PD - Largo Concrete Bldg 1998Planning l)ivisien
NOTE TO FILE
Date:
File #:
Address:
From:
Re:
December 5, 2001
PD 98-06
891 W. Hamilton Avenue
Stephanie Willsey
Landscape Bond
A landscape bond was required to ensure landscaping was installed at 891 W. Hamilton
Avenue. A site inspection revealed that all the required landscaping on the approved
landscaping plan was installed and healthy. Therefore the bond is being released back to
the property owner, Hal Long.
VOID AFTER 90 DAYS
! 1-35
WARRANT NO.
CITY OF CAMPBELL
70 NORTH FIRST STREET
CAMPBELL, CALIFORNIA 95008
PAY
1210
AMOUNT
BANK OF AMERICA
CAMPBELL OFFICE
125 E. CAMPBELL AVE.
CAMPBELL, CA. g5008
9%459
DATE
SIGNATURE
,' 0 q ;, t, 5 q,'
To: Finance Director
Check Payable To:
Address - Line 1:
Line 2:
City:
Description:
Account Number:
Account Number:
Account Number:
(Finance Dept only)
Total Payable:
Purpose:
Refundable Deposit Check Request
Refund Deposit
~01
101.540.7448
Interest Earned
Amount:
Amount:
Amount:
(Exact Amount)
(Finance Dept only)
Voucher #:
Receipt #:
Requested by:
Approved by:
Finance Dept Only:
Verified by:
Permit #: ~
Title: .(:~ ~_ f'~.'~ t"~ Date: ~
Title:~_____D~m. ~J. ~ C Date:
Title: Accounting Clerk II Date:
Approved by: Title: Accountant Date:
5peciel ]:nstructions For Hendling Check
Mail As Is:
Mail in Attached Envelope:
Interim Check:
Return To:
(Name)
Needed By:
(Dep~hr~nt)
Other:
f/n: Forms/excel/chkreq Revised 05,'00
To:
ITEM
City Clerk
Please collect and ipt
for the following monies.
Major:
A. 1 + acres - General Plan Amendment
Zone Change
Planned l~velopment Permit
EIR Review
$4,425
4,425
4,425
4,425
0-1 acre General Plan Amendment (552.4660)
Zone Change
Planned Development Permit
EIR Review
3,225
3,225
3,225
3,225
II.
Minor:
A. Subdivision Map (5+ Lots)
Site and Architectural 10+ K S.F.
Tentative Parcel Map (4<Lots)
3,225
2,150
2,150
Site and Architectural 0-10 K. S.F.
Variance (Non-residential)
Text Amendments
Use Permit
1,550
1,550
1,550
1,550
III. Miscellaneous
A. Variance (Residential)
Modifications of Approval
Modification PD Permit
Reinstatements
Revised Development Schedule
Extensions of Time
960
960
960
960
960
960
Lot Line Adjustments
Site and Architectural (Res/Each House)
Signs (Each Sign)
Fence Exception
Promotional Events
120
500
120
120
120
Appeals
Downtown Development Permit
Historic Preservation Zone, Use Permit, HP Permit
IV. Other
Maps
General Plan Text
Zoning Ordinance
Copies (per page)
~ Refundable Deposit -- Account 2203
Fire Department Review -- Account 01.303.3322
Architectural Approval
Project Plan Review
Subdivision
Park Impact Fee - Account 295.535.4920
Tree Replacement In-Lieu Fees - Account 101.701.4971
For City Clerk Only
Receipt No:
Amount Paid: "~.~- /o 2.5- Oo
Received by: [-]~
Date: -~x~ .
6.25
18.00
22.00
1.00
50.00
150.00
100+ I0 per lot/unit
Exception for Major Projects: It is anticipated that the application processing costs of selected major
projects will significantly exceed the above fees. In these cases, the Community Development Director may
collect a deposit and charge actual time spent to process the application based upon current hourly rates.
Note: Adopted by Resolution No. 8841 by City Council, City of Campbell, 6/20/95.
. LARGO
Concrete Inc.
3uly 16, 1999
Mr. Steve Piasecki
Planing Department, City of Campbell
70 N. First Street
Campbell, CA 95008-1423
PH 408/866-2140 FAX 408/866-8381
Re: 891 W. Hamilton Ave.
Subj: Request for Permanent Power
Mr. Piasecki,
Please grant our request to have permanent power at 891 W. Hamilton
Avenue.
We are committed to 100% completion of the project'no later than
July 30,1999.
I expect to be completing the landscaping, cabinet and casework,
lobby area finishes, and parking lot paving no later than July 26th.
Please let me know as soon as possible if Largo will be required to
provide anything to obtain the release on power so that we can
comply. My direct telephone number is 408/718-4515.
Sincerely,
Rodger Ward,
Project Manager
Headquarters: 310 W. Hamilton Ave., Suite 203 · Campbell, CA 95008 · (408) 378-4404 · Fax 378-4514
Southern CA: 1801 Edinger, Suite 200 · Santa Ana, CA 92705 * (714) 547-5600 · Fax 547-5120
License #592909
CITY OF CAMPBELL
Community Development Department · Current Planning
May 11, 1999
Mr. Harold Long
President
Largo Concrete, Inc.
310 W. Hamilton Avenue
Suite 203
Campbell, CA 95008
Letter dated May 4, 1999 from Largo Concrete requesting color changes to the building
currently being constructed at 891 W. Hamilton Avenue
Dear Mr. Long:
The Community Development Department has reviewed your letter and the alternative color and
materials sheet you had submitted on May 4, 1999 for the City's review. Upon review by Planning Staff
and the City's Architectural Advisor, the proposed colors for the building are considered acceptable for
the building and do not change the overall character of the project as previously-approved. Therefore,
the Community Development Depaxtnlent has approved a minor modification to allow the proposed
color changes to the building as noted in your letter of May 4* and as shown on the color and materials
sheet that was provided.
Should you have any questions regarding the above-referenced conditions, please feel free to contact me
at the Community Development Department at (408) 866-2142.
Sincerely,
Aki R. Irani
Planner I
enclosure
cc~
Frank Mills, Interim Building Official
File
70 North First Street - Campbell, California 95008.1423 · TEL 408.866.2140 · FaX 408.866.8381 · TDD 408.866.2790
VIOKY TSA!
I
INTERIOR
DESIGN
dc-Fo
~','~.~ i~ 1999
CITY OF C^MPBELL
PLANNING DEPT,
3011 RiDGEGATE DRIVE, SAN JOSE, CA 95133 (408)272-5322. FAX:(408)272-5522
}_LARGO
Concrete Inc.
May 4, 1999
Aki Irani
City of Campbell Planning Dept.
70 North First Street
Campbell, CA 95008
408/866-2140 Fax: 408/866-8381
Re: 891 W. Hamilton Ave.
Dear Aki,
Following are the color changes to the building that I have submitted for your approval:
ROOFING
They originally approved roofing tile was a seafoam green and had the number 4002 on
the back. I do not know who the manufacturer of that tile was. In its place we have
submitted Monier number 5085. This tile is a gray-green color. We feel that this is a
more conservative color and will lead to a better color combination.
STUCCO
The previously approved color for stucco was Pratt and Lambert Foam number 2263. As
a substitution we are a proposing a slightly darker color which is a Benjamin Moore paint
number HC-80.
FACIA
Depending on how the building looks when it is finished we may choose to add a color to
the facia. If we do it will be Benjamin Moore's number 1560.
WINDOW FRAMES
This item was previously approved as Arcadia's color cherokee blue UC52128. We have
proposed that this be replaced with Arcadia's anodized medium bronze AB-5.
Headquarters: 310 W. Homilton Ave., Suite 203 · Campbell, CA 95008 · (408) 378-4404 ° Fax 378-4514
Southern CA: 1801 Edinger, Suite 200 · Santa Ana, CA 92705 · (714) 547-5600 · Fax 547-5120
License #592909
OUR GLASS
The original approval was for a blue-green glass.
with a bronze tinted glass.
We have proposed that this be replaced
If you have any questions about any of these submittals please let me know.
Sincerely,
Largo Concrete, Inc.
Harold D. Long
President
HDL/drd
F:\VO L 1 \DYANE\HAL~LETTERXL279~aki. doc
LARGO
Concrete Inc.
February 23, 1999
Aki Irani
City of Campbell Planning Dept.
70 North First Street
Campbell, CA 95008
408/866-2140 Fax: 408/866-8381
Re: 891 W. Hamilton Ave.
Dear Aki,
Enclosed are the signed documents which eliminate the four easements that you were
asking about. I believe that the process on this stopped because Chuck in your Public
Works Department wanted to review them. If you can confirm for me that these
documents are satisfactory to the City of Campbell and therefore as in form then I will
have them recorded with the County Recorder's Office.
Sincerely,
Largo Concrete, Inc.
DICTATED BUT NOT READ
Harold D. Long
President
HDL/emf
Enclosure
Headquarters: 310 W. Hamilton Ave., Suite 203 * Campbell, CA 95008 * (408) 378-4404 · Fax 378-4514
Southern CA: 1801 Edinger, Suite 200 * Santa Ana, CA 92705 * (714) 547-5600 · Fax 547-5120
License #592909
LARGO
Concrete Inc.
December 18, 1998
Ms. Aki Irani
Planner I
Community Development Department
City of Campbell
70 North First Street
Campbell, CA 95008-1423
408/866-2140 FAX: 408/866-8381
Re: 891 W. Hamilton Avenue
NNIN b£t L
Dear Ms. Irani,
I am sorry that you feel that I am pestering you and pressuring you so I will make this
letter as breif as possible. Last week you and I stood at the counter and went over the
requirements contained in the City Council Resolution for work to be done "prior to the
issuance of building permits for the project." The items we discussed and the comments
were as follows as numbered in the resolution.
3. LANDSCAPING
I pointed out that I had given Sharon landscaping plans on 11/25/98 which should
have satisfied this requirement.
5. APPROVAL BY ADJACENT PROPERTY OWNER
You agreed that items A, B and C were satisfied by the letter that I had obtained
from the adjacent property owners and that you could probably get Steve to waive
item D until I had more time to obtain that document.
7. PARy~rNG AND DRIVEWAY
You agreed that both items A and B had been satisfied by the revised plans.
15. TRASH DISPOSAL/RECYCLING
I agreed that this information would be added to the plans and it was included in
the set that was given to you last week.
16. ON-SITE LIGHTING
A sight lighting plan was included in the set of plans that I gave you.
K:\CHARLOTTXHA L\IRANI5.DOC
Heodcluo#er$: 310 W. Hamilton Ave., Suite 203 · Campbell, CA 95008 · (408) 378-4404 · Fax 378-4514
Sou~hern CA: 1801 Edinger, Suite 200 · Santa Ana, CA 92705 · (714) 547-5600 · Fax 547-5120
License #592909
My point is that a quick review of the plans will satisfy your requirements for item #15
and #16 and should alow you to release the building department to issue us a permit.
Frank Mills stated that he would allow us to start the foundation construction as soon as
he receives clearance from the Fire Department, planning department and Public Works.
The Fire Department has given their release and Public Works is within a day or two of
being satisfied.
Sincerely,
Largo Concrete, Inc.
-DICTATED NOT READ-
Harold D. Long
President
HDL/cmo
K:\CHARLOTTXHALXIRANI5 DOC
· 0 0 ? 66& '
ORCH A~'~ ·
City of Campbell
70 N. First Street
Campbell, CA 95008
(408) 866-2140
NOTICE OF DETERMINA:T .4ON
Sa?ta Clara County '2
191~N. First Street -
San Jose, CA 95113
(3 copies & cover sheet filled out by planner)
Office of Planning & Research
1400 Tenth Street, Room 121
Sacramento, CA 95814
Subject: Filing of Notice of Determination in compliance with Section 21108 or 21152 of the Pubhc Resources Code.
Project Title: ~Y~) q6~O~
State Clearinghouse Number (If submitted to Clearinghouse)
Lead Agency Contact Person /4~LI I~--,~/ t V~~.~
Phone (408) 866-2140
ProjectLocation(includeCounty) ~l Vl/. 4qT Mtt Zo6J Au . 7:gedT,
This is to advise that the ~f Ti/ ~o L~F_~ C~ has approved the above-described project on
(~Lead Agency O Responsible Agency
I i -2 -~ ~ and has made the following determinations regarding the above described project: Date
1. The project ( 0 will (~will not) have a signification effect on the environment.
2. C~An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA.
~A Negative Declaration was prepared for this project pursuant to the provisions of CEQA.
3. Mitigation measures ((~) were (~5~were not ) made a condition of approval of the project.
4. A statement of Overriding Considerations ((~) was<~5~as not ) adopted for this project.
This is to certify that the f'mal EIR with comments and responses and record of project approval is available to the
General Public at the Community Development Department, City of Campbell, 70 N. First Street, Campbell, CA
95008, (408) 866-2140.
Signature (Public Agency) &&' ~(~P~-CLr._Dat~//~/~2~ Title:
Date received for filing and posting at OPR: PO~. T~D ON ~
M THE OFFICE OF THE COUNTY CLERK
0£c 04
THROUGH ......
BY DEPUTY
FooT66& '
CALIFORNIA DEPARTMENT OF FISH AND GAME
CERTIFICATE OF FEE EXEMPTION
De Minimis Impact Finding
Project Title/Location (include county):
PD 98-06
891 W. Hamilton Avenue
Campbell, CA 95008
Santa Clara County
Project Description:
Project entails a Planned Development application (PD 98-06) to allow the development of a two-story,
8,741 square foot office building.
Findings of Exemption (attach as necessary):
The City Council granted a Negative Declaration based upon the findings in the initial study prepared for
this project which determined that no effects to wildlife or the environment will result from development of
this project.
Certification:
I hereby certify that the public agency has made the above finding and that the project will not individually
or cumulatively have an adverse effect on wildlife resources, as defined in Section 711.2 of the Fish and
Game Code.
Signature: ~, L~4
Title:
City of Campbell
Date:
POSTED ON _ _ THROUGH -
1~4 TIlE OFFICE OF TIlE COUNTY CLERK
STEPtIEN V. LOVE, CbUHTY CLERK
BY __ "~'~ ~-"~ DEPUTY
DEC 0&19
November_4, 1998
CITY OF CAMPBELL
City Clerk's Office
Harold D. Long
Largo Concrete, Inc.
310 W. Hamilton Avenue, Ste. 203
Campbell, CA 95008
Dear Mr. Long:
At the regular meeting of November 2, 1998, the City Council held a public hearing to
consider your application for approval of a Planned Development Permit (PD 98-06) and a
Tree Removal Permit (TRP 98-01) to allow the development of a two-story office building at
property located at 891 W. Hamilton Avenue.
After due consideration and discussion, the City Council adopted Resolution No. 9455
approving the Planned Development Permit (PD 98-06) to allow the construction of a two-
story, 8,741 square foot office development on property located at 891 W. Hamilton Avenue in
a Planned Development Zoning District, subject to the Conditions of Approval. Please f'md a
certified copy of this Resolution enclosed for your records.
Should you have any questions in regard to the City Council's action, please do not hesitate to
contact this office (866-2117) or Aki Irani, Community Development Department.
Sincerely,
City Clerk
cc. Aki Irani, Community Development Dept.
70 North First Street · Campbell, California 95008.1423 - TEL 408.866.2117 - FAX 408.374.6889 · TDD 408.866.2790
MEMORANDUM
To:
From:
D ate:
Aki Irani, Planner I
Ja~emsley
Deputy City Clerk
November 4, 1998
CITY OF I?BELL
PLANNING DEPT.
Subject:
Planned Development Permit (PD 98-06) and Tree Removal Permit
(TRP 98-01) - 891 W. Hamilton Avenue
At the regular meeting of November 2, 1998, the City Council adopted Resolution No.
9455, incorporating the attached findings, and approving the Planned Development
Permit (PD 98-06) subject to the attached conditions of approval, for property located
at 891 W. Hamilton Avenue.
Please find a certified copy of this Resolution attached for your records, together with a
copy of the letter written to the applicant in follow-up to the City Council's action.
RESOLUTION NO. 9455
BEING A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CAMPBELL APPROVING A PLANNED DEVELOPMENT PERMIT (PD
98-06) TO ALLOW THE CONSTRUCTION OF A TWO-STORY, 8,741
SQUARE FOOT OFFICE DEVELOPMENT ON PROPERTY LOCATED AT
891 W. HAMILTON AVENUE IN A PD (PLANNED DEVELOPMENT)
ZONING DISTRICT. APPLICATION OF MR. HAROLD LONG. FILE NO.
PD 98-06.
After notification and public heating, as specified by law, and after presentation by the Community
Development Director, proponents and opponents, the heating was closed.
After due consideration of all evidence presented, the City Council finds as follows with respect to
application PD 98-06:
1. The proposed project is located on property with a commercial land use designation under the
General Plan.
2. The Planned Development Permit to allow a two-story, 8,741 square foot office development is
consistent with the Land Use Element of the General Plan.
o
The proposed office building, as conditioned, is well designed and architecturally compatible with
other developments in the surrounding area and is consistent with the development standards for
commercial uses.
4. The proposed project is compatible with the adjacent residential and commercial uses.
°
The proposed project will install the streetscape improvements along Hamilton Avenue in
compliance with the City's Streetscape Standards.
The requirement to maintain the pedestrian and vehicular ingress, egress and right-of-way easement
for the life of the development is necessary to maintain access to the exterior parking spaces for the
development along the northern portion of the property and to provide additional space as a setback
buffer between the proposed commercial development and the adjacent residential property to the
north.
o
o
The proposed landscaping within the pedestrian and vehicular easement along the wall adjacent to
the residential property to the north is necessary to provide screening and enhance the appearance
of the proposed development from the adjacent residential property to the north.
The removal of the existing walnut tree on-site and the existing pine trees on the adjacent property
to the east is necessary as it restricts the economic enjoyment of the property and creates an unusual
hardship for the property owner to develop the project as proposed.
City Council Resolution
PD 98-06 - 891 W. Hamilton Avenue - Harold Long
Page 2
9. The proposed reduction in the number of required parking spaces and in the required parking stall
sizes for the project is adequate to serve the proposed project.
10. The location of support columns for the building, size of the development and proposed office use
are circumstances which comprehensively warrant a reduction in the number of required parking
spaces and in the required parking stall sizes for the project.
11. An initial study was prepared for this project and no significant environmental impacts were found.
Based upon the foregoing findings of fact, the City Council further finds and concludes that:
1. The proposed development and uses clearly will result in a more desirable environment and use of
the land than would be possible under any other zoning classification.
2. The development and uses will be compatible with the General Plan of the City and will aid in the
harmonious development of the immediate area.
3. The proposed development will not be detrimental to the health, safety or welfare of the
neighborhood or the City as a whole.
No substantial evidence has been presented which shows that the project, as currently presented,
and subject to the required conditions of approval, will have a significant adverse impact on the
environment.
5. No evidence has been presented which shows that the project will have a substantial impact on
plant or animal life.
Further, the. applicants are notified as part of this application that they are required to comply with all
applicable Codes and Ordinances of the City of Campbell and the State of California which pertain to
this application and are not herein specified. And, that this approval is granted subject to the following
Conditions of Approval.
COMMUNITY DEVELOPMENT DEPARTMENT
1. Approved Project: Approval is granted to construct a two-story, 8,741 square foot office building
on property located at 891 W. Hamilton Avenue and shall substantially conform to the project
exhibits listed below, except as may be modified by the Conditions of Approval herein:
A. Combined Site plan and first floor plan prepared by Sophia M. Ostoya, Architect, dated as
submitted on September 3, 1998.
