Loading...
Use Permit - Cheerdivas - 2005August 25, 2005 Holly Romani 9430 Benbow Drive Gilroy, CA 95020 Re: PLN2005-60 -- 1400 Dell Avenue - Use Permit - Cheerdivas Dear Applicant: Please be advised that at its meeting of August 23, 2005, the Planning Commission adopted Resolution No. 3675 approving a Conditional Use Permit (pLN2005-60) to allow the establishment of a cheerleading training facility of approximately 7,000 square feet within an existing industrial building on above referenced property. This action is effective in ten calendar days, unless appealed in writing to the City Clerk by 5 p.m. on Friday, September 2, 2005. The time within which judicial review of this action must be sought is governed by Section 1094.6 of the California Code of Civil Procedure, unless another statute (such as California Government Code Section 65009 or some other applicable provision) sets forth a more specific time period. If you have any questions, please do not hesitate to contact me at (408) 866-2140. Sincerely, Tim J. Haley Associate Planner Cc: Ed Arango, Public Works Frank Mills, Building Chris Veargason, County Fire Harris & DeGeorge Properties (Owners) 906 Capri Drive Campbell, CA 95008 70 North First Street . Campbell, California 95008-1436 . TEL 408.866.2140 . FAX 408.866.8381 . TDD 408.866.2790 RESOLUTION NO. 3675 BEING A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CAMPBELL APPROVING A CONDITIONAL USE PERMIT (PLN2005-60) TO ALLOW THE ESTABLISHMENT OF A CHEERLEADING TRAINING FACILITY OF APPROXIMATELY 7,000 SQUARE FEET WITHIN AN EXISTING INDUSTRIAL BUILDING ON PROPERTY OWNED BY HARRIS & DeGEORGE PROPERTIES LOCATED AT 1400 DELL AVENUE IN THE C-M-S (CONTROLLED MANUFACTURING) ZONING DISTRICT. APPLICATION OF MS. HOLLY ROMANI, ON BEHALF OF CHEERDIVAS. FILE NO. PLN2005-60. After notification and public hearing, as specified by law and after presentation by the Community Development Director, proponents and opponents. the hearing was closed. After due consideration of all evidence presented, the Planning Commission did find as follows with respect to application PLN2005-60: 1. The proposed project consists of the establishment of an indoor training facility within an existing industrial building, 2. The development of the proposed project will result in a use that is consistent with the General Plan land use designation of Research and Development for this area. 3. The proposed fitness facility is consistent with the C-M-S (Controlled Manufacturing) zoning designation for the site with approval of a Use Permit and is compatible with the existing warehouse and office use on the site and the surrounding uses. 4. The existing parking of 98 parking spaces will adequately meet the demands generated by the change in use. and will not be detrimental to the overall parking and circulation in the area. Adequate parking, circulation, and access are provided for all users. 5. The proposed operational hours that are limited to Monday through Friday from 10:00 a.m. to 9:00 p.m., on Saturdays 10:00 to 5:00 p.m. and Sundays 5:00 p.m. to 9:00 p.m. are typical of commerciall industrial uses. 6. The project qualifies as a Categorically Exempt project per Section 15301, Class 1 (Existing Facilities) of the California Environmental Quality Act (CEQA). Based upon the foregoing findings of fact, the Planning Commission further finds and concludes that: 1. The proposed project is consistent with the General Plan and Zoning Ordinance. Planning Commission Resolution No. 3675 PLN2005-60 - 1400 Dell Avenue-Conditional Use Permit - Cheerdivas Page 2 2. The proposed project, as conditioned I will aid in the harmonious development of the immediate area. 3. No substantial evidence has been presented from which a reasonable argument could be made that shows that the project, as currently presented and subject to the required Conditions of Approval, will have a significant adverse impact on the environment. 4. The proposed development will not be detrimental to the health, safety or welfare of the neighborhood or the City as a whole. 5. The subject site is adequate in size and shape to accommodate the yards, walls, fences, parking and loading facilities, landscaping, and other development features required in order to integrate said use with uses in the surrounding area. 6. The subject site is adequately served by streets of sufficient capacity to carry the kind and quantity of traffic such use would generate. 