Loading...
Mod to Site - 2005June 28, 2005 Mr. Eric B. Euren CSHQA 1300 Ethan Way -Suite 600 Sacramento, CA 95828 Re: Administrative Planned Development Permit File No: PLN2005-70 2341 S. Winchester Blvd. Dear Mr. Euren: CAMPBELL r----- 1 l The Community Development Director has conditionally approved your Administrative Planned Development Permit application to allow facade improvement to the existing Safeway store located at the above referenced address. This approval is based upon the attached findings and is subject to the attached conditions of approval. This action is effective in ten calendar days, unless appealed in writing to the City Clerk by 5:00 p.m. on Friday, Julv 8, 2005. If you should have any questions, please do not hesitate to contact me at (408) 866-2140. Sincerely, • ~ l ~t~~ Stephanie Willsey ~J Planner I Encl: Findings and Conditions of Approval for File No. PLN2005-70 cc: Frank Mills, Building Division Chris Veargason, County Fire Department Joseph Costello, 6081-40 Meridian Avenue, San Jose, CA 95120 70 North First Street ~ Campbell, California 95008-1436 TF~ 408..866.2140 ~ Fnx 408.871 .5140 TDD 408.866.2790 JUNE 28, 2005 PLN2005-70 Application of Mr. Eric B. Euren for an Administrative Planned Development Euren, E. Permit to allow minor alterations to the fagade of an existing commercial building located at 2341 S. Winchester Boulevard in the P-D (Planned Development) Zoning District. PROJECT DESCRIPTION The project consists of minor alterations to the facade of an existing commercial building currently occupied by Safeway in the Campbell Plaza Shopping Center located at 2341 S. Winchester Blvd. The proposed modifications include a revised exterior color scheme for the front and sides of the building, new gabled entry features over the existing store entrances, new stone column bases for the existing columns along the front elevation, and the removal of an existing landscaping planter near the cart storage azea along the front elevation. New moveable produce and floral display stands as well as outdoor seating would be located near the entrances of the store. BACKGROUND The Safeway building was approved by the Planning Commission in February 1991 (S 90-11) when the property was zoned C-2 (General Commercial) and the property was subsequently re- zoned to P-D (Planned Development). The Campbell Plaza Shopping Center is located on the southwest corner of Winchester Boulevazd and Budd Avenue. The 11.3-acre shopping center is surrounded by commercial uses and single-family residences to the north, commercial auto repair uses and multiple family residences to the south, multiple family residences to the west and a church and commercial uses to the east. ANALYSIS The General Plan land use designation for the project site is Central Commercial and the project is compatible with this land use designation. The zoning designation for the project site is P-D. An Administrative Planned Development Permit is required for minor exterior modifications to an existing commercial building within the P-D zoning district. The proposed project does not affect the square footage of the building and therefore does not have an impact on the existing pazking for the project site. PLN2005-70 - 2341 S. ~ _ .chester Boulevard Administrative Planned Development Permit Page 2 of 2 No changes to the signage is approved as part of this application. Modifications to the existing signage for the building will need to be reviewed as a Sign Permit application. Attachments: 1. Findings for Approval of PLN2005-70 2. Conditions of Approval for PLN2005-70 Prepazed by: Stephanie Willsey, Planner I Attachment # 1 FINDINGS FOR APPROVAL OF FILE NO. PLN2005-70 SITE ADDRESS: 2341 S. Winchester Blvd. APPLICANT: Mr. Eric B. Euren DATE: June 28, 2005 Findings for approval of an Administrative Planned Development Permit to allow minor alterations to the facade of an existing commercial building located at 2341 S. Winchester Boulevard. The Community Development Director finds as follows with regard to File No. PLN2005-70: 1. The development of the proposed project will result in a use that is consistent with the General Plan land use designation of Central Commercial. 2. The project will be consistent with the P-D (Planned Development) zoning district with approval of an Administrative Planned Development Permit. 3. The Campbell Plaza Shopping Center is located on the southwest corner of Winchester Boulevard and Budd Avenue. The 11.3-acre shopping center is surrounded by commercial uses and single-family residences to the north, commercial auto repair uses and multiple family residences to the south, multiple family residences to the west and a church and commercial uses to the east 4. The proposed project does not affect the square footage of the building and therefore does not have an impact on the existing parking for the project site. 5. The proposed modifications include a revised exterior color scheme for the front and sides of the building, new gabled entry features over the existing store entrances, new stone column bases for the existing columns along the front elevation, and the removal of an existing landscaping planter near the cart storage area along the front elevation. 6. Changes to the existing signage for the building is not included as part of this application. Modifications to the existing signage will need to be reviewed as a Sign Permit application. 7. The project qualifies as a Categorically Exempt project per Section 15301, Class 1 (Existing Facilities) of the California Environmental Quality Act (CEQA). Based upon the foregoing findings of fact, the Community Development Director further finds and concludes that: 1. The proposed development will result in a more desirable environment and use of the land than would be possible under any other zoning classification. 