Loading...
Admin Site - Expired - 2007January 4, 2008 Rameil Eyvaznejad 111 W. Saint John St. #610 A San Jose, CA 95113 Re: Administrative Site & Architectural Review Permit File No: PLN2007-35 1133 Hazelwood Avenue Dear Mr. Eyvaznejad: The Community Development Director has conditionally approved your Administrative Site & Architectural Review Permit for a new two-story single family residence and attached garage located at 1133 Hazelwood Avenue in the R-1-6 (Single Family Residential) Zoning District. This approval is based upon the attached findings and is subject to the attached conditions of approval. This action is effective in ten calendar days, unless appealed in writing to the City Clerk by 5:00 p.m. on January 14, 2008. If you should have any questions regarding this approval, please do not hesitate to contact me at (408) 866-2193 or by email at kimberl~tyofcampbell.com. Sincerely, Kimberly Brosseau Planner II encl: Findings and Conditions of Approval for File No. PLN2007-168 cc: Jackie C. Young Lind, Acting Community Development Director Ed Arango, Public Works Department Attachment # 1 Page 1 of 2 RECOMMENDED FINDINGS FOR APPROVAL OF FILE NO. PLN2007-35 SITE ADDRESS: 1133 Hazelwood Avenue APPLICANT: Rameil Eyvaznej ad DATE: January 4, 2008 Findings for approval of an Administrative Site and Architectural Review Permit to allow a new two-story single family residence and attached garage located at 1133 Hazelwood Avenue. The Community Development Director finds as follows with regard to File No. PLN2007-35: 1. The density of the proposed project site is 3.5 units per gross acre, which is consistent with the General Plan land use designation of Low Density Residential (less than 6 units per gross acre). 2. The proposed project is consistent with the R-1-6 (Single-Family Residential, 6,000 square foot minimum lot size) Zoning District and meets the minimum setbacks, height restriction, building coverage, floor area ratio, and parking requirements of the R-1-6 Zoning District. 3. The project, as conditioned, is consistent with the development standards and design guidelines of the San Tomas Area Neighborhood Plan. 4. The proposed two-story single-family residence and attached garage consists of 4,474 square feet in area with a building coverage of 29% and floor area ratio of 0.45 5. The project provides two covered parking spaces in a 2-car garage, where a minimum of one covered and one uncovered parking space is required. 6. The height of the home is 27 feet, where the maximum height limit is 28 feet 7. The proposed project includes five existing trees and five trees will be required to be planted per the requirements of the STANP. 8. The proposed residence incorporates representative architectural features of homes in the San Tomas Neighborhood including simple rectangular shaped forms, hipped and gabled roofs, siding, and an attached garage. 9. The subject property is located on the north side of Hazelwood Avenue, between Pecan Way and Filbert Way. The property is surrounded by single-family residences to the south, east, and west and single family residences (in the City of San Jose) and a creek to the north. Attachment # 1 Page 2 of 2 10. The project qualifies as Categorically Exempt under Section 15303, Class 3 of the California Environmental Quality Act (CEQA) pertaining to new construction or conversion of small structures. Based upon the foregoing findings of fact, the Community Development Director further finds and concludes that: 1. The proposed project is allowed within the applicable zoning district with Administrative Site and Architectural Review Permit approval, and complies with all other applicable provisions of this Zoning Code and the Municipal Code 2. The proposed project is consistent with the City of Campbell General Plan. 3. The proposed project, as conditioned, will aid in the harmonious development of the immediate area. 4. The proposed project, as conditioned, will be architecturally compatible with the surrounding neighborhood. 5. No substantial evidence has been presented from which a reasonable argument could be made that shows that the project, as currently presented and subject to the required conditions of approval, will have a significant adverse impact on the environment. 6. The proposed development will not be detrimental to the health, safety or welfare of the neighborhood or the City as a whole. 7. The proposed project will contribute to the housing stock in the City of Campbell and serve the housing needs of the community. 8. There is a reasonable relationship between the use of the fees imposed upon the project and the type of development project. 