effect ground water quality, x o o o o 2,3 E. AIR QUALITY: 1. Violate any air quality standard or contribute x o o o o 1,2,3 to an existing or projected air quality violation. 2. Expose sensitive receptors to pollutants, x o o o o 2 3. Alter air movement, moisture, or temperature, x o o o o 2 or cause any change in climate. 4. Create objectionable odors, x o o o o 2 F. TRANSPORTATION AND CIRCULATION: 1. Increase vehicle trips or traffic congestion, o x o o o 2,3 2. Create safety hazards from design features x o o o o 2,3 (i.e., sharp curves or dangerous intersections) or from incompatible uses. Page 2 II. ENVIRONMENTAL CHECKLIST Yes Significant Significant WILL THE PROPOSED PROJECT Unless No Infor- RESULT IN THE FOLLOWING No Not It Is Apparent Cum- mation ENVIRONMENTAL EFFECTS: Impact Significant Mitigated Mitigation ulative Sources 3. Obstruct emergency access to nearby uses. x o o o o 2,3 4. Provide insufficient parking capacity, o x o o o 2,3 5. Create hazards for pedestrians/bicyclists, x o o o o 2 6. Conflict with adopted policies supporting x o o o o 2,3 alternative transportation. 7. Affect rail, waterborne, or air traffic impacts, x o o o o 2,3 G. BIOLOGICAL IMPACTS: 1. Disturb any endangered, threatened, or rare x o o o o 2,3 species or their habitats (e.g., plants, fish, insects, animals, and birds). 2. Affect or eliminate heritage trees, x o o o o 2,3 3. Affect locally designated natural communities x o o o o 2,3 (e.g., Shoreline). 4. Disturb wetland habitats (e.g., fresh and x o o o o 2,3 saltwater marshes, and riparian corridors). 5. Affect dispersal or migration corridors, x o o o o 2,3 H. ENERGY AND MINERAL RESOURCES: 1. Create conflicts with adopted energy x o o o o 1,2,3 conservation plans. 2. Use non-renewable resources in a wasteful and x o o o o 1,2 inefficient manner. I. HAZARDS: 1. Create a risk of accidental explosion or release x o o o o 2 of hazardous substances (e.g., oil, pesticides, chemicals, or radiation). 2. Interfere with an emergency response or x o o o o 2 evacuation plan. 3. Create any health hazard or potential x o o o o 2 health hazard. Page 3 II. ENVIRONMENTAL CHECKLIST Yes Significant Significant WILL THE PROPOSED PROJECT Unless No Infor- RESULT IN THE FOLLOWING No Not It Is Apparent Cum- marion ENVIRONMENTAL EFFECTS: Impact Significant Mitigated Mitigation ulative Sources 4. Expose people to existing sources of potential x o o o o 2,3 health hazards. 5. Increase fire hazards in areas with flammable x o o o o 2,3 brush, grass or trees. J. NOISE: 1. Increase existing noise levels, x o o o o 2,3 2. Expose people to severe noise levels, x o o o o 2,3 K. PUBLIC SERVICES: 1. Create a need for new or altered fire protection, x o o o o 2 2. Create a need for new or altered police services, x o o o o 2 3. Create a need for new or altered school services, x o o o o 2 4. Require increased maintenance services, x o o o o 2,3 5. Create a need for new governmental services, x o o o o 2,4 L. UTILITIES AND SERVICE SYSTEMS: 1. Create a need for new or altered power or x o o o o 2,3 natural gas systems. 2. Create a need for new communication systems, x o o o o 2,3 3. Require new or altered water treatment or x o o o o 2,3 distribution facilities. 4. Create a need for new or altered sewer service, x o o o o 2,3 5. Require new or altered storm water drainage, x o o o o 2,3 6. Require new or altered solid waste disposal, x o o o o 2,3 M. AESTHETICS: 1. Affect a scenic vista or scenic highway, x o o o o 2,3 2. Have a demonstrable negative aesthetic effect, x o o o o 2 3. Create light or glare, x o o o o 2 Page 4 II. ENVIRONMENTAL CHECKLIST Yes Significant Significant WILL THE PROPOSED PROJECT Unless No Infor- RESULT IN THE FOLLOWING No Not It Is Apparent Cum- mation ENVIRONMENTAL EFFECTS: Impact Significant Mitigated Mitigation ulative Sources N. CULTURAL RESOURCES: 1. Disturbance of paleontological resources, x o o o o 2,3 2. Disturbance of archaeological resources, x o o o o 2,3 3. Affect historical resources, x o o o o 2,3 4. Affect unique ethnic cultural values, x o o o o 2,3 5. Restrict existing religious or sacred uses within x o o o o 2,3 the potential impact area. O. RECREATION: 1. Increase in demand for parks or other x o o o o 2 recreational facilities. 