2. The development will be compatible with the General Plan of the City and will aid in the harmonious development of the immediate area. Attachment # 1 Page 2 of 2 3. The development will be compatible with the Zoning Code of the City. 4. The proposed development will not be detrimental to the health, safety or welfare of the neighborhood or the City as a whole. 5. The parking will adequately meet the demands generated by the change in use, and will not be detrimental to the overall parking and circulation in the area. 6. There is a reasonable relationship and a rough proportionality between the conditions of approval and the impacts of the project. 7. There is a reasonable relationship between the use of the fees imposed upon the project and the type of development project. 8. No substantial evidence has been presented from which a reasonable argument could be made that shows that the project, as currently presented and subject to the required conditions of approval, will have a significant adverse impact on the environment. Attachment #2 CONDITIONS OF APPROVAL FOR FILE NO. PLN2005-70 SITE ADDRESS: 2341 S. Winchester Blvd. APPLICANT: Mr. Eric B. Euren DATE: June 28, 2005 The applicant is hereby notified, as part of this application, that he/she is required to meet the following conditions in accordance with-the ordinances of the City of Campbell and the State of California. Where approval by the Community Development Director, City Engineer, Public Works Director, City Attorney, or Fire Department is required, that review shall be for compliance with all applicable Conditions of Approval, adopted policies and guidelines, ordinances, laws and regulations, and accepted engineering practices for the item under review. Additionally, the applicant is hereby notified that he/she is required to comply with all applicable Codes or Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified: COMMUNITY DEVELOPMENT DEPARTMENT Planning Division: Approved Project: Approval is granted for an Administrative Planned Development Permit (PLN2005-70) to allow minor alterations to the facade of an existing commercial building located at 2341 S. Winchester Boulevard. The project shall substantially conform to the project plans and sample/material board prepared by CSHQA and stamped as received by the Planning Division on June 22, 2005, except as may be modified by the conditions of approval herein. 2. Administrative Planned Development Permit Approval Expiration: The Administrative Planned Development Permit approval shall be valid for one year from the date of final approval. Within this one-year period a building permit must be obtained and construction completed one year thereafter or the use must be established on the property (if no building permit is required). Failure to meet these deadlines will result in the Administrative Planned Development Permit being void. 3. Trash and Recycling Enclosure: The applicant/property owner shall submit details for the construction of a new trash and recycling enclosure(s) in the rear loading dock area, prior to issuance of a building permit. The design and location of the enclosure shall be to the satisfaction of the Community Development Director. All refuse and recycling containers shall be located in an enclosure constructed and consisting of a concrete floor at least six inches in depth, surrounded by a minimum six-foot high masonry wall and having a solid metal gate. The design of the enclosure shall be compatible with the building. Driveways or aisles shall provide unobstructed access for collection vehicles and personnel and provide at least the minimum clearance required by the collection methods and vehicles utilized by the designated collector. The wall, gate and surface inside the enclosure must be kept in sound repair and condition. The refuse and recycling containers shall be kept in the enclosure at all times except when being emptied by collection personnel. Attachment #2 Paee 2 of 3 3. Building Elevations, Details and Colors: The applicant shall submit detailed building elevations depicting architectural details with the building permit application. The detailed elevations shall be reviewed and approved by the Community Development Director prior to the issuance of building permits. 4. Outdoor Storage: No outdoor storage is permitted on the subject property. No equipment, materials or business vehicles shall be pazked and/or stored outside the building or within the parking lot. The rear loading dock area €or the store shall be kept clean and free of trash and debris at all times. It shall be the responsibility of the store owner/operator as well as the property owner to immediately remove unused cazts, pallets, boxes, and other items associated with the operation of the store from this area, as well as illegally dumped items. 5. Sig_nage: No signage is approved as part of the development applications approved herein. Any change to the existing signage of the building shall require approval of a Sign Permit. 6. Outdoor Product Displaces: New moveable produce and floral display stands are allowed only near the entrances of the store, in the azeas specified on the approved plans, and shall not be allowed in the parking lot or walkways surrounding the store. 7. Location of Mechanical Equipment: No roof-mounted mechanical equipment shall be located on the roof of building without providing screening of the mechanical equipment from public view and surrounding properties. The screening material and method shall require submittal of a building permit for review and approval by the Community Development Director prior to installation of such mechanical equipment and screening. Building Division: 8. Permits Required: A building permit application shall be required for the proposed tenant improvements to the existing commercial structure. The building permit shall include ElectricaUPlumbing/Mechanical fees when such work is part of the permit. 