7. There is a reasonable relationship between the use of the fees imposed upon the project and the type of development project. 8. There is a reasonable relationship and a rough proportionality between the Conditions of Approval and the impacts of the project NOW, THEREFORE, BE IT RESOLVED that the Planning Commission approves a Conditional Use Permit (PLN2005-60) to allow the establishment of a cheerleading training facility of approximately 7,000 square feet within an existing industrial building on property owned by Harris & DeGeorge Properties located at 1400 Dell Avenue in a C-M-S (Controlled Manufacturing) Zoning District, subject to the following conditions: Where approval by the Director of Community Development, City Engineer, Public Works Director, City Attorney or Fire Department is required, that review shall be for compliance with all applicable conditions of approval, adopted policies and guidelines, ordinances, laws and regulations and accepted engineering practices for the item under review. Additionally, the applicant is hereby notified that he/she is required to comply with all applicable Codes or Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified. COMMUNITY DEVELOPMENT DEPARTMENT Plannlna Division 1. Aooroved Proiect: Approval is granted for a Conditional Use Permit (PLN2005-60) allowing the establishment of a 7,938 square foot indoor training facility within an Planning Commission Resolution No. 3675 PLN2005-60 - 1400 Dell Avenue-Conditional Use Permit - Cheerdivas Page 3 existing building located at 1400 Dell Avenue. The building design and site design shall substantially conform to the project exhibits listed below, except as may be modified by the Conditions of Approval herein: a. Project plans prepared by Holly Romani and received by the Planning Division on June 27, 2005, including a site plan and layout. b. Project Description prepared by Holly Romani and dated July 19, 2005. 2. Conditional Use Permit Aooroval Exoiration: The Conditional Use Permit approval shall be valid for one year from the date of final approval. Within this one-year period a building permit must be obtained and construction completed one year thereafter or the use must be established on the property (if no building permit is required). Failure to meet these deadlines will result in the Conditional Use Permit being void. 3. Review of Use Permit in Two Years at Lease Renewal: At such time that the applicant is set to renew the initial two-year lease for this cheerleading facility, the applicant shall consult with the Community Development Director to evaluate other uses on site to ensure continued compatibility of this use with the other building tenants and uses. If the Director finds this use remains compatible with the site, no action shall be taken. If the Director feels that this use is no longer compatible with the zoning and other uses on site, this Use Permit shall be brought back before the Commission for further consideration. 4. Revocation of Permit: Operation of the use in violation of the Conditional Use Permit or any standards, codes, or ordinances of the City of Campbell shall be grounds for consideration of revocation of the Conditional Use Permit by the Planning Commission. 5. Number of Students and Staff: The maximum number of people shall not exceed 20 students and 7 staff members at anyone time. Any increase or modification to the number of students and/or staff shall require approval of a Modification to the Conditional Use Permit by the Planning Commission. 6. Ooerational Hours: The hours of operation for the indoor healthlfitness facility shall be limited as follows: a. Monday through Friday 4:00 p.m. to 9:00 p.m. b. Saturday - 10:00 a.m. to 9:00 p.m. c. Sunday - 5:00 p.m. to 9:00 p.m. 7. Prooertv Maintenance: The owner/operator of the subject property shall maintain all exterior areas of the business free from graffiti, trash, rubbish, posters and stickers placed on the property. Planning Commission Resolution No. 3675 PLN2005-60 -1400 Dell Avenue-Conditional Use Permit - Cheerdivas Page 4 8. Outdoor StoraQe: No outdoor storage is permitted on the subject property. 