2. Affect existing recreational opportunities, x o o o o 2 P. MANDATORY FINDINGS OF SIGNIFICANCE: 1. Does the project have the potential to degrade x o o o o the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self sustaining levels, threaten to elim- inate a plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal, or eliminate important examples of California history? 2. Does the project have the potential to achieve x o o o o short-term, to the disadvantage of long-term, environmental goals? 3. Does the project have impacts that are x o o o individually limited, but cumulatively considerable? 4. Does the project have environmental effects x o o o o that will cause substantial adverse effects on human beings, either directly or indirectly? Page 5 1. CEQA Guidelines - 2. Project Plans, Chris Spaulding, Architect 5/18/98 Grading, drainage and utility plan, Carroll Engineering, mark 3. Campbell General Plan, Zoning Ordinanceand Redevelopment Plan [] £3~£IH3~IV U VINltOdI'-IVD o '-I'I~{{dIhIVD ~tADd(I ~I~t£N~tD DIAID ~ '~tAV ~IV'fllN~ID .I.V DNKI'-IIFI{I ~DlfldO (I~$OdO~,Id V :::1 rINg A V .o *,ti, VIN'~I.O'~I,.!clV. D o "I'I~tI~Id.IA[vD. · ~A~(I :~I~[.lM~[S DIALS ~ '~IAV £v DNKI'Ilfl~[ ~19I~ld'O (I~l$OdO~Id V Lid,} To: ITEM City Clerk Plea qlect and receipt for t Jllowing monies. Planning File No.: Address: AMOUNT II. Maior: A. 1+ acres - General Plan Amendment Zone Change Planned Development Permit EIR Review 0-1 acre General Plan Amendment (552.4660) Zone Change Planned Development Permit EIR Review Minor: A. Subdivision Map (5+ Lots) Site and Architectural 10+ K S.F. Tentative Parcel Map (4<Lots) Site and Architectural 0-10 K. S.F. Variance (Non-residential) · Text Amendments Use Permit $4,425 4,425 4,425 4,425 3,225 3,225 3,225 3,225 3,225 2,150 2,150 1,550 1,550 1,550 1,550 III. Miscellaneous A. Variance (Residential) Modifications of Approval Modification PD Permit Reinstatements Revised Development Schedule Extensions of Time 960 960 960 960 960 960 Lot Line Adjustments Site and Architectural (Res?Each House) Signs (Each Sign) Fence Exception Promotional Events 500 120 120 120 120 Appeals Downtown Development Permit Historic Preservation Zone, Use Permit, HP Permit IV. Other Maps General Plan Text Zoning Ordinance Copies (per page) Refundable Deposit -- Account 2203 Fire Department Review -- Account 01.303.3322 Architectural Approval Project Plan Review Subdivision Park Impact Fee - Account 295.535.4920 For City Clerk Only 6.25 18.00 22.00 1.00 50.00 150.00 100+ 10 per lot/unit RECEIVED Amount Paid: Received by: ~ Exception for Major Projects: It is anticipated that the application processing costs of selected major projects will significantly exceed the above fees. In these cases, the Community Development Director may collect a deposit and charge actual time spent to process the application based upon current hourly rates. Note: Adopted by Resolution No. 8841 by City Council, City of Campbell, 6/20/95. .o¥'Ca4~,~ CITY OF CAMPBELL Community Development Department · Current Planning November 13, 1998 NOTICE OF PUBLIC HEARING Notice is hereby given that the Planning Commission of the City of Campbell has set the time of 7:30 p.m., or shortly thereafter, on Tuesday, November 24, 1998, in the City Hall Council Chambers, 70 North First Street, Campbell, California, for a Public Heating to consider the application of BWI Downtown Partners for a Site and Architectural Approval (S 98-09) to allow the construction of a 12,711 square foot, two-stow office building with an interior first floor parking garage on property located at 54 N. Central Avenue in the C-3-S (Central Business District) Zoning District. A Negative Declaration has been prepared for this project. Interested persons may appear and be heard at this hearing. Please be advised that if you challenge the nature of the above project in court, you may be limited to raising only those issues you or someone else raised at the Public Hearing described in this Notice, or in