Loading...
Pre-App - 1999Tim Haley From: Sent: To: Cc: Subject: Tim Haley Friday, July 30, 1999 9:48 AM Sharon Fierro David Thompson RE: Bob Dodge's Property on the corner of Curtner and McGlincey use. Sharon: Update!! I left a message for Bob Dodge 7~30 to submit a request for the use of the property as a temporary storage yard. This would define the terms of the use and the nature of the Tim ..... Original Message ..... From: Sharon Fierro Sent: Monday, July 19, 1999 11:30 AM To: Tim Haley Subject: RE: Bob Dodge's Property on the corner of Cur`nar and McGlincey ..... Original Message ..... From: Tim Haley Sent: Monday, July 19, 1999 11:27 AM To: Sharon Fierro Subject:RE: Bob Dodge's Property on the corner of Cur`nar and McGlincey Sharon: I spoke to Bob Dodge regarding his property. He indicated that he had rented it to West Valley Construction again to store equipment similar to the previous approval which was granted for equipment storage.They are working on the installation of storm drainage for Campbell Technology Park. In fact he does not even have a lease or rental agreement. If we have a concern, he indicated that he'll ask for permission and clarify their use. Do you want me to follow up with more information? [$NARONF] Yes, we 9ranted West Volley Construction permission because it was for o limited term and they hod construction on their site ,hot impacted their normal operations. I'm unaware of any extraordinary circumstances now and I'm concerned tho, they ore jus, expanding ,heir opera,lanai capacity, some,hing we'd rather ,hey didn', do. Tim ..... Original Message ..... From: Sharon Fierro Sent: Monday, July 19, 1999 9:18 AM To: Tim Haley Subject: Bob Dodge's Property on the corner of Curtner and McGlincey Tim, will you please get in touch with Bob end find out who is storing construction equipment on the property. There is o sign advertising that the site may be leased or purchased for construction storage end the number given is 358-1155. Let me know what is up. CITY OF CAMPBELL Community Development Department February 12, 1998 Robert Dodge 170 Twin Oaks Drive Los Gatos, CA 95032 Subject: Preapplication for phased development of 215 Curtner Avenue (APN 413-12-032) Dear Mr. Dodge, Thank you for your patience regarding the above request. I have now received answers from Public Works regarding both the driveway issues and the fight-of-way configurations on both frontages. The following are comments which would require reconfiguration of your proposed plans: Driveway Traffic Engineer: 1. The right-mm-only driveway onto Curtner would be acceptable. 2. The two-way driveway on McGlincey should be moved northward as far as possible. This would not only take it away from the intersection, but would result in a better on-site circulation plan (no dead-end parking area where one needs to back out if no parking spaces are discovered). See enclosed marked plan. 3. All existing driveways should be removed when these driveways are constructed. 4. No trees should be located near the intersection; planting in this area to be kept below 30 inches. Right of Way Improvements Land Development Engineer: 5. McGlincey improvements to include a 10 foot commercial sidewalk, with street trees 40 feet on center, street light, and handicap ramp at comer 6. Curtner improvements to include a 7 foot wide commercial sidewalk. On-site Landscaping & Parking Planner: 7. Where storage is proposed along a street, a ten-foot landscape strip shall be provided. Said storage area shall be additionally screened by a six-foot sight-obscuring fence or wall at the rear of the landscaped area (assumes no storage higher than 6 feet in height. Fence to be taller if taller items to be stored.) 70 North First Street . Campbell, California 95008.1423 · TEL 408.866.2140 . F^X 408.866.8381 · 'rDD 408.866.2790 Page 2 of 3 - 215 Curtner - PA 97-67 8. If the development is not a storage area, a continuous landscape area shall be provided which has a minimum 5 foot depth, exclusive of any vehicle overhang. (Thus need 7 foot depth landscape area). 9. A Landscape Plan will be required, to include trees placed in a zigzag pattern with the street trees, and a line of shrubbery in front of the parking area. 10. The building face along Curmer should be set back 20 feet from the curbline along Curtner (an additional 5 feet), to provide a frontage which will be more in line with the existing and proposed building on the adjacent parcel, and to provide more street frontage landscaping. 11. The building along McGlincey should not extend further streetward than the adjacent building (appears to line up on plans). 