1475 York Ave. (1995)
PUBLIC WORKS DEPARTMENT F\~...EIPT
Effective July 1, 1994 \4--"tS "--(C'D-1.c~_
TO: City Clerk PUBLIC WORKS FILE NO.
Please collect & receipt for the monies:
Acer. ......... ................................ .... .nv. .........
35 - 3396 Proiect Revenue (specify project) $
ENCROACHMENT PERMIT
3372 Application Fee
Regular or Utility ($218)
R-1 First Permit (No Fee), SubseQuent Permit/Yr ($60)
2203 Plan Check Deposit $500)
2203 Faithful Performance Surety (FPS) 100% of ENGR. ESn 1*
2203 Cash Deposit 4% of FPS)($500 min.) *
2203 Labor and Material Surety 100% of ENGR. EST.) 1*
Plan Check & Inspection Fee
3372 Engr. Est. < $100,000 (12% of ENGR. EST.) ..
** 2203 Engr. Est. > $100,000 (Deposit 15% of ENGR. EST.)** *
3372 Utility < $100,000
Conduits/Pipelines $1.60/ft.)
Above 500 Feet $1.1 O/ft.)
Manholes/Vaults/Etc. $105/EA.)
Pole Set/Removal (No Permit Required) $100/EA)
Minimum Charge Per Location $115)
** 2203 Utility> $100,000 (Deposit 15% of ENGR. EST.)** *
3373 Project Plans & Specifications Project No.
3373 Standard Specifications & Details ($12)
3373 Copies of EnQineering Maps & Plans ($.50/sQ.ft.)
LAND DEVELOPMENT
3372 Parcel Map (4 Lots or Less) $1,040 + $22/Lot)
3372 Final Tract Map (5 or More Lots) $1,352 + $22/Lot)
3372 Certificate of Compliance $520)
3372 Vacation of Public Streets & Easements $546)
3372 Assessment Segregation or Reapportionment
First Split ($546) .....1.;
Each Additional Lot ($1 66)
3370 Storm Drainage Area Fee Per Acre (R-1, $1,950) ~~Cf .<Y r'. t (\
(Multi - Res, $2,142)
(All Other, $2,340)
3510 PostaQe
TRAFFIC
3368 Intersection Turn Counts (Two-Hour Count) $60)
3368 Intersection Turn Counts (a.m. or p.m. peaks) $120)
3368 Traffic Flow Map (Daily Traffic Volumes) $26)
3368 Campbell Traffic Model (Full Scope Assessment $2,200)
3368 Campbell Traffic Model (Reduced Scope Assessment)($725)
3368 Truck Permits ($35/trip)
3368 No ParkinQ SiQns ($1/each or $25/100)
OTHER
TOTAL $ +2...9c~C-:
C-<:~,
NAME OF APPLICANT <"-:..::~ \/--.-/7.::::.t a '\..:.e ~t (..[.:{0t/l ~~E 'L_ ~=- L-r-7A
ADDRESS L"04?~ Lc)A. 'Je-~ I,_L t2_O-~ ~Xo>Gt:,"Tn"'--- ZIP cq~C) '.d 'L-
FOR
CITY CLERK
ONLY
RECEIVED BY
DATE
~(9)/
FtECE'VED
FE8 0 6 1995
C i ( (;L[\K'S OFFICE'
*For Plan Check and Cash Deposits, send yellow copy to Finance.
** Actual Cost Plus 20% Overhead (Non - interest bearing deposit)
h:recptfrm. wk3(mp)
MEMORANDUM
CITY OF CAMPBELL PUBLIC WORKS DEPARlMENT
TO:
Gloria Sciara
Planner I
DATE: November 16, 1994
FROM: Cruz S. Gomez c:::.~
Assistant Engineer
SUBJECT: 1475 York Avenue, Proposed R-I-9 Single Family
Residential Units, Vernon Stuart, Jr., APN 403-18-108
------------------------------------------------------------------------------------------------------------------
The Public Works Department has reviewed the above application and the following are our
comments:
A. COMPLETENESS COMMENTS
1. The proposed development site consists of one remnant parcel of land fronting
upon public State of California property which is not a public street. Public
street improvements have been constructed.
A storm drain system has been constructed, however, it does not extend
through the frontage of this property. Public utility facilities have been
constructed. Public utility facilities are shown as encumbering parts of the
development site.
The City of Campbell has jurisdiction upon the proposed private development
site. The remnant parcel is owned by the SCC Traffic Authority. The parcel is
land locked by State of California property.
The City of Campbell does not have jurisdiction upon the State of California
public property, nor upon the existing roadway, nor upon the public utility
facilities.
The City cannot grant approval to a development that does not front upon a
City of Campbell public street. The City needs to issue encroachment permits
for work within the State's property for public street improvements and for
public utilities. The City cannot issue permits because the City does not have
jurisdiction on State property.
The proposed public street rights of way need to be granted to the City of
Campbell and the existing roadway improvements need to be relinquished to
and accepted by the City Council of the City of Campbell before the City can
issue encroachment permits or even approve the site plan. .
Gloria Sciara
1475 York
November 16, 1994
Page 2
2.
The plans submitted with the application include an "Architectural Site Plan"
and a "Topographic Survey" map. Each plan is contradictory to the other as to
existing physical improvements and/or rights of way and property lines.
Neither of the plans show a legend, notes or abbreviations as is normal standard
practice. Neither of the plans show the existing and/or proposed public utility
facilities. Neither of the plans show the proposed grading and drainage system
for the site, nor proposed pad elevations. The topography survey map shows
that the property is graded downstream to the north.
3.
Revise plans to show existing street centerline and horizontal control
monuments, existing and proposed right-of-way line, existing and proposed
public street improvements, with dimensions, existing and proposed public
utilities including existing and proposed on-site and off-site grading and storm
drain system.
B. CONDITIONS OF APPROVAL
I. Dedicate public street right of way for York Avenue.
2. Submit three sets of grading and drainage plans that show grading and drainage
of the property toward the proposed public street right of way.
3. Pay storm drainage area fee in the amount of $429.00 (0.2199 acres @
$1 ,950.00/acre).
4. Submit application for encroachment pennit(s), submit plans, post surety, and
pay fees for work within the public right of way.
cc: Robert Harary, City Engineer
h: I 475York(mp)
Sin & Archiuct.mat RniefD
Aftllchme'n' A
Assessors Parcel Nwnber:
Lot Size:
14.577
9,577
Page 3
PROJECT SUMMARY
1475 York Ave.
403
18
- 036
Gross sq. ft. <Property to center line of street)
9,577 + 5,000
Net sq. ft.
Utilization:
BuildIng Coverage
(Include cantilever portions)
Landscape Coverage
Paving Coverage
Sq. ft. Percent %
2,157 23%
6,120 61t%
1,300 13%
Floor Area Ratio:
Total building sq. ft.
divided by net lot size
Adjacent Land Uses
North
South
East
West
Parking
Standard
TOTAL 2
23%
!.lg
Zoning
R-1-9
Residential
"
"
"
"
"
"
2
Compact
Handicap
Restaurant and Assembly Uses
Seating Count
Residential Projects
Unit Type
Uving Area
Garage Area
Total Area
No. of Bedrooms
Single Family
A
1,717
440
2,157
II
B
C
Number of Units 1