City Council Resolution
PD 98-06 - 891 W. Hamilton Avenue - Harold Long
Page 3
o
B. Second floor plan prepared by Sophia M. Ostoya, Architect, dated as submitted on September
3, 1998.
C. Roof plan prepared by Sophia M. Ostoya, Architect, dated as submitted on September 3, 1998.
D. Building elevations prepared by Sophia M. Ostoya, Architect, dated as submitted on September
3, 1998.
E. Streetscape plan prepared by Sophia M. Ostoya, Architect, dated as submitted on September 3,
1998.
F. Color/material board and colored perspective submitted by Sophia M. Ostoya, Architect.
G. Preliminary Grading and Drainage Plan prepared by Mission Engineers, Inc. dated as submitted
on September 3, 1998.
Building Window Treatment: The applicant shall install window treatment on the windows
surrounding the parking garage portion of the building which are the same and consistent with the
window treatment used on the windows for the office building.
Landscaping: Prior to the issuance of building permits for the project, the applicant shall submit
landscaping and irrigation plans for review and approval by the Community Development Director
that incorporates the following:
A. Compliance with the City's Streetscape Standards for Hamilton Avenue which includes the
installation of a 10-foot wide landscaped parkway, a 7-foot wide sidewalk and a minimum 10-
foot wide landscaped buffer, and street trees planted 40 feet on center in double triangulated
rows.
B. Compliance with the City's Tree Protection Ordinance including obtainment of a tree removal
permit to remove any trees in conjunction with the development of the project and replacement
of trees required in conjunction with the development of the project.
C. Compliance with the City's Water Efficient Landscape Standards (WELS) for the protection of
any trees in conjunction with the development of the project.
D. Installation of minimum 24-inch box street trees planted 40 feet on center in tree wells along
Marathon Drive.
E. Installation of minimum 24-inch box trees and groundcover to be planted 20 feet on center
within the pedestrian and vehicular easement to the north of the project site along the wall
adjacent to the apartment complex property to the north for a length equal to the length of the
subject property.
F. Installation of minimum 24-inch box trees, minimum 5-gallon shrubs in the form of clinging
vines and groundcover in half-diamond planters to be located between the parking spaces
located along and adjacent to the north elevation of the proposed office building. The clinging
vines shall be trained to grow along the building wall on the northern elevation.
City Council Resolution
PD 98-06 - 891 W. Hamilton Avenue - Harold Long
Page 4
o
o
G. Installation of minimum 24-inch box trees, minimum 5-gallon shrubs and groundcover along
the east sideyard setback of the proposed office building.
Landscape Maintenance: The applicant shall be required to provide on-going maintenance of the
required landscaping for the project as approved by the Conditions of Approval herein.
Approval by Adjacent Property Owner: Prior to the issuance of grading and building permits for
the project, the applicant shall be required to obtain and submit verification of the following:
A. Approval by the adjacent property owner to the north of the subject site to amend the
easement(s) on the property to allow the addition of landscaping in the form of minimum 24-
inch box trees and groundcover planted 20 feet on center along the existing wall adjacent to the
apartment complex property to the north.
B. Approval by the adjacent property owner to the north of the subject site to maintain for the life
of the project a pedestrian and vehicular ingress, egress, and right-of-way easement to provide
access to and from the site from Marathon Drive.
C. Approval by the adjacent property owner to the east of the subject site to remove the easement
requiring the shared driveway access along W. Hamilton Avenue to allow remodeling of the
existing commercial shared driveway along W. Hamilton Avenue to serve only the adjacent
property owner to the east.
D. A title report which indicates that the easements have been amended and recorded to
accommodate the approvals required in Condition Nos. 5A, 5B and 5C.
Outdoor Storage: No outdoor storage is permitted on the property and/or pedestrian and vehicular
easement to the north of the project site. No construction equipment, construction vehicles, and/or
construction debris shall be parked and/or stored on the property and/or on the pedestrian and
vehicular easement to the north of the project site at any time.
Parking and Driveway: Prior to the issuance of building permits for the project, the applicant shall
comply with Chapter 21.50 of the Campbell Municipal Code, unless modified by the Conditions of
Approval herein and shall amend the plans to incorporate the following:
Ao
Deletion of one (1) parking space, either space number 24, 25 or 26, and revision of the parking
layout to situate the remaining two spaces so that there will be no possibility of maneuvering
difficulties for these spaces and the adjacent spaces #23 and #35.
Bo
Movement of the support columns to be inset a few feet into the length of the parking spaces
located within the first floor of the proposed building, so that there is better maneuvering ability
available for drivers to turn into parking spaces.
City Council Resolution
PD 98-06 - 891 W. Hamilton Avenue - Harold Long
Page 5
o
Parking Adjustment: The applicant is permitted a parking adjustment to provide a reduction in the
number of required parking spaces and a reduction in the required parking stall sizes for the
proposod project. The applicant shall be required to provide a total of 34 parking spaces (21 spaces
with a minimum dimension of 9 feet by 18 feet, 13 compact spaces with a minimum dimension of
8 feet by 18 feet).
9. Americans With Disabilities Act: The applicant shall be required to comply with all Americans
with Disabilities Act requirements.
10. Building Division Requirements: The applicant shall comply with all Building Code requirements
and obtain necessary permits as determined by the City's Building Division.
11. Fences/walls: Any newly proposed fencing and/or wall shall comply with Section 21.59.090 of the
Campbell Municipal Code and shall be submitted for review and approval by the Community
Development Department.
12. Property Maintenance: The property is to be maintained free of any combustible trash, debris and
weeds until the time that actual construction commences. All existing structures shall be secured
by having windows boarded up and doors sealed shut, or be demolished or removed from the
property (Section 11.201 and 11.414, 1985 Ed. Uniform Fire Code).
13. Location of Mechanical Equipment: No roof-mounted mechanical equipment, i.e. air conditioning
units, shall be located on the roof of building without providing screening of the mechanical
equipment from public view. Screening material and method shall require review and approval by
the Community Development Director prior to installation of such mechanical equipment
screening.
14. Utility Boxes and Back-Flow Preventers: Applicant to submit a plan prior to installation of PG&E
utility (transformer) boxes and San Jose Water Company back-flow preventers, indicating the
location of the boxes and screening (if the boxes are above ground) for approval by the Pla ~nning
Division.
15. Trash Disposal/Recycling: The applicant shall submit details regarding the design and location of
trash disposal/recycling facilities to the City for review and approval prior to the issuance of
building permits for the project. The design of the trash enclosure shall match the building in terms
of color and finish. Decorative tile trim cap shall match the roof tile.
City Council Resolution
PD 98-06 - 891 W. Hamilton Avenue - Harold Long
Page 6
16. On-site lighting: On-site lighting shall not create a glare on adjacent properties, and shall be
shielded away from adjacent properties and directed on-site. The applicant shall provide a lighting
plan ir~dic_ating the location of all light fixtures on site and on the building prior to issuance of
building permits. All outdoor light fixtures shall use low pressure sodium lamps.
17. Signs: Any signs proposed to be erected on site shall require approval of a Sign Permit. A Sign
Permit may be granted upon complete submission of a Sign application and approval by the
Community Development Department, in accordance with the City's Sign Ordinance. No sign
shall be permitted until the application is approved and a permit issued.
18. Construction Mitigation Measures: The applicant shall implement the following construction
mitigation measures:
A. Construction activities will be limited to daytime hours of 8:00 am to 5:00 p.m. weekdays and
9:00 a.m. to 4:00 p.m. Saturdays. Construction is prohibited on Sundays and Holidays unless
an exception is granted by the Building Official.
B. No pile driving is allowed for construction of the project.
C. All internal combustion engines for construction equipment used on the site will be properly
muffled and maintained.
D. All stationary noise generating construction equipment, such as air compressors and portable
power generator, will be located as far as practical from the existing residences and businesses.
E. All active construction areas shall be watered at least twice daily.
F. Cover all tracks hauling soil and other loose materials stationed or prior to leaving the site.
G. Pave, apply water, or apply non-toxic soil stabilizers on all unpaved surfaces, and staging areas
at the construction site.
H. Sweep daily all paved access roads, parking areas, staging areas, and adjacent public streets as
directed by the City Engineer.
I. Enclose, cover, water or apply soil binders to exposed stockpiles.
J. Install sandbags or other erosion control measures to prevent runoff to all roadways, waterways
or pubic walkways accessed by the public.
CENTRAL FIRE DISTRICT:
19. Automatic Fire Sprinkler System Required: Buildings requiring a fire flow in excess of 2,000
GPM, or in excess of two stories in height, or 35 feet in height, shall be equipped throughout with
an approved automatic fire sprinkler system. The fire sprinkler system shall be hydraulically
designed per National Fire Protection Association (NFPA) Standard /413, 1994 edition. Fire
sprinklers are also to be included within the space of the parking garage.
City Council Resolution
PD 98-06 - 891 W. Hamilton Avenue - Harold Long
Page 7
20. Final Required Fire Flow: Required fire flow may be reduced up to 50% in buildings equipped
with automatic fire sprinkler systems, but can be no less than 1500 GPM. Therefore, the final
require.d fire flow is 1750 GPM at 20 psi. residual pressure. This flow shall be taken from any two
fire hydrants, on or near the site so long as they are spaced at a maximum spacing of 250 feet.
21. Fire Department Key Box Required: Provide an approved fire department key box and appropriate
building keys. Installations shall conform with Fire Department standard Detail and Specification
K-1.
PUBLIC WORKS DEPARTMENT:
22. Driveway: Prior to the issuance of any grading or building permits for the site, the property owner
shall provide evidence that they have the legal right to use the northerly driveway, a portion of
Parcel C of PM 282 M55, for access and parking, or shall obtain such rights.
23. Preliminary Title Report: Prior to the issuance of any grading or building permits for the site, the
applicant shall provide a current Preliminary Title Report.
24. Right-of-Way for Public Street Purposes: Prior to issuance of any grading or building permits for
the site, the applicant shall grant an additional 7 feet of Right-of-Way for Public Street Purposes
along the Hamilton Avenue frontage to accommodate a 67 foot right-of-way from the centerline
with a 20 foot property return radius for installation of the City standard boulevard walk.
Applicant shall cause to be prepared all documents necessary to record dedication and submit to the
City for review.
25. Street Improvements: Prior to the issuance of any grading or building permits for the site, the
applicant shall execute a street improvement agreement and shall cause plans for public street
improvements to be prepared by a registered civil engineer, pay fees, post security and provide
insurance necessary to obtain an encroachment permit for construction of the public improvements,
as required by the City Engineer. The plans shall include the following:
Marathon Drive
· Removal of existing curb, gutter, and sidewalk.
· Construction of new curb and gutter, City standard commercial walk, street trees at 40 feet on
center, tree wells, and irrigation system.
Construction of two standard commercial driveways in accordance with an approved site plan
and ADA requirements.
City Council Resolution
PD 98-06 - 891 W. Hamilton Avenue - Harold Long
Page 8
Hamilton Avenue
· Removal of existing curb, gutter, sidewalk, and street tree.
· Construction of City standard boulevard walk including trees, landscape, and irrigation system.
· Installation of one new streetlight and appurtenances.
· Removal and remodeling of the existing commercial shared driveway with City standard
driveway approach (ADA compliant) to only serve the adjacent restaurant to the east, as
conceptually shown on the approved revised Site Plan.
Marathon Drive and Hamilton Avenue
· Installation of all existing and proposed water meters and sewer cleanouts on private property
behind the public right-of-way line.
· Removal and installation of traffic signs and striping as determined by the City Engineer.
· Removal of existing curb ramp and construction of new curb ramp and the return to be
compatible with the existing curb ramp on the west side of Marathon Drive.
Removal and replacement of asphalt paving as needed for installation of concrete curbs and
gutters.
Relocation, protection, relocation, adjustment and/or modification of existing and proposed
utilities as necessary.
Construction of conforms to existing improvements.
26. Utilities: All new on-site Utilities shall be installed underground per Section 20.36.150 of the
Campbell Municipal Code for any new or remodeled buildings or additions. Applicant shall
comply with all plan submittals, permitting, and fee requirements of the serving utility companies.
27. Utility Installation Plan: Prior to issuance of building permits for the site, the applicant shall
submit a Utility Installation Coordination Plan and Schedule for approval by the City Engineer for
installation and/or abandonment of all utilities. Streets which have been resurfaced within the
previous 5 years will require boring and jacking for all new utility installations. Applicant shall
also prepare pavement restoration plans for approval by the City Engineer prior to any utility
installation or abandonment.
28. Maintenance Security: Prior to issuance of occupancy approval for the site, all public street
improvements required by the street improvement agreement and the encroachment permit must be
completed and accepted by the City and the applicant must provide a one-year Maintenance
Security in an amount of 25% of the Faithful Performance Bond.
City Council Resolution
PD 98-06 - 891 W. Hamilton Avenue - Harold Long
Page 9
29. Grading and Drainage Plan: Prior to issuance of any grading or building permits for the site, the
applicant shall conduct hydrology studies based on a 10 year storm frequency, prepare an
engineered_Grading and Drainage Plan, and pay fees required to obtain necessary grading permits.
The plans shall comply with the 1994 edition of the UBC including Chapters 18, 33, and Appendix
Chapter 33. Should the development require hauling of soil or other demolition materials on or off
site, the applicant shall request and obtain approval of a haul route from the City Engineer. The
plans shall include reconstruction of the northerly driveway and conforms to existing
improvements.
30. Storm Water Pollution Prevention Measures: Prior to issuance of any grading or building permits,
the applicant shall comply with the National Pollution Discharge Elimination System (NPDES)
permitting requirements and the California Storm Water Best Management Practices handbook
prepared by the Storm Water Quality Task Force, Santa Clara Valley Water District and the City of
Campbell Municipal Code regarding Storm Water Pollution Prevention.
31. Monuments: A Record of Survey or Comer Record shall be filed in accordance with the
requirements of the Land Surveyor's Act for all Monuments set.
32. Site Plan: The applicant shall provide a complete and accurate Site Plan which includes the
information listed on the Planning Division's check list. It shall include all the existing easements
related to the property per the preliminary title report.
PASSED AND ADOPTED this 2nd day of November , 1998, by the following roll call vote:
AYES: COUNCILMEMBERS: Conant, Furtado, Dougherty,
NOES: COUNCILMEMBERS: None
ABSENT: COUNCILMEMBERS: None
ABSTAIN: COUNCILMEMBERS: None
ATTEST:
APPROVED:
tt%
Dean, Watson
Watson, Mayor
AND CORRECT COPY OF THE ORIGI~
ON FILE IN T~4,S
~[~AST: ANNE ~y[;EE,
MPBELL, CALIFO~I~
11.
to PO (Professional Office), application of Mr. Depois Wong, for first reading; and
introduce Ordinance 1976 amending the Land Use Element of the General Plan
changing the land use designation of property located at 1200, 1210, 1224 and 1240
Abbott Avenue from Commercial to Low-Density Residential, City-initiated
application, for first reading. Motion adopted by the following roll call vote:
AYES: Councilmembers: Conant, Furtado, Dougherty, Dean, Watson
NOES: Councilmembers: None
The City Clerk read the titles of Ordinance No. 1975 and No. 1976.
M/S: Furtado/Dougherty - that further reading of Ordinance No. 1975 and No.
1976 be waived. Motion adopted unanimously.
Application of Harold Long for Approval of a Planned Development Permit (PD
98-06) and Tree Removal Permit (TRP 98-01) to allow the development of a two-
story office building - 891 W. Hamilton Avenue (Resolution/Roll Call Vote)
This is the time and place for a public hearing to consider the application of Harold
Long for Approval of a Planned Development Permit (PD 98-06) and Tree Removal
Permit (TRP 98-01) to allow the development of a two-story office building - 891 W.
Hamilton Avenue.
Planner I Irani - Staff Report dated November 2, 1998.
Councilmember Dean recommended that the parking space that is being eliminated be
used for bicycle parking.
Councilmember Dougherty expressed concern regarding a reduced parking standard
which could impact parking should the use of the building change at some point in the
future.
Mayor Watson declared the public hearing open and asked if anyone in the audience
wished to be heard.
Harold Long, Applicant, 310 W. Hamilton Avenue, Campbell, appeared before the
City Council and spoke in support of the project stating that he would agree to replace
the existing trees with 24-inch box trees and inclusion of a bike rack in lieu of the one
parking space.
There being no one else wishing to speak, Mayor Watson closed the public hearing.
Minutes of 11/2/98 City Council Meeting 7
M/S: Dean/Conant - that the City Council grant a Negative Declaration for the
proposed project and adopt Resolution 9455 approving a Planned Development
Permit (PD 98-06) to allow the construction of a two-story, 8,741 square foot office
development on property located at 891 W. Hamilton Avenue in a PD (Planned
Development) Zoning District, subject to Conditions of Approval, including 24 inch
box tree replacement and bicycle rack, and approval of Tree Removal Permit (TRP
98-01) to allow the removal of six (6) trees in conjunction with the development
based upon findings. Motion adopted by the following roll call vote:
CITY COUNCIL DISCUSSION:
Councilmember Dougherty stated that the issue of parking standards should be
reviewed.
VOTE ON THE MOTION:
12.
AYES: Councilmembers: Conant, Furtado, Dougherty, Dean, Watson
NOES: Councilmembers: None
Consent of TCI - AT&T Merger (Introduction of Ordinance/Roll Call Vote)
This is the time and place for a public hearing to consent to the TCI - AT&T Merger
per the Campbell Municipal Code.
Administrative Analyst II Bito - Staff Report dated November 2, 1998.
Mayor Watson declared the public hearing open and asked if anyone in the audience
wished to be heard.
There being no one wishing to speak, Mayor Watson closed the public hearing.
M/S: Dean/Dougherty - that the City Council consent to the merger' of TCI with
AT&T, and introduce Ordinance 1977 consenting to the Merger of Tele-
Communications, Inc. (TCI) with AT&T Corporation (AT&T) for first reading.
Motion adopted by the following roll call vote:
AYES: Councilmembers: Conant, Furtado, Dougherty, Dean, Watson
NOES: Councilmembers: None
The City Clerk read the title of Ordinance No. 1977.
M/S: Dougherty/Dean - that further reading of Ordinance No. 1977 be waived
Motion adopted unanimously.
Minutes of 11/2/98 City Council Meeting
Oty
Council
Report
ITEM NO:
CATEGORY:
MEETING DATE:
Public Hearing
November 2, 1998
TITLE
Applications of Mr. Harold Long for approval of a Planned Development Permit (PD 98-06) and
a Tree Removal Permit (TRP 98-01) to allow the development of a two-story office building -
891 W. Hamilton Avenue.
RECOMMENDATION
The Planning Conunission recommends that the City Council take the following:
1. Grant a Negative Declaration for the proposed project; and
2. Adopt a Resolution incorporating the attached findings, and approving the Planned
Development Permit, PD 98-06, subject to the attached conditions of approval; and
3. Approve a Tree Removal Permit (TRP 98-01) to allow the removal of six (6) trees in
conjunction with the development based upon the attached findings.
ENVIRONMENTAL DETERMINATION
The City prepared an Initial Study for this project and it was determined that no significant
impacts would be created as a result of the project. Based upon the information provided in the
Initial Study, the Planning Commission recommends that the City Council grant a Negative
Declaration for this project.
BACKGROUND
The applicant is requesting approval of a Planned Development Permit (PD 98-06) and a Tree
Removal Permit (TRP 98-01) to allow the development of a two-story office building on
property located at 891 W. Hamilton Avenue.
The Planning Commission forwarded a recommendation to the City Council at its meeting of
October 13, 1998, to approve the project with the attached conditions of approval. The Planning
Commission also recommended that the City Council approve a Tree Removal Permit in
conjunction with the development of the project per the recently adopted Tree Protection'
Ordinance.