9. There is a reasonable relationship and a rough proportionality between the conditions of approval and the impacts of the project. Attachment #2 Page 1 of 6 CONDITIONS OF APPROVAL FOR FILE NO. PLN2007-35 SITE ADDRESS: 1133 Hazelwood Avenue APPLICANT: Rameil Eyvaznej ad DATE: January 4, 2008 The applicant is hereby notified, as part of this application, that (s)he is required to meet the following conditions in accordance with the ordinances of the City of Campbell and the State of California. The lead department with which the applicant will work is identified on each condition where necessary. Where approval by the Director of Community Development, City Engineer, Public Works Director, City Attorney, or Fire Department is required, that review shall be for compliance with all applicable conditions of approval, adopted policies and guidelines, ordinances, laws and regulations, and accepted engineering practices, for the items under review. Additionally, the applicant is hereby notified that (s)he is required to comply with all applicable Codes or Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified: COMMUNITY DEVELOPMENT DEPARTMENT Planning Division: 1. Declaration of Acceptance of All Conditions: Within thirty (30) days of the Community Development Director's approval, the applicant shall sign the final, approved set of Conditions of Approval. Until said Conditions are signed, the proposed Administrative Site and Architectural Review Permit shall not be valid for any permits sought from the City. 2. Approved Project: Approval is granted for an Administrative Site and Architectural Review Permit (PLN2007-35) for a new two-story, single family residence and attached garage located at 1133 Hazelwood Avenue. The project shall substantially conform to the project plans stamped as received by the Community Development Department on November 15, 2007, except as maybe modified by the conditions of approval herein.* a. Submit one copy of a revised elevation plan showing a less massive entry height reduced to reflect the guidelines of the San Tomas Area Neighborhood, prior to the issuance of building permits, for review and approval by the Community Development Director. • Planning sign off is required to prior to Building Permit final. Construction not in substantial compliance with the approved project plans shall not be approved without prior authorization of the necessary approving body. 3. Site and Architectural Review Permit Approval Expiration: The Administrative Site and Architectural Review Permit approval shall be valid for one year from the date of final approval. Within this one-year period a building permit must be obtained and construction completed one year thereafter or the use must be established on the property and all Attachment #2 Page 2 of 6 conditions of approval fulfilled (if no building permit is required). Failure to meet these deadlines will result in the Administrative Architectural Site and Review Permit being void. 4. Fences/Walls: Any newly proposed fencing and/or walls shall comply with Section 21.18.060 of the Campbell Municipal Code and shall be submitted for review and approval by the Community Development Department. Compliance with Other Regulations: The applicant shall comply with other state, county, and city ordinances that pertain to the proposed project and where they are conducted. 6. Contractor Contact Information Posting: The project site shall be posted with the name and contact number of the lead contractor in a location visible from the public street prior to the issuance of building permits. 7. On-Site Li htin~ On-site lighting shall be shielded away from adjacent properties and directed on site. The design and type of lighting fixtures and lighting intensity of any proposed exterior lighting for the project shall be reviewed and approved by the Community Development Director prior to installation of the lighting for compliance with all applicable Conditions of Approval, ordinances, laws and regulations. Lighting fixtures shall be of a decorative design to be compatible with the residential development and shall incorporate energy saving features. 8. Roof Vents: The applicant shall coordinate mechanical and plumbing plans to minimize the number of roof vents that are visible from the street frontage. The applicant shall provide the location of such vents on the building plan elevations and roof plans, to the satisfaction of the Community Development Director, prior to issuance of a building permit. 9. Construction Activities: The applicant shall abide by the following requirements during construction: a. Construction activities shall be limited to weekdays between 8:00 a.m. and 5:00 p.m. and Saturdays between 9:00 a.m. and 4:00 p.m. No construction shall take place on Sundays or holidays unless an exception is granted by the Building Official. b. All construction equipment with internal combustion engines used on the project site shall be properly muffled and maintained in good working condition. c. Unnecessary idling of internal combustion engines shall be strictly prohibited. d. All stationary noise-generating construction equipment, such as air compressors and portable power generators, shall be located as far as possible from noise-sensitive receptors such as existing residences and businesses. e. Use standard dust and erosion control measures that comply with the adopted Best Management Practices for the City of Campbell. Attachment #2 Page 3 of 6 Building Division: 10. Permits Required: A building permit application shall be required for the proposed structure. The building permit shall include Electrical, Mechanical, and/or Plumbing fees when such work is part of the permit. 