12. The new 200 amp power pole, if approved, should be located next to the building to the north and further back on the lot. New utilities are normally required to be underground, but in the case of the storage use, there is no building. The need for power outlets as high as 220 rather than 110 should be indicated. The higher number would indicate and permit a non-storage use. 13. No comment can be made on the parking ratio or the architecture without further information on the uses and appearance. The following are comments by the Fire Department: 13. Fireflow is 2250 GPM at 20 psi residual pressure. The required fireflow is not available from area mains and fire hydrants, which are spaced at the required spacing. 14. Buildings requiring a fireflow in excess of 2,000 GPM and/or in excess of 2 stories (35 feet) shall be equipped throughout with an approved automatic fire sprinkler system. The system shall meet National Fire Protection Association Standard #13, 1994 Edition. 15. Required fireflow may be reduced up to 50% in buildings equipped with automatic fire sprinkler systems, but can be no less than 1500 GPM at 20 psi. This flow shall be taken from 2 hydrants, on or near the site, as long as they are spaced at a maximum of 250 feet. 16. Provide public hydrant(s) at location(s) to be determined jointly by the Fire Department and the San Jose Water Company. Maximum spacing 250 feet, minimum fireflow 1500 GPM at 20 psi. If the hydrants are existing, they shall be indicated on civil engineering drawings with the building permit submittal. 17. Access roadway shall be provided which has a paved all weather surface with an unobstructed 20 foot width, vertical clearance of 13 feet 6 inches, minimum circulating turning radius of 36 feet outside, 23 feet inside, and a maximum slope of 15%. Installation shall be per FD Standard Detail and Specs. A-1. 18. When open, gates shall not obstruct any portion of the required access road or driveway width. If provided, all locks shall be fire department approved. Installation shall be per FD Standard Details and Specs. G-1. 19. Provide an approved Fire Department key box and appropriate building keys. Installations shall be per FD Standard Detail and Spec. K-1. Page 3 of 3 - 215 Curtner - PA 97-67 Development Land Development Engineer comments: 20. Prior to issuance of any building permits for the STAGE I. Storage Yard, the applicant shall refurbish, remodel, and reconstruct the on-site drainage system, as necessary, to demonstrate that it is functioning normally in accordance with City Standards. 21. Prior to issuance of grading, drainage, or building permits for Stage II, the applicant shall conduct hydrology studies, prepare an ENGINEERED grading and drainage plan, and pay fees required to obtain a grading permit. The plans shall comply with the 1994 edition of the UBC including Chapters 18, 33, and Appendix Chapter 33. 22. Prior to occupancy, all public street improvements shall be completed and accepted by the City, with the applicant providing a one-year maintenance security for 25% of the Faithful Performance Bond. 23. All new on-site utilities shall be installed underground. 24. All existing and new meters for water, sewer cleanouts, and the like shall be on private property, behind the public right-of-way. 25. Engineered improvement plans and encroachment permits required for all right-of-way work. Building Department comments: 25. Property line walls one hour fire-resistive for a type V-N (spr) construction. 26. Maximum allowable square footage without sprinklers is 8,000 square feet (16,000 with sphnklers). Should you have any questions, you may address them directly to the particular commenter. Sincerely, Planner I cc. Public Works DEVELOPMENT REVIEW COMMENT SHEET Distribution: 10/27,1997 Comments: 11/3/97 ROUTE TO: X Architectural or Landscape Advisor X Fire Department X Police Department X Redevelopment Agency X Engineering X Traffic Engineering Corporation Yard X Building Division PROJECT DESCRIPTION: Pre-application for two stages of development. Stage 1: a storage yard, but with public right-of-way improvements that would be those required for full development of the site (owner's request); and 2) site plan for full development of the site. INFORMATION: File No. PA 97-67 APN: 413-12-032 Applicant: Robert Dodge Project Address: 215 Curmer Avenue (northwest comer of McGlincey) Zoning: M- 1-S General Plan: Industrial PROJECT PLANNER: Barbara Ryan DEPARTMENTAL RECOMMENDATION: If it can be determined that this project will require minimal or no comments by your department/agency, please return this comment sheet with your initials to the Project Planner as soon as possible. Status Initial No Comment Additional information/revisions(see attached) Draft conditions of approval attached