260 Adler Ave.1. Date-2-
2. Site Add
3. For File
4. Project
5. Applica
6. By: ~
PRELIMINARX/
Prelit
Right
Publi~
~ Easer
Vacat
Street
CITY OF CAMPBELL
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
PROJECT EVALUATION
finary Title Report:
-of-Way for Public Street Purposes:
Service Easement:
lems:
ion of Public Streets/Easements'
Improvements:
~rbs and Gutters
Si :lewalks
;iveway
.ndscape
Page 1 of 4
E. T~aff'lc Control
H. Se
'['4 I. S~
J. O
Traff
tvement
sphalt Concrete Overlay
,,al Coat
reet Lights
~er
c Mitigation:
~ Utilit:
g.-.[ Utilir
Mainl
Coon
Gradi
Drain
Storrr
"-'C~ Natio
Installation Plan:
enance Security:
[ination with Capital Improvement/Other Projects:
ng and Drainage Plan:
ge System:
· Drain Area Fee:
hal Pollution Discharge Elimination System:
Page 2 of 4
Sant~
Tent:
Parc~
Tenu
Final
Mom
Cond
Dem(
Reapl
Lot
Certil
Vacat
Reiml
Plan
Legal
· Clara Valley Water District:
ttive Parcel Map:
..I Map:
~tive Map:
Map:
tments:
itions, Covenants, and Restrictions:
dition:
~ortionment of Assessments:
ine Adjustment:
icate of Compliance:
ion of Excess Right-of-Way:
~ursements:
Anes:
Lot:
Page 3 of 4
Site F
J:\FORMS\PRELPI~ OJ
Rev. 8/4/98
Page 4 of 4
Distribution: F
Comments: F
ROUTE TO:
Architec
X Fire Del:
Police D
Redeveh
X Enginee~
Corpora~
X Buildin
PROJECT D!
Pre-application
DEVELOPMENT REVIEW
~bruary 8, 1999
:bruary 16, 1999
COMMENT SHEET
Pre-application
:ural
artment
~partment
~pment Agency
lng (Land Development and Traffic Engineer)
ion Yard
Division
gCRIPTION
for site and architectural approval for additional unit in four unit apartment.
INFORMATIC N:
File No: PA 99-04
APN: 305-38-41
Applicant: Richard Hermle ~//~/£/4:
Project Addres: 260 Adler Avenue
Zoning: R-2-S
General Plan: Medium Density Residential
PROJECT PL) qNER: Tim J. Haley
DEPARTMEN FAL RECOMMENDATION:
No Comment
Draft conditions of approval attached or
comments
Status
Initial
Owner
Site
Mail
Use
Zoning
Census
Bedrm:
:Whizin Gr~
:260 Adler
:260 Adler
:03 Res,3-,
:R3S Res M~
:Tract:506!
Bth:
-:
[pel
Ave Campbell 95008
Ave Campbell Ca 95008
Family Units
lti-Unit
.03 Block:2
YB:1967 Gar:
MetroScan / Santa Clara
Pool:No
Parcel :305 38 041
Xfered :06/28/96
Price :
MapGrid :853 D7
Owner Phone :
Tenant Phone :
BldgSF:3,845 Ac:.23
T~e Information Provided Is Deemed Reliable, But Is Not Guaranteed.
~0
~$o
_1
/._7
PCL.
/.L.~ ~1 /5 I /~
I i ~
I i
6~ I G~
~ HOLLIS
I
33 I 3~
I
64. I 64-
31
L/
.oF.
March I, 1~99
Mr. Richar4 Hermle
Pacific Buil~ling Designs
102 Dillon ,~venue
Campbell, CA 95008
CITY OF CAMPBELL
Community Development Department · Current Planning
Re: (PA
260
Dear Mr. Hi
Thank you t
approval of
)9-04)
kdler Avenue
:rmle:
or your submittal of a preliminary application for a site and architectural
a new apartment unit on the referenced property.
The subject 'property is zoned R-2-S (Multiple Family Residential) and is shown as a
(Medium E ensity Residential) land use on the city s General Plan. Approval of a project
will require approval of a Site and Architectural application. This action requires Planning
Commissio~ approval and is considered at a public hearing.
A review o~ the lot size indicates a lot area of 10,080 square feet. Under the current zoning,
a maximumi of 4 dwelling units is permitted. This is based upon a calculation of 8,000
feet{or the first four units and 2,200 square feet per unit thereafter. The minimum lot
square
size for 5 urlits is 10,200 square feet.
The expansion of the existing apartments and the conversion of the covered parking to living
area may be possible assuming open space and parking needs are met and the net result is a
reasonable ot layout and use.
Parking: A 'our unit apartment project would require the provision of 4 covered parking
spaces and ~ uncovered.
Sprinklers: ~I'he expansion of the floor area on site may have an impacted on a sprinkler
system reqt~irement as noted in the attached Fire Department conditions.
Open Spac4: A minimum of 225 square feet of open space needs to be provided for each
unit. I
70 North First Street · Campbell, California 95008. 1423 · TEL 408.866.2140 · FaX 408.866.8381 · TDD 408.866.2790
PA 99-04 2{,0 Adler Avenue March 1, 1999
page 2
If the owner
· Fire Dep~
Please do not
information.
Sincerely,
Tim J. Ha'lcd,
Associate Plapner
is able to acquire additional property and achieve the minimum lot size of
10,200 squa~'e foot lot, a park impact fee of $7,035 is required for any new residential units
is required.
