Pre-App - 2004October 11, 2004 Mr. Jolm Milburn Milburn Architecture, Inc. 345 California Avenue, Suite 6 Palo Alto, CA 94306 Re: PRE 2004-57 65 E. Rincon Avenue Dear Mr. Milburn: Thank you for your submittal of a preliminary application for the remodel of an existing church building located at 65 East Rincon A venue. The proposed elevations present an enhanced and updated improvement for this building that is clearly welcome. Zoning: The subject property is zoned P-D (Planned Development) and is designated as a Low-Medium Density Residential land use on the City's General Plan Land Use Map. The remodel of an existing building within the P-D Zoning District requires approval of an Administrative Planned Development Permit that is reviewed and approved by the Community Development Director. An application has been enclosed. The processing time for such an application is approximately 30 days. Storage Structures in Parking Area: Two existing storage sheds are shown in the north portion of the parking area. A review of Planning Division records indicates no approval for these structures. Any proposed remodel should include the removal of these structures. Retention of these buildings would not be supported due to a lack of architectural compatibility and impact on already limited parking facilities. Parking: The parking area needs to be resurfaced and refurbished. Signing: The project description indicates the installation of a new monument sign. No signing was shown. A separate sign permit will be required for this new sign. Landscaping: The proposed ramp, patio and screen walls will occupy significantly portions of the current landscaping. The proposed renovations should include the installation of appropriate landscaping to soften the building/ screen wall appearance and to addressing the shading needs ofthe patio area. 65 E. Rincon Avenue _~age 2...o.f.? Your pre-application was distributed to the Public Works Department, Building Division, Planning Division and the County Fire Department. The comments from these departments are enclosed. Please note that all comments are meant to be preliminary. Conditions of approval from each department will be developed at the time a formal application is submitted. Please do not hesitate to contact me at (408) 866-2144 or via email at timh@cityofcampbell.com to schedule a meeting to discuss these comments or provide additional information regarding the application process. ~ [ 4-tlf Tim J. Haley Associate Planner enel: Planned Development Permit Application Form Comments from Public Works Department cc: Geoff L Bradley, Senior Planner Ed Arango, Associate Engineer St. Stephen Orthodox Church., 65 E. Rincon Avenue, Campbell, CA 95008 MEMORANDUM CITY OF CAMPBELL TO: 1/\ ,'R'" Haley, Project Planner FROM: JfYiI Oxonian, Senior Civil Engineer SUBJECT,1fiA:;RC PRE-APPLICATION DATE: 10/07/04 [iJ RECEIVED Site Address: 65 E. Rincon Avenue For File No(s): PRE 2004-57 Project Description: Pre-application for the remodel of an existing church building (Access Ramp/outdoor patio) John Milburn - Milburn Architecture, Inc. OCT 1 ~ 2004 CITY OF CAMPBELL PLANNlfIIG DEPT. Applicant: PUBLIC WORKS DEPARTMENT PRELIMINARY CONDITIONS OF APPROVAL 1 . Plan Lines Prior to issuance of any grading or building permits for the site, the applicant shall provide a plan layout showing the correct distance from the street centerline to the property line. 2. Proof of Ownership: Prior to issuance of any grading, drainage, or building permits for the site. the applicant shall provide a current Preliminary Title Report, grant deed. or other satisfactory proof of ownership. 3. Public Sidewalk Easement: Prior to issuance of any grading or building permits for the site, the applicant shall grant a sidewalk easement on private property contiguous with the public right-of-way along the Rincon Avenue frontage for construction of an ADA compliant driveway approach. The applicant shall cause all documents to be prepared by a registered civil engineer/land surveyor, as necessary, for the City's review and recordation. 4. Right-of-Wav for Public Street Purposes: Prior to issuance of any grading or building permits for the site, the applicant shall fully complete the process to cause additional right- of-way to be granted for public street purposes along the Rincon Avenue frontage to accommodate a 30-foot half street to the street centerline and a 20 foot radius at the corner of Rincon Avenue and Fourth Street to accommodate the construction of the handicap ramp. The applicant shall submit the necessary documents for approval by the City Engineer, process the submittal with City staff's comments and fully complete the right-of- way process. The applicant shall cause all documents to be prepared by a registered civil engineer/land surveyor, as necessary, for the City's review and recordation. 5. Street Imorovements: Prior to issuance of any grading or building permits for the site, the applicant shall execute a street improvement agreement, cause plans for public street improvements to be prepared by a registered civil engineer, pay various fees and deposits. post security and provide insurance necessary to obtain an encroachment permit for J :\LandDcv\ConditiollsWlng\Rincon 65-E PRE. DOC Page 1 of 3 construction of the standard public street improvements, as required by the City Engineer The plans shall include the following a. Removal of existing driveway approach and related curb, gutter and sidewalk on Rincon Avenue. b. Construction of ADA compliant driveway approach, curb, gutter and sidewalk c. Construction of conforms to existing public and private improvements as necessary. 