Loading...
Admin PD - Dental Ofc - 2008November 10, 2008 Dr. Adolfo Barrera 2211 Moorpark Avenue Suite 130 San Jose, CA 95128 Re: Administrative Planned Development Permit File No: PLN2008-148 40 Jeffers Way Dear Dr. Barrera, The Community Development Director has conditionally approved your Administrative Planned Development Permit to allow the establishment of a medical (dental) office within an existing office building on property located at 40 Jeffers Way in the P-D (Planned Development) Zoning District. This approval is subject to the attached Conditions of Approval. This action is effective in ten calendar days, unless appealed in writing to the City Clerk by 5:00 p.m. on November 20, 2008. Please note that pursuant to Planning Division Condition of Approval #1, a signed copy of the attached Conditions of Approval must be received by the Planning Division within thirty days (by December 10, 2008) of the Community Development Director's decision. If you should have any questions regarding this approval, please do not hesitate to contact me at (408) 866-2193 or by email at danielf@cityofcampbell.com. Sincerely, Daniel Fama Assistant Planner encl: Conditions of Approval for File No. PLN2008-148 cc: Jackie C. Young, Acting Community Development Director Rusty and Cindy Karraker, 530 E. Herndon Ave., #105, Fresno, CA 93720 (owner) Mark Rinkle/Lee & Associates, 5890 Stoneridge Dr., #210, Pleasanton, CA 94588 (agent) 11 /?8/2008 09:42 4089209851 BARRERA DDS PAGE 02 CONDITIONS OF APPROVAL FOR FILE NO. PLN2008-148 SITE ADDRESS: 40 Jeflers Way APPI..ICANT: Dx. Adolfo Barrera DATE: November 10, 2008 The applicant is hereby notified, as part of this epplieawon, that heJShe is required to meet the following conditions in accordance with the ordinances of the City of Campbell and the State of California. Where approval by the Community Development Director, City Engineer, Public Works Director, City Attorney, or Fire Department is rogtured, that review aliall be for compliance with all applicable Conditions of Approval, adopted policies and guidelines, ordinances, laws and regulations, and accepted engineering practices for the item under review. Additionally, the applicant is hereby notified that he/she is requited to comply with all applicable Codts or Ordinances of the City of Campbell and the State of California that pertain to this development and are not herein specified: Plansing Division 1. Ueclara 'on of Acc of All Condition : Within thirty (30} days of Community Development Director Approval, the applicant shall sign the final, approved set of Conditions of Approval. Until said Conditions are signed, the proposed Administrative Planned Development Permit shall not be valid for any permits sought from the City. 2. gnnro,,. ved Protect: Approval is gi~anted for an Administrative Planned Development Yertnit (PLN2008-J48) for a change in ust to a medical office (pediatric dentistry) located at 40 Jeffers Way. The project shall substantially conform to the project plans and project deectiption received by the Platuiing Division on October 3, 2008, except as may be modified by the conditions of approval contained hereita. 3. P1a~uyinR Final Required: Pianni~ag stgn oft fs required to prior to Building Permit final. Construction not in substantial compliance with the approved project plans shall not be approved without prior authorization of the necessary approving body Administrative planned Devclopmcxit Permi~,,,,pproval Expiration: The Administrative Planntd Development Permit approval shall be valid for two years from the date of final approval. Within this two-year period, a building permit must be obtained and constructiori completed two years thereaRer or the use must be established on the property and ail conditions of approval fulfilled (if ao building permit is ragttired). Failure to meet these deadlines will result in the Administrative Planned Development Permit being void. 5. Revocation of Permit: Operation of the use in violation of the Administrative Planned Development Permit or any stiuidards, codes, or ordinances of the City of Campbell shall be grounds for consideration of revocation of the Administrative Planned Development Permit by the Cotmrntimity Development Director. ODerstional Hours: The hours of operation shall be restricted to Monday through Sunday from 7: 00 a. rra. to 9:00 p.m. 11/18/2008 09:42 4089209851 BARRERA DDS PAGE 03 7. Property lylaintenatte_e: 'The pwnerloperator of the subject property shawl maintain all exterior areas of the business free from graffiti, trash, rubbish, posters and stickers placed on the p~~Y 8. Wall Cam: The Building Permit submittal shall indicate if the subject building is proposed to be