Conditions and comments outlined in the memorandum dated February 23,1999 from
the Public Works Department
trtment and Building Division Comments
hesitate to contact me at 866-2144, if you have any questions regarding this
enclosures: Public Works and Fire Department Memorandum
CC:
Sharm Fierro, Senior Planner
Harok Housley, Land Development Engineer
FIRE DEPARTMENT
SANTA CLARA COUNTY
14700 Winchester Blvd.. Los Gatos, CA 95032-1818
(408) 378-4010 (phone) · (408) 378-9342 (fax)
CONTROL NUMBER
BLDG PERMIT NUMBER
P~., REVi~, NUMBER 9 9' 0 3 5 0
.LE.O..E. PA 99-04
DEVELOPMENT REVIEW COMMENTS
CODE/SEC. SHEET NO.REQUIREMENT
ReView of proposed 964 square foot addition to an existing multi-unit
apartment building.
1 Review of this Developmental proposal is limited to acceptability of site access
andi water supply as they pertain to fire department operations, and shall not be
con~trued as a substitute for formal plan review to determine compliance with
adopted model codes. Prior to performing any work the applicant shall apply to
the Building Department for applicable construction permits.
UFC 2 For ithe purpose of assessing fire flow for the project, the applicant shall
1003.2.2
as resubmit a site plan depicting total current area to include livable floor area as
arnmaea well as garage space. It would appear that by scaling the plan provided, the total
bY17.04.040CMC building area may exceed 7,000 square feet. As such the required fire flow will
exceed 2,000 gallons per minute which will cause the installation of an
approved fire sprinkler system throughout the entire structure.
DISTRICT PLANS SPECS NEW RMDI~ AS OCCUPANCY CONST. TYPE PERMITTEE DATE PAGE
CBL [] [] [] [] I[] RICHARD HERMLE 2116199 I op~l
SECJFLOOR I AREA LOAD DESCRIPTION BY
Commercial Development Hokanson, Wayne
NAME OF PROJECT LOCATION
APARTMENT 260 Adler Av
,4 California Fire Protection District serving Santa Clara Count:k' and the communities of
Campbell, Cupertino. Los Altos. Los Altos Hills. Los Gatos. Monte Sereno. Morgan Hill, and Saratoga
MEMORANDUM
CITY OF CAMPBELL PUBLIC WORKS DEPARTMENT
TO: Tim Haley, Project Planner
FROM:
M
H~
PUBLIC WOR2
OF APPROVAl
Site Address: 260 Adler Avenue
For File No(s): PA 99-04
Project Description: Add unit to existing 4 unit building
Applicant: Richard Hermle (Architect)
COMMENTS: the area has been fully developed to the then current standards.
improvements arb in good condition.
DATE: 2/23/99
ichelle Quinney, City Engineer ~~.,t~
trold Housley, Land Development Engineer ~
.~S DEPARTMENT COMMENTS AND PRELIMINARY CONDITIONS
Public street
Water Metgr(s) and Sewer Cleanout(s): Existing and proposed Water Meter(s) and
Sewer Cleanout(s) shall be installed on private property behind the public right-of-way
line.
Street Tree1 Install one street tree and irrigation if it does not create a traffic hazard as
determined by the City Engineer.
H: \WORD\LANDDEV\260ADLER(JD)
Page 1 of
MEMORANE~UM CITY OF CAMPBELL PUBLIC WORKS DEPARTMENT
TO: Tm Haley, Project Planner DATE: 2/23/99
FROM: M ichelle Quinney, City Engineer '~/~~--
Hl~rold Housley, Land Development Engineer
woRKs DEPARTMENT COMMENTS AND PRELIMINARY CONDITIONS
PUBLIC
OF APPROVAL
Site Address:/ 260 Adler Avenue
For File No(s): i PA 99-04
Project Description: Add unit to existing 4 unit building
Applicant: Richard Hermle (Architect)
COMMENTS: ~?he area has been fully developed to the then current standards. Public street
improvements are~ in good condition.
Water Meter(s) and Sewer Cleanout(s): Existing and proposed Water Meter(s) and
Sewer Clea~aout(s) shall be installed on private property behind the public right-of-way
line. 1
Street Tree~ Install one street tree and irrigation if it does not create a traffic hazard as
determined ~y the City Engineer.
H:\WORD\LANDDEV\260ADLER(JD)
Page 1 of
DEVELOPMENT REVIEW COMMENT SHEET
Pre-application
Distribution: February 8, 1999
Comments: F~bruary 16, 1999
ROUTE TO: [
Architec~ ural
X
Fire Dep
Police D,
Redevelc
X Engineer
Corporat
X Building
PROJECT DE~
krtment
~partment
pment Agency
ing (Land Development and Traffic Engineer) ,~'~
on Yard
Division
Pm-application
INFORMATIO q:
File No:
APN:
Applicant:
Project Address
Zoning:
General Plan:
PROJECT PLANNER:
DEPARTMENTAL
Status
;CRIPTION
for site and architectural approval for additional unit in four unit apartment.
PA 99-04
305-38-41
Richard Hermle (/~2Z,c ~)
260 Adler Avenue
R-2-S
Medium Density Residential
Tim J. Haley
RECOMMENDATION:
Initial
No Comment
Draft conditions of approval attached or
comments