Loading...
Use Permit - Res Add - 2002January 29, 2003 Kevin Thurston 110 S. Second Street Campbell, CA 95008 Re: PLN2002-153 - 110 S. Second Street -- Conditional Use Permit Dear Applicant: Please be advised that at its meeting of January 28, 2003, the Planning Commission adopted Resolution No. 3478 granting a Conditional Use Permit to allow the construction of a new detached garage and an addition to an existing single-family residence on the above referenced property. This action is effective in ten calendar days, unless appealed in writing to the City Clerk by 5 p.m. on Friday, February 7, 2003. California Code of Civil Procedure, Section 1094.6, governs the time within which judicial review of this decision must be sought. If you have any questions, please do not hesitate to contact me at (408) 866-2140. Sincerely, Melinda Denis Planner I Cc: Lynn Penoyer, Public Works Frank Mills, Building Chris Veargason, County Fire RESOLUTION NO. 3478 BEING A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CAMPBELL APPROVING A CONDIDONAL USE PERMIT (PLN2002~I53) TO ALLOW THE CONSTRUCTION OF A NEW DETACHED GARAGE AND AN ADDITION TO AN EXISTING SINGLE-FAMILY RESIDENCE ON PROPERTY OWNED BY MR. KEVING THURSTON LOCATED AT 110 S. SECOND STREET IN A PD (PLANNED DEVELOPMENT) ZONING DISTRICT. APPUCATION OF MR. KEVIN THURSTON. FILE NO. PLN2002-153. After notification and public hearing, as specified by law, and after presentation by the Community Development Director, proponents and opponents, the hearing was closed. After due consideration of all evidence presented, the Planning Commission did find as follows with respect to application PLN2002-l53: 1. The development of the proposed project will result in a use that is consistent with the General Plan land use of Low-Medium Density Residential for this area. 2. The proposed project is well designed and is architecturally compatible with the surrounding neighborhood. 3. The proposed project consists of a 66 square foot addition on the first floor at the back of the residence, a seven square foot addition on the second floor at the back of the residence and construction of a new 736 square foot detached garage at the rear of the property. The project also includes relocating the porch entry from the left side to the front, replacing the aluminum windows with wood sash windows, removing all the existing siding and replacing with new siding and a new fifty-year composition shingle roof. The applicant is proposing an entire remodel on the interior including the basement, first and second floor. 4. The site plan illustrates the location of the addition at the rear of the house, minor demolition on the right side of the house, demolition of the existing garage and construction of a new detached garage. The demolition on the right side of the house is necessary for access to the new detached garage. The new garage will be visible from the street but will be designed to be consistent with the main house. The garage will provide two covered parking spaces which meets the requirements of the Zoning Code. 5. The proposed addition and detached garage are consistent with the architectural design and historic character of the structure. The addition and detached garage have been designed to be compatible with the existing structure. The new wood siding, windows, window trim, and roof will match the architecture of the existing residence. 6. The proposed project is consistent with the Secretary of the Interior's Standards for Rehabilitation and Guidelines for Rehabilitating Historic Structures. Planning Commission ResL .!On No. 3478 PLN2002-153 - 110 S. Second Street - Conditional Use Permit - Residential Addition Page 2 Based upon the foregoing findings of fact, the Planning COlllllllssion further finds and concludes that, as conditioned: 1. The establishment, maintenance, or operation of the use applied for will not be detrimental to the health, safety, peace, morals, comfort or general welfare of persons residing or working in the neighborhood of such proposed use, or be detrimental or injurious to property and improvements in the neighborhood or to the general welfare of the city; 2. The proposed site is adequate in size and shape to accommodate the yards, walls, fences, parking and loading facilities, landscaping and other development features required in order to integrate said use with uses in the surrounding area; 3. The proposed site is adequately served by streets of sufficient capacity to carry the kind and quantity of traffic such use would generate; 4. The proposed use is compatible with the uses in the area; 5. The project qualifies as Categorically Exempt under section 15331, Class 31 of the guidelines propounded under the California Environmental Quality Act (CEQA) pertaining to the rehabilitation of a historical resource; 6. There is a reasonable relationship and a rough proportionality between the conditions of the project and the impacts of the