repainted. If the btulding is to be painted, a color board Shall be provided for review and approval by the Coats~aunity Development Director prior to the issuance of a building $e~xtit. 9. : 1Vo signage is approvod as part of the development application approved herein. All signage shall be installed and maintained consistent with the provision of the Sign t7rdiziance, Chapter 21.30 of the Campbell Municipal Cade. l4 );:oe$ 'on of Meeh Teal Ec~uitatnen~;: ldo roof-~tnounted mechanical equipment (i.e. air conditioning units, ventilation ducts or vents), shall be added to the existing building without providing screening of the mechanical equipment from public view and surrourxiing properties. The screenintg material and method shall bo architecturally compatible with the building and requires review and approval by the Community Development Director and Building 17ivision prior to installation of such screening. 11. ~arkin~ Driveways, and Maintenance: All parking and driveway areas shall be developed and maintained in compliance with the approved plans and Chapter 21.28 (Parking and Loading) of the Campbell Municipal Code. 'lie project site shall ataintaia the 10 parking at al] times. All parking areas shall be regularly swtpt and cleaned to remove litter and debris from the parldn'g areas and driveways. 12. LRndecape Maintenance: The owner/operator of the property shall provide on-going maintatatuce of the existing on-stte lazidscaping. 13. On-Site Lishtinrt: Ott-site lighting shall be shielded away from adjacent properties and directed en site. The design and type of lighting fixtures stud lighting intensity of way proposed exterior lighting for the project shall be reviewed and approved by the Cazrurtunity Development Directoz prior to installation of the lighting for compliance with all applicable Conditions of Approval, ordinances, laws and regulations. Lighting fixtures shall be of a decorative design to ba compatible with the residential development and shall incozporate energy savittg featwes. 14. 'term :There shall bt no loitering allowod outside the business in the rear parking lot or the side parking lot areas. 15. Outdoor Storage: No outdoor storage is pet'rruitted on the subject property. Na equipment or materials-shall be stored outside the building or within the parking lot 16. Noise: a. Noise Standard: Any twises, sounds and/or voices, including but not limited to amptified sounds, loud speakers, sounds from audio sound systems, music, and/or public addreBs system, generated by the subject use shall not be audible to a person of normal hearing capacity from any residential property. 11/18!2068 09:42 4089209851 BARRERA DDS PAGE 04 b. Noise IylanaAemant Tn the event complaints are receivtd by the City regarding noise, the Community Development Director may immediately modify the hours of operation. and/or limit the extended hours of operation, subject to the project bring brought back to the Planning Commission for review. 17. na~~ Clean Up: gash and clean up shall not be done in the late evening or early momixtg hours, All trash and clean up shall be done between 6:00 a.m. and 11:00 p.m. daily. 18. 'on Activi ~ The applicant shall abide by the following xequirements during conswction: a. Construction activities shall be limited to weekdays between 8:00 a.m. and 5:00 p.m. and Saturdays between 9:00 a.m. and 4:00 p.m. No construction shall take place on Sundays or holidays unless an exception is granted by the Building Official. b. Truck routes to and from the construction site should be established and submitted to the City for review and approval prior to issuance of a building permit. These truck mutts shall avoid access to the project site via residential streets whore possible. c. Alt construction equipment with internal combustion engines used on the project site shall be properly muffled and maintained in good working condition. d. Unnecessary idling of internal combustion engir-es shall be strictly prohibited. e. All stationary noise-geneaating construction equipmem, such as air compressors and portable power generators, shall be located as far as possible from noise-sensitive receptors such as existing residences and businesses. f. Prior to the issuance of building permits, the project site shall be posted with the name and contact number of the lead contractor in a location visible from the public street so that the contractor can he mlade aware of noise complaints. g. Construction equipment, vehicles, and worlccrs associated with the dtvelopment of the project shaIl not bo permitted to park on any residential streets. Building Division l9. Permits R~~rred: A building permit application shall be required for ,the proposed change in use in an existing commercial structure. The building pemtit shall include Electrical/Plumbung/Mechanical fees when such work is part of the permit. 