Loading...
Site Modifications & Signs - Shell - 2003 0' . CA1j . /'>~ 2: i'" - ,- U r CAMPBELL r ~' o r-- O/(CHI'I'Q CITY OF CAMPBELL f l \ V Community Development Department February 5, 2004 Ms. Haleh Mousavi Arc Inc. Architects 940 Tyler Street, Suite 23 Benicia, CA 94510 Re: PLN 2003-124 & 125 570 E. Hamilton A venue Dear Ms. Mousavi, Thank you for revised sheets A-I and A-6 submitted on February 3, 2004, for the remodel of the Shell Gasoline Service Station at 570 E. Hamilton Avenue. Since the freestanding prime sign is not a v-shape sign, the sign area is only calculated one time. I have modified the Conditions of Approval to reflect the changes made on sheets A-I and A-6. Please do not hesitate to contact me at (408) 866-2142 if you have any questions regarding the revised conditions of approval. Sincerely, vlt!tlttt{I~L/ff.tk~~ Melinda M. Denis Planner I encl: Revised Conditions of Approval for File No. PLN2003-124 & 125 Revised Stamped Approved Plans - Sheet A-I and A-6 (1 color) cc: Geoff Bradley, Senior Planner Frank Mills, Senior Building Inspector 70 North First Street Carnrhell, Calitornia 950011-1436 rFI 408.866.'2140 !'AX 408.871.5140 - T111) 40b:.Hu(j.2790 CONDITIONS OF APPROVAL FOR FILE NO. PLN 2003-124 & 125 SITE ADDRESS: APPLICANT: DATE: 570 E. Hamilton Avenue ARC Inc., Architects February 5, 2004 The applicant is hereby notified, as part of this application, that (s)he is required to meet the following conditions in accordance with the ordinances of the City of Campbell and the State of California. The lead department with which the applicant will work is identified on each condition where necessary. Where approval by the Director of Community Development, City Engineer, Public Works Director, City Attorney, or Fire Department is required, that review shall be for compliance with all applicable conditions of approval, adopted policies and guidelines, ordinances, laws and regulations, and accepted engineering practices, for the items under review. Additionally, the applicant is hereby notified that (s)he is required to comply with all applicable Codes or Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified: CO~TYDEVELOPMENTDEPARTMENT Planninl! Division 1. Approved Proiect: Approval is granted for a Modification to a Site and Architectural Review Permit (PLN2003-124) to allow the exterior remodel of an existing gasoline service station and a Sign Program Application (PLN 2003-125) on property located at 570 E. Hamilton Avenue. The site, building, landscaping and sign(s) design shall substantially conform to the project exhibits listed below, except as may be modified by the Conditions of Approval herei n: a. Set of revised plans (Sheets A-2, A-3, A-4, A-5, and A-7) prepared by ARC Inc. Architects and stamped approved on January 23, 2004; b. Set of revised plans (Sheets A-I and A-6) prepared by ARC Inc. Architects and stamped approved on February 5, 2004. 2. Site and Architectural Review Permits Approval Expiration: Within one year from the date of approval, a building permit must be obtained and construction completed one year thereafter or the Site and Architectural Review Permit approvals shall be void. 3. Fencing: Any existing or proposed fencing shall comply with Section 21.59.090 of the Campbell Municipal Code. 4. Signing: This Sign Program Permit has been approved subject to the following conditions of approval: a. The applicant shall obtain a demolition permit for removal of the building signage and monument sign PLN 2003-124 & 125 - 5/,-, E. Hamilton Avenue PMe2 b. The applicant shall obtain any necessary building or electrical permits from the Building Division prior to sign installation. c. The existing freestanding price/id sign shall be refaced per the approved plans dated as approved on January 23,2004. d. The proposed building, canopy and freestanding prime sign shall be fabricated and installed per the approved plans dated as approved on February 5, 2004. e. The sign shall be maintained in good condition at all times and shall be repaired or replaced as necessary. 7. Mechanical Equipment: All roof mounted and ground mounted equipment shall be screened with architecturally compatible materials, subject to approval by the Community Development Director, prior to the issuance of building permits. 