project. NOW, THEREFORE, BE IT RESOLVED that the Planning Commission grants a Conditional Use Permit (PLN2002-153) to allow the construction of a new detached garage and an addition to an existing single-family residence on property owned by Mr. Kevin Thurston located at 110 S. Second Street, subject to the following conditions: Where approval by the Director of Community Development, City Engineer, Public Works Director, City Attorney or Fire Department is required, that review shall be for compliance with all applicable conditions of approval, adopted policies and guidelines, ordinances, laws and regulations and accepted engineering practices for the item under review. Additionally, the applicant is hereby notified that he/she is required to comply with all applicable Codes or Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified. COMMUNITY DEVELOPMENT DEPARTMENT Planning Division: 1. Proiect Aooroval: Approval is granted for a Conditional Use Permit (PLN2002-153) allowing a 66 square foot addition on the first floor at the back of the residence, a seven square foot addition on the second floor at the back of the residence and construction of a Planning Commission ReSL .!On No. 3478 PLN2002-153 - 110 S. Second Street - Conditional Use Permit - Residential Addition Page 3 new 736 square foot detached garage at the rear of the property. The approval also includes relocating the porch entry from the left side to the front, replacing the aluminum windows with wood sash windows, removing all the existing siding and replacing with new siding and a new fifty-year composition shingle roof. The approval includes the entire remodel on the interior including the basement, first and second floor. The building and site design shall substantially conform to the set of plans submitted to the Planning Division, and dated January 7, 2003, including building elevations and site plan, except as may be modified by the Conditions of Approval herein. 2. Conditional Use Permit Aoproval: The Conditional Use Permit approval shall be valid for a period of one year from the date of final approval. Within this one-year period, a building permit must be obtained and construction completed one year thereafter or the Conditional Use Permit shall be void. 3. Building Elevations, Details and Colors: The applicant shall submit detailed building elevations and exhibits depicting architectural details. Detailed elevations and exhibits shall be reviewed by and approved by the Community Development Director prior to the issuance of building permits. Project details include, but are not limited to, the following: a. Details of materials to be used on the addition to the historic structure. Materials are to be consistent with materials used on historic buildings of the same type, age, and style and shall be of historic quality or appear to be historic quality. b. Providing a color/material sample board specifying color palette, textures and materials to ensure that it matches the existing roof material. c. Providing roof samples or brochures of the color and material of the proposed roofing to ensure that it matches the existing roof material. d. Providing window schedules for high quality of window treatments and styles reflecting the high quality historic windows depicted on the elevations. All windows shall be consistent with the architectural style of the existing structure. 4. Parking and Drivewavs: All parking and driveway areas shall be developed in compliance with the approved plans and Chapter 21.50 (Parking and Loading) of the Campbell Municipal Code. All parking spaces and driveways shall be graded, drained and surfaced with an asphaltic or concrete surface to provide a durable and dust-free surface and access under all weather conditions. 5. Contractor Contact Information Posting: The project site shall be posted with the name and contact number of the lead contractor in a location visible from the public street prior to the issuance of building permits. Planning Commission Resu. ..on No. 3478 PLN2002-153 - 110 S. Second Street - Conditional Use Permit - Residential Addition Page 4 Building Division: 6. Permits Required: A separate building permit application shall be required for each addition proposed to the existing structures. The building permit shall include Electrical/PlumbinglMechanical fees when such work is part of the permit. 7. Plan Preparation: This addition may require plans prepared under the direction and oversight of a California licensed Engineer or Architect. When applicable, plans submitted for building permits shall be "wet stamped" and signed by the qualifying professional person. 8. Construction Plans: The Conditions of Approval shall be stated in full on the cover sheet of construction plans submitted for building permit. 