6. Occupancy: Prior to allowing occupancy for any and/or all buildings, the applicant shall have the required street improvements installed and accepted by the City. 7. Water Meter! s) and Sewer Cleanout! s): Existing and proposed water meter( s) and sewer cleanout(s) shall be relocated or installed on private property behind the public right-of-way line. 8. Utilities: All new on-site utilities shall be installed underground per Section 21.18.140 of the Campbell Municipal Code for any new or remodeled buildings or additions. Applicant shall comply with all plan submittals, permitting, and fee requirements of the serving utility compames 9. Utilitv Coordination Plan' Prior to issuance of building permits for the site, the applicant shall submit a utility coordination plan and schedule for approval by the City Engineer for the installation and/or abandonment of all utilities. The plan shall clearly show the location and size of all existing utilities and the associated main lines; indicate which utilities and services are to remain; which utilities and services are to be abandoned, and where new utilities and services will be installed. Joint trenches for new utilities shall be used whenever possible. 10. Pavement Restoration: Based on the utility coordination plan, the applicant shall prepare a pavement restoration plan for approval by the City Engineer prior to any utility installation or abandonment. Streets that have been reconstructed or overlaid within the previous five years will require boring and jacking for all new utility installations. Rincon Avenue has not been resurfaced in the last 5 years. The pavement restoration plan shall indicate how the street pavement shall be restored following the installation or abandonment of all utilities necessary for the project 11. Grading and Drainage Plan: Prior to issuance of any grading or building permits for the site, the applicant shall conduct hydrology studies based on a ten-year storm frequency, prepare an engineered grading and drainage plan, and pay fees required to obtain necessary grading permits. The plans shall comply with the 1998 edition of the California Building Code including Chapters 10,11,18,33, and Appendix Chapter 33. 12. Stormwater Pollution Prevention Measures: Prior to issuance of any grading or building permits, the applicant shall comply with the National Pollution Discharge Elimination System (NPDES) permit requirements, Santa Clara Valley Water District requirements, L\LandDcv\ConJitinlls\Pln!!:\RinCOll 65-E PRE. DOC Page 2 of 3 and the Campbell Municipal Code regarding SlOrmwater pollution prevention. The primary objectives are to improve the quality and reduce the quantity of stormwater runoff to the bay, 13. Storm Drain Area Fee: Prior to issuance of any grading or building permits for the site, the applicant shall pay the required Storm Drain Area fee of $2,575.00 per net acre, which is $1,08600 J:\LandDcv\Conditions\Plng\Rincon 65-E PRE. DOC Page 3 of 3 FIRE:; DEPARTMENT SANTA CLARA COUNTY "_ .REVIEWNUMBER 04 2497 BLOG PERMIT NUMBER 14700 Winchester Blvd.. Los Gatos. CA 95032-1818 (408) 378-4010 . (408) 378-9342 (fax) . www.sccfd.org CONTROL NUMBER FILE NUMBER DEVELOPMENT REVIEW COMMENTS CODE/SEC. I SHEET n REQUIREMENT Review of a proposed remodel of an existing church building access ramp / outdoor patio, Review of this Developmental proposal is limited to acceptability of site access and water supply as they pertain to fire department operations, and shall not be construed as a substitute for formal plan review to determine compliance with adopted model codes, Prior to performing any work the applicant shall make application to, and receive from, the Building Department all applicable construction permits. No fire department conditions or requirements, -- City ..- .PLANS SPECS NEW OCCUPANCY CONST. TYPE AppllcantName DATE .. -J PAGE - RMDL AS CBL 0 0 0 0 0 MILBURN ARCHITECTURE 9/30/2004 ~QF~ SECJFLOOR AREA LOAD DESCRIPTION BY Commercial Development Rucker, Ryan NAME OF PROJECT ~OCATION 65 -- -- RmconAv ST STEPHEN ORTHODOX CHURCH ___________ Orgilniz"d_ as the Santa Clara County Central Fir-,,_Protectio.':'.Plstrict Serving Santa Clara County and the communities of Campbell, Cupertino, Los Altos, Los Altos Hills. Los Gatos, Monte Sereno, Morgan Hill, and Saratoga Architecture, Inc. John B. Milburn, Architect September 23. 2004 City of Campbell Planning Department 15405 Willow Dr. Campbell, CA 95008 Re: Pre-Application Submittal for St. Stevens Orthodox Church 65 East Rincon Street Campbell, California Project #1082 Dear Sirs, St. Stephens Orthodox Church wishes to make improvements to their church to better serve the congregation and to improve the exterior appearance of the building. The scope of the improvements is as follows. . Provide disabled access to the church including parking and ramp. . Provide accessible toilet facilities. . Remove the existing wood trellis at the church entry and construct a new entry porch. . Remove the existing trellis area in the parking lot. . Provide an outdoor patio area. . Add landscaping and planters along the Rincon Avenue and 4th street frontages and in the parking lot area. . Replace the existing pavement and re-stripe the parking lot. No change to the total number of parking spaces is proposed. . Provide a new monument sign. No increase in building area or change to the building use is proposed. It is proposed that the existing storage sheds remain The existing church is 3,350 square feet. The new covered entry porch is 300 square feet. Total new landscape area is 2,166 square feet. Total new hardscape area is 1,957 square feet. 345 California Avenue, Suite 6 . Polo Alto, California 94306 . Phone 650 324-8875 . fax 650 324-3875 City of Campbell Planning uepartment Pre-Application Submittal 9/23/2004 Page 2 of 2 The church is bounded on all sides with single and multi-family residential uses. Yours truly, MILBURN ARCHITECTURE, INC. '.&~~ kn Milburn, Architect Attachments: Pre-application Form 7 Sets of plans Photographs