9. Parkina and Drivewavs: All parking and driveway areas shall be maintained in compliance with the standards in Chapter 21.28 of the Campbell Municipal Code. 10. SiQns: No signage is permitted as part of the development application approved herein. New signage shall not be installed prior to approval of a sign permit as required by Chapter 21.30 of the Campbell Municipal Code. 11. Trash and RecvclinQ Enclosure: The applicant shall submit details regarding the design and location of a trash and recycling enclosure to the Planning Division for review and approval by the Community Development Director prior to the issuance of building permits for the project. All refuse and recycling containers shall be located in an enclosure constructed and consisting of a concrete floor at least six inches in depth, surrounded by a minimum six-foot high masonry wall and having a solid metal gate. The refuse and recycling containers shall be kept in the enclosure at all times except when being emptied by collection personnel. BuildinG Division: 12. Permits Reauired: A building permit application shall be required for the proposed tenant improvements within the (e) commercial structure. The building permit shall include EleGtricaVPlumbing/Mechanical fees when such work is part of the permit. 13. Construction Plans: The conditions of Approval shall be stated in full on the cover sheet of construction plans submitted for building permit. 14. Size of Plans: The minimum size of construction plans submitted for building permits shall be 24 in. X 36 in. 15. Plan PreDaration: This project requires plans prepared under the direction and oversight of a California licensed Engineer or Architect. Plans submitted for building permits shall be "wet stamped" and signed by the qualifying professional person. 16. Site Plan: Application for building permit shall include a competent site plan that identifies property and proposed structures with dimensions and elevations as appropriate. Site plan shall also include site drainage details. Site address and parcel numbers shall also be clearly called out. Site parking and path of travel to public sidewalks shall be detailed. 17. Title 24 Energv Comoliance: California Title 24 Energy Standards Compliance forms shall be blue-lined on the construction plans. Compliance with the Standards shall be demonstrated for conditioning of the building envelope and lighting of the building. Planning Commission Resolution No. 3675 PLN2005-60 - 1400 Dell Avenue-Conditional Use Permit - Cheerdivas Page 5 18. SDeciallnsDections: When a special inspection is required by U.B.C. Section 1701, the architect or engineer of record shall prepare an inspection program that shall be submitted to the Building Official for approval prior to issuance of the building permits, in accordance with U.B.C Section 106.3.5. Please obtain City of Campbell, Special Inspection forms from the Building Inspection Division Counter. 19. Non-Point Source Provisions: The City of Campbell, standard Santa Clara Valley Non-point Source Pollution Control Program specification sheet shall be part of plan submittal. The specification sheet (size 24" X 36") is available at the Building Division service counter. 20. Title 24 Accessibilitv- Commercial: On site general path of travel shall comply with the latest California Title 24 Accessibility Standards. Work shall include but not be limited to accessibility to building entrances from parking facilities and sidewalks. 21. Title 24 Accessibilitv- Commercial: Projects seeking to use the Title 24 Hardship exemption clause shall blue-line completed, City of Campbell "20%" exemption form on submitted construction plans. Form is available at Building Division service counter. 22. ADDrovals Reauired: The project requires the following agency approval prior to issuance of the building permit: a. West Valley Sanitation District b. Santa Clara County Fire Department 23. P.G.& E.: Applicant is advised to contact Pacific Gas and Electric Company as early as possible in the approval process. Service installations, changes and/or relocations may require substantial scheduling time and can cause significant delays in the approval process. Applicant should also consult with P.G. and E. conceming utility easements, distribution pole locations and required conductor clearances. PASSED AND ADOPTED this 23rd day of August, 2005, by the following roll call vote: AYES: NOES: ABSENT: ABSTAIN: Commissioners: Commissioners: Commissioners: Commissioners: Alderete, Doorley, Francois, Gibbons and Rocha None Ebner and Roseberry None CITY OF CAMPBELL. PLANNING COMMISSION Staff Report. August 23, 2005 PLN2005-60 Romani, H. Public hearing to consider the application of Ms. Holly Romani, on behalf of