9. Size of Plans: The size of construction plans submitted for building permits shall be 24 in. x 36 in. 10. Site Plan: Application for building permit shall include a competent site plan that identifies property and proposed structures with dimensions and elevations as appropriate. Site plan shall also include site drainage details. Site address and parcel numbers shall also be clearly called out. 11. Title 24 Energv Compliance: California Title 24 Energy Compliance forms CF-IR and MF- lR shall be blue-lined on the construction plans. 8% by 11 calculations shall be submitted as well. 12. Special Insoections: When a special inspection is required by U.B.C. Section 1701, the architect or engineer of record shall prepare an inspection program that shall be submitted to the Building Official for approval prior to issuance of the building permits, in accordance with U.B.C Section 106.3.5. Please obtain City of Campbell, Special Inspection forms from the Building Inspection Division Counter. 13. Water Pollution: The City of Campbell, standard Santa Clara Valley Non-point Source Pollution Control Program specification sheet shall be part of plan submittal. The specification sheet (size 24" X 36") is available at the Building Division service counter. 14. Approvals Required: The project requires the following agency approval prior to issuance of the building permit: a. West Valley Sanitation District (378-2407) b. Santa Clara County Fire Department (378-4010) c. School District: i. Campbell Union School District (378-3405) ii. Campbell Union High School District (371-0960) iii. Moreland School District (379-1370) iv. Cambrian School District (377-2103) Planning Commission Resu._,ion No. 3478 PLN2002-153 - 110 S. Second Street - Conditional Use Permit - Residential Addition Page 5 Note: To Determine your district, contact the offices identified above. Obtain the School District payment form from the City Building Division, after the Division has approved the building permit application. PASSED AND ADOPTED this 28th day of January, 2003, by the following roll call vote: AYES: NOES: ABSENT: ABSTAIN: Commissioners: Commissioners: Commissioners: Commissioners: Alderete, Doorley, Francois, Gibbons and Rocha None Hernandez and Jones None APPROVED: George Doorley, Acting Chair ATTEST: Sharon Fierro, Secretary ITEM NO.3 CAMPBELL ~ STAFF REPORT. PLANNING COMMISSION MEETING OF JANUARY 28, 2002 PLN2002.153 Thurston, K. Public Hearing to consider the application of Kevin Thurston for a Conditional Use Permit (PLN2002-153) to allow the construction of a new detached garage and addition to an existing single-family residence that is on the Historic Resources Inventory on property owned by Kevin Thurston located at 110 S. Second Street in a P-D (Planned Development) Zoning District. STAFF RECOMMENDA TION That the Planning Commission takes the following action: Adopt a Resolution, incorporating the attached findings, approving a Conditional Use Permit to allow the construction of a new 736 square foot detached garage and a 73 square foot addition to an existing single-family residence that is on the Historic Resources Inventory, subject to the attached Conditions of Approval and find that this project is Categorically Exempt under Section 15331 Class 31 of the California Environmental Quality Act (CEQA) pertaining to the rehabilitation of a historical resource. PROJECT DATA Catel!orv Gross Lot Area: Net Lot Area: Density: Proposed 8,000 sq. ft. (0.18 acres) 6,500 sq. ft. (0.15 acres) 5.5 units per gross acre Required/Allowed N/A N/A 6-13 uni ts/ gross acre Building Coverage: 2,126 sq. ft. (32.7%) 40% Building Area: Existing: Basement: 1st Floor: 2nd Floor: Proposed Addition: 1st Floor: 2nd Floor: Garage: Total: 388 sq. ft. 1,324 sq. ft. 729 sq. ft. N/A N/A N/A 66 sq. ft. 7 sq. ft. 736 sq. ft. 3,250 sq. ft. N/A N/A 1,000 sq. ft. max N/A Parking: 2 covered, I uncovered 1 covered, I uncovered Building Height: 24ft. N/A Staff Report - Planning Commission Meeting of September 24, 200:L . PLN2002-153 - 110 S. Second Street Page 2 of 3 DISCUSSION Applicant's Proposal: The applicant is requesting approval of a Conditional Use Permit for the demolition of the existing garage, construction of a new detached garage and an addition to an existing single-family residence located at 110 S. Second Street. The project site is located on South Second Street just south of its intersection with Everett A venue. The proposed project consists of construction of a new 736 square foot detached garage at the rear of the property, 66 square foot addition on the first floor at the back of the residence and a seven square foot addition on the second floor at the back of the residence. The project also includes relocating the porch entry from the left side to the front, replacing the aluminum windows with wood sash windows, removing all the existing siding and replacing with new siding and a new fifty-year composition shingle roof. The applicant is proposing an entire remodel on the interior including the basement, first and second floor. Background: The site is a 6,000 net square foot residential