11. Plan Preparation: This project requires plans prepared under the direction and oversight of a California licensed Engineer or Architect. Plans submitted for building permits shall be "wet stamped" and signed by the qualifying professional person. 12. Construction Plans: The conditions of Approval shall be stated in full on the cover sheet of construction plans submitted for building permit. 13. Size of Plans: The minimum size of construction plans submitted for building permits shall be 24 in. X 36 in. 14. Soils Report: Two copies of a current soils report, prepared to the satisfaction of the Building Official, containing foundation and retaining wall design recommendations shall be submitted with the building permit application. This report shall be prepared by a licensed engineer specializing in soils mechanics. 15. Foundation Inspections: A pad certificate prepared by a licensed civil engineer or land surveyor shall be submitted to the project building inspector upon foundation inspection. This certificate shall certify compliance with the recommendations as specified in the soils report and the building pad elevation and on-site retaining wall locations and elevations are prepared according to approved plans. Horizontal and vertical controls shall be set and certified by a licensed surveyor or registered civil engineer for the following items: a. pad elevation b. finish floor elevation (first floor) c. foundation corner locations 16. Site Plan: Application for building permit shall include a competent site plan that identifies property and proposed structures with dimensions and elevations as appropriate. Site plan shall also include site drainage details. 17. Title 24 Energy Compliance: California Title 24 Energy Compliance forms CF-1R and MF- 1R shall be blue-lined on the construction plans. 8.5 X 11 calculations shall be submitted as well. 18. ~ecial Inspections: When a special inspection is required by C.B.C. Section 1704, the architect or engineer of record shall prepare an inspection program that shall be submitted to the Building Official for approval prior to issuance of the building permits, in accordance with C.B.C Appendix 1, Section 106. Please obtain City of Campbell, Special Inspection forms from the Building Inspection Division Counter. Attachment #2 Page 4 of 6 19. Non-point Pollution Control Program: The City of Campbell, standard Santa Clara Valley Non-point Source Pollution Control Program specification sheet shall be part of plan submittal. The specification sheet (size 24" X 36") is available at the Building Division service counter. 20. Approvals Required: The project requires the following agency approval prior to issuance of the building permit: a. West Valley Sanitation District (378-2407) b. Santa Clara County Fire Department (378-4010) c. School District: i) Campbell Union School District (378-3405) ii) Campbell Union High School District (371-0960) iii) Moreland School District (379-1370) iv) Cambrian School District (377-2103) Note: To determine your district, contact the offices identified above. Obtain the School District payment form from the City Building Division, after the Division has approved the building permit application. d. Bay Area Air Quality Management District (demolitions only) 21. P.G.&E: Applicant is advised to contact Pacific Gas and Electric Company as early as possible in the approval process. Service installations, changes and/or relocations may require substantial scheduling time and can cause significant delays in the approval process. Applicant should also consult with P.G.&E concerning utility easements, distribution pole locations and required conductor clearances. 22. Construction Fencing: This project shall be properly enclosed with construction fencing to prevent unauthorized access to the site during construction. The construction site shall be secured to prevent vandalism and/or theft during hours when no work is being done. All protected trees shall be fenced to prevent damage to root systems. 23. Automatic Sprinkler System: New Structures greater than 3,600 Square Feet in Gross Floor Area are subject to Section 903.2 of the California Fire Code (CFC) as modified by the City of Campbell in 2007. Public Works Department: 24. Proof of Ownership: Prior to issuance of any grading, drainage, or building permits for the site, the applicant shall provide a current Preliminary Title Report, grant deed, or other satisfactory proof of ownership. 25. Demolition: Prior to the issuance of any grading or building permits for the site, the applicant shall obtain a demolition permit and remove any nonconforming structures. Attachment #2 Page 5 of 6 26. Additional Street Improvements: Should any new utility main lines or other work required to service the development affect any public improvements, the City may add conditions to the development/project/permit, at the discretion of the City Engineer, to restore pavement or other public improvements to the satisfaction of the City. 27. Water Meter(s) and Sewer Cleanout(s~: Existing and proposed water meter(s) and sewer cleanout(s) shall be relocated or installed on private property behind the public right-of--way line. 28. Soils Report: Prior to issuance of any grading or building permits for the site, the applicant shall provide a soils report prepared by a registered geotechnical or civil engineer. 