Cheerdivas, for a Conditional Use Permit (PLN2005-60) to allow the establishment of a cheerleading training facility of approximately 7,000 square feet within an existing industrial building on property owned by Harris & DeGeorge Properties located at 1400 Dell Avenue in a C-M-S (Controlled Manufacturing) Zoning District. Staff is recommending that this project be deemed Categorically Exempt under CEQA. Project Planner: Tim J. Haley, Associate Planner STAFF RECOMMENDATION That the Planning Commission take the following action: 1. Adopt a Resolution, incorporating the attached findings, approving a Conditional Use Permit to allow the establishment of a cheerleading training facility within an existing industrial building, subject to the attached conditions of approval. ENVIRONMENTAL DETERMINATION Staff recommends that the Planning Commission find that this project is Categorically Exempt under Section 15301, Class 1 of the California Environmental Quality Act (CEQA), pertaining to minor alterations of existing structures. PROJECT DATA Gross Lot Area: Net Lot Area: 69,839 sq. ft. (1.6 acres) 65,230 sq. ft. (1.49 acres) Site Utilization: Building Coverage: Paving Coverage: Landscape Coverage: 25,576 sq. ft. (39.2%) 36,010 sq. ft (55.2%) 3,644 sq. ft. (5.6%) 25,576 sq. ft. 6,988 sq. ft. fitness use 950 SQ. ft. office use 7,938 sq. ft. total tenant space (31 % of building area) Total Building Area: Tenant Space: Parking: Provided: 98 parking spaces Staff Report - Planning Comn'lIssion Meeting of August 23, 2005 PLN2005-60 - 1400 Dell Avenue Required: Total: Hours of Operation: Monday: Tuesday Wednesday Thursday Friday Saturday: Sunday: Surrounding Uses: North: South: East: West: Page 2 of 4 46.6 parking spaces (fitness use 6,988 sq. ft. @ 1:150) 26 parking spaces (office use - 5,861 sq. ft. @ 1 :225) 31.8 parkino spaces (warehouse - 12,727 sq. ft. @ 1 :400) 105 parking spaces 5:00 p.m. to 9:00 p.m. 4:00 p.m. to 9:00 p.m. 5:00 p.m. to 9:00 p.m. 4:00 p.m. to 9:00 p.m. currently no classes 10:00 a.m. to 5:00 p.m. 5:00 p.m. to 9:00 p.m. Light Industrial Percolation Pond Percolation Pond Light Industrial DISCUSSION Applicant's Proposal: The applicant is requesting approval to allow the establishment of a cheerleading training facility within an existing industrial building. The proposed tenant, Cheerdivas, would occupy 7,938 square feet of the existing building. Backoround: The project site is developed with a one-story 25,576 square foot warehouse and manufacturing building that was constructed in the 1974. The other portions of the building are currently occupied by an office use and a warehousing! distribution facility for San Jose Mercury News. The project site is located on the east side of Dell Avenue between Hacienda Avenue and Vandel Way. The site is surrounded by research and development uses to the north and west, and percolation pond facilities to the south and east. The project site takes access from one driveway off of Dell Avenue. ANALYSIS General Plan Desionation: The General Plan land use designation for the project site is Research and Development. The proposed fitness use is compatible with the land use designation of the site. The proposed use is consistent with the following General Plan Policy: · Policy LUT-5.5: Industrial Oiversitv: Promote a variety of industrial use opportunities that maintain diversified services and a diversified economic base. Staff Report - Planning Commission Meeting of August 23, 2005 PLN2005-60 - 1400 Dell Avenue Page 3 of 4 · Policy LUT -13.1 : Varietv of Uses: Attract and maintain a variety of uses that create an economic balance within the City while maintaining a balance with other community land use needs and while providing high quality services to the community. Zonino Desionation: The zoning designation for the project site is C-M-S (Controlled Manufacturing). A Conditional Use Permit is required for a fitness center within the C- M-S zoning district. The proposed project will be consistent with the Zoning Ordinance with approval of a Conditional Use Permit. Use: The proposed use is an indoor recreational facility specializing in cheerleading training including gymnastics, conditioning, dance and stunts. Class sizes range from 10 to 19 members. The use averages between 12-19 students and 5-7 staff members. The maximum number of people on site at one time would be 20 students and 7 staff members. Operational Hours: The applicant's description