8. Utilities: All new on-site Utilities shall be installed underground per Section 20.36.150 of the Campbell Municipal Code for any new or remodeled buildings or additions. Applicant shall comply with all plan submittals, permitting, and fee requirements of the serving utility compames. Buildinl! Division 9. Permits Required: A building permit application shall be required for the proposed changes to the eXlstmg structure and canopy. The building permit shall include Electrical/PlumbinglMechanical fees when such work is part of the permit. 10. Construction Plans: The Conditions of Approval shall be stated in full on the cover sheet of construction plans submitted for building permit. II. Size of Plans: The maximum size of construction plans submitted for building permits shall be 24 inches by 36 inches. 12. Plan Preparation: This project requires plans prepared under the direction and oversight of a California Licensed Engineer or Architect. Plans submitted for building permits shall be "wet stamped" and signed by the qualifying professional person. 13. Site Plan: Application for building permit shall include a competent site plan that identifies property and proposed structures with dimensions and elevations as appropriate. Site plan shall also include site drainage details. Site address and parcel numbers shall also be clearly called out. Site parking and path of travel to public sidewalks shall be detailed. 14. Title 24 Energ:y compliance: California Title 24 Energy Standards Compliance forms shall be blue-lined on the construction plans. Compliance with the Standards shall be demonstrated for conditioning of the building envelope and lighting of the building. 15. Special Inspections: When a special inspection is required by U.B.C. Section 1701, the architect or engineer of record shall prepare an inspection program that shall be submitted to PLN 2003-124 & 125 - 57" ,":. Hamilton Avenue Page 3 the Building Official for approval prior to issuance of the building permits, in accordance with U.B.C Section 106.3.5. Please obtain City of Campbell, Special Inspection forms from the Building Inspection Division Counter. 16. Non-Point Source Pollution Control: The City of Campbell, standard Santa Clara Valley Non-point Source Pollution Control Program specification sheet shall be part of plan submittal. The specification sheet (size 24" by 36") is available at the Building Division service counter. 17. Title 24 Accessibi]itv - Commercial: On site general path of travel shall comply with the latest California Title 24 Accessibility Standards. Work shall include but not be limited to accessibility to building entrances from parking facilities and sidewalks. Projects seeking to use the Title 24 Hardship exemption clause shall blue-line completed, City of Campbell "20%" exemption form on submitted construction plans. Form is available at Building Di vision service counter. 18. Approvals Required: The project requires the following agency approvals prior to issuance of the building permit: a. Santa Clara County Fire Department (378-4010) PUBLIC WORKS DEPARTMENT No Conditions COUNTY FIRE DEPARTMENT No Conditions 'F February 2, 2004 ARC Inc. ARCHITECTS Ms. Melinda Denis City of Campbell Planning Division 70 North First Street Campbell, California 95008 940 Tyler Street, Suite 23 Benicia, CA 94510 Tel: 707.745.0502 Fax: 707.745.0592 ARClncArchitects. com Dear Melinda, RECE\VED fEe 0 3 2003 Cm OF CAMPBELL PLANNING OEPT. Re: Shell Stations 570 E. Hamilton Avenue Campbell, California Subject: Prime Sign Revisions Enclosed please find the following for the above referenced project: Quantity Date Description 2 Sets 02-02-04 Revised Design Drawings, Sheet A-1 and A-6 Per our conversation, we revised the site plan to show the location of the new sign on sheet A-1 and adjusted the sign calculations on sheet A-6. We have provided these documents for your use and records as required for review. Please contact me if you have any questions or need additional information. Sincerely, ARC Inc. ~.lJw, Haleh Mousavi, Project Coordinator Enclosures cc: TC1281 C-1 w/encls. U.s. Mail 0' . CA1j . />~ t ~ u r CAMPBELL ~ , ~ " c ,-- rJ II C H !, \~ \J CITY OF CAMPBELL i U Community Development Department January 27,2004 Ms. Haleh Mousavi Arc Inc. Architects 940 Tyler Street, Suite 23 Benicia, CA 94510 Re: PLN 2003-124 & 125 570 E. Hamilton A venue Dear Ms. Mousavi, Thank you for your revised Site and Architectural Review Permit/Sign Program application submitted