29. Utilities: All new on-site utilities shall be installed underground per Section 21.18.140 of the Campbell Municipal Code for any new or remodeled buildings or additions. Applicant shall comply with all plan submittals, permitting, and fee requirements of the serving utility companies. 30. Utility Encroachment Permit: Separate permits for the installation of utilities to serve the development will be required (including water, sewer, gas, electric, etc.). Applicant shall apply for and pay all necessary fees for utility permits for sanitary sewer, gas, water, electric and all other utility work. 31. Utility Coordination Plan: Prior to issuance of building permits for the site, the applicant shall submit a utility coordination plan and schedule for approval by the City Engineer for the installation and/or abandonment of all utilities. The plan shall clearly show the location and size of all existing utilities and the associated main lines; indicate which utilities and services are to remain; which utilities and services are to be abandoned, and where new utilities and services will be installed. Joint trenches for new utilities shall be used whenever possible. 32. Pavement Restoration: Based on the utility coordination plan, the applicant shall prepare a pavement restoration plan for approval by the City Engineer prior to any utility installation or abandonment. Streets that have been reconstructed or overlaid within the previous five years will require boring and jacking for all new utility installations. Hazelwood Avenue has not been resurfaced in the last 5 years. The pavement restoration plan shall indicate how the street pavement shall be restored following the installation or abandonment of all utilities necessary for the project. 33. Grading and Draina eg Plan: Prior to issuance of any grading or building permits for the site, the applicant shall conduct hydrology studies based on a ten-year storm frequency, prepare and engineered grading and drainage plan, and pay fees required to obtain necessary grading permits. The plans shall comply with the 1998 edition of the California Building Code including Chapters 10, 11, 18, 33 and Appendix Chapter 33. 34. Grading and Drainage Plan Review Fee: Prior to issuance of any grading or building permits for the project, the applicant shall pay the Grading and Drainage Plan Review Fee of $800.00. Attachment #2 Page 6 of 6 35. Storm Drain Area Fee: Prior to recordation of the parcel map, the applicant shall pay the required Storm Drain Area fee of $2,120.00 per net acre, which is $487.00. 36. Stormwater Pollution Prevention Measures: Prior to issuance of any grading or building permits, the applicant shall comply with the National Pollution Discharge Elimination System (NPDES) permit requirements, Santa Clara Valley Water District requirements, and the Carnpbell Municipal Code regarding Stormwater pollution prevention. The primary objectives are to improve the quality and reduce the quantity of Stormwater runoff to the bay. Resources to achieve these objectives include Stormwater Best Management Practices Handbook for New Development and Redevelopment ("CA BMP Handbook") by the California Stormwater Quality Association (CASQA), 2003; Start at the Source: A Design Guidance Manual for Stormwater Quality Protection ("Start at the Source") by the Bay Area Stormwater Management Agencies Association (BASMAA), 1999; and Using Site Design Techniques to Meet Development Standards for Stormwater Quality: A Companion Document to Start at the Source ("Using Site Design Techniques") by BASMAA, 2003. Fire Department: 37. Required Fire Flow: The fire flow for this project is 2000 gpm at 20 psi residual pressure. As an automatic fire sprinkler system will be installed, the fire flow has been reduced by 50% establishing a required adjusted fire flow of 1,000 gpm at 20 psi residual pressure. The adjusted fire flow is available from area water mains and fire hydrants, which are not spaced at the required spacing. 38. Automatic Fire Sprinkler System Required: Buildings requiring a fire flow in excess of 2,000 gpm, or in excess of two stories or 35 feet in height, shall be equipped throughout with an automatic fire sprinkler system, hydraulically designed per National Fire Protection Association (NFPA) Standard #13D. 39. Premises Identification: Approved numbers or addresses shall be placed on all new and existing buildings in such a position as to be plainly visible and legible from the street or road fronting the property. Numbers shall contrast with their background. Santa Clara Valley Water District: 40. A District Encroachment Permit is required for any work within District fee and easement right of way. The proposed demolition work within the District property requires a permit from the Water District. Final plans must be sent to the District for review and issuance prior to the start of demolition work. Acknowledged & Accepted: Rameil Eyvaznejad, Applicant