The site is currently vacant and undeveloped. The site was previously developed with a service
station; however, the service station was demolished in late 1996.
ANALYSIS "
General Plan Designation: The General Plan land use designation for the project site is
commercial. The proposed office building is a commercial use and is, therefore, consistent .with
the General Plan.
Zoning Designation: The zoning 'designation for the site is Planned Development (PD). The
proposed project as an office building is consistent with the General Plan and is permitted in a
PD zone with approval of a Planned Development Permit.
City Council Report - November 2, 1998
PD 98-06
Page 2
Planned Development Permit: The Planned Development Permit will allow for the construction
of a two-story, 8,741 square foot office building on the northeast comer of West Hamilton
Avenue and Marathon Drive. The design of the proposed project will be a modem-style stucco
building accented by two large concrete stucco towers protruding from the building, and will
have a concrete tile roof. The first floor of the building will consist of approximately 1,950
square feet of office area facing W. Hamilton Avenue and the remaining portions will
accommodate interior parking spaces. The second floor of the building will accommodate the
remaining 6,800 square feet of office area. Additional parking will also be provided along the
rear (north) elevation of the building.
Easements: The project site currently has several easements to serve the previous development
of the site as a service station. The recommended Conditions of Approval by the Planning
Commission include requirements to amend the easement(s) on the property to allow for planting
of landscaping in the 20-foot wide pedestrian and vehicular easement north of the project site,
maintenance of the 20-foot wide pedestrian and vehicular easement north of the project site for
the life of the project, and removal of any easement(s) which are no longer necessary to serve the
subject property and/or the adjacent property to the east.
Tree Removal Permit/Landscaping: The applicant is requesting that the City Council approve a
Tree Removal Permit to allow for the removal of a total of six (6) trees, which include one (1)
mature 30-inch diameter California black walnut tree on site and five (5) Monterey pine trees,
one of which is dead and the remaining of which are 8.5 inches, 11 inches, 13 inches and 15
inches in diameter, on the adjacent property to the east along the property line. The applicant has
obtained approval by the adjacent property owner to the east to remove the pine trees. The
justification given by the applicant is that the retention of these trees will restrict the economic
enjoyment of the property and create a hardship on the property owner to develop the project as
proposed. An arborist report has been submitted by the applicant which recommends that the
trees be removed as they are not anticipated to survive the impact of development on the
property. -
Within the recommended Conditions of Approval by the Planning Commission, there are
conditions which will require additional landscaping along the north elevation of the building
and along the wall adjacent to the apartment complex to the north, in addition to the streetscape
requirements for landscaping along W. Hamilton Avenue. This landscaping is recommended to
provide a visual softening of the building from the adjacent apartment complex to the north and
from the adjacent restaurant and W. Hamilton Avenue to the east. Additional trees on site as
required by the Tree Protection Ordinance for the removal of the existing trees on site will
provide further visual softening of the building and will enhance the aesthetic quality of the
development. These additional trees will include one (1) 36-inch box tree for the removal of the
Walnut tree, and five (5) 24-inch box trees for the removal of the pine trees.
Parking: The applicant is requesting approval of a parking layout which will allow a reduction in
the required number of parking spaces for a general office use. The Planning Commission
City Council Report - November 2, 1998
PD 98-06
expressed support of a reduced parking standard to allow 34 parking spaces on site in lieu of a
requirement for 39 parking spaces on site, and to allow a "standard" parking stall dimension
which is two (2) feet shorter than the required length (18 feet rather than 20 feet), given that the
applicant has demonstrated in a letter that the proposed parking will accommodate the office use.
.ALTERNATIVES
1. Approve the proposed project subject to additional and/or modified Conditions of Approval.
2. Deny the proposed project.
3. Continue for further review.
.FISCAL IMPACTS
None
Attachments:
1. Draft City Council Resolution approving PD 98-06
2. Planning Commission Resolution 3188.
3. Planning Commission Meeting Minutes of October ! 3, 1998
4. Staff Report for Planning Commission Meeting of October 13, 1998
5. Exhibits
6. Location Map
Prepared by:
Aki Irani, Planner I
Reviewed by:
Steve Piasecki, Community Development Director
Approved by:
Bernard Strojny, City Manager
City Council Report - November 2, 1998
PD 98-06
Page 3
expressed support of a reduced parking standard to allow 34 parking spaces on site in lieu of a
requirement for 39 parking spaces on site, and to allow a "standard" parking stall dimension
which is two (2) feet shorter than the required length (18 feet rather than 20 feet), given that the
applicant has demonstrated in a letter that the proposed parking will accommodate the office use
and that other surrounding cities use more lenient parking standards which would require the
number of parking spaces for the development as the applicant has proposed.
ALTERNATIVES
1. Approve the proposed project subject to additional and/or modified Conditions of Approval.
2. Deny the proposed project.
3. Continue for further review.
FISCAL IMPACTS
None
Attachments:
1. Draft City Council Resolution approving PD 98-06
2. Planning Commission Resolution 3188.
3. Planning Commission Meeting Minutes of October 13, 1998
4. Staff Report for Planning Commission Meeting of October 13, 1998
5. Exhibits
6. Location Map
Prepared by:
Reviewed by~./ x~/.>'k,. \~ ,-~,.,.~ '
Steve Piasecl~i, Community Development Director
Approved by:
Bernard Strojny, City Manager
.0¥ ' C'4 ~t,~
CITY OF CAMPBELL
Community Development Department · Current Planning
October 16, 1998
Mr. Harold Long
Largo Concrete Inc.
310 W. Hamilton Avenue
Campbell, CA 95008
Re: PD 98-06 - 891 W. Hamilton Avenue
Dear Applicant:
Please be advised that the Planning Commission, at its meeting of October 13, 1998,
adopted Resolution No. 3188 recommending approval of a Planned Development Permit
to allow the construction of a two-story, 8,741 square foot office development on the
above referenced property.
This project will be considered by the City Council at its meeting of November 2, 1998,
for approval. If you have any questions, please do not hesitate to contact me at (408)
866-2140.
Sincerely,
Aki Irani
Planner I
70 North First Street · Campbell, California 95OO8.1423 · TEL 408.866.2140 · F^X 408.866.8381 · TDD 408.866.2790
RESOLUTION NO. 3188
BEING A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF CAMPBELL RECOMMENDING APPROVAL OF A PLANNED
DEVELOPMENT PERMIT (PD 98-06) TO ALLOW THE CONSTRUCTION
OF A TWO-STORY, 8,741 SQUARE FOOT OFFICE DEVELOPMENT ON
PROPERTY LOCATED AT 891 W. HAMILTON AVENUE IN A PD
(PLANNED DEVELOPMENT) ZONING DISTRICT. APPLICATION OF
MR. HAROLD LONG. FILE NO. PD 98-06.
After notification and public heating, as specified by law, and after presentation by the Community
Development Director, proponents and opponents, the heating was closed.
After due consideration of all evidence presented, the Planning Commission finds as follows with
respect to application PD 98-06:
1. The proposed project is located on property with a commercial land use designation under the
General Plan.
2. The Planned Development Permit to allow a two-story, 8,741 square foot office development is
consistent with the Land Use Element of the General Plan.
The proposed office building, as conditioned, is well designed and architecturally compatible with
other developments in the sun'ounding area and is consistent with the development standards for
commercial uses.
4. The proposed project is compatible with the adjacent residential and commercial uses.
5. The proposed project will install the streetscape improvements along Hamilton Avenue in
compliance with the City's Streetscape Standards.
The requirement to maintain the pedestrian and vehicular ingress, egress and right-of-way easement
for the life of the development is necessary to maintain access to the exterior parking spaces for the
development along the northern portion of the property and to provide additional space as a setback
buffer between the proposed commercial development and the adjacent residential property to the
north.
The proposed landscaping within the pedestrian and vehicular easement along the wall adjacent to
the residential property to the north is necessary to provide screening and enhance the appearance
of the proposed development from the adjacent residential property to the north.
o
The removal of the existing walnut tree on-site and the existing pine trees on the adjacent property
to the east is necessary as it restricts the economic enjoyment of the property and creates an unusual
hardship for the property owner to develop the project as proposed.
Planning Commission Resolution No. 3188
PD 98-06 - 891 W. Hamilton Avenue - Harold Long
Page 2
9. The proposed reduction in the number of required parking spaces and in the required parking stall
sizes for the project is adequate to serve the proposed project and is consistent with parking
standards for office developments in other surrounding cities.
10. The location of support columns for the building, size of the development and proposed office use
are circumstances which comprehensively warrant a reduction in the number of required parking
spaces and in the required parking stall sizes for the project.
11. An initial study was prepared for this project and no significant environmental impacts were found.
Based upon the foregoing findings of fact, the Planning Commission further finds and concludes that:
1. The proposed development and uses clearly will result in a more desirable environment and use of
the land than would be possible under any other zoning classification.
2. The development and uses will be compatible with the General Plan of the City and will aid in the
harmonious development of the immediate area.
3. The proposed development will not be detrimental to the health, safety or welfare of the
neighborhood or the City as a whole.
No substantial evidence has been presented which shows that the project, as currently presented,
and subject to the required conditions of approval, will have a significant adverse impact on the
environment.
5. No evidence has been presented which shows that the project will have a substantial impact on
plant or animal life.
Further, the applicants are notified as part of this application that they are required to comply with all
applicable Codes and Ordinances of the City of Campbell and the State of California which pertain to
this application and are not herein specified. And, that this approval is granted subject to the following
Conditions of Approval.
COMMUNITY DEVELOPMENT DEPARTMENT
1. Approved Project: Approval is granted to construct a two-story, 8,741 square foot office building
on property located at 891 W. Hamilton Avenue and shall substantially conform to the project
exhibits listed below, except as may be modified by the Conditions of Approval herein:
A. Combined Site plan and first floor plan prepared by Sophia M. Ostoya, Architect, dated as
submitted on September 3, 1998.
Planning Commission Resolution No. 3188
PD 98-06 - 891 W. Hamilton Avenue - Harold Long
Page 3
B. Second floor plan prepared by Sophia M. Ostoya, Architect, dated as submitted on September
3, 1998.
C. Roof plan prepared by Sophia M. Ostoya, Architect, dated as submitted on September 3, 1998.
D. Building elevations prepared by Sophia M. Ostoya, Architect, dated as submitted on September
3, 1998.
E. Streetscape plan prepared by Sophia M. Ostoya, Architect, dated as submitted on September 3,
1998.
F. Color/material board and colored perspective submitted by Sophia M. Ostoya, Architect.
G. Preliminary Grading and Drainage Plan prepared by Mission Engineers, Inc. dated as submitted
on September 3, 1998.
Building Window Treatment: The applicant shall install window treatment on the windows
surrounding the parking garage portion of the building which are the same and consistent with the
window treatment used on the windows for the office building.
Landscaping: Prior to the issuance of building permits for the project, the applicant shall submit
landscaping and irrigation plans for review and approval by the Community Development Director
that incorporates the following:
A. Compliance with the City's Streetscape Standards for Hamilton Avenue which includes the
installation of a 10-foot wide landscaped parkway, a 7-foot wide sidewalk and a minimum 10-
foot wide landsc,aped buffer, and street trees planted 40 feet on center in double triangulated
rOWS.
B. Compliance with the City's Tree Protection Ordinance including obtainment of a tree removal
permit to remove any trees in conjunction with the development of the project and replacement
of trees required in conjunction with the development of the project.
C. Compliance with the City's Water Efficient Landscape Standards (WELS) for the protection of
any trees in conjunction with the development of the project.
D. Installation of minimum 24-inch box street trees planted 40 feet on center in tree wells along
Marathon Drive.
E. Installation of minimum 24-inch box trees and grotmdcover to be planted 20 feet on center
within the pedestrian and vehicular easement to the north of the project site along the wall
adjacent to the apartment complex property to the north for a length equal to the length of the
subject property.
F. Installation of minimum 24-inch box trees, minimum 5-gallon shrubs in the form of clinging
vines and groundcover in half-diamond planters to be located between the parking spaces
located along and adjacent to the north elevation of the proposed office building. The clinging
vines shall be trained to grow along the building wall on the northern elevation.
Planning Commission Resolution No. 3188
PD 98-06 - 891 W. Hamilton Avenue - Harold Long
Page 4
G. Installation of minimum 24-inch box trees, minimum 5-gallon shrubs and groundcover along
the east sideyard setback of the proposed office building.
Landscape Maintenance: The applicant shall be required to provide on-going maintenance of the
required landscaping for the project as approved by the Conditions of Approval herein.
Approval by Adjacent Property Owner: Prior to the issuance of grading and building permits for
the project, the applicant shall be required to obtain and submit verification of the following:
A. Approval by the adjacent property owner to the north of the subject site to amend the
easement(s) on the property to allow the addition of landscaping in the form of minimum 24-
inch box trees and groundcover planted 20 feet on center along the existing wall adjacent to the
apartment complex property to the north.
B. Approval by the adjacent property owner to the north of the subject site to maintain for the life
of the project a pedestrian and vehicular ingress, egress, and right-of-way easement to provide
access to and from the site from Marathon Drive.
C. Approval by the adjacent property owner to the east of the subject site to remove the easement
requiring the shared driveway access along W. Hamilton Avenue to allow remodeling of the
existing commercial shared driveway along W. Hamilton Avenue to serve only the adjacent
property owner to the east.
D. A title report which indicates that the easements have been amended and recorded to
accommodate the approvals required in Condition Nos. 5A, 5B and 5C.
Outdoor Storage: No outdoor storage is permitted on the property and/or pedestrian and vehicular
easement to the north of the project site. No construction equipment, construction vehicles, and/or
construction debris shall be parked and/or stored on the property and/or on the pedestrian and
vehicular easement to the north of the project site at any time.
Parking and Driveway: Prior to the issuance of building permits for the project, the applicant shall
comply with Chapter 21.50 of the Campbell Municipal Code, unless modified by the Conditions of
Approval herein and shall amend the plans to incorporate the following:
Deletion of one (1) parking space, either space number 24, 25 or 26, and revision of the parking
layout to situate the remaining two spaces so that there will be no possibility of maneuvering
difficulties for these spaces and the adjacent spaces//23 and #35.
Bo
Movement of the support columns to be inset a few feet into the length of the parking spaces
located within the first floor of the proposed building, so that there is better maneuvering ability
available for drivers to mm into parking spaces.
Planning Commission Resolution No. 3188
PD 98-06 - 891 W. Hamilton Avenue - Harold Long
Page 5
Parking Adjustment: The applicant is permitted a parking adjustment to provide a reduction in the
number of required parking spaces and a reduction in the required parking stall sizes for the
proposed project. The applicant shall be required to provide a total of 34 parking spaces (21 spaces
with a minimum dimension of 9 feet by 18 feet, 13 compact spaces with a minimum dimension of
8 feet by 18 feet).
9. Americans With Disabilities Act: The applicant shall be required to comply with all Americans
with Disabilities Act requirements.
10. Building Division Requirements: The applicant shall comply with all Building Code requirements
and obtain necessary permits as determined by the City's Building Division.
11. Fences/walls: Any newly proposed fencing and/or wall shall comply with Section 21.59.090 of the
Campbell Municipal Code and shall be submitted for review and approval by the Community
Development Department.
12. Property Maintenance: The property is to be maintained flee of any combustible trash, debris and
weeds until the time that actual construction commences. All existing structures shall be secured
by having windows boarded up and doors sealed shut, or be demolished or removed from the
property (Section 11.201 and 11.414, 1985 Ed. Uniform Fire Code).
13. Location of Mechanical Equipment: No roof-mounted mechanical equipment, i.e. air conditioning
units, shall be located on the roof of building without providing screening of the mechanical
equipment from public view. Screening material and method shall require review and approval by
the Community Development Director prior to installation of such mechanical equipment
screening.
14. Utility Boxes and Back-Flow Preventers: Applicant to submit a plan prior to installation of PG&E
utility (transformer) boxes and San Jose Water Company back-flow preventers, indicating the
location of the boxes and screening (if the boxes are above ground) for approval by the Planning
Division.
15. Trash Disposal/Recycling: The applicant shall submit details regarding the design and location of
trash disposal/recycling facilities to the City for review and approval prior to the issuance of
building permits for the project. The design of the trash enclosure shall match the building in terms
of color and finish. Decorative tile trim cap shall match the roof tile.
Planning Commission Resolution No. 3188
PD 98-06 - 891 W. Hamilton Avenue - Harold Long
Page 6
16. On-site lighting: On-site lighting shall not create a glare on adjacent properties, and shall be
shielded away from adjacent properties and directed on-site. The applicant shall provide a lighting
plan indicating the location of all light fixtures on site and on the building prior to issuance of
building permits. All outdoor light fixtures shall use low pressure sodium lamps.
17. Signs: Any signs proposed to be erected on site shall require approval of a Sign Permit. A Sign
Permit may be granted upon complete submission of a Sign application and approval by the
Community Development Department, in accordance with the City's Sign Ordinance. No sign
shall be permitted until the application is approved and a permit issued.
18. Construction Mitigation Measures: The applicant shall implement the following construction
mitigation measures:
A. Construction activities will be limited to daytime hours of 8:00 am to 5:00 p.m. weekdays and
9:00 a.m. to 4:00 p.m. Saturdays. Construction is prohibited on Sundays and Holidays unless
an exception is granted by the Building Official.
B. No pile driving is allowed for construction of the project.
C. All internal combustion engines for construction equipment used on the site will be properly
muffled and maintained.
D. All stationary noise generating construction equipment, such as air compressors and portable
power generator, will be located as far as practical from the existing residences and businesses.
E. All active construdtion areas shall be watered at least twice daily.
F. Cover all trucks h. auling soil and other loose materials stationed or prior to leaving the site.
G. Pave, apply water, or apply non-toxic soil stabilizers on all unpaved surfaces, and staging areas
at the construction site.
H. Sweep daily all paved access roads, parking areas, staging areas, and adjacent public streets as
directed by the City Engineer.
I. Enclose, cover, water or apply soil binders to exposed stockpiles.
J. Install sandbags or other erosion control measures to prevent runoff to all roadways, waterways
or pubic walkways accessed by the public.
CENTRAL FIRE DISTRICT:
19. Automatic Fire Sprinkler System Required: Buildings requiring a fire flow in excess of 2,000
GPM, or in excess of two stories in height, or 35 feet in height, shall be equipped throughout with
an approved automatic fire sprinkler system. The fire sprinkler system shall be hydraulically
designed per National Fire Protection Association (NFPA) Standard #13, 1994 edition. Fire
sprinklers are also to be included within the space of the parking garage.
Planning Commission Resolution No. 3188
PD 98-06 - 891 W. Hamilton Avenue -Harold Long
Page 7
20.
Final Required Fire Flow: Required fire flow may be reduced up to 50% in buildings equipped
with automatic fire sprinkler systems, but can be no less than 1500 GPM. Therefore, the final
required fire flow is 1750 GPM at 20 psi. residual pressure. This flow shall be taken from any two
fire hydrants, on or near the site so long as they are spaced at a maximum spacing of 250 feet.
21.
Fire Department Key Box Required: Provide an approved fire department key box and appropriate
building keys. Installations shall conform with Fire Department standard Detail and Specification
K-1.
PUBLIC WORKS DEPARTMENT:
22. Driveway: Prior to the issuance of any grading or building permits for the site, the property owner
shall provide evidence that they have the legal fight to use the northerly driveway, a portion of
Parcel C of PM 282 M55, for access and parking, or shall obtain such rights.