on January 21, 2004, for the remodel of the Shell Gasoline Service Station at 570 E. Hamilton A venue. Your application has been conditional approved by the Community Development Director as a Modification to the prior Site and Architectural Approval and approval of a Sign Application and is subject to the attached Conditions of Approval. Thank you for the opportunity to review these plans. It has been a pleasure working with you. Please do not hesitate to contact me at (408) 866-2142 if you have any questions regarding the conditions of approval. Sincerely, '-J1IkluiL L/!f(}~ Melinda M. Denis Planner I encl: Conditions of Approval for File No. PLN2003-124 & 125 Stamped Approved Plans (I color and 2 b/w) cc: Geoff Bradley, Senior Planner Frank Mills, Senior Building Inspector 70 North First Street Camphdl, California 9,)OOH-1436 rEL 408.H(j6,J 140 I'^\ 408.871.5140 Jilll 408.866.'2790 CONDITIONS OF APPROVAL FOR FILE NO. PLN 2003-124 & 125 SITE ADDRESS: APPLICANT: DATE: 570 E. Hamilton Avenue ARC Inc., Architects January 27, 2004 The applicant is hereby notified, as part of this application, that (s)he is required to meet the following conditions in accordance with the ordinances of the City of Campbell and the State of California. The lead department with which the applicant will work is identified on each condition where necessary. Where approval by the Director of Community Development, City Engineer, Public Works Director, City Attorney, or Fire Department is required, that review shall be for compliance with all applicable conditions of approval, adopted policies and guidelines, ordinances, laws and regulations, and accepted engineering practices, for the items under review. Additionally, the applicant is hereby notified that (s)he is required to comply with all applicable Codes or Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified: COMMUNITY DEVELOPMENT DEPARTMENT Planninl! Division 1. Approved Proiect: Approval is granted for a Modification to a Site and Architectural Review Permit (PLN2003-124) to allow the exterior remodel of an existing gasoline service station and a Sign Program Application (PLN 2003-125) on property located at 570 E. Hamilton Avenue. The site, building, landscaping and sign(s) design shall substantially conform to the revised project plans prepared by ARC Inc. Architects and stamped approved on January 23, 2004, except as may be modified by the Conditions of Approval herein. 2. Site and Architectural Review Permits Approval Expiration: Within one year from the date of approval, a building permit must be obtained and construction completed one year thereafter or the Site and Architectural Review Permit approvals shall be void. 3. Fencin~: Any existing or proposed fencing shall comply with Section 21.59.090 of the Campbell Municipal Code. 4. Signing: This Sign Program Permit has been approved subject to the following conditions of approval: a. The applicant shall obtain a demolition permit for removal of the building signage and monument sign b. The applicant shall obtain any necessary building or electrical permits from the Building Division prior to sign installation. c. The proposed wall and freestanding signs shall be fabricated and installed per the approved plans dated as approved on January 23, 2004. PLN2003-124 & 125 - 570 _. Hamilton Avenue Paf!e2 d. The sign shall be maintained in good condition at all times and shall be repaired or replaced as necessary. 7. Mechanical Equipment: All roof mounted and ground mounted equipment shall be screened with architecturally compatible materials, subject to approval by the Community Development Director, prior to the issuance of building permits. 8. Utilities: All new on-site Utilities shall be installed underground per Section 20.36.150 of the Campbell Municipal Code for any new or remodeled buildings or additions. Applicant shall comply with all plan submittals, permitting, and fee requirements of the serving utility companies. Building Division 9. Permits Required: A building permit application shall be required for the proposed changes to the existing structure and canopy. The building permit shall include Electrical/PlumbinglMechanical fees when such work is part of the permit. 10. Construction Plans: The Conditions of Approval shall be stated in full on the cover sheet of construction plans submitted for building permit. 