20. Construction Plans: The conditions of approval shall be stated in ful] on the cover sheet of constrvction plans submitted for building perrrrit. 21. Size of Plans: The size of construction plans submitted for building permits shall be 24 inches by 36 inches. 11/18/2008 09:42 4089209851 BARRERA DDS PAGE 05 22. Plan e a t'on: This project requires plans prepared under the direction and oversight of a California licensed Engilxeer or Architect. Plans submitted far building permits shall be "wet stamped" and signed by the qualifying professional person. 23. Site Plan: Application for building permit shall include a competent site plan that identifies property and proposed structures with dimensions and elevations as appropriate. Tlae site plan shad also include site drainage de+.ails, site address. amd parcel numbers. Site parking and path of travel to public sidewalks shall he detailed. 2Q. Title 24 EncrRV Comg fiance: California Title 24 Energy Standards Compliance forms shall be blue-lined on the construction plans. Compliance with the Standards shall be demonstrated for conditioning of the building envelope and lighting of the building. 25. Special oection6: When a special inspection is required by U.B.C. Section 1701, tho architect or eaigineer of rxord shall prepare an inspection I~B~" ~~ shall be submitted to the Building OfSciat for approval prior to issuance of the building permits, in accordance with U.H.C Section ]06.3.5. Please obtain City of Campbell, Special Inspection forms from the Building Inspection Division Counter. 26. Non-Point arcs: The City of Campbell, standard Santa Clara Valley Non-point Source Pollution Control Program specification sheet shall be part of plan submittal. The specification sheet (siu 24" X 36'~ is available at the Building Aivision service eourrter. 27. Title 24 Accessibility - Cortta:ztercial: Orr site general path of travel shall comply with the latest California Title 24 Accessibility Standards. Work shall include but not be limited to accessibility to building entrances front parking facilities and sidewalks. 28. Title 24 Accessibility - Commercial: Projects seelsang to use the Title 24 Hardship exemption clause shall blue-line completed, City of Campbell " 20°/d' exomption form on submitted construction plans. Form is available at Building Division service counter. 29. ADp var~ls .Required: The project requires the following agency approval prior to issuance of the building permit a. West Valley Sanitation District b. Santa Clara County Fire Deparirraent 30. P.G•& E•: Applicant is advised to contact Pacific Gas and Electric Corrrpeny as early as possible in the approval process. Service installations, changes and/or relocations may require substantial scheduling time and. can cause significant delays in the approval process. Applicant should also consult with P.G. and E. concerning utility easements, distribution pole locations and required conductor clearances. Public Works Dcprtrt~nt 31. Proof of OwmGr$~ Prior to issuance of any grading, drainage, or building permits for the site, the applicant shall provide a current Prcliminsry Witte Report, grant deed, or other satisfactory proof of ownership. 11/16/2008 09:42 4069209851 BARRERA DDS PAGE 06 32. Street Improvemomts: prior to recordation of the final map, the applicant shall execute a street improvement agreement, cause plans far public street improvements to be prepared by a registered civil engineer, pay various fees and deposits, poet security end provide insurance necessary to obtain an encroachment permit for construction of the standard public street improvements, as required by the City Engineer. The Plans shall include the following: a. Show location of all existing utilities within the new and existing public right of way. b. Relocation of all existing utilities including utility boxes, covers, poles, etc. outside of sidewalk area. No utility boxes, covers, etc. will be allowed in the sidewalk area. e. Removal of existing sidewalk, curb and guttcx necessary to aceottumodate an ADA curb ramp at the corner of Jeffers Way and Rose Court. d. Removal of existing driveway approach and necessary aidewallc, curb and ~~'- e. Installation of three (3) 24" box Chinese Pistache street trees, groundcover and irrigation in the park strip on Jeffe~ Way. f. lrugtallation of groundcover in the park strip on Rose Court. g. Installation of City standard curb, gutter, sidewalk and ADA compliant driveway approach. h. Installation of ADA corrrpliant curb ramp at the cornet of Jeffers Way and Rose Court. i. Construction of conforms to existing public and private improvements, as necessary. 