parcel that is developed with a residence that was built in approximately 1904. The single-family residence was approved to the Historic Resources Inventory in 1984. ANALYSIS General Plan Designation: The General Plan land use designation for the project site is Low- Medium Density Residential (6-13 units/gross acre). The proposed project is consistent with the land use designation. Zoning Designation: The zoning designation for the project site is P-D (Planned Development District). The proposed project is permitted with approval of a Conditional Use Permit which must be reviewed by the Historic Preservation Board. Site Plan: The site plan illustrates the location of the demolition of the eXlstmg garage, construction of a new detached garage, addition at the rear of the house and removal of the projecting wall on the right side of the house. The demolition on the right side of the house is necessary for access to the new detached garage. The new garage will be visible from the street but will be designed to be consistent with the main house. The garage will provide two covered parking spaces in order to meet the requirements of the Zoning Code. Architecture: Staff has reviewed the proposed detached garage and addition and finds that it is consistent with the architectural design and historic character of the structure. The addition and detached garage has been designed to be compatible with the existing structure. The new wood siding, windows, window trim, and roof will match the architecture of the existing residence. The Secretarv of the Interior's Standards for the Treatment of Historic Properties: The proposed project is consistent with the Secretary of the Interior's Standards for Rehabilitation and Guidelines for Rehabilitating Historic Structures. Per the Standards, the addition does not destroy historic materials, features, and spatial relationships that characterize the property. Parking: Currently there is no covered parking at the subject site. The existing garage is deteriorating and cannot accommodate a vehicle. The proposed project would include the Staff Report - Planning Commission Meeting of September 24, 200:L PLN2002-153 - 110 S. Second Slreet Page 3 of 3 construction of a new detached garage providing two parking spaces. This project provides two covered parking spaces and one covered parking space. Historic Preservation Board: This application was referred to the Historic Preservation Board for review and comment at their meeting of December 17, 2002. The Board determined that the addition and detached garage are consistent with the architectural design and character of the structure and passed a motion recommending approval of the Conditional Use Permit to the Planning Commission with the following recommendations: 1. The proposed addition, detached garage and massing is acceptable 2. The change from aluminum to wood windows is acceptable 3. Maintain the open eave design to support the bungalow style of the home Site and Architectural Review Committee: The Site and Architectural Review Committee reviewed this application at its meeting of January 28, 2003. Attachments: 1. Findings for Approval of File No. PLN2002-153 2. Conditions of Approval for File No. PLN2002-153 3. Letter from Applicant 4. Exhibits (Site Plan, Floor Plans & Elevations) 5. Historic Resources Inventory Sheet 6. Location Map Prepared by: Lllft LU1j<< :iJ-bt~ Melinda Denis, Planner I AP,""db~~ G off I. radley, Senior Plann Attachment #1 FINDINGS FOR APPROVAL OF FILE NO. PLN2002-153 (CONDITIONAL USE PERMIT) SITE ADDRESS: APPLICANT: DATE: 110 S. Second Street Kevin Thurston January 28, 2003 Findings for approval of a Conditional Use Permit to allow a 73 square foot addition and construction of a new 736 square foot detached garage to a single-familv residence that is a Historic Resources Inventorv The Planning Commission finds as follows with regard to File No. PLN2002-153: 1. The development of the proposed project will result in a use that is consistent with the General Plan land use of Low-Medium Density Residential for this area. 2. The proposed project is well designed and is architecturally compatible with the surrounding neighborhood. 3. The proposed project consists of a 66 square foot addition on the first floor at the back of the residence, a seven square foot addition on the second floor at the back of the residence and construction of a new 736 square foot detached garage at the rear of the property. The project also includes relocating the porch entry from the left side to the front, replacing the aluminum windows with wood sash windows, removing all the existing siding and replacing with new siding and a new fifty-year composition shingle roof. The applicant is proposing an entire remodel on the interior including the basement, first and second floor. 