11. Size of Plans: The maximum size of construction plans submitted for building permits shall be 24 inches by 36 inches. 12. Plan Preparation: This project requires plans prepared under the direction and oversight of a California Licensed Engineer or Architect. Plans submitted for building permits shall be "wet stamped" and signed by the qualifying professional person. 13. Site Plan: Application for building permit shall include a competent site plan that identifies property and proposed structures with dimensions and elevations as appropriate. Site plan shall also include site drainage details. Site address and parcel numbers shall also be clearly called out. Site parking and path of travel to public sidewalks shall be detailed. 14. Title 24 Energv compliance: California Title 24 Energy Standards Compliance forms shall be blue-lined on the construction plans. Compliance with the Standards shall be demonstrated for conditioning of the building envelope and lighting of the building. 15. Special Inspections: When a special inspection is required by U.B.c. Section 1701, the architect or engineer of record shall prepare an inspection program that shall be submitted to the Building Official for approval prior to issuance of the building permits, in accordance with D.B.C Section 106.3.5. Please obtain City of Campbell, Special Inspection forms from the Building Inspection Division Counter. 16. Non-Point Source Pollution Control: The City of Campbell, standard Santa Clara Valley Non-point Source Pollution Control Program specification sheet shall be part of plan submittal. The specification sheet (size 24" by 36") is available at the Building Division service counter. PLN2003-124 & 125 - 570. HamiltonAvenue Paf!e3 17. Title 24 Accessibilitv - Commercial: On site general path of travel shall comply with the latest California Title 24 Accessibility Standards. Work shall include but not be limited to accessibility to building entrances from parking facilities and sidewalks. Projects seeking to use the Title 24 Hardship exemption clause shall blue-line completed, City of Campbell "20%" exemption form on submitted construction plans. Form is available at Building Division service counter. 18. Approvals Required: The project requires the following agency approvals prior to issuance of the building permit: a. Santa Clara County Fire Department (378-4010) PUBLIC WORKS DEPARTMENT No Conditions COUNTY FIRE DEPARTMENT No Conditions ARC Inc. January 20, 2004 ARCHITECTS Ms. Melinda Denis City of Campbell Planning Division 70 North First Street Campbell, California 95008 940 Tyler Street, Suite 23 Benicia, CA 94510 Tel: 707.745.0502 Fax: 707.745.0592 ARC IncArchi tects .com Re: Shell Stations 570 E. Hamilton Avenue Campbell, California RECEIVED JAN 2 1 Z003 Ct1Jn~/~~~~~L Subject: Re-Submittal Dear Melinda, Enclosed please find the following for the above referenced project: Quantity Date Description 2 Sets 2 Sets 01-08-04 01-08-04 Revised Design Drawings, including colored elevations Revised Design Drawings, in black and white Per your recommendation a lighter gray band has been used as an accent on the building and canopy fascia. We have provided these documents for your use and records as required for review. Please contact me if you have any questions or need additional information. Sincerely, ARC Inc. ~.~- Haleh Mousavi, Project Coordinator ~ Enclosures cc: TC 128 I C-1 w/encls. us Mail December 8, 2003 Ms. Melinda Denis City of Campbell Planning Division 70 North First Street Campbell, California 95008 RE'~II7'~q '1~1/"r, ~r.~n t7'lk!~ DEe 0 9 2003 CITY OF G/'d',lPBFLL PLANNING DEPT. Re: Shell Stations 570 E. Hamilton Avenue Campbell. California Subject: Re-Submittal Dear Ms. Melinda Denis, Enclosed please find the following for the above referenced project: Quantity Date Description 1 ea 11-23-03 Owner Authorization letter We have provided these documents for your use and records as required for review. Please contact me if you have any questions or need additional information. Sincerely, ARC Inc. M.