indicates that the general hours of operation for the fitness center are (5:00 to 9:00 p.m. during the week and 10:00 a.m. to 9:00 p.m. on weekends). Parkina: The site plan indicates the provision of 98 parking spaces or a parking ratio of 1 :260. The parking ordinance requires the provision of 1 :150 square feet for a fitness use and 1 :225 for office uses. The proposed use would generate a parking demand of 51 parking spaces for the proposed fitness/office use and the remaining portion of the building would generate a parking demand of 54 parking spaces for a total demand of 105 parking spaces. There are 98 existing parking provided on the project site. The different uses in the building have different parking demands thus supporting a shared parking concept. Consequently, adequate parking is provided for the existing and proposed tenant spaces. The establishment of an indoor recreation facility at this location would not use a disproportionate share of the existing parking spaces available on site. Architectural chanoes: The applicant is not proposing any changes to the exterior of the building or increasing the square footage of the buildings. Site and Architectural Review Committee: The Site and Architectural Review Committee reviewed did not review this application, as there are no changes proposed to the exterior of the building. Attachments: 1. Findings for Approval of the Conditional Use Permit (PLN2005-60) 2. Conditions of Approval for the Conditional Use Permit (PLN2005-60) 3. Letter from Applicant 4. Exhibits Staff Report - Planning Commission Meeting of August 23, 2005 PLN2005-60 - 1400 Dell Avenue Page 4 of 4 5. Location Map ~~ Prepared by: Ti J. H ey Associate Planner Approved by: ran Fierro, Community Development Director Attachment #1 FINDINGS FOR APPROVAL OF FILE NO. PLN2005-60 SITE ADDRESS: APPLICANT: DATE: 1400 Dell Avenue Holly Romani on behalf Cheerdivas August23,2005 Findinos for Approval of a Conditional Use Permit to allow the establishment of a health/fitness center within an existina buildino located at 1400 Dell Avenue The Planning Commission finds as follows with regard to File No. PLN2005-60: 1. The proposed project consists of the establishment of an indoor training facility within an existing industrial building, 2. The development of the proposed project will result in a use that is consistent with the General Plan land use designation of Research and Development for this area. 3. The proposed fitness facility is consistent with the C-M-S (Controlled Manufacturing) zoning designation for the site with approval of a Use Permit and is compatible with the existing warehouse and office use on the site and the surrounding uses. 4. The existing parking of 98 parking spaces will adequately meet the demands generated by the change in use, and will not be detrimental to the overall parking and circulation in the area. Adequate parking, circulation, and access are provided for all users. 5. The proposed operational hours that are limited to Monday through Friday from 10:00 a.m. to 9:00 p.m., on Saturdays 10:00 to 5:00 p.m. and Sundays 5:00 p.m. to 9:00 p.m. are typical of commercial/ industrial uses. 6. The project qualifies as a Categorically Exempt project per Section 15301, Class 1 (Existing Facilities) of the California Environmental Quality Act (CEQA). Based upon the foregoing findings of fact, the Planning Commission further finds and concludes that: 1. The proposed project is consistent with the General Plan and Zoning Ordinance. 2. The proposed project, as conditioned, will aid in the harmonious development of the immediate area. 3. No substantial evidence has been presented from which a reasonable argument could be made that shows that the project, as currently presented and subject to the required Conditions of Approval, will have a significant adverse impact on the environment. 4. The proposed development will not be detrimental to the health, safety or welfare of the neighborhood or the City as a whole. Findings for Approval - Planning Commission Meeting of August 23, 2005 PLN2005-60 - 1400 Dell Avenue Page 2 of 3 5. The subject site is adequate in size and shape to accommodate the yards, walls, fences, parking and loading facilities, landscaping, and other development features required in order to integrate said use with uses in the surrounding area. 6. The subject site is adequately served by streets of sufficient capacity to carry the kind and quantity of traffic such use would generate. 