Loading...
Pre-App - Proposed Bldg - 2007August 16, 2007 Scott Reno C&J Constracting, Inc. 1506 Dell Avenue #B Campbell, CA 95008 Re: PRE 2007-10 ~ Preliminary Application Comments 200 Cristich Lane Dear Mr. Reno: Thank you for your submittal of a preliminary application proposal for a new 2- story office building and conversion of two existing buildings into tenant spaces to be rented out as offices, which would be located at 200 Cristich Lane. The Planning Division completed the review of your pre-application and has the following comments regarding your proposal: 1. Zo ins: The subject property is zoned M-1 (Light Industrial) and is designated as Light Industrial on the City's General Plan Land Use Map. Uses appropriate in the Light Industrial areas include professional offices, manufacturing, warehousing, and research and development. The proposed new construction in this zoning district would require approval of a Site & Architectural Review Permit which is reviewed by the Planning Commission at a public hearing. 2. Existing Structures: There are existing buildings on site that do not meet current setback requirements. Please provide evidence, at the time of application submittal for the Site & Architectural Review Permit, that these buildings were legally created. 70 North First Street Campbell, California 95008-1 4 3 6 Ts~ 408.866.2140 Fnx 408.871.5140 ~ r~[~ 408.866.2790 200 Cristich Lane 2of3 3. Site Plan: The following information should be indicated on the site plan: a. Please prepare a "Project Data Table" that includes the lot size (less any street dedication), building size, lot coverage calculation, landscaping calculation and parking data. b. Include a clear project description regarding type of use, hours of operation, number of employees, etc. c. Please show the distance from the centerline of the adjacent street to the property lines. d. Include a north arrow on the site plan. e. All existing trees on the site should be indicated on the plans and should specify the location, type, size and whether such tree is proposed to be removed or preserved. f. Any proposed or existing fencing needs to be shown. The height, materials and location should be listed. 4. Si~nage: If signage is proposed, a Sign Permit will be required and may be submitted at the same time of the Site & Architectural Review Permit application. The sign requirements can be found in the enclosed Sign Regulations (Chapter 21.30). 5. Elevations: No elevations were submitted. Elevations will be required at the time of application submittal for the Site & Architectural Review Permit. A color samples material board will also be required. 6. Floor Plan: No floor plans were submitted. Floor plans will be required at the time of application submittal for Site & Architectural Review Permit. 7. Pa king: The Zoning Ordinance requires the provision of 1 parking space for each 225 square feet of gross floor area for professional office space. The proposed building is 16,750 square feet of office use, therefore requiring 75 parking spaces. The proposed project illustrates 67 parking spaces. 8. Landscaping: a. Please provide a Landscaping Plan. The plan shall show the type of trees, size of trees and tree planting detail and irrigation details. 200 Cristich Lane Page 3 of 3 The landscape plan shall substantially conform to the approved site plan and the City's Water Efficient Landscaping Standards (WELS). b. Per Chapter 21.26.020 of the Campbell Municipal Code, all developments within the M-1 zoning district shall be required to provide for landscaping a minimum extent of 8 percent of the net site area. Continuous landscape areas a minimum of 10-feet wide shall be required along the public street frontages of all developments, excluding driveways. A minimum 5-foot planter strip shall be provided along abutting property lines. Your pre-application was distributed to the Building Division, the Public Works Department and the County Fire Department. Their comments are enclosed. Please note that all comments are meant to be preliminary. Conditions of approval from each department will be developed at the time a formal application is submitted. Please do not hesitate to contact me at (408) 866-2193 or via email at kimberlyb@cityofcampbell.com to schedule a meeting to discuss these comments or provide additional information regarding the application process. Sincerely, K mberly Br seau Planner II encl: Comments from Building Division, dated 7/17/07 Comments from Public Works, dated 7/26/07 Comments from Fire Department, dated 7/18/07 Application for Site & Architectural Review Parking Requirements Sign Regulations cc: David Houge, 780 Union Avenue, Campbell, CA 95008 (property owner) Jackie C. Young Lind, Acting Community Development Director Ed Arango, Land Development Engineer