~ Haleh Mousavi, Project Coordinator Enclosures cc: Jennifer Firman, Trammell Crow Coy McDaniel, Trammell Crow Tom Wilson, ARC Inc. TC128 / C-1 w/encls. Overnight ARC Inc. ARCHITECTS 940 Tyler Street, Suite 23 [lenicia, CA 94510 Tel: 707.745.0502 Fax: 707.74S.0592 ARClncArchi tee tS.com ARC Inc. December 2,2003 ARCHITECTS Re: Shell Stations 570 E. Hamilton Avenue Campbell, California RECEIVED DEe 0 4 2003 CITY OF CAMPBELL PLANNING DEPT. 940 Tyler Street, Suite 23 [lenicia, CA 94510 Tel: 707.745.0502 Fax: 707.745.0592 ARC I ncArchitects. com Ms. Melinda Denis City of Campbell Planning Division 70 North First Street Campbell, California 95008 Subject: Re-Submittal Dear Ms. Melinda Denis, Enclosed please find the following for the above referenced project: Quantity Date Description 1 Set 11-03 Revised Design Drawings, including colored elevations We are in the process of obtaining owner authorization for this station. I will send you the authorization letter as soon as I receive it. We have provided these documents for your use and records as required for review. Please contact me if you have any questions or need additional information. Sincerely, ARC Inc. ~.~ Haleh Mousavi, Project Coordinator Enclosures cc: Jennifer Firman, Trammell Crow Coy McDaniel, Trammell Crow Tom Wilson, ARC Inc. TC128/ C-1 w/encls. Overnight -c. D ,....., -- c. , ~ _l ..c: .....'"' '-..' </J .j -.-- .-.-..-.....----" ...,.---....-----.-.-----.--..-...-.- -,,_._,_.._.--~_._-~._,--~..,_.._-"..--~----_..- "-,....~.... .-.... ..- ._'..,."__"~-'" - -_.. -_._,-"...._,.~ .,- ...--..... ,., November 14,2003 Bitney Investments Attn: Josh Paris 9i2i SW 43,J Ave Portland, OR 97219-5207 Shell Lubricants 12700 Norlhborough Drive Houston, TX 77067 Subject: Shell Service Station, 570 East Hamilton, Campbell, CA To Whom It May Concern: Shell Oil Company is in the process of re-imaging its service station network in Northem Califomia. The re-image work consists of painting the building, canopy and replacing the primary lD sign to conform with city requirements. The city responsible for reviewing our application has requested that we obtain property owner pennission to apply for pernlits. We request that you signify your approval by signing in the space below and retUlTI this letter to us in the enclosed envelope. .\ CO?y aT this Jetter is cndost:~ lur your records. We would appreciate receiving this letter as soon as possible, inasmuch as we would like to move as quickly as possible with this process. Any questions you may have should be directed to me at 281-874-7771. Sincerely, Matthew Ke Project Manager This is to advise that pernlission to alter the above referenced service station site to Shell colors and trademarks is granted. Printed Name: Authorized Signature: J IJ '7 If.. f},-.( (~ II J?~-; f ( Date: 0' . CA1j . /'>~ t: (<' ~ ,- U r CAMPBELL , , , , c' L__ O"e H AI'IJ CITY OF CAMPBELL u Community Development Department October 30, 2003 Hardy Knight ARC Inc. Architects 940 Tyler Street, Suite 23 Benicia, CA 94510 Re: PLN2003.124 & 125 - 570 E. Hamilton A venue Site and Architectural Review Permit & Sign Program Dear Mr. Knight: Thank you for your Site and Architectural Review Permit/Sign Program application submitted on October 06, 2003, for the remodel of the Shell gasoline service station at 570 E. Hamilton Avenue. Your application was distributed to the City's Development Review Committee. The Committee, which consists of the County Fire Department, Building Division, Planning Division and Public Works Department, reviewed the application for completeness and compliance with the City's Zoning Code and General Plan. The Planning Division has prepared comments that are included herein and the Building Division comments are attached for your review. 1. Design: The project site is located within the Site and Architectural Design Review Area and subject to the development policies of the General Plan. Development requirements for this area are intended to enhance the character, stability, and integrity of the business districts and to assure high quality architectural design and optimum site design. The City recently adopted a General Plan Update in 2001, which states clearly that generic "corporate architecture is discouraged." Corporate architecture is more difficult to blend with existing development and becomes dated quickly. Development projects are required to be compatible with the surrounding development and can be achieved through careful attention to scale, materials, colors, building form, and design details. The Planning Division is not supportive of the proposed project since it does not meet the City's design requirements and is not consistent with the City's General Plan in regards to corporate architecture. 