7. There is a reasonable relationship between the use of the fees imposed upon the project and the type of development project. 8. There is a reasonable relationship and a rough proportionality between the Conditions of Approval and the impacts of the project. Attachment #2 CONDITIONS OF APPROVAL FOR FILE NO. PLN2005-60 SITE ADDRESS: APPLICANT: DATE: 1400 Dell Avenue Holly Romani on behalf of Cheerdivas August23,2005 The applicant is hereby notified, as part of this application, that (s)he is required to meet the following conditions in accordance with the ordinances of the City of Campbell and the State of California. The lead department with which the applicant will work is identified on each condition where necessary. Where approval by the Director of Community Development, City Engineer, Public Works Director, City Attorney, or Fire Department is required, that review shall be for compliance with all applicable conditions of approval, adopted policies and guidelines, ordinances, laws and regulations, and accepted engineering practices, for the items under review. Additionally, the applicant is hereby notified that (s)he is required to comply with all applicable Codes or Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified: COMMUNITY DEVELOPMENT DEPARTMENT Plannina Division: 1. Approved Proiect: Approval is granted for a Conditional Use Permit (PLN2005-60) allowing the establishment of a 7.938 square foot indoor training facility within an existing building located at 1400 Dell Avenue. The building design and site design shall substantially conform to the project exhibits listed below, except as may be modified by the Conditions of Approval herein: a. Project plans prepared by Holly Romani and received by the Planning Division on June 27, 2005, including a site plan and layout. b. Project Description prepared by Holly Romani and dated July 19, 2005. 2. Conditional Use Permit Approval Expiration: The Conditional Use Permit approval shall be valid for one year from the date of final approval. Within this one-year period a building permit must be obtained and construction completed one year thereafter or the use must be established on the property (if no building permit is required). Failure to meet these deadlines will result in the Conditional Use Permit being void. 3. Revocation of Permit: Operation of the use in violation of the Conditional Use Permit or any standards, codes, or ordinances of the City of Campbell shall be grounds for consideration of revocation of the Conditional Use Permit by the Planning Commission. 4. Number of Students and Staff: The maximum number of people shall not exceed 20 students and 7 staff members at anyone time. Any increase or modification to Findings for Approval- Plannirlij Commission Meeting of August 23, 2005 PLN2005-60 - 1400 Dell Avenue Page 2 of 3 the number of students and/or staff shall require approval of a Modification to the Conditional Use Permit by the Planning Commission. 5. Operational Hours: The hours of operation for the indoor health/fitness facility shall be limited as follows: a. Monday through Friday 4:00 p.m. to 9:00 p.m. b. Saturday - 10:00 a.m. to 9:00 p.m. c. Sunday - 5:00 p.m. to 9:00 p.m. 6. Property Maintenance: The owner/operator of the subject property shall maintain all exterior areas of the business free from graffiti, trash, rubbish, posters and stickers placed on the property. 7. Outdoor StoraQe: No outdoor storage is permitted on the subject property. 8. ParkinQ and Drivewavs: All parking and driveway areas shall be maintained in compliance with the standards in Chapter 21.28 of the Campbell Municipal Code. 9. SiQns: No signage is permitted as part of the development application approved herein. New signage shall not be installed prior to approval of a sign permit as required by Chapter 21.30 of the Campbell Municipal Code. 10. Trash and RecvclinQ Enclosure: The applicant shall submit details regarding the design and location of a trash and recycling enclosure to the Planning Division for review and approval by the Community Development Director prior to the issuance of building permits for the project. All refuse and recycling containers shall be located in an enclosure constructed and consisting of a concrete floor at least six inches in depth, surrounded by a minimum six-foot high masonry wall and having a solid metal gate. The refuse and recycling containers shall be kept in the enclosure at all times except when being emptied by collection personnel. Buildina Division: 11. Permits Required: A building permit application shall be required for the proposed tenant improvements within the (e) commercial structure. The building permit shall include Electrical/Plumbing/Mechanical fees when such work is part of the permit. 