written correspondence delivered to the City of Campbell Planning Commission at, or prior to, the Public Heating. Questions may be addressed to the Community Development Department at (408) 866-2140. Decisions of the Planning Commission may be appealed to the City Council. Appeals must be submitted to the City Clerk in writing within 10 calendar days of an action by the Commission. In compliance with the Americans with Disabilities Act, listening assistive devices are available for all meetings held in the Council Chambers. If you require accommodation, please contact the Community Development Department at (408) 866-2140, at least one week in advance of the meeting. PLANNING COMMISSION CITY OF CAMPBELL STEVE PIASECKI SECRETARY PLEASE NOTE: When calling about this Notice, please refer to File No. S 98-09 Address: 54 N. Central Avenue 70 North First Street . Campbell, California 95008.1423 . TEL 408.866.2140 · ~^X 408.866.8381 · 'rOD 408.866.2790 .0¥' CITY OF CAMPBELL Community Development Department · Current Planning November 3, 1998 Re: S 98-09 - 54 N. Central Avenue Dear Applicant: Please be advised that the above-referenced application has been scheduled for the following meetings: Site and Architectural Review Committee Meeting Date: Tuesday, November 10, 1998 Time: 6:15 p.m. Location: Doetsch Conference Room, City Hall, 70 N. First Street, Campbell Planning Commission Meeting Date: Tuesday, November 24, 1998 Time: 7:30 p.m. Location: City Hall Council Chambers, 70 N. First Street, Campbell Should you have any questions or comments, please do not hesitate to contact me at (408) 866- 2140. Sincerely, ~~ ]$choetz Ry~ ~~'~ cci BWI Downtown Partners (Applicant) 54 N. Central Avenue Campbell, CA 95008 Jeff Wyatt (Property Owner) 14630 Horseshoe Drive Saratoga, CA 95070 Bruce Bowen (Property Owner) 54 N. Central Avenue Campbell, CA 95008 70 North First Street - Campbell, California 95OO8.1423 . TEL 408.866.2140 · F^X 408.866.8381 - TDD 4O8.866.2790 CITY OF CAMPBELL Community Development Department Notice of Intent to Adopt a Negative Declaration Notice is hereby given that the City of Campbell has prepared an initial study and intenlll Ja~adotat-.a Negative Declaration for the following projects: Project descriptions: An application of BWI Downtown Parmers for a Site and Architectural Approval (S98-09) to allow the construction of a 12,71 ! square foot, two-story office building with an interior first floor parting garage on property located at 54 N. Central Avenue, Campbell, CA 95008 in the C-3-S (Central Business District) Zoning District. An application of BWI Downtown Partners for a Site and Architectural Approval (S 98-17) to allow the construction of a new two-story building, approval of a parking adjustment to allow 8.5 feet wide "standard" parking stalls, and approval of a Conditional Use Permit (UP98-11) to allow a billiard establishment with an sale liquor license and late night hours of operation, Monday throughThursday until 12 a.m. and Friday and Saturday until 2 a.m., on property located at 368 E. Campbell Avenue, Campbell, CA 95008, in the C-3-S (Central Business District) Zoning District. Pursuant to the Public Resources Code Section 21092, a public review period of 20 days will begin November 4, 1998 and end November 24, 1998. A copy of the Initial Study is available in the Office of the Community Development Director located at Campbell City Hall, 70 North First Street, Campbell California. If you have any questions on Item 1, you may contact Barbara Ryan, Planner I at (408) 866-2193, and on Item 2, Aki Iriani, Planner I at (408) 866-2142. Please be advised that if you challenge the nature of the above project in court, you may be limited to raising only those issues you or someone else raised in written correspondence delivered to the City of Campbell during the Public Review Period or prior to or at the Planning Commission meeting or City Council Public Hearing. The Planning Commission will hold a public hearing on November 24, 1998 and interested parties may appear and be heard. Comments may be submitted in writing any time prior to the Planning Commission hearing date to the Planning Department, 70 N. First Street, Campbell, CA 95008. In compliance with the Americans with Disabilities Act, listening assistive devices are available for all meetings held in the hearing chambers. If you require accommodation, please contact the Community Development Department at (408) 366-2140, at least one week.in, advance of the meeting. NOV i~1 1998 Iq0¥ 0 2 1998 F ..... 