23. Preliminary Title Report: Prior to the issuance of any grading or building permits for the site, the
applicant shall provide a current Preliminary Title Report.
24.
Right-of-Way for Public Street Purposes: Prior to issuance of any grading or building permits for
the site, the applicant shall grant an additional 7 feet of Right-of-Way for Public Street Purposes
along the Hamilton Avenue frontage to accommodate a 67 foot right-of-way from the centerline
with a 20 foot property return radius for installation of the City standard boulevard walk.
Applicant shall cause to be prepared all documents necessary to record dedication and submit to the
City for review.
25.
Street Improvements: Prior to the issuance of any grading or building permits for the site, the
applicant shall execute a street improvement agreement and shall cause plans for public street
improvements to be prepared by a registered civil engineer, pay fees, post security and provide
insurance necessary to obtain an encroachment permit for construction of the public improvements,
as required by the City Engineer. The plans shall include the following:
Marathon Drive
· Removal of existing curb, gutter, and sidewalk.
· Construction of new curb and gutter, City standard commercial walk, street trees at 40 feet on
center, tree wells, and irrigation system.
· Construction of two standard commercial driveways in accordance with an approved site plan
and ADA requirements.
Planning Commission Resolution No. 3188
PD 98-06 - 891 W. Hamilton Avenue - Harold Long
Page 8
26.
27.
Hamilton Avenue
· Removal of existing curb, gutter, sidewalk, and street tree.
· Construction of City standard boulevard walk including trees, landscape, and irrigation system.
· Installation of one new streetlight and appurtenances.
· Removal and remodeling of the existing commercial shared driveway with City standard
driveway approach (ADA compliant) to only serve the adjacent restaurant to the east, as
conceptually shown on the approved revised Site Plan.
Marathon Drive and Hamilton Avenue
· Installation of all existing and proposed water meters and sewer cleanouts on private property
behind the public right-of-way line.
· Removal and installation of traffic signs and striping as determined by the City Engineer.
· Removal of existing curb ramp and construction of new curb ramp and the return to be
compatible with the existing curb ramp on the west side of Marathon Drive.
· Removal and replacement of asphalt paving as needed for installation of concrete curbs and
gutters.
· Relocation, protection, relocation, adjustment and/or modification of existing and proposed
utilities as necessary.
· Construction of conforms to existing improvements.
Utilities: All new on-site Utilities shall be installed underground per Section 20.36.150 of the
Campbell Municipal Code for any new or remodeled buildings or additions. Applicant shall
comply with all plan. submittals, permitting, and fee requirements of the serving utility companies.
Utility Installation Plan: Prior to issuance of building permits for the site, the applicant shall
submit a Utility Installation Coordination Plan and Schedule for approval by the City Engineer for
installation and/or abandonment of all utilities. Streets which have been resurfaced within the
previous 5 years will require boring and jacking for all new utility installations. Applicant shall
also prepare pavement restoration plans for approval by the City Engineer prior to any utility
installation or abandonment.
28.
Maintenance Security: Prior to issuance of occupancy approval for the site, all public street
improvements required by the street improvement agreement and the encroachment permit must be
completed and accepted by the City and the applicant must 'provide a one-year Maintenance
Security in an amount of 25% of the Faithful Performance Bond.
Planning Commission Resolution No. 3188
PD 98-06 - 891 W. Hamilton Avenue - Harold Long
Page 9
29.
30.
31.
32.
Grading and Drainage Plan: Prior to issuance of any grading or building permits for the site, the
applicant shall conduct hydrology studies based on a 10 year storm frequency, prepare an
engineered Grading and Drainage Plan, and pay fees required to obtain necessary grading permits.
The plans shall comply with the 1994 edition of the UBC including Chapters 18, 33, and Appendix
Chapter 33. Should the development require hauling of soil or other demolition materials on or off
site, the applicant shall request and obtain approval of a haul route from the City Engineer. The
plans shall include reconstruction of the northerly driveway and conforms to existing
improvements.
Storm Water Pollution Prevention Measures: Prior to issuance of any grading or building permits,
the applicant shall comply with the National Pollution Discharge Elimination System (NPDES)
permitting requirements and the California Storm Water Best Management Practices handbook
prepared by the Storm Water Quality Task Force, Santa Clara Valley Water District and the City of
Campbell Municipal Code regarding Storm Water Pollution Prevention.
Monuments: A Record of Survey or Comer Record shall be filed in accordance with the
requirements of the Land Surveyor's Act for all Monuments set.
Site Plan: The applicant shall provide a complete and accurate Site Plan which includes the
information listed on the Planning Division's check list. It shall include all the existing easements
related to the property per the preliminary title report.
PASSED AND ADOPTI~D this 13th day of October, 1998, by the following roll call vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
Commissioners:
Commissioners:
Commissioners:
Commissioners:
Francois, Gibbons, Jones, Kearns, Lindstrom, Meyer-Kennedy
None
Lowe
None
ATTEST'
APPROVED:
Steve Piasecki, Secretary
Brad Jones, Acting Chair
Planning Commission Minutes of October 13, 1998 Page 5
Acting Chair Jones opened the Public Hearing for Agenda Item No. 2.
Acting Chair Jones closed the Public Hearing for Agenda Item No. 2.
Motion:
Upon motion of Commissioner Lindstrom, seconded by Commissioner
Kearns, the Planning Commission adopted Resolution No. 3187 approving
the granting of a Negative Declaration and a Modification to a previously-
approved Conditional Use Permit (UP 78-09) for St. Lucy's Parish to allow
the addition of a 4,575 square foot activity center and a 780 square foot office
addition on property located at 2350 S. Winchester Boulevard, by the
following roll call vote:
AYES: Francois, Gibbons, Jones, Kearns, Lindstrom, Meyer-Kennedy
NOES: None
ABSENT: Lowe
ABSTAIN: None
Acting Chair Jones advised that this decision is final unless appealed in writing within 10 days to
the City Clerk.
Acting Chair Jones read Agenda Item No. 3 into the record.
o
PD 98-06
Long, H.
Public Heating to consider the application of Mr. Harold Long
for a Planned Development Permit (PD 98-06) to allow the
construction of a two-story, 8,741 square foot office
development on property located at 891 W. Hamilton Avenue
in a PD (Planned Development) Zoning District. A Negative
Declaration has been prepared for this project. Tentative City
Council Meeting Date: November 2, 1998. -~ '
Ms. Aki Irani, Planner I, presented the staffreport as follows:
· Applicant is seeking approval of a Planned Development Permit to allow the development of
a two-story office building.
· The project site is located on the northeast comer of Hamilton at Marathon.
· Surrounding uses include apartments, a service station, a restaurant and commercial uses.
· The proposal is consistent with the General Plan and Zoning of the site.
· There are no environmental impacts.
· The proposal is for a 8,741 square foot office building with two driveways off of Marathon
Drive.
· The building proposed is a modem style office building which includes two large concrete
tower elements.
· Staff is supportive of the project but has concerns about the unenhanced rear and east
elevations. To counter that concern, staff is recommending the use of additional landscaping.
Planning Commission Minutes of October 13, 1998 Page 6
Additionally, the applicant is seeking a Tree Removal Permit to remove six trees trees, a
mature walnut and five pines.
Staff is supportive of the applicant's request for less parking and smaller stalls. They will
provide 34 spaces while 39 are required. The standard parking stall is 9 x 20 while the
applicant is proposing stalls which are 9 x 18.
Commissioner Gibbons presented the Site and Architectural Review Committee report as
follows:
· SARC extensively reviewed this project and had concerns regarding parking. SARC is
supportive of the reduction in parking stall size and number of stalls.
· SARC seeks a condition that prevents the parking of construction vehicles and/or equipment
on site.
Acting Chair Jones opened the Public Hearing for Agenda Item No. 3.
Acting Chair Jones closed the Public Heating for Agenda Item No. 3.
Commissioner Keams sought clarification about the installation of landscaping at the property
line and about the need for an easement.
Ms. Aki Irani advised that trees are recommended by staff and tall shrubs by SARC. She added
that there is an existing 20 foot easement and the applicant must show proof that they will be
allowed to install landscaping there. This easement must be kept open.
Motion:
Upon motion of Commissioner Gibbons, seconded by Commissioner
Lindstrom, the Planning Commission adopted Resolution No. 3188
recommending the granting of a Negative Declaration and recommending the
approval of a Planned Development Permit (PD 98-06) to allow the
construction of a two-story, 8,741 square foot office development unit on
property located at 891 W. Hamilton Avenue, by the following roll Call vote:
AYES: Francois, Gibbons, Jones, Kearns, Lindstrom, Meyer-Kennedy
NOES: None
ABSENT: Lowe
ABSTAIN: None
Acting Chair Jones advised that this project will be considered by Council at its meeting of
November 2, 1998.
Acting Chair Jones read Agenda Item No. 4 into the record.
ITEM NO. 3
STAFF REPORT - PLANNING COMMISSION MEETING
OF OCTOBER 13, 1998
PD 98-06
Long, H.
Public Hearing to consider the application of Mr. Harold Long for a
Planned Development Permit (PD 98-06) to allow the development of an
8,741 square foot, two-story office building on property located at 891
W. Hamilton Avenue in a PD (Planned Development) Zoning District.
STAFF RECOMMENDATION
That the Planning Commission take the following action:
1. Recommend that the City Council grant a Negative Declaration for this project based upon
the attached findings; and
Adopt a Resolution, incorporating the attached findings, recommending that the City Council
approve a Planned Development Permit to allow the development of a two-story office
building, subject to the attached Conditions of Approval; and
3. Recommend that the City Council approve a Tree Removal Permit to allow removal of six
(6) trees in conjunction with the development of the project.
ENVIRONMENTAL DETERMINATION
In accordance with CEQA, the City conducted an Initial Study for this project. The results of
the study determined that no significant impacts would be created as a result of this project.
Based upon the information provided in the environmental assessment, Staff recommends that
the Planning Commission recommend that the City Council adopt the Negative Declaration
prepared for this project. The Initial Study and the findings in support of the Negative
Declaration are included as an attachment to this report.
PROJECT DATA
Gross Lot Area:
Net Lot Area:
.65 acres
.34 acres
28,500 square feet
14,760 square feet
Site Utilization:
Building Coverage:
Landscape Coverage:
Paving Coverage:
54%
20%
26%
7,937 sq. ft.
2,888 sq. ft.
3,935 sq. ft.
Floor Area Ratio (FAR):
.59
8,741 sq. ft.
Parking
Provided:
Required:
35 parking spaces
39 parking spaces
Staff Report- Planning Commission Meeting of October 13, 1998
PD 98-06 - 891 W. Hamilton Avenue
Page 2
DISCUSSION
Applicant's Proposal: The applicant is requesting approval of a Planned Development Permit
(PD 98-06) to construct a new two-story office building on property located at 891 W. Hamilton
Avenue. The subject property is located on the northeast comer of W. Hamilton Avenue and
Marathon Drive and is surrounded by an apartment complex to the north, a service station and
apartment complexes to the west across Marathon Drive, a restaurant to the east and
commercial/retail uses to the south across W. Hamilton Avenue.
Background: The project site is currently vacant and undeveloped. The site was previously
developed with a service station; however, the service station, including all structures, dispenser
islands, canopy, and underground tanks and utilities were demolished and removed from the site
in late 1996. The Santa Clara County Central Fire District stated that the removal of all
structures on site complied with all Fire Department regulations. The Santa Clara Valley Water
District also evaluated the site and found no groundwater contamination, and deemed the site
compliant with the Water District regulations.
ANALYSIS
General Plan Designation: The General Plan land use designation for the project site is
commercial. The proposed office building is a commercial use and is, therefore, consistent with
the General Plan.
Zoning Designation: The zoning designation for the project site is Planned Development (PD).
The Planned Development zoning designation allows for the development of uses consistent with
the General Plan with greater flexibility in the arrangement of buildings on site and building
design in order to promote a quality development which is consistent and compatible with the
character of the surrounding neighborhood. The proposed project as conditioned as a
commercial office development achieves this goal.
Site Plan: The proposed site plan illustrates the development of a two-story, 8,741 square foot
office building on the northeast comer of W. Hamilton Avenue and Marathon Drive served by
two (2) driveways along Marathon Drive. One driveway allows access into the proposed
building, which provides parking on the first floor of the building. A second driveway access is
provided within a pedestrian and vehicular ingress, egress and right-of-way easement in favor of
the project site and is located north of the subject property. The second driveway provides access
to the proposed parking spaces behind the building along the north elevation of the building.
The existing driveway access along W. Hamilton Avenue at the southeast comer of the property,
which is shared between the subject property and the adjacent property to the east, will require
partial removal and remodeling to serve only the adjacent property to the east (restaurant use).
The applicant has submitted a letter dated September 14, 1998, and signed by the adjacent
property owners to the east, which agrees to the removal of the easements on the southeast comer
of the property and modification to this existing shared driveway. The letter also agrees to allow
the installation of trees along the wall adjacent to the apartment complex property to the north for
additional screening. Planning Staff has added a condition which requires that the applicant
Staff Report - Planning Commission Meeting of October 13, 1998
PD 98-06 - 891 W. Hamilton Avenue
Page 3
indicate on a title report that the easements have been amended to incorporate the above-
referenced changes to verify that such changes can be accommodated on the easements prior to
the issuance of building permits.
The proposed setback of the building includes a 10-foot setback along the front of the building
facing W. Hamilton Avenue, a 23-foot setback from the rear property line to the north, a 1 O-foot
setback to the west along Marathon Drive and a 5-foot setback along the east side of the property
facing the restaurant. With the proposed driveway easement north of the project site, there will
be a 44-foot setback from the apartment complex property to the north. Planning Staff is
supportive of the proposed site plan with the understanding that the 20-foot pedestrian and
vehicular easement will be maintained for the life of the development to ensure proper access to
the rear parking area for the development, and to serve as an additional setback buffer from the
adjacent apartment complex property to the north.
Floor Plans and Building Design: The proposed floor plans indicate a 1,947 square foot office
area on the first floor of the building facing W. Hamilton Avenue and the remaining 6,794 square
feet of office area on the second floor. The main entrance to the building will be provided at the
comer of the building along W. Hamilton Avenue and Marathon Drive adjacent to the stucco
tower elements.
The proposed colors for the building include a navajo white color for the body of the building, a
cherokee blue color for the window and door framing, and an anodized copper color for the
concrete tile roof.
The design of the proposed office building is a modem-style, two-story, 30-foot high office
building with a stucco exterior and concrete tile roofing, and will be accented by two large
concrete stucco tower elements protruding from the building. A covered porch will also be
provided on the southeast comer of the building accessed from the first floor office space. The
two concrete stucco towers will be located near the comer of the building and will be visible
from W. Hamilton Avenue and Marathon Drive.
The elevations along both street frontages and for a portion of the east elevation over the covered
porch area will be enhanced and articulated by insetting the second floor building wall from the
first floor building walls. The articulation along these elevations will be further enhanced by
providing a roof element over the first floor portions of the building. However, the remaining
east and north (rear) elevations of the building will not be enhanced or provide articulation
between the first and second story portions of the building. These elevations show a 22-foot
high, two-story wall which will be highly visible from the adjacent apartment buildings north of
the project site and from the shopping center to the east. In addition, the first floor portions of the
building facing the east and north (rear) elevations will primarily be open and supported by
columns, which will allow visibility of the parking spaces from within the building.
Staff Report - Planning Commission Meeting of October 13, 1998
PD 98-06 - 891 W. Hamilton Avenue
Page 4
Planning Staff is concerned that these unenhanced elevations along the east and north (rear)
elevations will be unattractive as viewed from the residential uses to the north and from the
commercial uses to the east along W. Hamilton Avenue. Visibility of these unenhanced
elevations is greater given that the building will be significantly taller than adjacent buildings.
Planning Staff is generally supportive of the design of the building and site plan, but believes that
additional enhancements are necessary to mitigate the heightened visibility of the development.
These enhancements include installation of landscaping within the easement north of the project
site and also along the northern (rear) and eastern elevations of the building to soften the
unarticulated two-story high building walls along those elevations. Without these additional
landscaping requirements, Staff recommends that the applicant reduce the size of the building
and building coverage to provide a landscaping buffer on the property which will provide
sufficient screening between the commercial development and the apartment complex property,
and revise the plans to soften the appearance of the northern (rear) and eastern elevations of the
proposed building.
Landscaping/Proposed Tree Removal: The project site currently has one (1) mature 30-inch
diameter walnut tree within the northern portion of the property, which will require removal to
accommodate the development. There are also five (5) mature pine trees east of the subject
property near the property line, which the applicant is requesting, with the adjacent property
owner's permission, to remove in conjunction with the development. The applicant is requesting
approval to remove these trees on the adjacent property and is intending to install new trees along
the east side of the property which will better accommodate the development.
The removal of these trees will require approval of a tree removal permit per the recently adopted
Tree Protection Ordinance for the City. The tree removal permit is granted by the approval
authority for the development project, which in this case is the City Council, since the project
requires City Council approval of the Planned Development Permit. The applicant is requesting
that the Planning Commission recommend that the City Council approve the tree removal permit
to allow the development of the project. If a tree removal permit is granted by the City Council,
the applicant will be required at a minimum to plant one (1) 24-inch box tree on-site for each 12-
inch to 24-inch diameter tree removed, and one (1) minimum 36-inch box tree on site for each
24-inch or greater diameter tree removed.
The applicant will also be required to install the required streetscape improvements for Hamilton
Avenue. The streetscape improvements entail installation of a 10-foot landscaped parkway with
turf and street trees along W. Hamilton Avenue, a 7-foot wide detached sidewalk and a minimum
10-foot wide landscape buffer behind back of sidewalk with street trees, shrubs, turf and ground
cover. The required street tree for Hamilton Avenue is the Evergreen Ash tree, to be planted 40-
feet on center in double triangulated rows. Along Marathon Drive, the applicant will be required
to provide the Evergreen Ash trees within tree wells in the sidewalk.
Staff Report - Planning Commission Meeting of October 13, 1998
PD 98-06 - 891 W. Hamilton Avenue
Page 5
In addition to the above-referenced landscaping requirements, Planning Staff also recommends
that the applicant obtain approval from the property owner of the pedestrian and vehicular
easement to allow the applicant to install trees for screening along the wall adjacent to the
apartment complex property to the north. Planning Staff recommends that 24-inch box trees be
planted in tree wells, 20 feet on center along the existing wall within the pedestrian and vehicular
easement to provide screening. This is based upon standard requirements for commercial
developments in commercial zoning districts to provide a minimum 6-foot high masonry wall
and a landscape buffer with trees and plants to screen such uses from adjoining residentially
zoned properties. Planning Staff also recommends that half-diamond tree planters be installed
20-feet on center along the northern elevation of the building within the parking spaces along the
building to further provide relief from the unarticulated two-story building wall facing the
apartment complex to the north.
Planning Staff has added a condition of approval for the project which requires that the applicant
submit a landscape and irrigation plan for review and approval by the Community Development
Director prior to issuance of building permits for the project, which specifies the incorporation of
the above-referenced landscape proposal.
Parking: The applicant is providing a total of 35 parking spaces for the project, which does not
meet the City's parking requirements for general office developments. The City's Parking
Ordinance requires 1 parking space for each 225 square feet of gross floor area; the applicant
would be required to provide 39 parking spaces using this standard. The applicant is requesting a
parking adjustment to allow a parking standard of 1 space for each 250 square feet of gross floor
area.
Planning Staff is generally supportive of the applicant's request to use a lesser parking standard
of 1 space for each 250 square feet of gross floor area, as it appears that many surrounding cities
use similar or more lenient parking requirements for office developments. The Town of Los
Gatos requires 1 space for each 250 square feet and the Cities of Santa Clara and Mountain View
require 1 space for each 300 square feet.