12. Construction Plans: The conditions of Approval shall be stated in full on the cover sheet of construction plans submitted for building permit. 13. Size of Plans: The minimum size of construction plans submitted for building permits shall be 24 in. X 36 in. 14. Plan Preparation: This project requires plans prepared under the direction and oversight of a California licensed Engineer or Architect. Plans submitted for building permits shall be "wet stamped" and signed by the qualifying professional person. Findings for Approval - Planning Commission Meeting of August 23. 2005 PLN2005-60 - 1400 Dell Avenue Page 3 of 3 15. Site Plan: Application for building permit shall include a competent site plan that identifies property and proposed structures with dimensions and elevations as appropriate. Site plan shall also include site drainage details. Site address and parcel numbers shall also be clearly called out. Site parking and path of travel to public sidewalks shall be detailed. 16. Title 24 Enerav Compliance: California Title 24 Energy Standards Compliance forms shall be blue-lined on the construction plans. Compliance with the Standards shall be demonstrated for conditioning of the building envelope and lighting of the building. 17. Special Inspections: When a special inspection is required by U.B.C. Section 1701, the architect or engineer of record shall prepare an inspection program that shall be submitted to the Building Official for approval prior to issuance of the building permits, in accordance with U.B.C Section 106.3.5. Please obtain City of Campbell, Special Inspection forms from the Building Inspection Division Counter. 18. Non-Point Source Provisions: The City of Campbell, standard Santa Clara Valley Non-point Source Pollution Control Program specification sheet shall be part of plan submittal. The specification sheet (size 24" X 36") is available at the Building Division service counter. 19. Title 24 Accessibilitv- Commercial: On site general path of travel shall comply with the latest California Title 24 Accessibility Standards. Work shall include but not be limited to accessibility to building entrances from parking facilities and sidewalks. 20. Title 24 Accessibilitv- Commercial: Projects seeking to use the Title 24 Hardship exemption clause shall blue-line completed, City of Campbell "20%" exemption form on submitted construction plans. Form is available at Building Division service counter. 21.Approvals Required: The project requires the following agency approval prior to issuance of the building permit: a. West Valley Sanitation District b. Santa Clara County Fire Department 22. P.G.& E.: Applicant is advised to contact Pacific Gas and Electric Company as early as possible in the approval process. Service installations, changes and/or relocations may require substantial scheduling time and can cause significant delays in the approval process. Applicant should also consult with P.G. and E. concerning utility easements, distribution pole locations and required conductor clearances. July 19, 2005 City of Campbell Planning Department Attn: Sean G. Conditional Use Permit 1400 Dell Ave Unit A Campbell, CA 95008 This facility will be used to train and teach members in cheerleading. This includes: gymnastics, conditioning, dance, stunts. Classes and hours are as foUows: Monday-5:00 to 7:00pm-class size 14 members 7:00 to 9:00pm-class size 16 members Tuesday-4:00 to 5:00pm-class size 12 members. 5:00 to 7:30pm--class size 19 members 7:--30 to 9:00pm-class size 16 members Wednesday-5:00 to 7:00pm-class size 14 members 7:00 to 9:00pm-class size. 16 members Thursday-4:00 roS:OOpm-class size 12 me~ 5:00 to 7:30pm-class size 19 members 7:-30 to 9:00pm-class size 16 members Friday-currently no classes Saturday-l 0:00-11 :OOam-class size under 10 members 1l:00-12:00pm-dass size under to-members.. 12:00-1:00 pm-class size under 10 members I:OO-3:0o-pm-class size 14 members 3:00-5:00pm-class size 16 members S\.U1day-5.:00-9:00pm-class size 15 members Please- call me if you baYe. any questi~ Holly Rmnani-408--592-15-9-5. Attachment #3