4. The site plan illustrates the location of the addition at the rear of the house, minor demolition on the right side of the house, demolition of the existing garage and construction of a new detached garage. The demolition on the right side of the house is necessary for access to the new detached garage. The new garage will be visible from the street but will be designed to be consistent with the main house. The garage will provide two covered parking spaces which meets the requirements of the Zoning Code. 5. The proposed addition and detached garage are consistent with the architectural design and historic character of the structure. The addition and detached garage have been designed to be compatible with the existing structure. The new wood siding, windows, window trim, and roof will match the architecture of the existing residence. 6. The proposed project is consistent with the Secretary of the Interior's Standards for Rehabilitation and Guidelines for Rehabilitating Historic Structures. Attachment #2 CONDITIONS OF APPROVAL FOR FILE NO. PLN2002-153 (CONDITIONAL USE PERMIT) SITE ADDRESS: APPLICANT: DATE: 110 S. Second Street Kevin Thurston January 28,2003 The applicant is hereby notified, as part of this application, that (s)he is required to meet the following conditions in accordance with the ordinances of the City of Campbell and the State of California. The lead department with which the applicant will work is identified on each condition where necessary. Where approval by the Director of Community Development, City Engineer, Public Works Director, City Attorney, or Fire Department is required, that review shall be for compliance with all applicable conditions of approval, adopted policies and guidelines, ordinances, laws and regulations, and accepted engineering practices, for the items under review. Additionally, the applicant is hereby notified that (s)he is required to comply with all applicable Codes or Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified: COMMUNITY DEVELOPMENT DEPARTMENT Planning Division: 1. Proiect Approval: Approval is granted for a Conditional Use Permit (PLN2002-153) allowing a 66 square foot addition on the first floor at the back of the residence, a seven square foot addition on the second floor at the back of the residence and construction of a new 736 square foot detached garage at the rear of the property. The approval also includes relocating the porch entry from the left side to the front, replacing the aluminum windows with wood sash windows, removing all the existing siding and replacing with new siding and a new fifty-year composition shingle roof. The approval includes the entire remodel on the interior including the basement, first and second floor. The building and site design shall substantially conform to the set of plans submitted to the Planning Division, and dated January 7, 2003, including building elevations and site plan, except as may be modified by the Conditions of Approval herein. 2. Conditional Use Permit Approval: The Conditional Use Permit approval shall be valid for a period of one year from the date of final approval. Within this one-year period, a building permit must be obtained and construction completed one year thereafter or the Conditional Use Permit shall be void. 3. Building Elevations, Details and Colors: The applicant shall submit detailed building elevations and exhibits depicting architectural details. Detailed elevations and exhibits shall be reviewed by and approved by the Community Development Director prior to the issuance of building permits. Project details include, but are not limited to, the following: a. Details of materials to be used on the addition to the historic structure. Materials are to be consistent with materials used on historic buildings of the same type, age, and style and shall be of historic quality or appear to be historic quality. b. Providing a color/material sample board specifying color palette, textures and materials to ensure that it matches the existing roof material. Conditions of Approval - hanning Commission Meeting of January L8, 2003 PLN2002-153 - 110 S. Second Street Attachment #2 Page 2 of 3 c. Providing roof samples or brochures of the color and material of the proposed roofing to ensure that it matches the existing roof material. d. Providing window schedules for high quality of window treatments and styles reflecting the high quality historic windows depicted on the elevations. All windows shall be consistent with the architectural style of the existing structure. 4. Parking and Drivewavs: All parking and driveway areas shall be developed in compliance with the approved plans and Chapter 21.50 (Parking and Loading) of the Campbell Municipal Code. All parking spaces and driveways shall be graded, drained and surfaced with an asphaltic or concrete surface to provide a durable and dust-free surface and access under all weather conditions. 