2. Signag:e: The proposed remodel involves the addition and reconfiguration of signage. The City considers the entire yellow and red fascia panel to be signage since they are designated Shell colors and reflect the Shell corporate identity. The proposed sign program exceeds the number and area standards of the sign ordinance. 70 North First Street. Campbell, California 95008-' 436 . rEI 408.866.2140 I'AX 408.871.5140 "11)1) 408.866.1790 PLN2003-124.125 - 570 E. .lmiltonAvenue POlle 2 of3 Additional signage requires the approval of a Sign Exception under a separate application. The City is not supportive of additional signage beyond what is permitted for service stations in the Sign Ordinance, which consists of only: a. One wall sign per business, mounted parallel to the building. Any illumination shall be provided by interior lights or reflectors concealed in shrubbery or decorative structures. Such illumination shall not cause glare on surrounding streets or adjacent property. b. One freestanding sign for each parcel. The maximum height of a freestanding sign shall be fourteen feet above ground. c. A maximum of two readerboard signs, not to exceed sixteen square feet each, to be attached to an approved freestanding sign, the building, the canopy or secured to the property. 3. Lig:hting: If any new lighting is proposed with the remodel, it should be as minimal as possible. The City will not be supportive of lighting that causes glare upon any adjacent property or the public right-of-way. 4. Propertv Owner's Signature: The owner of record according to the County Assessor is Lillian S Bitney Trustee, 570 E. Hamilton A venue, Campbell, CA 95008. 5. Site Plan: Please include the following information: a. Please indicate the dimensions of all setbacks from property line and distances between buildings/structures. Refer to Section 21.22.030.D.2 and 21.24.050.B of the Municipal Code for the setback requirements. b. Provide location and uses of buildings on adjacent properties. Describe the height, setbacks and type of structures on adjacent properties Your application has been deemed incomplete and will not be placed on the Planning Commission agenda until additional information and details are submitted and your application is deemed complete. If you have any questions regarding these comments, please feel free to contact me at (408) 866-2142 or by email atmelindad@citvofcampbell.com. Sincerely, llfjJt~dcJfJuu0 Melinda Denis Planner I encl: Building Inspection Division Comments, 10/20/03 cc: Geoff Bradley, Senior Planner CITY OF CAMPBELL BUILDING INSPECTION DMSION - COMMENTS TO THE DEVELOPMENT REVIEW COMMITTEE DRC: October 20, 2003 ADDRESS: 570 E. Hamilton Ave. Project Application: PLN-2003-00124 PLN-2003-00125 RECOMMENDATION: Note: No building code issue has been reviewed at Development Review Committee; it will be reviewed in the Building Permit process. Please be aware that building codes are changing constantly; plans submitted for building permit shall comply with the code in effect at that time. Submit permit application together with required documents to the Building Inspection Division to obtain a building permit. No construction can be commenced without an appropriate building permit. It is recommended that this item be forwarded to the Planning Commission for review, with the following conditions. TO THE SA TISF ACTION OF THE BUILDING DIVISION MANAGERlBUILDING OFFICIAL: I. PERMITS REQUIRED: A building permit application shall be required for the proposed changes to the existing structure. The building permit shall include Electrical/Plumbing/Mechanical fees when such work is part ofthe permit. 2. CONSTRUCTION PLANS: The conditions of Approval shall be stated in full on the cover sheet of construction plans submitted for building permit. 3. SIZE OF PLANS: The minimum size of construction plans submitted for building permits shall be 24 in. X 36 in. 4. PLAN PREPARATION: This project requires plans prepared under the direction and oversight of a California licensed Engineer or Architect. Plans submitted for building permits shall be "wet stamped" and signed by the qualifying professional person. 5. SITE PLAN: Application for building permit shall include a competent site plan that identifies property and proposed structures with dimensions and elevations as appropriate. Site plan shall also include site drainage details. Site address and parcel numbers shall also be clearly called out. Site parking and path of travel to public sidewalks shall be detailed. 