9. Construction Plans: The conditions of approval shall be stated in full on the cover sheet of construction plans submitted for building permit. 10. Size of Plans: The size of construction plans submitted for building permits shall be 24 inches by 36 inches. 11. Plan Preparation: This project requires plans prepared under the direction and oversight of a California licensed engineer or azchitect. Plans submitted for building permits shall be "wet stamped" and signed by the qualifying professional person. 12. Site Plan: Application for building permit shall include a competent site plan that identifies property and proposed structures with dimensions and elevations as appropriate. Site plan shall also include site drainage details. Site address and parcel numbers shall also be clearly called out. Site parking and path of travel to public sidewalks shall be detailed. Attachment #2 Page 3 of 3 13. Title 24 Energy Compliance: California Title 24 Energy Standards Compliance forms shall be blue-lined on the construction plans. Compliance with the Standards shall be demonstrated for conditioning of the building envelope and lighting of the building. 14. Special Inspections: When a special inspection is required by U.B.C. Section 1701, the architect or engineer of record shall prepare an inspection program that shall be submitted to the Building Official for approval prior to issuance of the building permits, in accordance with U.B.C. Section 106.3.5. Please obtain City of Campbell, Special Inspection forms from the Building Inspection Division Counter. 15. Non-Point Source Pollution Control: The City of Campbell standard Santa Clara Valley Non-point Source Pollution Control Program specification sheet shall be part of plan submittal. The specification sheet (size 24-inches by 36-inches) is available at the Building Division service counter. 16. Title 24 Accessibility -Commercial: On site general path of travel shall comply with the latest California Title 24 Accessibility Standards. Work shall include but not be limited to accessibility to building entrances from parking facilities and sidewalks. 17. Title 24 Accessibility -Commercial: Projects seeking to use the Title 24 Hardship exemption clause shall blue-line completed, City of Campbell " 20%" exemption form on submitted construction plans. Form is available at Building Division service counter. 18. P.G. &E.: The applicant is advised to contact P.G.&E. as early as possible in the approval process. Service installations, changes and/or relocations may require substantial scheduling time and can cause significant delays in the approval process. The applicant should also consult with P.G.&E. concerning utility easements, distribution pole locations and required conductor clearances. 19. Other Agenc~pprovals: The project requires the following agency approval prior to issuance of the building permit: a. Santa Clara County Fire Department FIRE DEPARTMENT 20. Premises Identification: Approved numbers or addresses shall be placed on all new and existing buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Numbers shall contrast with their backgrounds. ..-- of • ca,~n ..,., ,~' ~~ r CAMPBELL V - r J. -. .S. ., ~ T •~RCH A~~ z, /.- \`~ _ ~ CITY of CAMPBELL ~~ 1 Community Development Department June 15, 2005 Mr. Eric B. Euren CSHQA 1300 Ethan Way -Suite 600 Sacramento, CA 95828 Re: Administrative Planned Development Permit File No.: PLN2005-70 2345 S. Winchester Blvd. Dear Mr. Euren: Thank you for your application for facade improvement to the existing Safeway store located at the above referenced address. The subject property is presently zoned P-D (Planned Development) and is designated as Central Commercial on the City's General Plan Land Use Map. The proposed project will require approval of the Administrative Planned Development Permit by the Community Development Director. Your application has been deemed incomplete. The following information and details are needed to complete your application: 1. Elevations: Please provide the following information on the elevations: a. Submit elevations for all sides of the building and indicate any proposed modifications. b. Provide an accurate depiction of the existing signage for the structure. 2. Loading Area: The loading dock area for the building has been an on-going code enforcement problem for the City. As part of this request, a new trash enclosure will be required to replace the existing dilapidated chain link fence enclosure that is filled with trash. The new enclosure shall be constructed of a solid six-foot masonry wall and shall match the building in terms of colors and materials. The enclosure shall have a solid metal gate and shall provide unobstructed access for collection vehicles and provide at least the minimum clearance required by the collection methods and vehicles utilized by the designated collector. Additionally, the trash and debris that has been dumped in the loading area needs to be cleaned up prior to any permit approvals. 3. Signaae: The existing signage for the store should be reviewed and updated as part of the fagade improvements. Staff recommends that the individual signs advertising "Pharmacy," "Deli/Bakery," and "China Express" be removed for a more coherent signage display. Additionally, staff recommends that the "Safeway" sign be centered between the two front entrances. 70 North First Street Campbell, California 95008-1436 rEL 408.866.2140 Fnx 408.871.5140 ~ ToD 408.866.2790 PLN2005-70 - 2345 S. Win~..aster Blvd. Page 2 of 2 If you should have any questions regarding these comments or the requested information, please feel free to contact me at (408) 866-2193 or by email at stephaniew(a~cit o~pbell.com. Sincerely, Stephanie Willsey Planner I cc: Geoff Bradley, Senior Planner