7 (;:'1 ~ THROUGH. - Date: October 30, 1998 1~; :; ~;i:i:lr.,t OF IHt COUNTY CLERK $'~'~p,'-tEN ~/. LOVE, COUNTY CLERK 70 North First Street - Campbell, California 95008.1423 - TEL 408.866.2130 F^X 408.866.8381 - TDD 408.866.2790 CITY OF CAMPBELL Community Development Department July 2, 1998 BWI Downtown Partners 54 N. Central Avenue Campbell, CA 95008 Subject: Incompleteness of application for 54 N. Campbell Dear BWI Downtown Partners, Your application for a Site and Architectural Review Permit has been reviewed by the Development Review Commission and found to be incomplete. In order to be deemed complete, the following information is to be included: 1. Plot Plan Information, as listed on application Attachment A: A. Bearings and referenced recorded map. B. Proposed AND existing street improvements; showing correct location of all contiguous street improvements, including curb face, street lights, hydrants, traffic control boxes, etc. C. Proposed building: showing perimeter pedestrian entrances to the building, in addition to the vehicular access. D. Existing AND proposed driveways, ingress and egress. E. Existing and proposed trees in the fight-of-way; exact tree location and dimension of existing trees, especially the redwoods, is required. F. Location and uses of buildings on adjacent properties, including loading area for restaurant to south. 2. Preliminary grading and drainage plan, to include proposed connection, if any, to public system. Include drainage arrows. How will sidewalk grades compare with the adjacent property to the east? The Public Works Department has information on this to assist you. 3. Preliminary Title Report 4. Materials and samples board. 5. Colored elevation or rendering (15 sets of, reduced) 6. Photos of surrounding properties. Additionally, it has been determined that an arborist report, by a licensed ISA arbofist, is to be submitted. This report should include recommendations regarding the location and foundation of the proposed building, and methods to be undertaken before, during, and after construction, to protect the redwood trees on site. Sincerely, ~~~r [Schoet%yan~,'AICP~ 70 No~ [-I~r6ldet-toustym!~bl/~fork~ 95008.1423 . TEL 408.866.2130 ' V^X 408.866.8381 · TDD 408.866.2790 ZUN-22-1998 09:25 SAN ~OSE REDEU. AGENCY 408 2?? 3153 P.01/01 Barbara Ryan, Planner Planning Departmem 70 N First St. City of Campbell, CA VXA FA~ (408) $66-8381 22 June 1998 RE: Proposed office building at Central Avenue and Civic Center Drive At your request, I have reviewed the submitted plans for the project mentioned above. As an overall statement, it is my opinion that the design proposed is of good quality and is largely sympathetic to the neighborhood in its contextual references use of materials and massing. I am concerned about a couple o£items however, which is the purpose of this letter. 1. The use of vinyl windows is out of character. Tree-divided lite wood (painted or aluminum clad) or possibly a high-quality al,mlnum (Blomberg or similar) window and door should only be considered for use on this building to preserve its integrity. 2. The second floor light well to the parking area should be eliminated. Noise and exhaust fumes from vehicles will be a nuisance to office tenanta. Please verify, but I believe that code requirements will necessitate a 3 hour occupancy separation between the parking areas and the office u~e, which is expensive. A second floor level open air courtyard would be a preferable solution and would give light and ambiance to the offices. Please ask the architect to reconsider. Sincerely, Jeff Bowhby AIA, CSI Architectural Advisor Site and Architectural Review Committee TOTAL P.O1 °'~c H h9'-9 Development Application FileNo. 