Upon review of the parking layout for the development, the applicant is proposing 22 parking
spaces within the building on the first floor and 13 parking spaces outside of the building along
the north elevation. In addition to the request for a lesser parking standard, the applicant is also
requesting approval of a parking adjustment for parking space dimensions which do not meet the
standard parking dimensions of 9 feet by 20 feet. The proposed "standard" parking dimension is
9 feet by 18 feet. Planning Staff is supportive of this request. Planning Staff is concerned with
the parking spaces numbered 24, 25 and 26. Their size and location make backing out of the
spaces difficult. Staff recommends that one space be removed.
Staff Report - Planning Commission Meeting of October 13, 1998
PD 98-06 - 891 W. Hamilton Avenue
Pase 6
Site and Architectural Review Committee: The Site and Architectural Review Committee
reviewed the application at its meeting of September 22, 1998 and expressed the following
comments:
The Committee expressed concern that the proposed parking space widths for spaces abutting
the support columns will only be 8 feet 5 inches wide instead of the required 9 feet, given the
width and location of the support columns of the building to be located within the parking
area. The applicant has stated that the columns will be 14 inches wide, which means that
parking spaces on either sides of the columns will have widths reduced by 7 inches each. The
Committee also raised concerns that the location of the columns at the end of the parking stall
will create maneuvering difficulties, particularly when turning into the spaces. The
Committee recommends that the applicant inset the columns a few feet into the length of the
parking spaces, so that there is better maneuvering ability available for drivers to turn into
parking spaces.
The Committee was supportive of the reduced parking standard of 1 space for each 250
square feet of gross floor area, but additionally recommended that one of the three parking
spaces, either space number 24, 25 or 26 be removed for better maneuvering within the
parking area.
o
The Committee recommends that high shrubs which would grow a minimum height of 8 feet
be planted in the pedestrian and vehicular easement along the wall adjacent to the apartment
complex to the north, rather than trees as Planning Staff has recommended. The Committee
expressed concern that the roots of trees may uplift and create maintenance problems within
the paved easement, and as a result recommends that Oleander bushes or similar type of
planting be used to achieve screening purposes.
4. It was recommended that the landscape plan be revised to show the required street trees
(Evergreen Ash trees) in tree wells within the sidewalk along Marathon Drive.
o
It was also recommended that the applicant submit a letter stating that there will be no
construction equipment and/or vehicles parked on the property and that there would be no
overnight parking of vehicles in the parking lot. The Committee also asked that the applicant
state the total number of employees and visitors that are anticipated to use the parking lot.
6. The Committee stated that the applicant should comply with the City's recently adopted Tree
Protection Ordinance pertaining to the proposed removal of trees for the development.
Staff Report - Planning Commission Meeting of October 13, 1998
PD 98-06 - 891 W. Hamilton Avenue
Page 7
Attachments:
1. Planning Commission Findings for PD 98-06
2. Planning Commission Conditions of Approval for PD 98-06
3. Exhibits
4. Initial Study/Environmental Documentation
5. Location Map
Approved by:
Aki R. Irani, Planner I
Sharon Fierro, Senior Planner
Attachment #1
PLANNING COMMISSION FINDINGS FOR APPROVAL OF FILE NO. PD 98-06
SITE ADDRESS: 891 W. Hamilton Avenue
APPLICANT: Harold Long
P.C. MEETING: October 13, 1998
Planning Commission Recommended Findings for Approval of a Planned Development Permit
to allow the development of a two-story office building
The Planning Commission finds as follows with regard to File No. PD 98-06:
1. The proposed project is located on property with a commercial land use designation under the
General Plan.
2. The Planned Development Permit to allow a two-story, 8,741 square foot office development
is consistent with the Land Use Element of the General Plan.
o
The proposed office building, as conditioned, is well designed and architecturally compatible
with other developments in the surrounding area and is consistent with the development
standards for commercial uses.
4. The proposed project is compatible with the adjacent residential and commercial uses.
5. The proposed project will install the streetscape improvements along Hamilton Avenue in
compliance with the City's Streetscape Standards.
o
The requirement to maintain the pedestrian and vehicular ingress, egress and right-of-way
easement for the life of the development is necessary to maintain access to the exterior
parking spaces for the development along the northern portion of the property and to provide
additional space as a setback buffer between the proposed commercial development and the
adjacent residential property to the north.
The proposed landscaping within the pedestrian and vehicular easement along the wall
adjacent to the residential property to the north is necessary to provide screening and enhance
the appearance of the proposed development from the adjacent residential property to the
north.
o
The removal of the existing walnut tree on-site and the existing pine trees on the adjacent
property to the east is necessary as it restricts the economic enjoyment of the property and
creates an unusual hardship for the property owner to develop the project as proposed.
°
The proposed reduction in the number of required parking spaces and in the required parking
stall sizes for the project is adequate to serve the proposed project and is consistent with
parking standards for office developments in other surrounding cities.
Findings - Planning Commission Meeting of October 13, 1998
PD 98-06 - 891 W. Hamilton Avenue
Page 2
10. The location of support columns for the building, size of the development and proposed
office use are circumstances which comprehensively warrant a reduction in the number of
required parking spaces and in the required parking stall sizes for the project.
11. An initial study was prepared for this project and no significant environmental impacts were
found.
Based upon the foregoing findings of fact, the Planning Commission further finds and concludes
that:
1. The proposed development and uses clearly will result in a more desirable environment and
use of the land than would be possible under any other zoning classification.
2. The development and uses will be compatible with the General Plan of the City and will aid
in the harmonious development of the immediate area.
3. The proposed development will not be detrimental to the health, safety or welfare of the
neighborhood or the City as a whole.
No substantial evidence has been presented which shows that the project, as currently
presented, and subject to the required conditions of approval, will have a significant adverse
impact on the environment.
5. No evidence has been presented which shows that the project will have a substantial impact
on plant or animal life.
Attachment//2
PLANNING COMMISSION CONDITIONS OF APPROVAL FOR FILE NO. PD 98-06
SITE ADDRESS: 891 W. Hamilton Avenue
APPLICANT: Harold Long
P.C. MEETING: October 13, 1998
The applicant is hereby notified, as part of this application, that he/she is required to meet the
following conditions in accordance with the ordinance of the City of Campbell and the State of
California. The lead department with which the applicant will work is identified on each
condition where necessary. Additionally, the applicant is hereby notified that he/she is required
to comply with all applicable Codes or Ordinances of the City of Campbell and the State of
California that pertain to this development and are not herein specified:
COMMUNITY DEVELOPMENT DEPARTMENT
1. Approved Project: Approval is granted to construct a two-story, 8,741 square foot office
building on property located at 891 W. Hamilton Avenue and shall substantially conform to
the project exhibits listed below, except as may be modified by the Conditions of Approval
herein:
A. Combined Site plan and first floor plan prepared by Sophia M. Ostoya, Architect, dated
as submitted on September 3, 1998.
B. Second floor plan prepared by Sophia M. Ostoya, Architect, dated as submitted on
September 3, 1998.
C. Roof plan prepared by Sophia M. Ostoya, Architect, dated as submitted on September 3,
1998.
D. Building elevations prepared by Sophia M. Ostoya, Architect, dated as submitted on
September 3, 1998.
E. Streetscape plan prepared by Sophia M. Ostoya, Architect, dated as submitted on
September 3, 1998.
F. Color/material board and colored perspective submitted by Sophia M. Ostoya, Architect.
G. Preliminary Grading and Drainage Plan prepared by Mission Engineers, Inc. dated as
submitted on September 3, 1998.
Building Window Treatment: The applicant shall install window treatment on the windows
surrounding the parking garage portion of the building which are the same and consistent
with the window treatment used on the windows for the office building.
Landscaping: Prior to the issuance of building permits for the project, the applicant shall
submit landscaping and irrigation plans for review and approval by the Community
Development Director that incorporates the following:
A. Compliance with the City's Streetscape Standards for Hamilton Avenue which includes
the installation of a 10-foot wide landscaped parkway, a 7-foot wide sidewalk and a
minimum 10-foot wide landscaped buffer, and street trees planted 40 feet on center in
double triangulated rows.
Conditions of Approval - Planning Commission Meeting of October 13, 1998
PD 98-06 - 891 W. Hamilton Avenue
Page 2
o
o
B. Compliance with the City's Tree Protection Ordinance including obtainment of a tree
removal permit to remove any trees in conjunction with the development of the project
and replacement of trees required in conjunction with the development of the project.
C. Compliance with the City's Water Efficient Landscape Standards (WELS) for the
protection of any trees in conjunction with the development of the project.
D. Installation of minimum 24-inch box street trees planted 40 feet on center in tree wells
along Marathon Drive.
E. Installation of minimum 24-inch box trees and groundcover to be planted 20 feet on
center within the pedestrian and vehicular easement to the north of the project site along
the wall adjacent to the apartment complex property to the north for a length equal to the
length of the subject property.
F. Installation of minimum 24-inch box trees, minimum 5-gallon shrubs in the form of
clinging vines and groundcover in half-diamond planters to be located between the
parking spaces located along and adjacent to the north elevation of the proposed office
building. The clinging vines shall be trained to grow along the building wall on the
northern elevation.
G. Installation of minimum 24-inch box trees, minimum 5-gallon shrubs and groundcover
along the east sideyard setback of the proposed office building.
Landscape Maintenance: The applicant shall be required to provide on-going maintenance of
the required landscaping for the project as approved by the Conditions of Approval herein.
Approval by Adjacent Property Owner: Prior to the issuance of grading and building permits
for the project, the applicant shall be required to obtain and submit verification of the
following:
A. Approval by the adjacent property owner to the north of the subject site to amend the
easement(s) on the property to allow the addition of landscaping in the form of minimum
24-inch box trees and groundcover planted 20 feet on center along the existing wall
adjacent to the apartment complex property to the north.
B. Approval by the adjacent property owner to the north of the subject site to maintain for
the life of the project a pedestrian and vehicular ingress, egress, and right-of-way
easement to provide access to and from the site from Marathon Drive.
C. Approval by the adjacent property owner to the east of the subject site to remove the
easement requiring the shared driveway access along W. Hamilton Avenue to allow
remodeling of the existing commercial shared driveway along W. Hamilton Avenue to
serve only the adjacent property owner to the east.
D. A title report which indicates that the easements have been amended and recorded to
accommodate the approvals required in Condition Nos. 5A, 5B and 5C.
Outdoor Storage: No outdoor storage is permitted on the property and/or pedestrian and
vehicular easement to the north of the project site. No construction equipment, construction
vehicles, and/or construction debris shall be parked and/or stored on the property and/or on
the pedestrian and vehicular easement to the north of the project site at any time.
Conditions of Approval - Planning Commission Meeting of October 13, 1998
PD 98-06 - 891 W. Hamilton Avenue
Page 3
Parking and Driveway: Prior to the issuance of building permits for the project, the applicant
shall comply with Chapter 21.50 of the Campbell Municipal Code, unless modified by the
Conditions of Approval herein and shall amend the plans to incorporate the following:
A. Deletion of one (1) parking space, either space number 24, 25 or 26, and revision of the
parking layout to situate the remaining two spaces so that there will be no possibility of
maneuvering difficulties for these spaces and the adjacent spaces #23 and #35.
Movement of the support columns to be inset a few feet into the length of the parking
spaces located within the first floor of the proposed building, so that there is better
maneuvering ability available for drivers to turn into parking spaces.
o
Parking Adjustment: The applicant is permitted a parking adjustment to provide a reduction
in the number of required parking spaces and a reduction in the required parking stall sizes
for the proposed project. The applicant shall be required to provide a total of 34 parking
spaces (21 spaces with a minimum dimension of 9 feet by 18 feet, 13 compact spaces with a
minimum dimension of 8 feet by 18 feet).
9. Americans With Disabilities Act: The applicant shall be required to comply with all
Americans with Disabilities Act requirements.
10. Building Division Requirements: The applicant shall comply with all Building Code
requirements and obtain necessary permits as determined by the City's Building Division.
11. Fences/walls: Any newly proposed fencing and/or wall shall comply with Section 21.59.090
of the Campbell Municipal Code and shall be submitted for review and approval by the
Community Development Department.
12. Property Maintenance: The property is to be maintained free of any combustible trash, debris
and weeds until the time that actual construction commences. All existing structures shall be
secured by having windows boarded up and doors sealed shut, or be demolished or removed
from the property (Section 11.201 and 11.414, 1985 Ed. Uniform Fire Code).
13. Location of Mechanical Equipment: No roof-mounted mechanical equipment, i.e. air
conditioning units, shall be located on the roof of building without providing screening of the
mechanical equipment from public view. Screening material and method shall require review
and approval by the Community Development Director prior to installation of such
mechanical equipment screening.
14. Utility Boxes and Back-Flow Preventers: Applicant to submit a plan prior to installation of
PG&E utility (transformer) boxes and San Jose Water Company back-flow preventers,
indicating the location of the boxes and screening (if the boxes are above ground) for
approval by the Planning Division.
Conditions of Approval - Planning Commission Meeting of October 13, 1998
PD 98-06 - 891 W. Hamilton Avenue
Page 4
15. Trash Disposal/Recycling: The applicant shall submit details regarding the design and
location of trash disposal/recycling facilities to the City for review and approval prior to the
issuance of building permits for the project. The design of the trash enclosure shall match the
building in terms of color and finish. Decorative tile trim cap shall match the roof tile.
16. On-site lighting: On-site lighting shall not create a glare on adjacent properties, and shall be
shielded away from adjacent properties and directed on-site. The applicant shall provide a
lighting plan indicating the location of all light fixtures on site and on the building prior to
issuance of building permits. All outdoor light fixtures shall use low pressure sodium lamps.
17. Signs: Any signs proposed to be erected on site shall require approval of a Sign Permit. A
Sign Permit may be granted upon complete submission of a Sign application and approval by
the Community Development Department, in accordance with the City's Sign Ordinance. No
sign shall be permitted until the application is approved and a permit issued.
18. Construction Mitigation Measures: The applicant shall implement the following construction
mitigation measures:
A. Construction activities will be limited to daytime hours of 8:00 am to 5:00 p.m. weekdays
and 9:00 a.m. to 4:00 p.m. Saturdays. Construction is prohibited on Sundays and
Holidays unless an exception is granted by the Building Official.
B. No pile driving is allowed for construction of the project.
C. All internal combustion engines for construction equipment used on the site will be
properly muffled and maintained.
D. All stationary noise generating construction equipment, such as air compressors and
portable power generator, will be located as far as practical from the existing residences
and businesses.
E. All active construction areas shall be watered at least twice daily.
F. Cover all trucks hauling soil and other loose materials stationed or prior to leaving the
site.
G. Pave, apply water, or apply non-toxic soil stabilizers on all unpaved surfaces, and staging
areas at the construction site.
H. Sweep daily all paved access roads, parking areas, staging areas, and adjacent public
streets as directed by the City Engineer.
I. Enclose, cover, water or apply soil binders to exposed stockpiles.
J. Install sandbags or other erosion control measures to prevent runoff to all roadways,
waterways or pubic walkways accessed by the public.
CENTRAL FIRE DISTRICT:
19. Automatic Fire Sprinkler System Required: Buildings requiring a fire flow in excess of
2,000 GPM, or in excess of two stories in height, or 35 feet in height, shall be equipped
throughout with an approved automatic fire sprinkler system. The fire sprinkler system shall
be hydraulically designed per National Fire Protection Association (NFPA) Standard #13,
1994 edition. Fire sprinklers are also to be included within the space of the parking garage.
Conditions of Approval - Planning Commission Meeting of October 13, 1998
PD 98-06 - 891 W. Hamilton Avenue
Page 5
20. Final Required Fire Flow: Required fire flow may be reduced up to 50% in buildings
equipped with automatic fire sprinkler systems, but can be no less than 1500 GPM.
Therefore, the final required fire flow is 1750 GPM at 20 psi. residual pressure. This flow
shall be taken from any two fire hydrants, on or near the site so long as they are spaced at a
maximum spacing of 250 feet.
21. Fire Department Key Box Required: Provide an approved fire department key box and
appropriate building keys. Installations shall conform with Fire Department standard Detail
and Specification K-1.
PUBLIC WORKS DEPARTMENT:
22. Driveway: Prior to the issuance of any grading or building permits for the site, the property
owner shall provide evidence that they have the legal right to use the northerly driveway, a
portion of Parcel C of PM 282 M55, for access and parking, or shall obtain such rights.
23. Preliminary Title Report: Prior to the issuance of any grading or building permits for the site,
the applicant shall provide a current Preliminary Title Report.
24. Right-of-Way for Public Street Purposes: Prior to issuance of any grading or building
permits for the site, the applicant shall grant an additional 7 feet of Right-of-Way for Public
Street Purposes along the Hamilton Avenue frontage to accommodate a 67 foot right-of-way
from the centerline with a 20 foot property return radius for installation of the City standard
boulevard walk. Applicant shall cause to be prepared all documents necessary to record
dedication and submit to the City for review.
25. Street Improvements: Prior to the issuance of any grading or building permits for the site, the
applicant shall execute a street improvement agreement and shall cause plans for public street
improvements to be prepared by a registered civil engineer, pay fees, post security and
provide insurance necessary to obtain an encroachment permit for construction of the public
improvements, as required by the City Engineer. The plans shall include the following:
Marathon Drive
· Removal of existing curb, gutter, and sidewalk.
· Construction of new curb and gutter, City standard commercial walk, street trees at 40
feet on center, tree wells, and irrigation system.
· Construction of two standard commercial driveways in accordance with an approved site
plan and ADA requirements.
Hamilton Avenue
· Removal of existing curb, gutter, sidewalk, and street tree.
· Construction of City standard boulevard walk including trees, landscape, and irrigation
system.
· Installation of one new streetlight and appurtenances.
Conditions of Approval - Planning Commission Meeting of October 13, 1998
PD 98-06 - 891 W. Hamilton Avenue
Page 6
Removal and remodeling of the existing commercial shared driveway with City standard
driveway approach (ADA compliant) to only serve the adjacent restaurant to the east, as
conceptually shown on the approved revised Site Plan.
Marathon Drive and Hamilton Avenue
· Installation of all existing and proposed water meters and sewer cleanouts on private
property behind the public right-of-way line.
· Removal and installation of traffic signs and striping as determined by the City Engineer.
· Removal of existing curb ramp and construction of new curb ramp and the return to be
compatible with the existing curb ramp on the west side of Marathon Drive.
· Removal and replacement of asphalt paving as needed for installation of concrete curbs
and gutters.
· Relocation, protection, relocation, adjustment and/or modification of existing and
proposed utilities as necessary.
· Construction of conforms to existing improvements.
26. Utilities: All new on-site Utilities shall be installed underground per Section 20.36.150 of
the Campbell Municipal Code for any new or remodeled buildings or additions. Applicant
shall comply with all plan submittals, permitting, and fee requirements of the serving utility
companies.
27. Utility Installation Plan: Prior to issuance of building permits for the site, the applicant shall
submit a Utility Installation Coordination Plan and Schedule for approval by the City
Engineer for installation and/or abandonment of all utilities. Streets which have been
resurfaced within the previous 5 years will require boring and jacking for all new utility
installations. Applicant shall also prepare pavement restoration plans for approval by the
City Engineer prior to any utility installation or abandonment.
28. Maintenance Security: Prior to issuance of occupancy approval for the site, all public street
improvements required by the street improvement agreement and the encroachment permit
must be completed and accepted by the City and the applicant must provide a one-year
Maintenance Security in an amount of 25% of the Faithful Performance Bond.