33. Maintenance of Landscaping: Owner(s), current and future, are required to maintain the landscaped park strip end tree wolfs in the public right of way. 'This includes, but is not limited to• trees, lawn, plantings, irrigation, etc. Trees shall not be pruned in a manner that would not allow the tree to grow to a mature height. 34. U ' ' 'es: All on-site utilities shall be installed underground per Section 21.18.140 of the Campbell Municipal Code for any new or remodeled buildings or additions. Applicant shall comply with all plan submittals, permitting, and fee requirements of the serving utility companies. 35. Water Ms(s) and Sewer CI an ut{s): Existing and proposed water meter(s) and sewer cleanout(s) shall be relocated or installed on private property behind the public tight-of-way line 36. Utilicy Coordination Plata; Prior to issuance of building permits for the silo, the applicant shall submit a utility coordination plan and schedule for approval by the City Bttgineer for installation and/or abandonment of all utilities. The plan shall clearly show the location and size of all existing utilities and the associated main lines; indicate which utilities and services arc to remain; which utilities and services are to be abandoned, and where new utilities and services will be installed. Joint trenches for uew utilities shall be used whenever poseiblc. 37. Pavement R;eswrapon: Based on the utility coordination plan, the applicant shall prepare a pavement restoration plan for approval by the City Engineer prior to any utility installation or 11/18/2008 09:42 40B9209R51 BARRERA DDS PAGE 07 abandonment. Streets that have been reconstructed or overlaid within the previous five years will require boring and jacking for all new utility irtsta]lations. Jeffers Way and Rose Court have not been reconstructed or overlaid in the last 5 years. The pavement restoration plan shall indicate how the street pavement shall be restored following the installation or abandonment of all utilities necessary for the project. 38.littiility Encroachment Permit: Separate permits for the installation of utilities to strut the development will bo required (including water, sewer, gas, electric, etc.). Applicant shall apply for and pay al] nxessary fees for utility permits for sanitary sewer, gas, water, electric and all other utility wozk. 39. Additional Street lmnrovements: Should it be discovered after the approval process that new utility main lines, extra utility work or other work is required to service the development, and should those facilities or other work affect any public improvements, the City may add conditions to the development/project/permit, at the discretion of the City Engineer, to restore pavement or other public improvements to the sapsfaction of the City. 40. Stormwater Pollution Prevention Measttras: Prior to issuance of any grading or building permits, the applicant shall comply with the National Pollution Discharge Elimination System (NPDES) pernit zequirements, Santa Clara Valley Watet District requirements, and the Campbell Municipal Code regarding stormwater pollution prevention. Specifically the project must- include source contznl, site design and treatment measures to achieve connpliance with Provision C.3, of the NPDES Permit. Measures may include, but are not limited to, minimization of impervious surface area, vegetated swales, ittfatsation areas, and treatment devices. The primary objectives are to improve the quality and reduce the quantity of stormyvater r~uaff to the bay. Resources to achieve these objectives include Stormwater Bert Management Practices Handbook for New Development and Redeveloprne»t ("CA BMP Handbook's by tho California Stozrnwater Quality Association (CASQA), 2t?03; Start at the Source: .! Design Guidance Monual far Srormwarer Quality Protection ("Start at the Source") by the Bay Area Storntwater Management Agencies Association (BASMAA), 1999; and Using Site Design Techniques to Meet Development Standards for Stormwater Quality: A Companion Document to Start at the Source ("Using Site .Design Tec~gtres") ~y$AS~AA, 3003. 41. )'lan Lines:, Prior to issuance of any grading or building permits for the site, the applicant shall provide a plan layout showing the correct street dinnensions (dimension widths of entire street and dirneosion from property line to~centerfinc-of roadway), and existing street improvement.. dimensions (sidewalk, park strip, twit, gutter, etc) and other relevant information in the public right of wa:}r. Acknowledged 8t AceePte~t `~ NNtN~ aEPpR~M D Adolfo Barters, Applicant 70 ~, ~1RSj ~ ~,~-PBEI.I., d-