9 c~'"tS~ Planning Department 70 North First Street, Campbell, California 95008 (408) 866-2140 APN(S): Z7'~- ~/- ~ / PROPERTY ADDRESS: c~y' ,,~'. TYPE OF APPLICATION(S): DATE FILED: GENERAL PLAN: Q - _'3 TELEPHONE: PROPERTY OWNER: '~"e',,6a'r.~./o/,~-;7' / xz~a~:~ ,,~'~-,"~ ,,'- / / _ _ _ ~~~// ~ 9~ ZIP: CI~/STATE: ~~q~ ~'a ~/ Auach a separate sheet ~snng the name~and addresses of others you wish to receive copies of staff repo~s and agendas. AFFIDAVIT/SIGNATURE(S): The undersigned person(s), having an interest in the above-described property, hereby make this application in accordance with the provisions of the Campbell Municipal Code; and, hereby certify that the information given herein is true and correct to the best of my/our knowledge and belief. NOTE: Staff is required by State Law to notify applicants of the completeness of their applications within 30 days. Only those applications which are found complete will be placed on the Planning Commission Agenda. OFFICE USE ONLY PC Meeting: PC Action: CC Meeting: CC Action: Fee Paid: Receipt No: Completeness Letter Sent: 300 Foot Notices Mailed: Press Notice Published: Notice of Prep/Public Review: Notice of Determination: Rvsd. 02/24/98 ORCH Ag,0 FILE NO. Site & Architectural Review Permit Supplemental A/~iglication PURPOSE The Site and Architectural Review Area is intended to promote orderly development; to enhance the character, stability, and integrity of neighborhoods and zoning districts; to secure the general purpose of the City's Zoning Ordinance and General Plan, and to assure high quality architectural design and optimum site design through the architectural review process. PROCESS Pre-Application Review: It is recommended that the applicant make an appointment with a planner prior to submitting an application to discuss the preliminary design of the project. This will help the applicant determine if the proposal is consistent with existing review standards and ordinance requirements. Filine of Application: The completed application must be filed with the Planning Department along with the appropriate fee and all required data. The staff planner who is on duty will give the application and data a cursory review for completeness. The application cannot be accepted if the submittal is incomplete. After the project has been assigned to a plmmer, it will be reviewed in more detail for completeness. A letter stating if the application is complete or if additional information is required will be sent to the applicant within 30 days after receipt of the application. Environmental Review: Nearly all Site and Architectural Review requests are required to have an environmental assessment to determine if it will be necessary to prepare an Environmental Impact Report or a Negative Declaration. Traffic safety, congestion, and site circulation; Landscaping; and Building and site layout. Staff Review: The Planning Staff will evaluate the request by conducting an investigation of the site and considering the proposal in relation to adjoining structures. Staff will prepare a written report for the Planning Commission which will analyze the development proposal and provide staff recommendations. A copy of this report will be sent to the applicant. Site and Architectural Review Committee (SARC): Prior to the Planning Commission meeting your aplfilication will be reviewed by SARC. The Committee reviews the application for site layout and building design and then forwards a recommendation to the Planning Commission. Public Notice: At least 10 days prior to the public hearing, property owners within 300 feet of the subject property will be notified by mail of the hearing. In addition, a notice of the public hearing will be published in the Campbell Express. Planning Commission Meeting: The Planning Commission is required to review and approve detailed site, building, and landscape plans. Staff will present an oral report and recommendation for the proposed project. This presentation will be followed by testimony from the applicant and then by any interested persons who may wish to comment on the