29. Grading and Drainage Plan: Prior to issuance of any grading or building permits for the site,
the applicant shall conduct hydrology studies based on a 10 year storm frequency, prepare an
engineered Grading and Drainage Plan, and pay fees required to obtain necessary grading
permits. The plans shall comply with the 1994 edition of the UBC including Chapters 18, 33,
and Appendix Chapter 33. Should the development require hauling of soil or other
demolition materials on or off site, the applicant shall request and obtain approval of a haul
route from the City Engineer. The plans shall include reconstruction of the northerly
driveway and conforms to existing improvements.
Conditions of Approval - Planning Commission Meeting of October 13, 1998
PD 98-06 - 891 W. Hamilton Avenue
Page 7
30. Storm Water Pollution Prevention Measures: Prior to issuance of any grading or building
permits, the applicant shall comply with the National Pollution Discharge Elimination
System (NPDES) permitting requirements and the California Storm Water Best Management
Practices handbook prepared by the Storm Water Quality Task Force, Santa Clara Valley
Water District and the City of Campbell Municipal Code regarding Storm Water Pollution
Prevention.
31. Monuments: A Record of Survey or Comer Record shall be filed in accordance with the
requirements of the Land Surveyor's Act for all Monuments set.
32. Site Plan: The applicant shall provide a complete and accurate Site Plan which includes the
information listed on the Planning Division's check list. It shall include all the existing
easements related to the property per the preliminary title report.
.LARGO
Concrete Inc.
September 14, 1998
Shigeru and June Tachibana
12321 Stonebrook Court
Los Altos Hills, CA 94022
650/948-1744
Re'.
851 W. Hamilton Avenue
Campbell, CA
Dear Shig and June,
Enclosed is a copy of the set of preliminary plans which we have submitted to the city of
Cambell for planning department approval. I am writing to you at this time to make the
following requests:
1. ELIMINATION OF EASEMENTS.: On Sheet C-1 you will find four triangular
areas which I have colored. The two red ones are on my property, the two yellow
ones are on your property. It appears that these are easments were granted
primarily for the convenience of union oil. I no longer see any need for the
existence of these easements. If you are in agreement I will have the proper
paperwork drawn up to have them eliminated. In doing this I would also want to
rebuild the west side of the driveway in to your property off of West Hamilton.
Your driveway would still be over 20 feet wide.
2. NEW TREES ON YOUR PROPERTY.: The city of Campbell has asked me to
plant 4 trees along the north side of the piece of your property that runs behind my
property. I have marked these trees in yellow on both sheets L-1 and C-1. Since
this will effectively narrow the width of this alley I will pave the northern 5 feet of
my property so that the driving area will end up being 25 feet wide instead of the
present 20 feet wide. This will offset the effect of the trees narrowing the drive
area. If you will grant this request I will repave the entire 120 feet of your
property which is the area we are talking about in this paragraph.
3. REMOVAL OF PINE TREES.: The 5 pine trees on the west side of your property
are rather unsightly. If you have no objections I would like to remove these trees
and replace them with a different specimen. I would also like to extend the line of
trees further down this property line towards Hamilton Avenue.
/~eoc~quo#er$: 310 W. Hamilton Ave., Suite 203 · Campbell, CA 95008 · (408) 378-4404 · Fox 378-4514
Southern CA: 1801 Edinger, Suite 200 · Santo Ana, CA 92705 · (714)547-5600 · Fax 547-5120
License #592909
If you have any questions about any of these requests please call me.
If you are in agreement with these changes please sign where indicated below and I will
have the proper paperwork drawn up.
Sincerely,
Largo Concrete, Inc.
Harold D. Long
President
HDL/cmo
Accepted By:.
Accepted By:
K: \CHA KLOT'ISHAL\TCHIBNA. DOC
- .LARGO
Concrete Inc.
September 29, 1998
Ms. Aki Irani
Planner I
Community Development Department
City of Campbell
70 North First Street
Campbell, CA 95008-1423
408/866-2140 FAX: 408/866-8381
Re: 891 W. Hamilton Avenue
RECEIVED
CiTY OF CA,UP, ELL
PLANNING DE .
Dear Aki,
The above referenced building is going to be Largo Concrete, Inc.'s corporate
headquarters. By the nature of our business we are a low density operation. The
minimum size for each engineer's office is 10' x 13'. They need this room to unroll and
compare plans for estimating and project managing purposes. As a result there will be a
maximum of 25 people working on the second floor. The first floor will be used by our
detailing department. There will be approximately 5 people working in this space
preparing drawings for the foremen to use in the field. This means that we will have a
maximum total of 30 people working on this site. With 35 parking spaces there would be
5 spaces left for visitors. This assumes that everyone in the office is at work when there
are visitors which I have never seen happen. Our design was based on 250 square feet of
office space per car which in many areas is the industry standard. I understand that the
Campbell standard is 225 square feet per car but I hope that you will make an
acceptation for our building since we are going to be occupying it ourselves.
It has also been mentioned that you feel that parking spaces #24 through #26 should be
reduced fi:om 3 cars to 2 cars. I do not understand your concern here. If the spaces are
not wide enough for cars then I would be concerned myself. However, they are wide
enough and the only question is how do you get in and out of them. Admittedly it takes a
few more moves than getting into the spaces which are perpendicular to these but it really
isn't that difficult. I would greatly appreciate it if you could let us live with this matter
and have the three parking spaces.
Sincerely,
Largo Concrete, Inc/'~
Harol.d 1~. Long /
President /
HDL/cmo
K:/CI. LAP~LOTT~Ua t st~ a'ntta
Headquarters: 310 W. Hamilton Ave., Suite 203 · Campbell, CA 95008 · (408)378-4404 * Fax 378-4514
Southern CA: 1801 Edinger, Suite 200 · Santa Ana, CA 92705 · (714) 547-5600 * Fax 547-5120
License #592909
CITY OF CAMPBELL, CALIFORNIA
California Environmental Quality Act
INITIAL STUDY
Two-story office building development for Largo Concrete
September 1998
Prepared By:
Aki Irani, Planner I
City of Campbell
Community Development Department
70 North First Street
Campbell CA, 95008
(408) 866-2140
This statement is prepared in compliance with the California Environmental Quality Act
INITIAL STUDY
ENVIRONMENTAL EVALUATION CHECKLIST
I. BACKGROUND
Name and Address of Project Proponent:
Mr. Harold D. Long, President of Largo Concrete, Inc.
310 W. Hamilton Avenue
Suite 203
Campbell, CA 95008
Name of Project:
PD 98-06
Two-story office building
Project Address:
891 W. Hamilton Avenue
Campbell, CA 95008
Project Description:
The project consists of the development of a two-story, 8,741 square foot office building on the
subject site. The project requires approval of a Planned Development Permit (PD 98-06) to allow
the development of the office building.
Environmental Setting:
The project site is located on the north side of West Hamilton Avenue, on the northeast comer of
W. Hamilton Avenue and Marathon Drive. The site is located within a PD (Planned Development)
zoning district and is currently vacant and undeveloped. The site was previously developed with a
service station; however, the service station, including all structures, dispenser islands, canopy, and
underground tanks and utilities were demolished and removed in late 1996. The Santa Clara County
Central Fire District stated that the removal of all structures on site complied with all Fire
Department regulations*. The Santa Clara Valley Water District also evaluated the site and found
no groundwater contamination as of an evaluation in January of 1997, at which time the site was
deemed compliant with SCVWD regulations**.
There is a large 30-inch diameter walnut tree within the northern portion of the property, which will
require approval of a tree removal permit by the City in compliance with the City's Tree Protection
Regulations (Chapter 21.56 of the Campbell Municipal Code) prior to removal. The proposed
location of the office building will require removal of the tree. There are no other trees or
vegetation on the site; however, there are five (5) mature pine trees on the adjacent property to the
east which are along the property line.
Initial Study Page 2
891 W. Hamilton - PD 98-06 September 24, 1998
The site is surrounded by a service station to the west across Marathon Drive, a restaurant to the
east, apartment units to the north and retail commercial uses to the south across West Hamilton
Avenue.
Date Checklist Completed:
Prepared By: Aki Irani
Planner I
September 24, 1998
*Information provided by Richard Baker of the Santa Clara County Central Fire District on 9-24-98.
**Information provided by Kris Tullic of the Santa Clara Valley Water District on 9-24-98.
Initial Study
891 W. Hamilton - PD 98-06
Page 3
September 24, 1998
II. ENVIRONMENTAL IMPACT EVALUATION
Introduction: The following evaluation has been prepared to determine if the project may have a
significant impact on the environment. For the purposes of this study, a significant impact shall
mean a substantial or potentially substantial change in the physical environment.
Evaluations: An "A" rating indicates that based upon the available information, the
environmental coordinator has determined that there will be no impact on the environment. A
"B" rating indicates that the impact will be insignificant. A "C" rating indicates that a specific
change to the project (mitigation measures) could reduce the impact to a level of insignificance.
A "D" rating indicates that the impact may or will be significant.
Discussion: A description of the proposed mitigation measures and the factual data or evidence
used to reach conclusions regarding impact significance is attached following the Determination
in Section III.
Ao
Earth.
Evaluation of the impact of the project upon:
(A) (B) (C) (D)
No Impact Insignifi Insig. if May Be
Mitigated
1. Earth stability or geologic substructure conditions X [-'] ['-'[ [-]
2. Soil Conditions: (disruptions, displacements, compaction or overcrowding) X [--] I--] [-]
3. Topography or ground surface relief features X
4. Unique geologic or physical features X 1'-'] [--] [--]
5. Wind or water erosion of soils (on or off site) X [-]
6. Beach sands, siltation, deposition or erosion which may modify the channel of X
a river or stream or the bed of the ocean or the bay
7. Exposure of people or property to geologic hazards such as earthquakes, X [--I [--] [--1
landslides, mudslides, ground failure, or similar hazards
No geophysical impacts will occur as a result of this project. According to the Geotechnical
Investigation prepared by Lowney Associates for the proposed project site, the site is not located
within an Alquist-Priolo Earthquake Fault Zone and is not near any known earthquake fault. The
nearest earthquake fault is approximately 3 miles away to the southwest. With respect to soil
conditions, samples of the soil were taken and it was found that the subsurface soils were stiff to
hard; therefore, it is determined that the probability of ground movement at the site is low.
Initial Study Page 4
891 W. Hamilton - PD 98-06 September 24, 1998
Although the project site is currently vacant and undeveloped, the site was previously developed
as a service station. However, in late 1996, all structures in conjunction with the service station
use were demolished and removed. With respect to the new development, the project will be
required to comply with all City of Campbell Building Code Standards to reduce the potential for
geophysical hazards.
Be
Air.
Evaluation of the impact of the project upon:
(A) (B) (C) (D)
No Impact Insignif. Insig. if May Be
Mitigated
1. The deterioration of ambient air quality X [~ [~ [-]
2. The creation of objectionable odors X [~] ~] []
3. Air temperatures, moisture, movements, or micro-climates X [-] [--] [~
The proposed project as an office building will not violate any air quality standards. Standard
construction practices will be implemented to ensure that short term dust and dirt impacts due to
construction are minimized.
C. Water.
Evaluation of the impact of the project upon:
(A) (B) (C) (D)
No Impact Insignif. Insig. if May Be
Miti
1. Currents or natural water courses X [--] ~] I--]
2. Absorption rates, drainage patterns, or the rate and amount of surface water [~] X ["] I-]
runoff
3. Flood water courses or flows X ~l ~] []
4. Amount of surface water in any water body X [~ ~l ~]
5. Discharges into surface waters, or alteration of surface water quality X I'-] [--I [--]
6. Direction or rate of flow of ground water X ~1 [--] ~[
7. Ground water quantity (additions, withdrawals, interceptions of an aquifer?) X ['~ [~] [~]
8. Amount of water otherwise available for public water supplies X I--] [-'-i ~]
9. Exposure of people or property to water related hazards (flooding) X [--] ~] ~]
The project will result in an increase in the amount of storm water run-off from the site,
given that the site is currently vacant and undeveloped. However, the run-off is not
Initial Study Page 5
891 W. Hamilton - PD 98-06 September 24, 1998
considered significant since the development will be required to comply with the City codes
and standard conditions to provide for proper drainage on-site; therefore, no additional
mitigation measures are necessary. In addition, the site was previously developed as a
service station prior to demolition which provided impermeable coverage on the lot. It is
not anticipated that the proposed development will provide significantly more impermeable
coverage on the lot than the previous development or any other similar commercial
developments in the surrounding neighborhood. The proposed office building will cover
approximately 50% of the site, with an additional 32% of the site to be paved.
Approximately 18% of the site will be landscaped which will allow for filtration and
percolation of run-off.
De
Plant-life and Wildlife.
Evaluation of the impact of the project upon:
(A) (B) (C) (D)
No Impact Insignif. Insig. if May Be
Mitigated nif.
1. The diversity of species or number of any species of plants X ~1 I--I [--1
2. The number of any unique, rare or endangered species of plants X
3. The normal replenishment of existing species X ['-I
4. Acreage of an agricultural crop X [--I I--[ [--I
5. The diversity of species or numbers of species of animals X I~l
6. Numbers of any unique, rare or endangered species of animals X ["'] [~]
7. The normal migration or movement of animals X
8. Deterioration to existing fish or wildlife habitat X I--I [--I
The project site currently has one (1) tree, which is a 30-inch diameter walnut tree within the
northern portion of the property. The walnut tree is located adjacent to the driveway access
which is along the northern property line. There are also mature pine trees on the adjacent
property to the east. There are no endangered species or habitats of plant life and/or wildlife on
or adjacent to this site; however, the City does have a Tree Protection Ordinance which requires
that any trees with a diameter of 12 inches or more be retained on site, unless a Tree Removal
Permit is obtained to remove a tree. Any trees which are permitted to be removed will be
required to meet the tree replacement requirements per the City of Campbell Tree Protection
Ordinance.
Initial Study Page 6
891 W. Hamilton - PD 98-06 September 24, 1998
Ee
Noise.
Evaluation of the impact of the project upon:
(A) (B) (C) (D)
No Impact Insignif. Insig. if May Be
Miti
1. Existing noise levels [""1 X [] []
2. Exposure of people to severe noise levels X ['--] [~] [-']
The project will not create any significant increases in noise within the surrounding
neighborhood and to adjacent properties as a developed project than would be expected with any
other commercial office uses in the surrounding area. During construction of the project,
additional noise may be created; however, standard construction practices will be implemented to
ensure that construction noise is minimized, and conditions of approval for the project will
require compliance with local ordinances for construction hours and practices.
Fe
Natural Resources and Energy.
Evaluation of the impact of the project upon:
(A) (B) (C) (D)
No Impact Insignif. Insig. if May Be
Miti :nif.
1. Rate of use of any natural resource X [~]
2. Depletion of any nonrenewable natural resource X [--] [--] ["-]
3. Use of substantial amounts of fuel or energy X I--I [--] I'-I
4. Demand upon existing sources of energy X I--I [-']
The project is consistent with the General Plan and will neither conflict with adopted energy
conservation plans, nor waste non-renewable resources.
Ge
Human Health
Evaluation of the impact of the project upon:
(A) (B) (C) (D)
No Impact Insignif. Insig. if May Be
Miti ~nif.
1. The creation of any physical or mental health hazards X [--I [-] I--I
2. Exposure of people to potential health hazards X
3. Risk of explosion of, or release of hazardous substances X [--] [---] l--]
Initial Study Page 7
891 W. Hamilton - PD 98-06 September 24, 1998
The project is not anticipated to create any health or safety hazards. The proposed office building
will be constructed in compliance with the City of Campbell's Building Code Standards. The
Fire Department is also requiring that an approved fire sprinkler system be provided throughout
the building.
He
Visual Impacts
Evaluation of the impact of the project upon:
(A) (B) (C) (D)
No Impact Insignif. Insig. if May Be
Miti nif.
1. Obstruction of any scenic vista or view open to the public X
2. Creation of an aesthetically offensive site open to public view X [~] [-]
3. Production of new light or glare X [-'] [-] ['-]
No scenic vistas or views open to the public will be impacted by the development of this project.
The project is designed to be architecturally compatible with the surrounding commercial
neighborhood in scale and size.
Historical Resources.
Evaluation of the impact of the project upon:
(A) (B) (C) (D)
No Impact Insignif. lnsig, if May Be
Mitigated Si~nif.
1' Significant arche°l°gical °r hist°rical sites' structures' °bjects °r I Xbuildings. I[--1 I[--1 I[--] I
The project site is currently is vacant and undeveloped. The site is not listed on the City's
Historic Resources Inventory List.
Je
Land Use
Evaluation of the impact of the project upon:
(A) (B) (C) (D)
No Impact Insignif. Insig. if May Be
Miti ,
1. Present and/or planned land uses in the area X ~] [--] [--]
2. Population: The location, distribution, density or growth rate of the X [--I ~] [-']
human population in the area
3. Housing: Existing housing or demand for additional housing X [--] ['"-] [-']
4. Transportation: A) The generation of substantial additional vehicular X [~] [--] [--]
movement
Initial Study Page 8
891 W. Hamilton - PD 98-06 September 24, 1998
B) Existing parking facilities, or demand for new parking ['-'] X ['-'] [--]
C) Existing transportation systems X [-'] ['-'] [--]
D) Present patterns of circulation or movement of people and/or goods X
E) Waterborne, rail or air traffic X
F) Traffic hazards to motor vehicles, bicyclists or pedestrians X [-"] [-] ['-]
5. Recreation: The quality or quantity of existing recreational X [~] [--1 [~]
opportunities
The subject site is surrounded by commercial uses to the east (a restaurant), west (a service
station across W. Hamilton Avenue), and to the south (retail commercial businesses). To the
north is a multiple-family residential complex. The proposed project is consistent with the
surrounding uses in the neighborhood and will not impact the present land uses in the area.
The proposed project as an office use requires a total of 39 parking spaces (1 space for each 225
square feet of gross floor area) per the City's Parking and Loading Ordinance; however, the
applicant is proposing a total of 35 parking spaces, using a parking ratio standard of 1 parking
space for each 250 square feet of gross floor area. Planning Staff has reviewed the application
and is supportive of the reduced parking standards, with the additional recommendation to delete
one (1) proposed parking space to better accommodate maneuverability within the parking area.
Staff finds that the proposed reduction of parking spaces to accommodate the project is
considered insignificant, given that the project will entail only four (5) less parking spaces than
the required number of spaces.
In addition, Planning Staff has surveyed surrounding cities for parking requirements for office
uses, and finds that many cities typically use standards of 1 space/250 square feet of gross floor
area or 1 spaces/300 square feet of gross floor area, which require less parking than the City's
parking requirements. Therefore, Staff has determined that the provision of 34 parking spaces on
site will accommodate the proposed office use.
K. Is the project consistent with:
Yes No
1. The General Plan X [-]
2. The Zoning Ordinance X
3. Congestion Management Program X ["-]
4. Other applicable land use controls X
Initial Study Page 9
891 W. Hamilton - PD 98-06 September 24, 1998
The project site is currently zoned PD (Planned Development) and has a General Plan Land Use
Designation of "Commercial". The proposed office use is consistent with the General Plan
designation and, with a approval of a PD Permit, is consistent with the PD zone.
Le
Public Services and Utilities
Evaluation of the impact of the project upon:
(A) (B) (C) (D)
No Impact Insignif. Insig. if May Be
Mitigated Signif.