5. Contractor Contact Information Posting: The project site shall be posted with the name and contact number of the lead contractor in a location visible from the public street prior to the issuance of building permits. Building Division: 6. Permits Required: A separate building permit application shall be required for each addition proposed to the existing structures. The building permit shall include ElectricalJPlumbinglMechanical fees when such work is part of the permit. 7. Plan Preparation: This addition may require plans prepared under the direction and oversight of a California licensed Engineer or Architect. When applicable, plans submitted for building permits shall be "wet stamped" and signed by the qualifying professional person. 8. Construction Plans: The Conditions of Approval shall be stated in full on the cover sheet of construction plans submitted for building permit. 9. Size of Plans: The size of construction plans submitted for building permits shall be 24 in. x 36 in. 10. Site Plan: Application for building permit shall include a competent site plan that identifies property and proposed structures with dimensions and elevations as appropriate. Site plan shall also include site drainage details. Site address and parcel numbers shall also be clearly called out. 11. Title 24 Energv Compliance: California Title 24 Energy Compliance forms CF-IR and MF- 1R shall be blue-lined on the construction plans. 8% by 11 calculations shall be submitted as well. 12. Special Inspections: When a special inspection is required by D.B.C. Section 1701, the architect or engineer of record shall prepare an inspection program that shall be submitted to the Building Official for approval prior to issuance of the building permits, in accordance with U.B.C Section 106.3.5. Please obtain City of Campbell, Special Inspection forms from the Building Inspection Division Counter. 13. Water Pollution: The City of Campbell, standard Santa Clara Valley Non-point Source Pollution Control Program specification sheet shall be part of plan submittal. The specification sheet (size 24" X 36") is available at the Building Division service counter. 14. Approvals Required: The project requires the following agency approval prior to issuance of the building permit: Conditions of Approval- hanning Commission Meeting of January ,,8, 2003 PLN2002-153 - 110 S. Second Street Attachment #2 Page 3 of 3 a. West Valley Sanitation District (378-2407) b. Santa Clara County Fire Department (378-4010) c. School District: i) Campbell Union School District (378-3405) ii) Campbell Union High School District (371-0960) iii) Moreland School District (379-1370) Iv) Cambrian School District (377-2103) Note: To Determine your district, contact the offices identified above. Obtain the School District payment form from the City Building Division, after the Division has approved the building permit application. Attachment #3 December 3,2002 City of Campbell Planning Department 70 North 1 st Street Campbell, CA 95008 To Whom It May Concern: I am writing this letter regarding the proposed plans for the renovation of my house located at I ] 0 South 2nd Street, here in town. I am proposing to completely renovate tillS house which was originally built in 1904. Items of interest from a planning/preservation point of view would be as follows: ;;.. Rectify previous owner's attempts at non-complying remodels :;.. Retrotit earthquake hardware to current codes :;.. Restore the exterior to it's original condition ';- Replace aluminum windows with wood sash windows r Re-roofthe whole house My plan is to renovate the interior of the home to current construction and design standards. I am also planning to build a garage at the rear of the property which will match and complement the renovated house. Sincerely ~~'";: Homeowner January 28, 2003 Subject: IlO South Second Street - PLN 2002-153 Conditional Use Permit for an Addition and New Detached Garage Proposal The applicant is requesting approval of a Conditional Use Permit for an addition to a residence and a new detached garage at IlO South Second Street. This home is on the Historic Resources Inventory. The project site is on the south side of Second Street between Everett A venue and Rincon A venue. The proposed project is surrounded by single-family residential uses to the north, south, east and west. The subject property is currently developed with a 2,442.28 square feet two-story residence and basement. Site Layout and Architecture: The proposed site plan shows the demolition of the existing garage, minor demolition on the existing residence, construction of a new garage and an addition to the existing residence. The site plan also shows the removal of the existing sidewalk and placement of the new sidewalk. The existing siding will be completely removed and replaced with siding to match the existing. The existing aluminum windows will be replaced with wood windows. The entry on the front porch will be relocated from the north side of the house to the west side. The proposed colors for the house consist of a beige body color, white trim and a burgundy accent color. Staff Analysis: The zoning classification for the project site is PD (Planned Development). The proposed project is consistent with the zoning designation and meets the minimum requirements of the P-D Zoning District. The applicant met with the Historic Preservation Board (HPB) on December 17, 2002. The HPB approved the proposal and made the following recommendations: 1. The proposed addition, detached garage and massing is acceptable. 