8. TITLE 24 ENERGY COMPLIANCE: If there will be proposed changes to the lighting and/or heating of the structure, California Title 24 Energy Standards Compliance forms shall be blue- J:\Building DRC Comments\570ehamiltooave_2.doc lined on the construction plans. Compliance with the Standards shall be demonstrated for conditioning of the building envelope and lighting of the building. 9. SPECIAL INSPECTIONS: When a special inspection is required by U.B.c. Section 1701, the architect or engineer of record shall prepare an inspection program that shall be submitted to the Building Official for approval prior to issuance of the building permits, in accordance with U.B.C Section 106.3.5. Please obtain City of Campbell, Special Inspection forms from the Building Inspection Division Counter. 10. The City of Campbell, standard Santa Clara Valley Non-point Source Pollution Control Program specification sheet shall be part of plan submittal. The specification sheet (size 24" X 36") is available at the Building Division service counter. 11. TITLE 24 ACCESSIBILITY - COMMERCIAL: On site general path of travel shall comply with the latest California Title 24 Accessibility Standards. Work shall include but not be limited to accessibility to building entrances from parking facilities and sidewalks. 12. TITLE 24 ACCESSIBILITY - COMMERCIAL: Projects seeking to use the Title 24 Hardship exemption clause shall blue-line completed, City of Campbell "20%" exemption form on submitted construction plans. Form is available at Building Division service counter. 13. APPROVALS REQUIRED: The project requires the following agency approval prior to issuance of the building permit: a. Santa Clara County Fire Department J:\Building ORe Comments\570ehamiltonave_2.doc ~ 12700 Norrhbo'cugh D",. Hous'on, TX 77Gb" ",Jay 9, 2003 Subject: Shell L'pgrading Service Stations to its Retail Visual Identity (RYI) To Whom It ilia)' Concern: Please be ach-ised by this correspondence that Arc Inc, has been aUlhorized to act as ,\gent on behalf of Shell Oil Products US for the purpuse of making application submittals and negoliating conditions for the abo\'e referenced Shell RVI Program. The RVI ptogram entails the re-imab>ing of existing Shell service stations in the San Francisco 1\ rea. Our re-branding process im'olves modifications to the signage, canopy, and buildings. If you have any questions or comments, please do not hesitate to contact me at 281-874-777\ regarding Ihis matter Thank you for YOllr assistance. Sincerely, Matthew C. ' ey Project Mannger Shell Oil Products, US SHELL RENOVATION NARRATIVE Shell has recently embarked on a nationwide program to convert their gray and yellow Shell Retail Gasoline Stations image to their international image standard. The international image standard, known as RVI (Retail Visual Identity), has been designed to embody the core values of the Shell brand in a modern and welcoming design resulting in a retail environment that is warm. friendly and inviting. The functional benefits of Shell's RVI include. for example, the design of signs that communicate information clearly and lighting that provides illumination for safety and visibility. One of the emotional benefits of RVI design is that it creates a clean and comfortable environment - an ambience that is more "retail" and less "industrial". Shell is in the process of upgrading all Shell branded sites over the next few years and they are very excited about the positive effect these upgrades will have on their customers and the communities they serve The conversions of their facilities will include painting, general maintenance, and signage that will considerably improve the facilities' appearances. Standard Proposed Up!lrades' . Paint building white with gray band at bottom Add yellow/red sign fascia to building, where applicable Add yellow/blue sign fascia to car wash. where applicable Yellow canopy fascia with illuminated red band, where applicable Paint canopy columns white with gray band at bottom Replace pumps and pump valences (removing pump spandrels where applicable) Reface sign (where applicable) , . . . . . . . Please refer to "scope of work" notes for specific proposed upgrades located on cover page of each site's architectural drawings.