1. Fire Protection Services X ~] [-'] [-']
2. Police Protection Services X [--] [--] [-]
3. Schools X [--] I--] [-']
4. Parks or other recreational facilities X [--] ['-]
5. Maintenance of public facilities, including roads X [~ [--] [~]
6. Other governmental services X [-] I--]
7. Power or natural gas systems X I-I [-I [-']
8. Communication systems x I'-] ['-] ['-1
9. Water systems x ~] [--] [-']
10. Sewer or septic tanks X [~] [~] [--]
11. Storm water drainage X ['-] [-']
12. Solid waste and disposal X ~] [-'] [~]
The project will not require additional public services than already provided, as the site was
previously developed as a commercial use (service station) and is located within a commercial
neighborhood which is already developed. The applicant will be required as a part of the
standard requirements for the development to install street improvements to serve the project and
neighborhood. This includes dedication of additional right-of-way, replacement of sidewalk and
driveways, installation of street lights and underground utilities, installation of landscape planters
with irrigation, and installations of traffic signs and striping as required by the City Engineer.
The utilities for this project including water, power, storm drainage and sewage disposal will tie
into existing service mains and will not require new or altered service systems.
Initial Study
891 W. Hamilton - PD 98-06
Page 10
September 24, 1998
M. Mandatory Findings of Significance
Yes No
1. Does the project have the potential to degrade the quality of the environment, I'-] X
substantially reduce the habitat or a fish or wildlife species, cause a fish or
wildlife population to drop below self sustaining levels, threaten to eliminate a
plant or animal community, reduce the number or restrict the range of a rare or
endangered plant or animal or eliminate important examples of the major periods
of California history or prehistory?
2. Does the project have the potential to achieve short term goals to the I--[ X
disadvantage of long term goals?
3. Does the project have impacts which are individually limited, but cumulatively [--I X
considerable? (A project may impact on two or more separate resources where
the impact on each resource is relatively small, but where the effect of the total
of those impacts on the environment is significant.)
4. Does the project have environmental effects which will cause substantial adverse I--] X
effects on human beings, either directly or indirectly?
III. DETERMINATION AND RECOMMENDATION
On the basis of this initial evaluation and the information available, the environmental
coordinator has determined that:
(Check one)
X A) The proposed project could not have a significant effect on the environment. A Negative
Declaration should be prepared.
I~ B) Although the proposed project could have a significant effect on the environment, there will
not be a significant effect in this case because the mitigation measured described on the
attached sheet(s) have been added to the project. A Negative Declaration should be prepared.
I-1 C) The proposed project may have a significant effect on the environment. An Environmental
Impact Report should be prepared.
Initial Study
891 W. Hamilton - PD 98-06
Page 1 1
September 24, 1998
IV. SUPPLEMENTAL INFORMATION
Reference Documents:
1. CEQA Guidelines, 1994 version
2. Project Plans dated February 12, 1998 as received by the Planning Department
3. Campbell General Plan and Zoning Ordinance
4. Geotechnical Investigation prepared by Lowney Associates dated August 27, 1998
Initial Study
891 W. Hamilton - PD 98-06
Page 12
September 24, 1998
Tree Health
rofessionals, Inc.
October 13, 1998
Mr. Hal Long
President
Largo Concrete Inc.
31 OW. Hamiltion Avenue, #203
Campbell, CA 95008
Re:
Tree evaluation @ vacant lot, comer of Marathon Drive and Hamilton
Avenue
Dear Mr. Long:
At your re.quest, I have evaluated six trees located at the above referenced
vacant lot.. This report serves as a. summary of my evaluation, gives
recommendations/or the care of the trees, and an appraised doIlar value for each
tree. The trees were not climbed and all of the evalUation was done from the
ground.. Five photographs are included as visual aids. For the purposes of this
report, the north-south delineation is parallel with Marathon Drive while the east-
west delineation is parallel with Hamilton Avenue.
Summary of Evaluation
There are two species of trees on the property: One California black walnut
(Juglans hindsii) tree and five Monterey. pine (Pi'nus r.adiata) trees. Generally,
California black walnut trees .are considered poorly tolerant and Monterey pine
trees are considered moderately tolerant of development impacts (Trees and
Development, Matheny & Clark, 1998, page 172 and 174) which would include
root loss, and/or soil cuts and fills.
If tree protection zones cannot be delineated as outlined below than all six
trees should be removed.
The Tree Protection Zone (TPZ) . _
The tree protection zone is defined as the area adjacent to the mainstem ota
tree which should not be disturbed by excavation of soil, the application of soil ..
fill, compaction, or the storage and/6r disposal of construction materials. For the
t[..ees on thi_sproperty I have determined that the TPZ is equal to one times the.
diameter ot the ~unk (measured in inches) at four feet above ground line or the
aggregate sum ot the multi-leadered trees (Trees and Development,Matheny & _
.Clark, 1998, page 7.4) for the Monterey pine trees and 1.25 t~mes the diameter ot
the trunk for the Cahfomia black walnut tree.
Appraised Value .
The appraised value of a tree is determined by using a formula developed by
thee .Council of Tree and_.Landscape Appraisers. The fiicto, rs involved are the size
ot the tree, species, condition, and location. The size of the tree is typicallythe
diameter of the trunk measured four and one half feet above ground line. 'For
15466 Los Gatos Blvd., Suite 109-046 · Los Gatos, CA 95032 · (408) 929-3040 · Fax (408) 871-0284
)argo Concrete Inc., Marathon Drive and Hamilton Avenue
ctober 13, 1998
Page 2
the pu~oses of this rep9rt, .the .diameter of each tree was taken at four feet above
ground line unless stipulated otherwise.
The Western Chapter of the Internat!onal Society of Arboriculture developed
the basic price of a replacement tree a.nd sp. ecies ratings for each tree species m
California. These two factors are used to determine the basic value of-a
articular~ tree in a landscape_. The basic value is then adjusted by condition and
cation tactors.~ .Condition factors are summarized in the Analysis of. Condition
actors pages pt this rePort and adjust the appraised value (line 7 of the
Appraised-Value page). . . A
The location percent is the average of site, contrit~ution, and pla. cement .factors
and is summarized on line 8 of the Appraised Value page. Site reters to wigan
versus rural, residential versus commercial or industrial Placement is a function
of where a tree is growing.on a property. Contribution and placement are.
.usually eomplimen.tary in that .the better theplacement the higher the epntribution
I~ut in the case of the trees on this property they are placed poprly' but they are
the only trees in a barren landscape so they have a high contril~ution rating.
California black walnut.tree (photo 1-2)
This is a multistem~ tree that has seven stems that appear to have sprouted from
a stump at a height pt approximately 18 inches above grade..This tree. could have
had an English walnut graft, which died. There is asplialt within two teet of the
stump on the north side of the tree. On the south side there is a concrete block
adjacent to a root and a soil depression. Roots on the west and east sides are
damaged (photo 2).
Tile diameters of the stems at four feet above ground line are 7.5, 7.5, 7.5,
7.5, 7.5, 8, and 5.5 for an aggregate sum of 51 inches The diameter of .the stump
is 30 inches measured at 12 inches above grade and this is the diameter that was
calculated for the tree appraisal as per the Guide for Plant Appraisal, 8th Edition,
1992
The TPZ would need to include the area within 30 feet of the trunk of the
tree.
The foliar spread of the tree measured north-south is 38 feet and east-west is
40 feet.
.T.he root crown of the tree is at a higher elevation than the surrounding soil
anti the tree has suffered significant root damage in the past and will suffer
additional significant root damage during the development of the property.
The.tree is in poor structural condition. The appraised dollar value f6r this
tree is $4,000.00
Monterey pine trees (photo 3-5)
The five Monterey pine trees are numbered one to five with number one being
the northernmost tree {tree at the far left in photos 3 and 4). Thes~e trees are on
the neighbor's prope.rt2y but will be affected'by the development pi' the property
and are included in this report.
The diameters of thefour of the trees are 15 and 13 (twin leadered), 11~ 8.5,
and 16.5 measured at four feet above ground line. The southernmost tree is dead
and the diameter was not measured. The TPZ for the four trees, fi.om north to
south, would need to include the area within 28, 11, 8.5, and 16.5 feet from the
trunks of each tree.
There is no evidence of boring beetles present. The trees have asphalt over
(~argo Concrete Inc., Marathon Drive and Hamilton Avenue
ctober 13, 1998
Page 3
their roots on the east side and ve..ry, compact soil on the west side.
The four trees are in fair condition. Their atmraised dollar values are
$2,700.00, $1,100.00, $1,000.00, and $1,500.00 ¥or a total of $6,300.00
Conclusions
I do not believe the trees on this site would survive the im~pact of the
development of the property b.eeause a sigl~i_'fieant amount ot roots would be
removed, damaged, or stressed within the TPZ. I recommend replacing all of the
trees.
Please do not hesitate to call with questions.
Sincerely, , / ,/3
Gil Mitchell, Registered Consulting Arbofist//317
ISA Certified Ar-bofist
enclosures: Photographs (1-5) _
Analysis of Condition Factors
Appraised Value Chart
Property owner: Largo Concrete Inc., Marathon Drive & Hamilton Avenue
Analysis of Condition Factors*
The condition rating is determined by tho sum of the rating scores for roots, trunk, scaffold
branches/twigs, and foliage
Factors**
WalnutlMP1 MP2 MP3 MP4
Root anchorage 2; 4 4 4 4
Confined relative to top
Collar soundness
Mechanical injury
Girdling or kinked roots
Compaction or water-logged roots
Toxic gases & chemical symptoms
Presence of insects or diseases
TRUNK
Sound bark & wood, no cavities 2 4 4 4 4
Upright trunk (well tapered)
Mechanical or fire injury
Cracks-frost, etc.
Swollen or sunken areas
Presence of insects or diseases
SCAFFOLD BRANCHES
Strong attachments 2 4 4 4 4
Smaller diameter than trunk
Vertical branch distribution
Free of included bark
I
Free of decay and cavities
Well-pruned, no severe heading back
Well-proportioned-tapered, laterals
along branches
Wound closure
Amount of dead wood or fire injury
Presence of decay, insects or diseases
I I
SMALLER BRANCHES & TWIGS
Vigor of current shoots, compared to that 3 3 2 2 3
of 3-5 previous years
Well-distributed through canopy
Normal appearance of buds-color, shape &
size of species
Presence of insects or diseases
I I
*From the Guide for Plant Appraisal, 8th Edition
Property owner: Largo Concrete Inc., Marathon Drive & Hamilton Avenue
I Walnut MP I MP 2 MP 3 MP 4
FOMAGE
Normal appearance-size & color 3 3 3 3 3
Nutrient deficiences
Herbicide, chemical or pollutant injury
sympt°ms I
Wilted or dead leaves
Presence of insects or diseases
TOTAL POINTS 1 2 1 8 1 7 1 7 1 8
Total Points Condition Rating
23 to 25 Excellent 90 to 100
19 to 22 Good 70 to 89
15 to 18 Fair 50 to 69
11 to 14 Poor 25 to 49
5 to 10 Very Poor 5 to 24
Condition rating 34 67 62 62 67
**Factors
No problem 5
No apparent problem(s) 4
Minor problem(s) 3
Major problem(s) 2
Extreme problem(s) '0 or 1
Appraised Value
Line Largo Concrete Inc., Marathon Drive arid
Hamilton Avenue
Tree # 1 2 3 4
Walnut !M P M P M P M P
---~ F~-RePlacement Cost -- 1805 1805 1805 1805 1805
2 Basic Price of replacement tree
'2'-~- Wholesale cost 902.5 902.5 " 902.5 '' 9021'5 902.5
2B Replacement tree Trunk area (TAr) 14.6 19.6 19.6 19.6 19.6
2Ca Basic price 37 27.5 27.5 27.5 27.5
Determine difference in trunk areas
3, Diameter = d(A) "30 28 11 8.5 16.5
..................,
~A ~'~';~~ 706.5 6i5;44 94,985 56.71625 213.71625
3B Replacement tree TAr (2B) 14.6 19.6 19.6 19.6 19.6
~'~ Subtract TAr from TA(A) ........ 691~9 5'95.84 75.385 37.11625 194.11625
~lf al(A)=30" or more, determine ATA(A)
3AA ATA(A) from table ...................
~ Replacement tree TAr'"'~'9) , ...................
3C,__~ Subtract TAr from ATA(A) ....
~ Multiply Basic Price by area differences ~ ~"'~ $2560~ $16386 $2073 $1021 $5338'
2Ca x 3C or 3CC
~ Species rati~ (%) 5_~ . 20 20 20 20
,Adjust step 4 by species rating ....................... ~,!,2800 $3277 ,$~15 $2~ $1068
Basic Value (add line 1 + line 5) $14605 $5082 $2220 $2009 $2873
_................. ~ Condition (0/o) 34 67 62 62 67~,
~ Adjust line 6 by condition $496~ $34~5 $1376 $1246 $1925
Location (%) 80 80 80 80 80
8~ Adjust line 7 by location $3973 $2724 $1101 $997 $1540
9 Appraised Value = Round line 8 to nearest $100 $4000 $2700 $1100 $1000 $1500
~ Grand Total $10300.00
Location factor
Site 100 100 100 100 100
Placement 50 50 50 50 50
Contribution ~9~ 90 90 90 ,9~
Ave rag e 80. 00 80.00 80.00 80.00 80.00
O~CH Ag.O *
City of Campbell, 70 N. First Street, Campbell, CA 95008, (408) 866-2140
APPLICATION FOR PERMIT TO REMOVE TREES
(For All Properties Except Developed Single Family Residential)
Name of Applicant
Mailing Address
Phone ~'- -~'c::~-~'
Name of Property Owner
Mailing Address:
Phone
(TREES ON PRIVATE PROPERTY ONLY)
Number, Size and Species of Tree(s) to be removed:
r
·
eason emoval (Attach additional sheet if / 0 /
A SITE PLAN MUS~ ACCOMPANY THIS APPLICATION A~ SHOW:
1. Location, size and species of protected trees over 12 inches in diameter when measured 4 feet above
grade to be removed.
2. Existing and/or proposed footprint of the structure(s), paving, and landscape areas (scaled site plan
required).
3. Location of areas for tree re-planting. The City has adopted tree replacement ratios for trees approved
for removal. Please review the Tree Replacement Requirements and Replanting Plan in the Tree
Technical Manual for submittal requirements.
4. If construction is associated with tree removal request: Show existing and proposed final elevations
for new construction and proximity of trees (to scale); an excavation and fill plan MUST be submitted
with this application if fill is anticipated with development.
OTHER SUBMITTAL REQUIREMENTS:
1. Photographs of trees proposed for removal.
2. Arborist Report
3. Replacement Plan (if not indicated on application)
NOTE: The decision of the Approval Authority is based on information submitted with this application. If
the design is altered or the location of the structure changed, another application for a tree permit is
required.
NO WORK IS PERMITTED UNTIL YOU RECEIVE AN APPROVED TREE PERMIT
ALLOWING TREE REMOVAL. THE PERMIT MUST BE ON THE JOB SITE.
If you disagree with the decision of the Approval~uthority, you have ten (10) days in which to file an
appeal in accordance ~~.80~Zoning Ordinance.
Owner's Signature: Date:
Agent for Owner Signature: Date /
CITY OF CAMPBELL
Community Development Department · Current Planning
September 30, 1998
NOTICE OF PUBLIC HEARING
Notice is hereby given that the Planning Commission of the City of Campbell has set the
time of 7:30 p.m., or shortly thereafter, on Tuesday, October 13, 1998, in the City Hall
Council Chambers, 70 North First Street, Campbell, California, for a Public Hearing to
consider the application of Mr. Harold Long for a Planned Development Permit (PD 98-
06) to allow the construction of a two-story, 8,741 square foot office development on
property located at 891 W. Hamilton Avenue in a PD (Planned Development) Zoning
District. A Negative Declaration has been prepared for this project.
Interested persons may appear and be heard at this hearing. Please be advised that if you
challenge the nature of the above project in court, you may be limited to raising only
those issues you or someone else raised at the Public Heating described in this Notice, or
in written correspondence delivered to the City of Campbell Planning Commission at, or
prior to, the Public Hearing. Questions may be addressed to the Community
Development Department at (408) 866-2140.
Decisions of the Planning Commission may be appealed to the City Council. Appeals
must be submitted to the City Clerk in writing within 10 calendar days of an action by the
Commission.
In compliance with the Americans with Disabilities Act, listening assistive devices are
available for all meetings held in the Council Chambers. If you require accommodation,
please contact the Community Development Department at (408) 866-2140, at least one
week in advance of the meeting.
PLANNING COMMISSION
CITY OF CAMPBELL
STEVE PIASECKI
SECRETARY
PLEASE NOTE:
When calling about this Notice,
please refer to File No. PD 98-06
Address: 891 W. Hamilton Avenue
70 North First Street · Campbell, California 95008.1423 · TEL 408.866.2140 · Vax 408.866.8381 · TDD 408.866.279O
_LARGO
Concrete Inc.
September 29, 1998
Ms. Aki Irani
Planner I
Community Development Department
City of Campbell
70 North First Street
Campbell, CA 95008-1423
408/866-2140 FAX: 408/866-8381
RECEIVED
CITY OF CAMPBELL
R.ANNING DEPT.
Re: 891 W. Hamilton Avenue
Dear Aki,
The above referenced building is going to be Largo Concrete, Inc.'s corporate
headquarters. By the nature of our business we are a low density operation. The
minimum size for each engineer's office is 10' x 13'. They need this room to unroll and
compare plans for estimating and project managing purposes. As a result there will be a
maximum of 25 people working on the second floor. The first floor will be used by our
detailing department. There will be approximately 5 people working in this space
preparing drawings for the foremen to use in the field. This means that we will have a
maximum total of 30 people working on this site. With 35 parking spaces there would be
5 spaces left for visitors. This assumes that everyone in the office is at work when there
are visitors which I have never seen happen. Our design was based on 250 square feet of
office space per car which in many areas is the industry standard. I understand that the
Campbell standard is 225 square feet per car but I hope that you will make an
acceptation for our building since we are going to be occupying it ourselves.
It has also been mentioned that you feel that parking spaces #24 through #26 should be
reduced from 3 cars to 2 cars. I do not understand your concern here. If the spaces are
not wide enough for cars then i would be concerned myself. However, they are wide
enough and the only question is how do you get in and out of them. Admittedly it takes a
few more moves than getting into the spaces which are perpendicular to these but it really
isn't that difficult. I would greatly appreciate it if you could let us live with this matter
and have the three parking spaces.
Sincerely,
Largo Cgncrete, Inc/~
President
HDL/cmo
Heodquorters: 310 W. Hamilton Ave., Suite 203 · Campbell, CA 95008 · (408) 378-4404 · Fax 378-4514
Southern CA: 1801 Edinger, Suite 200 · Santa Aha, CA 92705 · (714) 547-5600 · Fax 547-5120
License #592909
LARGO
Concrete Inc.
September 14, 1998
Shigeru and June Tachibana
12321 Stonebrook Court
Los Altos Hills, CA 94022
650/948-1744
Re:
851 W. Hamilton Avenue
Campbell, CA
Dear Shig and June,
Enclosed is a copy of the set of preliminary plans which we have submitted to the city of
Cambell for planning department approval. I am writing to you at this time to make the
following requests:
ELIMINATION OF EASEMENTS: On Sheet C-1 you will find four triangular
areas which I have colored. The two red ones are on my property, the two yellow
ones are on your property. It appears that these are easments were granted
primarily for the convenience of union oil. I no longer see any need for the
existence of these easements. If you are in agreement I will have the proper
paperwork drawn up to have them eliminated. In doing this I would also want to
rebuild the west side of the driveway in to your property off of West Hamilton.
Your driveway would still be over 20 feet wide.