application. The Planning Commission may then close the public hearing and make a decision approving or conditionally approving the request, denying the request, or postponing the decision to a later date. Unless an appeal is filed, the Planning Commission's decision is final. Application Review: The Planning Staff, the Site and City Council: Site and Architectural Review applications are Architectural Review Committee, and the Planning not required to go before the City Council, unless the Planning Commission will consider the following in the review of Site Commission's decision is appealed within ten calendar days. and Architectural Review applications: Project Summary INFORMATION TO BE FILLED OUT BY APPLICANT Zoning: (o. 3 ' ~ Proposed Use: ~,~,~'~ Gross Floor Area: /e2t 7// No. of Stories: ~._ Lot Coverage: ~ ~ Surrounding Uses: North: East: Net Lot Size: /oc', ~ Landscape Coverage: /,2~.,,~ ~,~/. o ,,~,,r_~..r General Plan Designation: ~~.~ - ~ Existing Use: ~ Floor Area Ratio: ~.. ,~, ~' ~g.5' Pavement Coverage: Pavement Coverage: Sou : Rvsd. 02/24/98 Site & Architectural Review Supplemental Application Page 2 ENVIRONMENTAL INFORMATION Are the following items applicable to the project or its effects? Yes No t,/ 3. t,/ 4. /5. i./ 10. 12. Change in existing features of any lakes, hills, or substantial alteration of ground contours. Change in scenic views or vistas from existing residential areas or public lands or roads. Change in pattern, scale or character of the general area surrounding the project. Significant amounts of solid waste or litter. Change in dust, ash, smoke, fumes or odors in vicinity. Change in lake, stream or ground water quality or quantity, or alteration of existing drainage patterns. Substantial change in existing noise or vibration levels in the vicinity. Proposed development is on a filled site or on a slope of 10 percent or more. Use of and/or disposal of potentially hazardous materials, such as toxic substances, flammables or explosives. Substantial change in the demand for municipal services (police, fire, water, etc.). Substantial increase in the demand for fossil fuel consumption (electricity, oil, natural gas, etc.). Relationship to larger project or series of projects. Additional traffic generation or parking demand. Discuss below all of the above items checked yes. (Attach additional sheets as necessary) I4. Describe the project site as it exists, include information on topography, soil stability, plants and animals, and any cultural, historical or scenic aspects. Describe any existing structures on the site. 15. Describe surrounding properties, including information on plants and animals, and any cultural, historical or scenic aspects. Indicate the intensity of land use and the scale of development (height, frontage, setbacks, etc.) Rvsd. 02/24/98 Site & Architectural Review A ttachmen t A Page 3 PROJECT SUMMARY Assessor's Parcel Number: "27 ~ - 5// - ~, ( Lot Size: ~'Y'e ,O ~0 Gross sq. ft. (Property to center line of street) I ~: Loo Net sq. ft. Utilization: Sq. ft. Building Coverage (include cantilever portions) ~Z ~ ce/ Landscape Coverage 23 / 0 Paving Coverage t '7~, tO ~, Percent % Floor Area Ratio: Total building sq. ft. divided by net lot size Adjacent Land Uses North South East West Use oFF ¢ Zoning Parking Standard TOTAL Compact ~ 9_. Handicap 2-- Restaurant and Assembly Uses Seating Count Residential Proiects Unit Type Living Area Garage Area Total Area No. of Bedrooms Number of Units A B C Rvsd. 02/24/98 Attachment D Contribution Disclosure Eom! Page 2 TO BE FILLED OUT BY APPLICANT I. [ ] IF CONTRIBUTIONS TOTALING $250 HAVE NOT BEEN MADE, CHECK BELOW IN SECTION III. II. TO BE COMPLETED ONLY IF CONTRIBUTIONS TOTALING $250 OR MORE NAME: ADDRESS: AND SIGN BEEN MADE. TELEPHONE NO: LIST COMMISSION MEMBER(S) TO WHOM CONTRIBUTIONS TOTALING $250 OR MORE, AND THE DAd NAME: CONTRIBUTOR: DATE (S): AMOUNT (S): ZIP: CAMPAIGN OF THOSE CONTRIBUTIONS. (if other than yourself) NAME: CONTRIBUTOR: DATE (S): AMOUNT (S): (if other than yourself) NAME: CONTRIBUTOR: (if other than yourself) (S): III. SIGNATURE ent DATE: Rvsd. 02/24/98