2. The change from aluminum to wood windows is acceptable. 3. Recommended to maintain the open eave design to support the bungalow style of the home. Due to the current poor conditions of the eaves, the applicant agreed to work with staff during construction to maintain the open eave design of the home. Attachment: site plan, floor plan, and elevations. January 21, 2003 Re: PLN2002-153 - 110 S. Second Street - Residential Addition & New Detached Garage Dear Applicant: Please be advised that the above-referenced application has been scheduled for the following meeting(s): Site and Architectural Review Committee Meeting Date: Tuesday, January 28,2003 Time: 6:45 p.m. Location: Doetsch Conference Room, City Hall, 70 N. First Street, Campbell Planning Commission Meeting Date: Tuesday, January 28, 2003 Time: 7:30 p.m. Location: City Hall Council Chambers, 70 N. First Street, Campbell Should you have any questions or comments, please do not hesitate to contact me at (408) 866- 2140. Sincerely, Melinda Denis Planner I cc: Kevin Thurston (ApplicantJProperty Owner) 110 S. Second Street Campbell, CA 95008 December 24, 2002 Mr. Kevin Thurston 110 South Second Street Campbell, CA 95008 Re: PLN 2000-153 Conditional Use Permit 110 South Second Street Dear Mr. Thurston: The Planning Division has reviewed your application submittal of December 4, 2002 for a conditional use permit to allow the construction of a new detached garage and an addition to an existing single-family residence. Based upon this review and the submittal requirements your application has been deemed incomplete. If you can submit a revised application by January 8, 2003, your application will be placed on the Site and Architectural Committee meeting agenda for January 14, 2003. The tentative Planning Commission date will be January 28, 2003. Your application was presented to the Historic Preservation Board (HPB) on December 17, 2002. The HPB made the following recommendations: the proposed addition, detached garage and massing is acceptable the change from aluminum to wood windows is acceptable recommended to maintain the open eave design to support the bungalow style of the home Please make the following modifications and submit 15 revised half-size sets and 2 full- size sets to the Planning Division by Wednesday, January 8, 2003. Sheet 1: Site Plan and Project Data Please indicate the location of the existing and proposed sidewalk Show any new landscaping Please indicate on the drawings where any demolition will occur Sheet 7: Elevations Please note on the drawings that all of the existing siding will be removed and replaced with new siding to match the existing 110 S. Second Street -1. /2002-153 Paee 2 of2 Per the HPB recommendations, please modify the drawings to maintain the open eave design that is consistent with the architectural style of the home Front View: modify the front-right window to appear as two windows milled together Right Side View: reduce the size of the window over the stairwell. The window should be consistent in size with the other windows. Sheet 8: Proposed Detached Garage Please provide more detail of the design of the garage door. The garage door should be consistent with the architectural style of the house. Please submit a color/material board (max. 11" x 17" size) along with the revised sets. You can contact me at (408) 866-2142 or via email atmelindad@citvofcamobell.comif you have any questions regarding the requested information. Sincerely, '11tdttr~ Melinda Denis Planner I enc1: Building Department Preliminary Conditions cc. Geoff Bradley, Senior Planner December 3, 2002 City of Campbell Planning Department 70 North 1 st Street Campbell, CA 95008 To Whom It May Concern: I am writing this letter regarding the proposed plans for the renovation of my house located at 110 South 2nd Street, here in town. I am proposing to completely renovate this house which was originally built in 1904. Items of interest from a planning/preservation point of view would be as follows j; Rectify previous owner's attempts at non-complying remodels , Retrofit earthquake hardware to current codes ;... Restore the exterior to it's original condition , Replace aluminum windows with wood sash windows , Re-roofthe whole house My plan is to renovate the interior of the home to current construction and design standards. I am also planning to build a garage at the rear of the property which will match and complement the renovated house. Sinc/erelY ~~_/ ~- # l' -~/- ~vin G. Thurston, Homeowner