NEW TREES ON YOUR PROPERTY: The city of Campbell has asked me to
plant 4 trees along the north side of the piece of your property that runs behind my
property. I have marked these trees in yellow on both sheets L-1 and C-1. Since
this will effectively narrow the width of this alley I will pave the northern 5 feet of
my property so that the driving area will end up being 25 feet wide instead of the
present 20 feet wide. This will offset the effect of the trees narrowing the drive
area. If you will grant this request I will repave the entire 120 feet of your
property which is the area we are talking about in this paragraph.
o
REMOVAL OF PINE TREES: The 5 pine trees on the west side of your property
are rather unsightly. If you have no objections I would like to remove these trees
and replace them with a different specimen. I would also like to extend the line of
trees further down this property line towards Hamilton Avenue.
Headquarters: 310 W. Hamilton Ave., Suite 203 * Campbell, CA 95008 * (408) 378-4404 * Fax 378-4514
Southern CA: 1801 Edinger, Suite 200 * Santa Ana, CA 92705 * (714) 547-5600 · Fax 547-5120
License #592909
If you have any questions about any of these requests please call me.
If you are in agreement with these changes please sign where indicated below and I will
have the proper paperwork drawn up.
Sincerely,
Largo Concrete, Inc.
Harold D. Long
President
HDL/cmo
Accepted By:
Accepted By:
K:\CHARLOTTXHAL\TCHIBNA.DOC
}LARGO
Concrete Inc.
September 11, 1998
Ms. Aki Irani
Planner I
Community Development Department
City of Campbell
70 North First Street
Campbell, CA 95008-1423
408/866-2140 FAX: 408/866-8381
Re: 891 W. Hamilton Avenue
Dear Aki,
Enclosed is a copy of a preliminary title report as requested in the memorandum from
Michelle Quinney and Harold Housley dated 8/31/98. Please refer to parcel 7 on page 3
of this Preliminary Title Report which will satisfy the first requirement in the
memorandum for proof of "legal right to use the northerly driveway of parcel C for
access and parking".
Enclosed are six new copies of sheet 2 from the plans, the site plan. I have transferred the
information you requested from sheet C-1 to this plan.
Also enclosed is a new C-1 on which we have shown a revised driveway entrance on the
neighbors property to the east of our property. This is per the request in the last line of
the last paragraph on page 4 of 4 of the above referenced memo dated 8/31/98.
If you have any questions or need any additional information on the above referenced
items please call me.
Sincerely,
Largo Concrete, Inc./,/,~)
Harold D~'E, ong /
President ~
HDL/cmo
Enclosures
K:\CHAR LOTT\HAL\IRAN13 .DOC
310 W. Hamilton Avenue Suite 203 · Campbell, CA 95008 · (408) 378-4404 · Fax: 378-4514
License #592909
.LARGO
Concrete Inc.
September 3, 1998
Ms. Aki Irani
Planner I
Community Development Department
City of Campbell
70 North First Street
Campbell, CA 95008-1423
408/866-2140 FAX: 408/866-8381
Re: 891 W. Hamilton Avenue
Dear Ms. Irani,
Enclosed is our development application including the seven sets of plans that were
requested.
This building will serve as Largo Concrete's corporate headquarters and we are extremely
anxious to get it under construction so that we can occupy the building as soon as
possible. Any help that you can give us to expedite this process will be greatly
appreciated.
Since we do not have a complete set of construction documents from which we will do
the construction we do not have an accurate estimate at this time. However, from my past
expehence I anticipate that the construction should take 6 months or less.
Sincerely,
President
HDL/cmo
K:\CHARLOTT~HALXlRANI2.DOC
310 W, Hamilton Avenue Suite 203 · Campbell, CA 95008 · (408) 378-4404 · Fax: 378-4514
License #592909
%
CITY OF CAMPBELL
Community Development Department · Current Planning
Mr. Jeff Heid
14630 Big Basin Way
Saratoga, CA 95070
August 26, 1998
RE: Streetscape improvement requirements for W. Hamilton Avenue
Dear Mr. Heid:
It was a pleasure to speak to you today regarding your questions about landscaping
requirements for the Office building project proposed to be constructed by Largo Concrete.
Please find enclosed a copy of the City's Streetscape Standards which outlines the
requirements for streetscape improvements along Hamilton Avenue in conjunction with new
developments. For the proposed two-story office project to be located at 891 W. Hamilton
Avenue, the streetscape improvement requirements will entail installation of a 10-foot wide
landscape parkway with turf and designated street trees, a 7-foot detached sidewalk, and a 10-
foot wide landscape buffer with designated street trees and a mixture of turf, groundcover and
shrubs. The designated street tree for Hamilton Avenue is the Evergreen Ash tree (Fraxinus
Uhdei) which is to be planted 40-feet on center in double triangulated rows.
Along Marathon Drive, the City will require installation of street trees in tree wells to be
planted 40-feet on center. The street trees likely to be designated along Marathon Drive are
Evergreen Ash trees to match the street trees across the street on Marathon Drive.
Should you have any questions regarding the above-mentioned matter or need additional
information, please do not hesitate to contact me at the Community Development Department
at (408) 866-2142.
Sincerely,
Aki R. Irani
Planner I
cc: file
70 North First Street . Campbell, California 95OO8.1423 · TEL 408.866.2140 - F^X 408.866.8381 · TDD 408.866.2790
}LARGO
Concrete Inc.
July 28, 1998
Mr. Steve Piasecki, AICP
Community Development Director
City of Campbell
70 North First Street
Campbell, CA 95008-1423
408/866-2140 FAX: 408/866-8381
Re: 891 W. Hamilton Avenue
C!TY OF C,q PBELL
?L.4SNIr, iG DEPT.
Dear Steve,
In early March of this year when I saw that our office needs were expanding I contacted
Peter Eakland at traffic engineering and I asked him if he could temporarily change the
signs on C arlyn from "Residential Parking" to "Two Hour Parking 8:00 AM to 5:00 PM
Monday through Friday". He said that that was a reasonable request and would have
these signs changed within two weeks. Over four months have gone by with many
additional requests and additional promises to get the signs changed but nothing has
happened. Finally Peter wrote me the attached July 13, 1998 letter and encouraged me
verbally to go ahead and park on Carlyn.
To help alleviate our office space needs I put the temporary trailer in the parking lot. To
make up for the loss of parking spaces taken by this trailer and to assure the spaces will
always be available for the patients in the dental office I have asked several of our
employees to park off site. They have been doing this since earlier this year. They have
not been parking on Carlyn but in other unrestricted locations.
The purpose of this letter is to ask permission to leave our trailer in place for
approximately 9 months until our new office building at 891 W. Hamilton Avenue is
completed and we can move into it. If you will honor this request we will of course
withdrawal our request to park on Carlyn and satisfy our parking requirements in another
way. I would greatly appreciate if you would give this request serious consideration and
at the same time expedite the approval process on our new office building so that the time
to leave the trailer in place will be as short as possible.
Sincerely,
ete, Inc.
Harold D. Long
President
HDL/cmo
KSCHARLOTT\PtASECK1 DOC
310 W. Homilton Avenue Suite 203 · Campbell, CA 95008 · (408) 378-4404 · Fax: 378-4514
License #592909
.0'~' C,4~t
RECEIVED
JUL 1 1998
CITY OF CAMPBELL
Public Works Department
July 13, 1998
Mr. Hal Long, President
Largo Concrete, Inc.
310 West Hamilton, Suite 203
Campbell CA 95008
Dear Mr. Long:
Please be advised that the "Residential Parking Only" signs on Carlyn Avenue are advisory only
and are not subject to enforcement under any provisions of either the California Vehicle Code or
the City of Campbell Municipal Code.
The intent of the signs is to discourage the encroachment of commercial parking into adjacent
residential areas. Please give me a call at 866-2154 if you have any questions.
cerely~
Peter Eakland
Traffic Engineer
cc: Sgt. Mitch Becerra, Bill Helms
70 North First Street
Campbell, California 95OO8.1423 · TEt. 408.866.2150 . VAX 408.379.2572 . 'r~t) 408.866.2790
NEW PW ['AX #
408-376-0958
LARGO
Concrete Inc.
July 7, 1998
Mr. Bill Helms
Acting Public Works Director
City of Campbell
70 North First Street
Campbell, CA 95008-1243
408/866-2154 FAX: 408/376-0958
Re: Parking on Carlyn Avenue
Dear Mr. Helms,
Four months ago, on March 9th, I met with Mr. Peter Eakland and made what I though
was a minor request. At that meeting he in fact told me that it was a minor request and
that it would be taken care of in two weeks.
What I am asking for is a temporary change of the sign.q on Carlyn Avenue. These signs
currently read "Residential Parking Only". After my meeting with Peter he suggested
that the signs be changed to read "Two Hour Parking Between 8:00 AM and 5:00 PM".
The reason for the request is as follows.
Largo Concrete is growing rapidly and has more people working in the office than we can
provide parking spaces for. To help alleviate this problem I am having some of the
people park at the Best store and walk the two blocks to the office. One of our other
tenants Pentech Financial is also growing rapidly and is in need of more parking places
than I can provide them. The real problem is with the last tenant, the dentist. Their
patients are reporting that they cannot find parking and have in fact let~ the practice
became of the unavailability of parking. In my meeting with Peter he told me that the
''Residential Parking Only" were not enforceable and that I should tell the dentist to
advise their patients to park their anyway. I am not comfortable, nor is the dentist
comfortable, asking their patients to park in and area that is marked no parking.
To solve this problem I am planning to build a new office building at 891 W. Hamilton
and move Largo into that facility. Pentech financial will then expand into Largo's current
space and the problem should be solved. To help us in the interim I would appreciate it
very much if the signs in front of the first two houses on each side of the street going
south from Hamilton could have the signs changed to "Two Hour Parking Between 8:00
AM and 5:00 PM Monday Through Friday". Would you please call me and let me know
if this request can be accommodated and if so when.
C ~,4SOFFICE~WINWORD~HELMS DOC
310 W. Hamilton Avenue Suite 203 * Campbell, CA 95008 · (408) 378-4404 * Fax: 378-4514
License #592909
Attached are the letters that I have written to Mr. Eakland on this subject. In addition I
have telephoned him and come to see him many times to see if our request could be
accomplished.
One thing that I forgot to mention is that the parking problem was further compounded
when Hamilton was restriped and the bicycle lane was placed against the curb in front of
our building. This took away all ofthe parking that we had in front of the building. At
the time this was done I asked Peter if he would change the signs on Carlyn and he said
he would consider it but of course nothing ever happened.
Sincerely,
President
C: ~91S0 FIqCI~WlNWO ILI~tlT. LM~ DOC
.LARGO
Concrete Inc.
June 24, 1998
Ms. Aki Irani
Planner I
Community Development Department
City of Campbell
70 North First Street
Campbell, CA 95008-1423
408/866-2140 FAX: 408/866-8381
Re: 891 W. Hamilton Avenue
Dear Ms. Irani,
I am surprised by your supervisors concem for our design and his request that we
eliminate some of the parking and replace it with office space on the ground floor. This
building is to be our corporate headquarters and as you can see by the attached
preliminary floor plan we need the entire 9,750 square feet. To satisfy your supervisors
request I assume that he would want us to eliminate the six parking spaces at the front of
the building. This would provide 1,560 square feet of office space which would be very
difficult to lease because of its small size. Also, any restrooms for this space would be on
the second floor, making it less attractive.
Attached are some photographs that I took of our current building at 310 W. Hamilton
Avenue. This building which we own is considered by many to be the most attractive
building on this street. At this site the parking is visible on both sides and part of the
elevation is a solid brick wall which hides the parking behind it. This is a very typical
parking arrangement.
In our new building at 891 W. Hamilton we are proposing to hide all of the parking by
placing it inside of the building. The elevation which I think would be very attractive
from both Hamilton and Marathon and especially from the comer is designed to look like
an office building on both levels. The only solid walls that we will have are the shear
walls which are needed for seismic resistance.
By this letter I formally request a meeting with your supervisor to discuss these concepts
with him. If it is his desire I will also have the architect attend with me.
K:\CHARLOTTXHAL~IRANI.DOC
310 W. Hamilton Avenue Suite 203 * Campbell, CA 95008 · (408) 378-4404 · Fax: 378-4514
License #592909
As I mentioned in my letter two weeks ago when I first submitted this plan for circulation
I am very anxious to get started with construction because we are extremely crowded in
our present facility. I would appreciate it if you would expedite this request and set up a
meeting as soon as possible.
Sincerely,
Largo Co,ncrete, Inc.
Harold D YL~ong
President
K:\CHARLOTT~AL~IRANI.DOC
.LARGO
Inc.
June 18, 1998
Mr. Tim J. Haley
Associate Planner
Community Developmem Department
City of Campbell
70 North First Street
Campbell, CA 95008-1423
408/866-2144 FAX: 408/866-8381
Re:
891 W. Hamilton Avenue
Pre-Application Development Review
Dear Mr. Haley,
In my June 10, 1998 letter I promised you a floor plan to support our request to build 250
square feet per car. Enclosed are copies of that plan showing space for 29 people in 9,750
square feet. Since we have 39 parking spaces in our preliminary plan this leaves 10
spaces available for visitors. Hopefully this will justify our request.
Sincerely,
HDL/cmo
Enclosures
K:\CHARLOTTXHAL\HALEY 1 .DOC
310 W. Hamilton Avenue Suite 203 * Compbell, CA 95008 * (408) 378-4404 * Fax: 378-4514
License #592909
LARGO
Concreto Inc.
June 18, 1998
Mr. Peter B. Eakland, T.E.
Traffic Engineer
City of Campbell
70 North First Street
Campbell, CA 95008-1243
408/866-2154 FAX: 408/376-0958
Re: Parking on Carlyn Avenue
Dear Mr. Eakland,
On Tuesday of this week, June 16th, Michelle Jiang f~m our office parked in front of
Mr. Kloclcman's property per my instmction~. Tuesday is the dentists heaviest day and
we try hard to keep spaces available for them. Mr. Klockman came out and threatened
her and demanded that she move her car from in front of his house.
I am really getting tired of putting up with this man and his threats to my employees. I
would hope that you and the police department could straighten out this problem by
changing the signs that we have been talking about since March 9th of this year. Please
feel free to stop by my office and talk to Miehelle about this incident if it will help you
resolve this matter.
Sincerely,
President
HDL/cmo
K:'~CHA R. LO~ L~.A KLAN D DOC
310 W. Hamilton Avenue Suite 203 · Campbell, CA 95008 * (408) 378-4404 * Fax: 378-4514
License #592909
.LARGO
Inc.
June 10, 1998
Mr. Tim J. Haley
Associate Planner
Community Development Department
City of Campbell
70 North First Street
Campbell, CA 95008-1423
408/866-2144 FAX: 408/866-8381
Re:
891 W. Hamilton Avenue
Pre-Application Development Review
Dear Mr. Haley,
Enclosed are six copies of the drawings for the above referenced project. This building
will be for Largo Concrete's corporate headquarters. We have outgrown the facility that
we are currently in and are very anxious to proceed with construction of this building so
that we can occupy it as soon as possible.
One day when you were out I came to the counter and explained to one of the other
planners that we are a very low density operation. The typical engineers office is 10 feet
by 13 feet. This is so that they can spread out plans and have plenty of room to work on
them. In addition we plan to have a large conference room, a kitchen area and a large
plan storage area. Because of the type of operation that we have I ask if the planning
department would consider allowing us to build 250 square feet per car rather that 225
square feet per car. Our current plan shows 39 parking spaces. Multiplying this times 250
square feet per car would allow us to build 9,750 square feet. Dividing this by 225 square
feet per car would require 43.3 cars. The planner I talked to said that she felt that since
the difference was only 4.3 cars that if we could substantiate our usage with a detailed
floor plan that she would seriously consider our request. The attached plans show the
8,775 square feet of building which could be built at 225 square feet per car and the
additional 975 square feet as a dotted line on the rear of the property. I hope that you will
process this application and give it your tentative approval without waiting for the floor
plan since this will take some time to develop.
At my meeting with the architect today I asked him to start on the detailed floor plan. As
soon as this is developed I will submit it to you for additional review.
On the assumption that we do not have the legal right to park at the rear of our building
using access from the neighbors 20 foot wide strip I have entered negotiations with the
owner of that property.
K:\CHARLOTT~HAL~HALEY.DOC
310 W. Hamilton Avenue Suite 203 · Campbell, CA 95008 · (408) 378-4404 · Fax: 378-4514
License #592909
Yesterday I concluded negotiations with the owners to purchase the property from them.
Their attorney will draw up the papers when he returns from vacation on June 22nd. The
document will call for me to purchase the 20 foot by 120 foot strip behind 891 W.
Hamilton at this time and to purchase the balance when their tenant's lease on the
restaurant expires. I will get that document to you as soon as it is finalized so that you
will know that I have the legal right to enter my property from the rear.
If you need any additional information for your review would you please call me.
Sincerely,
Largo Co~ncrete, Inc,~/f
President
HDL/cmo
Enclosures
K: \CHARLOTT~IA L~q3.LEY. DOC
' .LARGO
Concrete Inc.
June 3, 1998
Mr. Peter B. Eakland, T.E.
Traffic Engineer
City of Campbell
70 North First Street
Campbell, CA 95008-1243
408/866-2154 FAX: 408/376-0958
Re: Parking on Carlyn Avenue
Dear Mr. Eakland,
Last night the dentist fi'om downstai~ came to my office and complained again about the
parking situation. He said that they have lost two patients this week. The first patient
they lost because they have not been able to find parking on the property for each of their
last appointments and therefore do not find it worthwhile to come to this office. The
other patient left because they could not find parking and chose to park in front of Mr.
Ex~,4n Klockman's property even though the signs say residential parking only and he
came out and threatened them with damage to their ear if they did not move it.
You and I have been talking about this problem since March 9th. I really need your _
immediate attention to this matter to help me satisfy this parking problem for my tenant.
Sincerely,
Largo Concrete,
President
I-fi)L/cmo
C:~K~OFFICE~WlN~'O~D~CARLYN2.DOC
310 W.
Hamilton Avenue - Campbell, CA 95008
License
· (408) 378-4404 · FOx: 378-4514
LARGO
Inc.
April 23, 1998
Mr. Peter B. Eakland, T.E.
Traffic Engineer
City of Campbell
70 North First Street
Campbell, CA 95008-1243
408/866-2154 FAX: 408/376-0958
Re: Parking on Carlyn Avenue
Dear Mr. Eakland,
On March 9, 1998 you met at my office to discuss the problem that the patients visiting
the dental office in our building are having finding parking. Your proposed solution to
the problem was that the signs be changed from "Residential Parking" to "Two Hour
Parking" in fi:ont of the first two houses south of Hamilton on each side of Carlyn. You
indicated that it would take about two weeks to have the signs changed. When we talked
three weeks later on March 31 st you indicated that it would be another two weeks before
the signs could be changed. It has now been an additional three weeks and the signs are
still not changed. I would appreciate it very much if you could get this change made or
call me and explain if it is not going to be possible.
Also, when we met on March 9th I asked you to take a look at the light used for the
school crossing on Hamilton. I think the correct words to describe your reaction are that
you were shocked at how long the light stayed red. I took the reaction as an indication
that you were going to do something to change the light. As near as I can tell it still stays
red for the same length of time. I would also appreciate a call fi:om you to learn if the
length of the red light is-going to be changed or if you have not been able to do that.
Sincerely, ~
Largo Concrete, Inc. ~//
Harold D
President/
HDL/cmo
C ~ISOFFICBWINWO P.D\CAELYN. DOC
310 W. Homilton Avenue * Coml::)bell. CA 95008 - (408) 378-4404 · Fox: 378-4514
License #592909